CN1793519A - 快速“高真空击密、桩基”复合软地基处理方法 - Google Patents

快速“高真空击密、桩基”复合软地基处理方法 Download PDF

Info

Publication number
CN1793519A
CN1793519A CN 200510134966 CN200510134966A CN1793519A CN 1793519 A CN1793519 A CN 1793519A CN 200510134966 CN200510134966 CN 200510134966 CN 200510134966 A CN200510134966 A CN 200510134966A CN 1793519 A CN1793519 A CN 1793519A
Authority
CN
China
Prior art keywords
pile
well point
pipe
foundation
vacuum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510134966
Other languages
English (en)
Other versions
CN100359100C (zh
Inventor
徐士龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Bay Infrastructure Construction (group) Ltd By Share Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2005101349665A priority Critical patent/CN100359100C/zh
Publication of CN1793519A publication Critical patent/CN1793519A/zh
Priority to PCT/CN2006/003337 priority patent/WO2007073662A1/zh
Application granted granted Critical
Publication of CN100359100C publication Critical patent/CN100359100C/zh
Priority to MYPI20082377A priority patent/MY154548A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种快速“高真空击密、桩基”复合软地基处理方法,其特征在于:首先,采用在软土中密布井点管,井点管上端用卧管连接至真空泵抽真空拔除井点管,击密,如此井点管抽真空、击密交叉作用数遍;然后,采用在软土中填入碎石再击密成墩,或采用沉管法成碎石桩,或采用水泥土搅拌成桩,使软土通过井点管真空抽水、击密数遍交叉、再结合碎石墩/桩或水泥土桩形成一个复合地基。本发明能有效快速提高地基承载力,工后或差异沉降小。

Description

快速“高真空击密、桩基”复合软地基处理方法
技术领域:
本发明涉及一种处理软地基的方法,具体涉及一种快速“高真空击密、桩基”复合软地基处理方法。适用于大面积软弱地基的处理。属地基处理
技术领域。
背景技术:
目前大面积软弱地基处理一般采用快速“高真空击密”软地基处理方法。快速“高真空击密”软地基处理方法(专利号:ZL01127046.2)是通过数遍高真空结合击密(强夯或振动碾压)交叉作用来快速达到浅层(10m)内软地基提高承载力,消除部分工后或差异沉降之目的。但大量的工程中,由于软弱土厚度较深,并且厚度差异较大,单独采用快速“高真空击密”软地基处理方法,对承载力、工后或差异沉降等都难以满足设计要求。另一方面,软弱地基也有采用桩基法(碎石、水泥土桩等)处理,由于其各桩基间软弱土的磨擦阻力较低,使得桩基的承载力极低,并且工后沉降较大,每个桩基的差异性较大,施工安全隐患较多。
发明内容:
本发明的目的在于克服上述不足,提供一种能有效快速提高地基承载力,工后或差异沉降小的快速“高真空击密、桩基”复合软地基处理方法。
本发明的目的是这样实现的:一种快速“高真空击密、桩基”复合软地基处理方法,其特征在于:首先,采用在软土中密布井点管,井点管上端用卧管连接至真空泵抽真空降低软土含水量,拔除井点管,采用击密来减小软土孔隙比,如此井点管抽真空、击密交叉作用数遍;然后,采用在软土中填入碎石再击密成墩,或采用沉管法成碎石桩,或采用水泥土搅拌成桩,使软土通过井点管真空抽水、击密数遍交叉、再结合碎石墩/桩或水泥土桩形成一个复合地基。通过计算调整真空抽水、击密的交叉遍数及碎石墩/桩或水泥土桩的长度和间距,来达到设计所需的高承载力、高精度控制工后及差异沉降的要求。
本发明“高真空击密、桩基”形成复合地基,其创新之处在于通过高真空抽水、击密、桩基的相互有利作用,即:桩基在软土中提高有效排水通道,增加真空在软土的排水效果,有利软土的加快固结,同时真空抽水、击密也使桩基间磨擦阻力大大提高,桩基自身密度提高,提高了单桩承载力。同时通过控制桩基的长度、间距,使“高真空击密”深层软土工后或差异沉降得到了控制。
具体实施方式:
本发明快速“高真空击密、桩基”复合软地基处理方法,首先,采用在软土中密布(一般1~3m间距)井点管,井点管上端用卧管连接至真空泵抽真空,主动降低软土含水量(孔压水),拔除井点管,采用击密(强夯或振动碾压)来减小软土孔隙比,井点管抽真空、击密交叉作用数遍(常规1~4遍),然后,采用在软土中填入碎石再击密成墩,或采用沉管法成碎石桩,或采用水泥土搅拌成桩。
例:
该方法应用于某工程10万m3的贮油罐,原设计¢1.2的碎石桩,但施工后差异性较大,单桩承载力低,工后沉降难以控制。后采用本方法,使软土处理和桩基共同作用,节约造价30%以上,工期缩短约50%,并且承载力、工后或差异沉降均匀可控。

Claims (1)

1、一种快速“高真空击密、桩基”复合软地基处理方法,其特征在于:首先,采用在软土中密布井点管,井点管上端用卧管连接至真空泵抽真空拔除井点管,击密,如此井点管抽真空、击密交叉作用数遍;然后,采用在软土中填入碎石再击密成墩,或采用沉管法成碎石桩,或采用水泥土搅拌成桩,使软土通过井点管真空抽水、击密数遍交叉、再结合碎石墩/桩或水泥土桩形成一个复合地基。
CNB2005101349665A 2005-12-29 2005-12-29 快速“高真空击密、桩基”复合软地基处理方法 Active CN100359100C (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CNB2005101349665A CN100359100C (zh) 2005-12-29 2005-12-29 快速“高真空击密、桩基”复合软地基处理方法
PCT/CN2006/003337 WO2007073662A1 (fr) 2005-12-29 2006-12-08 Procede de traitement rapide de fondations sur sol mou par densification a vide eleve en combinaison avec un procede de fondations empilees
MYPI20082377A MY154548A (en) 2005-12-29 2008-06-27 Method for fast treating soft soil foundation by a high vacuum densification method in combination with a pile foundation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005101349665A CN100359100C (zh) 2005-12-29 2005-12-29 快速“高真空击密、桩基”复合软地基处理方法

Publications (2)

Publication Number Publication Date
CN1793519A true CN1793519A (zh) 2006-06-28
CN100359100C CN100359100C (zh) 2008-01-02

Family

ID=36805157

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005101349665A Active CN100359100C (zh) 2005-12-29 2005-12-29 快速“高真空击密、桩基”复合软地基处理方法

Country Status (3)

Country Link
CN (1) CN100359100C (zh)
MY (1) MY154548A (zh)
WO (1) WO2007073662A1 (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100532729C (zh) * 2007-06-28 2009-08-26 刘汉龙 浅层振夯击密与深层爆炸挤密联合高真空井点降水地基处理方法
CN102011391A (zh) * 2010-11-11 2011-04-13 河北建设勘察研究院有限公司 一种软弱地基的加固处理方法
CN101806055B (zh) * 2009-02-13 2011-09-21 梁闽 真空预压联合刚性桩复合地基加固方法
CN102926393A (zh) * 2012-11-22 2013-02-13 河海大学 一种处理建筑地基液化的真空抽水装置及施工方法
CN103669331A (zh) * 2013-12-25 2014-03-26 中国铁道科学研究院铁道建筑研究所 高速铁路流塑状软土地基加固方法
CN104060624A (zh) * 2014-06-30 2014-09-24 温州电力设计有限公司 复杂软土地基中桩基的设置方法
CN110904944A (zh) * 2019-11-18 2020-03-24 何小钟 一种湿软土地基的处理方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101660312B (zh) * 2009-09-11 2011-05-11 朱奎 加筋水泥搅拌桩复合地基处理及施工方法
CN102966097A (zh) * 2012-11-30 2013-03-13 华侨大学 一种新型竖向承载桩复合地基
CN103015396A (zh) * 2012-12-21 2013-04-03 王强 软土地基施工方法
CN111945701A (zh) * 2019-05-15 2020-11-17 中交四航工程研究院有限公司 吹填深厚软基一次性排水固结处理系统及方法
CN115045262B (zh) * 2022-06-10 2024-04-09 中国建筑一局(集团)有限公司 岩溶地貌高填覆地基桩基施工方法

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU552443B2 (en) * 1981-09-22 1986-05-29 Fudo Construction Co. Ltd. Compacting soils
CN86200550U (zh) * 1986-08-12 1987-04-01 上海铁路局科学技术研究所 加固软土地基的钢渣挤密桩
CN1021982C (zh) * 1991-06-26 1993-09-01 黄正轩 房屋倾斜纠偏加固的方法
CN1098156A (zh) * 1993-07-26 1995-02-01 建设部综合勘察研究院 碎石挤密强夯法
CN1121973A (zh) * 1994-05-13 1996-05-08 顾叙根 挤密碎石桩与混凝土灌注桩的双重复合地基及其施工方法
JP3486572B2 (ja) * 1999-05-11 2004-01-13 不動建設株式会社 地盤強化複合工法
JP3723460B2 (ja) * 2001-02-16 2005-12-07 株式会社間組 真空圧密による地盤改良工法及びその施工構造
CN1127595C (zh) * 2001-07-28 2003-11-12 徐士龙 快速“高真空击密法”软地基处理方法
CN1584220A (zh) * 2003-08-18 2005-02-23 梁闽 自锚真空压密刚性桩复合地基综合处理法
CN1584221A (zh) * 2004-06-16 2005-02-23 周健 浅层软土地基快速动力固结技术
CN1609345A (zh) * 2004-11-25 2005-04-27 徐士龙 高真空变能量交叉击密软地基处理的方法
CN1293263C (zh) * 2004-11-25 2007-01-03 徐士龙 新型高真空变能量交叉击密软地基处理的方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100532729C (zh) * 2007-06-28 2009-08-26 刘汉龙 浅层振夯击密与深层爆炸挤密联合高真空井点降水地基处理方法
CN101806055B (zh) * 2009-02-13 2011-09-21 梁闽 真空预压联合刚性桩复合地基加固方法
CN102011391A (zh) * 2010-11-11 2011-04-13 河北建设勘察研究院有限公司 一种软弱地基的加固处理方法
CN102011391B (zh) * 2010-11-11 2012-01-11 河北建设勘察研究院有限公司 一种软弱地基的加固处理方法
CN102926393A (zh) * 2012-11-22 2013-02-13 河海大学 一种处理建筑地基液化的真空抽水装置及施工方法
CN103669331A (zh) * 2013-12-25 2014-03-26 中国铁道科学研究院铁道建筑研究所 高速铁路流塑状软土地基加固方法
CN104060624A (zh) * 2014-06-30 2014-09-24 温州电力设计有限公司 复杂软土地基中桩基的设置方法
CN110904944A (zh) * 2019-11-18 2020-03-24 何小钟 一种湿软土地基的处理方法

Also Published As

Publication number Publication date
CN100359100C (zh) 2008-01-02
WO2007073662A1 (fr) 2007-07-05
MY154548A (en) 2015-06-30

Similar Documents

Publication Publication Date Title
CN100359100C (zh) 快速“高真空击密、桩基”复合软地基处理方法
CN101736738B (zh) 一种抗压、抗拔两用型注浆碎石桩的制作工法
CN103233468A (zh) 高聚物碎石桩注浆方法
CN106703044A (zh) 一种流塑状冲填土软弱地层放坡组合支护方法
CN101634139B (zh) 带疏水层的回填地基强夯方法
CN104060601A (zh) 利用预制工程桩桩基进行地基处理的施工方法
CN1195130C (zh) 一种投石压浆无砂砼小桩地基加固法
CN206385525U (zh) 一种防止高回填土方下沉的木桩结构
CN103758109B (zh) 用于欠固结土的排水旋喷桩地基的设置及处理方法
CN208545745U (zh) 带分级扩大头的碎石注浆桩
CN208563316U (zh) 一种大直径灌注桩桩底虚土沉渣处理装置
CN1740457A (zh) 振动法cfg桩消除地基湿陷性处理方法
CN103015438A (zh) 湿陷性黄土路基滑坡处理方法
CN109778833A (zh) 一种抛石与柔性塑料排水板结合的围海滩涂路基施工方法
CN216689341U (zh) 一种土挤密桩与cfg桩组合作用的复合地基处理结构
RU121274U1 (ru) Искусственное армированное основание для возводимого или реконструируемого здания
CN1514073A (zh) 一种挡土墙的支护结构
CN106049508B (zh) 一种坑塘型洼地土石方填筑结构及施工方法
CN101024957A (zh) 预应力混凝土管桩的复合处理的工艺
CN204551160U (zh) 吹填场地条带状路基的握裹式预压排水固结系统
CN209243733U (zh) 一种软土地区超深基坑复合重力式挡土墙结构
CN1566538A (zh) 无填料振冲法
CN106337409A (zh) 一种利用堆载预压结合盐桩处理泥炭土地基的方法
CN107687168A (zh) 内击植桩法及其应用
CN208934005U (zh) 一种竖向弧形挡板景观桩板墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shanghai harbor Soft Foundation Treatment Engineering Co., Ltd.

Assignor: Xu Shilong

Contract fulfillment period: 2009.1.31 to 2014.1.31

Contract record no.: 2009310000041

Denomination of invention: Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method

Granted publication date: 20080102

License type: Exclusive license

Record date: 2009.4.10

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.1.31 TO 2014.1.31; CHANGE OF CONTRACT

Name of requester: SHANGHAI CITY GANGWAN SOFT BASE TREATMENT ENGINEER

Effective date: 20090410

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170619

Address after: 201507, Shanghai, Jinshan District Town, East China Sea, eight groups

Patentee after: Shanghai harbor infrastructure (Group) Co., Ltd.

Address before: 214400, room 4, building 106, Chengjiang village, Jiangyin, Jiangsu

Patentee before: Xu Shilong

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 201507 Shanghai Jinshan District, Caojing Town, Ting Wei Road, 3316, 1, two, 207 rooms.

Patentee after: Shanghai Bay infrastructure construction (Group) Limited by Share Ltd

Address before: 201507 eight Caojing Town, Jinshan District, Shanghai

Patentee before: Shanghai harbor infrastructure (Group) Co., Ltd.