CN1584233A - Building structure and installing method for two-layer movable panel house - Google Patents
Building structure and installing method for two-layer movable panel house Download PDFInfo
- Publication number
- CN1584233A CN1584233A CN 200410027482 CN200410027482A CN1584233A CN 1584233 A CN1584233 A CN 1584233A CN 200410027482 CN200410027482 CN 200410027482 CN 200410027482 A CN200410027482 A CN 200410027482A CN 1584233 A CN1584233 A CN 1584233A
- Authority
- CN
- China
- Prior art keywords
- column
- building
- grade
- collar tie
- movable plank
- Prior art date
Links
- 239000010410 layers Substances 0.000 title 1
- 239000000463 materials Substances 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 19
- 239000010959 steel Substances 0.000 claims description 19
- 241000357293 Leptobrama muelleri Species 0.000 claims description 2
- 239000004793 Polystyrene Substances 0.000 claims description 2
- 239000011490 mineral wool Substances 0.000 claims description 2
- 229920002223 polystyrenes Polymers 0.000 claims description 2
- 239000004814 polyurethane Substances 0.000 claims description 2
- 229920002635 polyurethanes Polymers 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 7
- 238000009776 industrial production Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 16
- 230000000694 effects Effects 0.000 description 13
- 239000004035 construction materials Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000004064 recycling Methods 0.000 description 3
- 241000209094 Oryza Species 0.000 description 2
- 235000007164 Oryza sativa Nutrition 0.000 description 2
- 238000005516 engineering processes Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 235000009566 rice Nutrition 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 281000119710 All-Steel companies 0.000 description 1
- 239000000686 essences Substances 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000000034 methods Methods 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000002104 routine Effects 0.000 description 1
- 239000007787 solids Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Abstract
Description
One, technical field
The present invention relates to a kind of building structure and mounting method thereof of one deck movable plank house, particularly a kind of building structure and mounting method thereof as multi-purpose a kind of one deck movable plank houses such as inhabitation, office, storages.
Two, background technology
Construction activity board house normally building operations personnel is lived and the place of office.Simultaneously, the construction activity board house also can be used as the usefulness of storage buildings such as safedeposit, material.At present, owing to material, technology etc. are all, the construction activity board house can only be dismantled after building is finished, and the neither environmental protection of this way is also uneconomical.In addition, the structure of construction activity board house adopts the girder steel steel column that connects as frame construction at present, and wall body structure then adopts the frame mode of whole elongated vertical member.The construction activity board house spillage of material that this frame mode is built is big, and reuse factor is low, and wind resistance and shock resistance are relatively poor.In view of this, how to make the construction material of construction activity board house repeatedly use, Recycling, how to make the generalization of construction activity board house, standardization, make the movable plank house builing industry can really realize suitability for industrialized production, this is the place of the initial motivation of the present invention's design just.
Three, summary of the invention
At the deficiencies in the prior art, the present inventor is by means of being engaged in the construction activity board house for many years, practical experiences such as the research of particularly light steel construction activity board house and site operation, installation, use, in repetition test, select repeatedly, adjust repeatedly, optimize on the basis of scantling repeatedly, the principle of modular coordination in the utilization architecture theory, design a whole set of brand-new, unitized, standardized construction activity board house wall body structure member series, thereby laid a solid foundation for the industrialization of movable plank house builing industry.
The objective of the invention is to design that a kind of construction material can repeatedly use with Recycling, can really realize the building structure of a kind of one deck movable plank house of suitability for industrialized production.
The technical solution adopted for the present invention to solve the technical problems is: by four grade beams, four corner posts, some root posts, four collar tie beams, some sandwiched plates, roof, several, several windows form the building structure of one deck movable plank house.Wherein, the height of every corner post, column is the height dimension sum of three sandwiched plates, and the distance between the adjacent corner post and column, between column and the column is the length dimension of a sandwiched plate.The length dimension of every sandwiched plate is 1.77 meters to 1.87 meters, and height dimension is 0.90 meter to 1.05 meters, and all the sandwiched plate size equates and all rectangular shape.And between each adjacent corner post and column, column and column, vertical array embeds three sandwiched plates to constitute the perpend wall board member of a unit successively, and all unit perpend wall board members constitute the whole four sides wall plated construction of one deck movable plank house.
Corner post becomes vertical orthogonal fillet weld to be formed by connecting by two identical C shaped steel, and column is formed by connecting by two whole weld seams in the identical C shaped steel back side.Grade beam is a C shaped steel, and the notch of C shaped steel is downward.Grade beam is positioned at the below of corner post or column, and grade beam is connected with the lower end of corner post or the column bolt that meets at right angles respectively.Collar tie beam is a C shaped steel, and the notch of C shaped steel laterally.Collar tie beam is positioned at the outside of corner post or column upper end, and collar tie beam is connected with the upper end of corner post or the column bolt that meets at right angles respectively.The material of sandwiched plate mostly is polystyrene or polyurethane or rock wool etc., and it has functions such as heat insulation, sound insulation, protection against the tide, waterproof, fire prevention.The roof can be pitched roof, flat roof, arch roof etc.
The actual installation method step of one deck movable plank house of the present invention building structure is: 1, with four grade beams respectively the right angle bolts connect, constituting the grade beam framework of a rectangle, and this grade beam frame fixation is installed in ground; 2, connect four corner posts at the respectively vertical bolt of four square position of grade beam framework; 3, press the distance of a sandwiched plate length dimension on the grade beam framework, promptly 1.77 meters to 1.87 meters, vertical successively respectively bolt connects some root posts; 4, with the right angle bolt connection respectively of four collar tie beams, to constitute the collar tie beam framework of a rectangle; 5, the respectively vertical bolt of collar tie beam framework with rectangle connects four corner posts and some root posts, constitutes a cuboid steel framed structure by grade beam framework, four corner posts, some root posts and collar tie beam frameworks; 6, between each adjacent corner post and column, column and column, vertical array embeds three sandwiched plates to constitute the perpend wall board member of a unit, all integrant four sides wall plated constructions of unit perpend wall board member successively; 7, on wall plate structure, several doors, several windows are installed, and the roof is connected with four corner posts, collar tie beam framework bolt by the position of design.
The invention has the beneficial effects as follows, follow the modular coordination principle, the building structure size of round Realization one deck movable plank house cooperates, make the construction material of this building structure can repeatedly use with Recycling, normalization of the member of building structure and generalization, thereby be applicable to one deck construction activity board house of various routines, and the client that can satisfy comings and goings board house building designs needs.Like this, this building structural element just can carry out a large amount of regularization specifications to be produced, steady quality, and cost reduces, and really realizes suitability for industrialized production, and guarantees that its function, quality and economic benefit aspect obtain optimization in the process that the movable plank house building is built.
The building structure of movable plank house of the present invention is creatively to design according to the requirement of facing the removable repetition dismounting in the room that builds a house.This building structure has good ductility, and anti-seismic performance is excellent, and the quality of its steel work guarantees easily.For example, this one deck construction activity board house that has been completed is verified, and the wind resistance and the shock resistance of this wall body construction structure are stronger.This steel structure member is made in factory and processing all, its precision height.Only assemble in placely in the building site, so recruitment economizes.This steel structure member is in light weight, so speed of application is fast, the cycle short.And the building structure of this movable plank house in use is easy to transform, enlarges house interior and cuts apart and arrange.The component standard of this movable plank house building structure is general, and is easy for installation.So the building structure of this one deck movable plank house is environment-friendly type building, its member can repeat dismounting, repeatedly turnover is used.
Four, description of drawings
Below in conjunction with drawings and Examples the present invention is further described.
Fig. 1 is the floor map of one deck movable plank house of the present invention building structure.
Fig. 2 is the front schematic view of one deck movable plank house of the present invention building structure.
Fig. 3 is the side schematic view of one deck movable plank house of the present invention building structure.
Fig. 4 is the schematic perspective view of one deck movable plank house of the present invention building structure.
Wherein among the figure: 1, grade beam; 2, corner post; 3, column; 4, collar tie beam; 5, sandwiched plate; 6, roof; 7, door; 8, window.
Five, the specific embodiment
Embodiment 1.Whole members of one deck movable plank house of the present invention building structure adopt universal standard modulus to make processing and construction and installation, and all steel structure members all assemble with bolt and form.The member universal standard modulus of this one deck movable plank house building structure be with the central axis between adjacent corner post (2) and the column (3), between column (3) and the column (3) apart from being a unit, conventional letter " K ", 1K=1.82 rice.1K also equals the length of a sandwiched plate (5).This one deck movable plank house building structure is a standard standard width of a room in an old-style house with " 2K " usually, the vertically plurality of unit that can need arbitrarily " K " assembling.This its span of one deck movable plank house building structure is a unit with " K " also, and maximum span can be made five units " K ".But one deck movable plank house building structure among Fig. 1 of present embodiment description of drawings, Fig. 2, Fig. 3 and Fig. 4, its span is three units " K ".And the roof in this structure all adopts pitched roof.The corner post (2) of this one deck movable plank house building structure or the height of column (3) are that the piece number with sandwiched plate (5) is a unit, and promptly the height with a sandwiched plate (5) is a unit, and conventional letter is " P ", 1P=0.95 rice.The corner post (2) of this one deck movable plank house building structure or the height of column (3) are 3P, promptly 2.85 meters.
Embodiment 2.The actual installation method step of one deck movable plank house of the present invention building structure is:
1, with four grade beams (1) respectively the right angle bolt connect, with grade beam (1) framework that constitutes a rectangle, and this grade beam (1) frame fixation is installed in ground;
2, connect four corner posts (2) at the respectively vertical bolt of four square position of grade beam (1) framework;
3, on grade beam (1) framework, connect some root posts (3) by the vertical successively respectively bolt of the length distance (1.82 meters) of 1K;
4, with four collar tie beams (4) right angle bolt connection respectively, with collar tie beam (4) framework that constitutes a rectangle;
5, the respectively vertical bolt of collar tie beam (4) framework with rectangle connects four corner posts (2) and some root posts (3), constitutes a cuboid steel framed structure by grade beam (1) framework, four corner posts (2), some root posts (3) and collar tie beam (4) framework;
6, between each adjacent corner post (2) and column (3), column (3) and column (3), vertical array embeds three sandwiched plates (5) to constitute the perpend wall board member of a unit, all integrant four sides wall plated constructions of unit perpend wall board member successively;
7, on wall plate structure, several (7), several windows (8) are installed, and roof (6) are connected with four corner posts (2), collar tie beam (4) framework bolt by the position of design.
Need to prove especially; if the equivalence of being done according to shape of the present invention, structure, step method etc. changes; when the structure that it produced, function, size, step method etc. do not exceed the essence of these claims, manual and technical characterictic that accompanying drawing is contained, all should fall into protection scope of the present invention.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200410027482 CN1222671C (en) | 2004-06-07 | 2004-06-07 | Building structure and installing method for two-layer movable panel house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200410027482 CN1222671C (en) | 2004-06-07 | 2004-06-07 | Building structure and installing method for two-layer movable panel house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1584233A true CN1584233A (en) | 2005-02-23 |
CN1222671C CN1222671C (en) | 2005-10-12 |
Family
ID=34601364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200410027482 CN1222671C (en) | 2004-06-07 | 2004-06-07 | Building structure and installing method for two-layer movable panel house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1222671C (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296842A (en) * | 2011-05-20 | 2011-12-28 | 广东电网公司广州供电局 | Operation shed frame for mounting cable accessory |
CN102454220A (en) * | 2010-10-21 | 2012-05-16 | 浙江鑫源彩钢有限公司 | Spatial layout system of prefabricated house |
CN104389349A (en) * | 2014-11-29 | 2015-03-04 | 山东双得利建设科技有限公司 | Novel house capable of being fast disassembled and assembled and assembling method thereof |
CN110080566A (en) * | 2019-04-29 | 2019-08-02 | 重庆房地产职业学院 | A kind of container type prefabricated house |
-
2004
- 2004-06-07 CN CN 200410027482 patent/CN1222671C/en active IP Right Maintenance
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102454220A (en) * | 2010-10-21 | 2012-05-16 | 浙江鑫源彩钢有限公司 | Spatial layout system of prefabricated house |
CN102454220B (en) * | 2010-10-21 | 2016-03-02 | 浙江鑫源彩钢有限公司 | A kind of spatial layout system of prefabricated house |
CN102296842A (en) * | 2011-05-20 | 2011-12-28 | 广东电网公司广州供电局 | Operation shed frame for mounting cable accessory |
CN104389349A (en) * | 2014-11-29 | 2015-03-04 | 山东双得利建设科技有限公司 | Novel house capable of being fast disassembled and assembled and assembling method thereof |
CN104389349B (en) * | 2014-11-29 | 2017-01-04 | 山东双得利建设科技有限公司 | The novel house can quickly remove, assembled and assemble method |
CN110080566A (en) * | 2019-04-29 | 2019-08-02 | 重庆房地产职业学院 | A kind of container type prefabricated house |
Also Published As
Publication number | Publication date |
---|---|
CN1222671C (en) | 2005-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102995743B (en) | Multi-high-rise assembly type steel structure system | |
CN102979178B (en) | Industrialized multi-story high-rise assembled steel structure frame - eccentrically-braced system | |
US6003280A (en) | Modular frame building | |
US8166714B2 (en) | Buildings formed of a plurality of prefabricated modules | |
CN102108736B (en) | Combined container room | |
EP1733100B1 (en) | A transportable modular building and method of constructing thereof | |
US20060117689A1 (en) | Apparatus, system and method of manufacture thereof for insulated structural panels comprising a combination of structural metal channels and rigid foam insulation | |
KR101208264B1 (en) | Ancillary structure and unit building | |
US20080178551A1 (en) | Flexible modular building framework | |
CN102979175A (en) | Industrialized multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system | |
EA032418B1 (en) | Panelized structural system for building construction | |
CN102979162A (en) | Multi-story high-rise assembled steel structure frame - prestressed centrally-braced system | |
CN200967999Y (en) | Detachable container type movable house | |
CZ289321B6 (en) | Building structure | |
US6588161B2 (en) | Laminated construction elements and method for constructing an earthquake-resistant building | |
US8850764B2 (en) | Structure anti-torsion system and device, and method of use providing compression and tension support | |
CN102493548A (en) | Steel framework concrete structural system and construction method thereof | |
CN102979176A (en) | Industrialized multi-story high-rise assembled steel structure system | |
CN103993654A (en) | Modularized assembly type steel structure house building system | |
CN103276804B (en) | A kind of industrialization assembling hetermorphiscal column steel work prestressing force center support system | |
CN103114648A (en) | Multi-high-layer assembly type steel structure frame-center supporting system | |
CN103276806B (en) | A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces | |
CN203334428U (en) | Whole box type structure for assembling multilayer large-span public building and industrial factory building | |
CN103334491A (en) | Multi-story high-rise fabricated steel-structure special-shaped column framework supporting system | |
CN104895229A (en) | Prefabricated steel joint concrete slab-column structure and hoisting method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20080411 Address after: Guangdong city of Foshan province at a road Lanshi international metal trading center 14 North 1 staircase two floor No. 20-24 Patentee after: FOSHAN NANHAI YAODA BUILDING MATERIAL CO., LTD. Address before: Section 325 Village section of National Road, Chancheng District, Foshan, Guangdong Patentee before: Yaoda Building Materials Trading Co., Ltd., Foshan City |
|
ASS | Succession or assignment of patent right |
Owner name: NANHAI YAODA BUILDING MATERIAL CO., LTD., FOSHAN Free format text: FORMER OWNER: YAODA BUILDING MATERIALS TRADING CO., LTD., FUSHAN CITY Effective date: 20080411 |
|
DD01 | Delivery of document by public notice |
Addressee: Chen Chilun Document name: Notice of request for invalidation |
|
DD01 | Delivery of document by public notice |
Addressee: Chen Chilun Document name: Decision of the request for invalidation |
|
C35 | Partial or whole invalidation of patent or utility model | ||
IW01 | Full invalidation of patent right |
Decision date of declaring invalidation: 20121206 Decision number of declaring invalidation: 19420 Granted publication date: 20051012 |