CN102454220B - A kind of spatial layout system of prefabricated house - Google Patents

A kind of spatial layout system of prefabricated house Download PDF

Info

Publication number
CN102454220B
CN102454220B CN201010514768.2A CN201010514768A CN102454220B CN 102454220 B CN102454220 B CN 102454220B CN 201010514768 A CN201010514768 A CN 201010514768A CN 102454220 B CN102454220 B CN 102454220B
Authority
CN
China
Prior art keywords
column
eaves
draw
groove
long
Prior art date
Application number
CN201010514768.2A
Other languages
Chinese (zh)
Other versions
CN102454220A (en
Inventor
程兵
Original Assignee
浙江鑫源彩钢有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 浙江鑫源彩钢有限公司 filed Critical 浙江鑫源彩钢有限公司
Priority to CN201010514768.2A priority Critical patent/CN102454220B/en
Publication of CN102454220A publication Critical patent/CN102454220A/en
Application granted granted Critical
Publication of CN102454220B publication Critical patent/CN102454220B/en

Links

Abstract

A kind of spatial layout system of prefabricated house is made up of module section, coupling part and funtion part; Module section comprises on-gauge plate, short slab, long band luffer boards, short strip luffer boards, roofing slab, set square, door; Coupling part comprises side column, column, lower eaves girder, long limit eaves, spine, minor face eaves, spine top cover, eaves pillar, long struts; Funtion part is by washroom lavatory basin, flush toilet, bathtub, gas-cooker, kitchen lavatory basin.The present invention, by each components of modularization, is convenient to movable plank house installation and removal, movable plank house inner space is carried out rational deployment simultaneously and divides to meet temporary building inner inhabitation personnel living standard.

Description

A kind of spatial layout system of prefabricated house

[technical field]

The present invention relates to a kind of temporary building, be specifically related to a kind of technical field of spatial layout system of prefabricated house.

[background technology]

When modern urban construction or field engineer operation, staff needs to settle lodging temporarily, especially along with the continuous appearance of recent years as the natural calamity such as earthquake, floods, needs the victims of the disaster of interim arrangement transfer also to need to settle lodging temporarily.Common brick and tile temporary building is low in construction period long-acting rate, and transport construction cost is comparatively large, and movable plank house occurs meeting people for temporary building demand.

China Patent No. 200910102231.2 discloses a kind of Foldable prefabricated house, its technology adopted comprises base plate, front wall, Hou Qiang, Zuo Qiang, You Qiang, left roof, right roof and roof frame, by being rotationally connected assembly between each body of wall, this invention can fold reduction cost of transportation when transport like this, and after assembling, house is firmly easy to use.But the scheme that this technology provides is more complicated in installation, simultaneously along with people's material and culture water product improve, people are not only be satisfied with accommodation demands for lodge building, also wish to meet bathing, regions module of cooking of cooking simultaneously.

[summary of the invention]

For solving above deficiency, the invention provides a kind of spatial layout system of prefabricated house, its all component modularization standardization can very simply be installed by step by this system, and 2 employees can complete whole movable plank house in about 3 hours, and installing/dismounting is extremely simple.Simultaneously by block combiner rational deployment inner space is separated into 2 Living Areas, parlor, between a washroom and a kitchen with meet people to living, eat, the requirement such as bathing.

How problem to be solved by this invention: how inner space is rationalized layout by existing movable plank house, improve the efficiency of movable plank house installing/dismounting simultaneously, and each assembly is convenient to transport simultaneously.

The technical solution adopted in the present invention is: a kind of spatial layout system of prefabricated house, is characterized in that, is made up of module section, coupling part and funtion part; Wherein module section comprises on-gauge plate, short slab, long band luffer boards, short strip luffer boards, roofing slab, set square, the door of normal size, and various body of wall can configure all kinds standard module as required; Coupling part comprises side column, column, lower eaves girder, long limit eaves, spine, minor face eaves, spine top cover, eaves pillar, long struts, and all module sections can by the draw-in groove clamping of linkage; Funtion part is made up of washroom lavatory basin, flush toilet, bathtub, gas-cooker, kitchen lavatory basin.

Whole system outside is divided into front wall, Hou Qiang, Zuo Qiang, right wall and roof parts, and inner space is divided into two bedrooms, a parlor, eaves, a washroom, a kitchen function region by interval.

Described front wall has the side column and a root post that are placed in both sides, after bottom is connected and fixed by expansion screw and ground, on the left of front wall, in the draw-in groove of column and side column, snap in on-gauge plate, long band luffer boards and on-gauge plate from top to bottom, on the right side of wall wall, snap in door then in the draw-in groove of column and side column, snap in short slab, short strip luffer boards, on-gauge plate from top to bottom.

Described Zuo Qiang and right wall are connected and fixed side column, long struts, side column, eaves pillar by spacing by expansion screw and ground from back to front successively, then on rear side of Zuo Qiang and right wall, snap in 3 pieces of on-gauge plates and set square from top to bottom successively in the draw-in groove of side column and long struts; On-gauge plate, long band luffer boards, on-gauge plate, set square is snapped in from top to bottom successively in side column in the middle part of Zuo Qiang and right wall and the draw-in groove of long struts.

Described rear wall is from left to right connected and fixed side column, column, side column by spacing by expansion screw and ground successively, then in the side column of the left and right sides and the draw-in groove of pillar, snaps in on-gauge plate, long band luffer boards and on-gauge plate successively from top to bottom.

Described bedroom district and other functional areas partition walls, from left to right two long struts line centers are connected and fixed long struts by expansion screw and ground, both sides snap in door respectively by position of center line, then snap in two pieces of short slabs, on-gauge plate, set squares from top to bottom successively.

Described bedroom is interval every snapping in 4 pieces of on-gauge plates from top to bottom successively by the draw-in groove between long struts and column.

Described washroom and kitchen function district, column and long struts is connected and fixed to Left-side center line place, bedroom by expansion screw and ground on the left of front wall, in column and long struts draw-in groove, snap in door near one end, bedroom, then snap in two pieces of short slabs, on-gauge plate, set squares from top to bottom successively.

Described roof parts fixes spine in long struts, roof is divided two pieces, front and back by spine from high in the end, required roofing slab is snapped in spine draw-in groove successively, block the right and left fixed length limit eaves before roof, behind roof, block the right and left fixes minor face eaves, then under front and back end, roof, eaves girder draw-in groove is inserted in roofing slab and fixes, and then on spine top, fixes spine top cover.

Beneficial effect of the present invention: the present invention is by each components of modularization, be convenient to movable plank house installation and removal, through Validity Test, whole system can install by 2 staff for 3 hours, movable plank house inner space is carried out rational deployment simultaneously and divides to meet temporary building inner inhabitation personnel living standard.

For making further to understand characteristic sum technology contents of the present invention, refer to drawings and embodiments of the present invention, however institute's accompanying drawings only for reference with explanation use, the present invention is limited.

[accompanying drawing explanation]

Fig. 1 front wall structure chart of the present invention;

The left wall construction figure of Fig. 2 the present invention;

The right wall construction figure of Fig. 3 the present invention;

Wall construction figure after Fig. 4 the present invention;

Fig. 5 built-in function administrative division map of the present invention;

101-on-gauge plate in figure; 102-short slab; 103-long band luffer boards; 104-short strip luffer boards; 105-door; 106-set square; 107-roofing slab; 201-side column; 202-column; Eaves girder under 203-; 204-long limit eaves; 205-spine; 206-minor face eaves; 207-spine top cover; 208-eaves pillar; 209-long struts; 301-washroom lavatory basin; 302-flush toilet; 303-bathtub; 304-gas-cooker; 305-kitchen lavatory basin; 401-bedroom; 402-parlor; 403-eaves; 404-washroom; 405-kitchen.

[detailed description of the invention]

Below in conjunction with accompanying drawing and embodiment, the invention will be further described.

A kind of spatial layout system of prefabricated house its be made up of module section, coupling part and funtion part; Wherein module section comprises on-gauge plate (101), short slab (102), long band luffer boards (103), short strip luffer boards (104), roofing slab (107), set square (106), the door (105) of normal size, and various body of wall can configure all kinds standard module as required; Coupling part comprises side column (201), column (202), lower eaves girder (203), long limit eaves (204), spine (205), minor face eaves (206), spine top cover (207), eaves pillar (208), long struts (209), and all module sections can by the draw-in groove clamping of linkage; Funtion part is made up of washroom lavatory basin (301), flush toilet (302), bathtub (303), gas-cooker (304), kitchen lavatory basin (305).

Whole system outside is divided into front wall, Hou Qiang, Zuo Qiang, right wall and roof parts, and inner space is divided into two bedrooms (401), a parlor (402), an eaves (403), a washroom (404), a kitchen function region (405) by interval.

Front wall has the side column (201) and a root post that are placed in both sides, after bottom is connected and fixed by expansion screw and ground, on the left of front wall, in the draw-in groove of column and side column, snap in on-gauge plate, long band luffer boards and on-gauge plate from top to bottom, on the right side of wall wall, snap in door then in the draw-in groove of column and side column, snap in short slab, short strip luffer boards, on-gauge plate from top to bottom.

Zuo Qiang and right wall are connected and fixed side column, long struts, side column, eaves pillar by spacing by expansion screw and ground from back to front successively, then on rear side of Zuo Qiang and right wall, snap in 3 pieces of on-gauge plates and set square from top to bottom successively in the draw-in groove of side column and long struts; On-gauge plate, long band luffer boards, on-gauge plate, set square is snapped in from top to bottom successively in side column in the middle part of Zuo Qiang and right wall and the draw-in groove of long struts.

Rear wall is from left to right connected and fixed side column, column, side column by spacing by expansion screw and ground successively, then in the side column of the left and right sides and the draw-in groove of pillar, snaps in on-gauge plate, long band luffer boards and on-gauge plate successively from top to bottom.

Bedroom district and other functional areas partition walls, from left to right two long struts line centers are connected and fixed long struts by expansion screw and ground, and both sides snap in door respectively by position of center line, then snap in two pieces of short slabs, on-gauge plate, set squares from top to bottom successively.

The interval draw-in groove every between elongated pillar and column in bedroom snaps in 4 pieces of on-gauge plates from top to bottom successively.

Washroom and kitchen function district are connected and fixed column and long struts to Left-side center line place, bedroom by expansion screw and ground on the left of front wall, in column and long struts draw-in groove, snap in door near one end, bedroom, then snap in two pieces of short slabs, on-gauge plate, set squares from top to bottom successively.

Roof parts fixes spine in long struts, roof is divided two pieces, front and back by spine from high in the end, required roofing slab is snapped in spine draw-in groove successively, block the right and left fixed length limit eaves before roof, behind roof, block the right and left fixes minor face eaves, then under front and back end, roof, eaves girder draw-in groove is inserted in roofing slab and fixes, and then on spine top, fixes spine top cover.

The present invention is by each components of modularization, be convenient to movable plank house installation and removal, through Validity Test, whole system can install by 2 staff for 3 hours, movable plank house inner space is carried out rational deployment simultaneously and divides to meet temporary building inner inhabitation personnel living standard.

But the better feasible embodiment of above-mentioned only the present invention, non-ly therefore limit to scope, do various distortion according to above-described embodiment or apply mechanically all within this technical scheme protection domain.

Claims (1)

1. a spatial layout system of prefabricated house, is characterized in that, is made up of module section, coupling part and funtion part, wherein module section comprises on-gauge plate, short slab, long band luffer boards, short strip luffer boards, roofing slab, set square, the door of normal size, and various body of wall can configure all kinds standard module as required, coupling part comprises side column, column, lower eaves girder, long limit eaves, spine, minor face eaves, spine top cover, eaves pillar, long struts, and all module sections can by the draw-in groove clamping of linkage, funtion part is by washroom lavatory basin, flush toilet, bathtub, gas-cooker, kitchen lavatory basin formed, whole system outside is divided into front wall, rear wall, left wall, right wall and roof parts, inner space is divided into two bedrooms by interval, a parlor, eaves, a washroom, a kitchen function region, front wall is placed in side column and a root post on both sides, after bottom is connected and fixed by expansion screw and ground, in the draw-in groove of column and side column, on-gauge plate is snapped in from top to bottom on the left of front wall, long band luffer boards and on-gauge plate, on the right side of front wall, snap in door then in the draw-in groove of column and side column, snap in short slab from top to bottom, short strip luffer boards, on-gauge plate, Zuo Qiang and right wall are connected and fixed side column by spacing by expansion screw and ground from back to front successively, long struts, side column, eaves pillar, in the draw-in groove of side column and long struts, 3 pieces of on-gauge plates and set square is snapped in from top to bottom successively on rear side of Zuo Qiang and right wall, on-gauge plate is snapped in successively from top to bottom in side column in the middle part of Zuo Qiang and right wall and the draw-in groove of long struts, long band luffer boards, on-gauge plate, set square, described rear wall is from left to right connected and fixed side column by spacing by expansion screw and ground successively, column, side column, then in the side column of the left and right sides and the draw-in groove of pillar, on-gauge plate is snapped in from top to bottom successively, long band luffer boards and on-gauge plate, described bedroom district and other functional areas partition walls, from left to right two long struts line centers are connected and fixed long struts by expansion screw and ground, both sides snap in door respectively by position of center line, then two pieces of short slabs are snapped in from top to bottom successively, on-gauge plate, set square, described bedroom is interval every snapping in 4 pieces of on-gauge plates from top to bottom successively by the draw-in groove between long struts and column, described washroom and kitchen function district are connected and fixed column and long struts to Left-side center line place, bedroom by expansion screw and ground on the left of front wall, door is snapped near one end, bedroom in column and long struts draw-in groove, then two pieces of short slabs are snapped in from top to bottom successively, on-gauge plate, set square, described roof parts fixes spine in long struts, roof is divided two pieces, front and back by spine from high in the end, required roofing slab is snapped in spine draw-in groove successively, block the right and left fixed length limit eaves before roof, behind roof, block the right and left fixes minor face eaves, then under front and back end, roof, eaves girder draw-in groove is inserted in roofing slab and fixes, then on spine top, spine top cover is fixed.
CN201010514768.2A 2010-10-21 2010-10-21 A kind of spatial layout system of prefabricated house CN102454220B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010514768.2A CN102454220B (en) 2010-10-21 2010-10-21 A kind of spatial layout system of prefabricated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010514768.2A CN102454220B (en) 2010-10-21 2010-10-21 A kind of spatial layout system of prefabricated house

Publications (2)

Publication Number Publication Date
CN102454220A CN102454220A (en) 2012-05-16
CN102454220B true CN102454220B (en) 2016-03-02

Family

ID=46037861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010514768.2A CN102454220B (en) 2010-10-21 2010-10-21 A kind of spatial layout system of prefabricated house

Country Status (1)

Country Link
CN (1) CN102454220B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317114A (en) * 2015-10-27 2016-02-10 重庆光煦科技有限公司 board house having corridor structure
CN107605049A (en) * 2017-09-01 2018-01-19 浙江夏远信息技术有限公司 A kind of movable plank house

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20004665U1 (en) * 2000-03-14 2000-09-14 Kusan Andre Prefabricated house made of panels
CN1584233A (en) * 2004-06-07 2005-02-23 佛山市耀达建材贸易有限公司 Building structure and installing method for two-layer movable panel house
CN101360868A (en) * 2006-02-17 2009-02-04 哈伯德知识产权有限公司 Wall system
CN201424753Y (en) * 2009-02-27 2010-03-17 深圳市雅泰组合房屋有限公司 Center pillar structure of combined house
CN201546460U (en) * 2009-11-19 2010-08-11 东莞巨千家具有限公司 Multifunctional field house

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20004665U1 (en) * 2000-03-14 2000-09-14 Kusan Andre Prefabricated house made of panels
CN1584233A (en) * 2004-06-07 2005-02-23 佛山市耀达建材贸易有限公司 Building structure and installing method for two-layer movable panel house
CN101360868A (en) * 2006-02-17 2009-02-04 哈伯德知识产权有限公司 Wall system
CN201424753Y (en) * 2009-02-27 2010-03-17 深圳市雅泰组合房屋有限公司 Center pillar structure of combined house
CN201546460U (en) * 2009-11-19 2010-08-11 东莞巨千家具有限公司 Multifunctional field house

Also Published As

Publication number Publication date
CN102454220A (en) 2012-05-16

Similar Documents

Publication Publication Date Title
US20160160515A1 (en) System for modular building construction
JP6175568B2 (en) Junction between floor panel and panel rail
US9067721B2 (en) Height adjustable shipping container
US8001730B2 (en) System for modular building construction
US8291647B2 (en) Self-contained structure configurable as a shipping container and as a dwelling
CN103993664B (en) A kind of assembly type light house and construction thereof, method for dismounting
US20140013678A1 (en) Prefabricated Module Used for Living Accommodations
US7765745B2 (en) Reusable worker housing and methods relating thereto
US10323428B2 (en) Sequence for constructing a building from prefabricated components
CN102108736B (en) Combined container room
US20130014451A1 (en) Prefabricated integrated utilities building core system
MX2013003931A (en) Modular building system.
CN104278688B (en) Structure for providing emergency housing for a plurality of displaced people
WO2013069971A1 (en) Container house having structural stability
JP2003500573A (en) Building structure improvements
CN103485414B (en) Prefabricated assembled type steel structure house building system and construction method thereof
CN103953117B (en) It is easy to the folding container house of mobile transport
US20080256882A1 (en) System for attaching prefabricated architectural panels
CN102242575A (en) Noise-reducing dust-reducing partition system for construction site as well as assembling and use method thereof
CN101457552A (en) Composite hollow slab house and building method thereof
CN103206018B (en) The connection structure on wallboard and floor, collar tie beam and modularization integrated house
CN201031441Y (en) Multipurpose movable dwelling capable of repeat quick-speed disassembling and assembling multipurpose mobile house
CN204141876U (en) Solar bracket structure
US20100180518A1 (en) Emergency Habitat for Catastrophes
US20080236056A1 (en) Modular buildings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190222

Address after: 314400 No. 11 Tingchao Road, Jiaxing City, Zhejiang Province, Jianshan New District, Haining City

Patentee after: Zhejiang Xinyuan Purification Equipment Co., Ltd.

Address before: 310000 Dongjiamen No. 18, Sandun Town, Xihu District, Hangzhou City, Zhejiang Province

Patentee before: Zhejiang Xinyuan Color Steel Co.,Ltd.