CN102454220A - Spatial layout system of prefabricated house - Google Patents
Spatial layout system of prefabricated house Download PDFInfo
- Publication number
- CN102454220A CN102454220A CN2010105147682A CN201010514768A CN102454220A CN 102454220 A CN102454220 A CN 102454220A CN 2010105147682 A CN2010105147682 A CN 2010105147682A CN 201010514768 A CN201010514768 A CN 201010514768A CN 102454220 A CN102454220 A CN 102454220A
- Authority
- CN
- China
- Prior art keywords
- column
- eaves
- snap
- draw
- groove
- Prior art date
Links
- 230000001808 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reactions Methods 0.000 claims description 6
- 238000005192 partition Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 6
- 238000005516 engineering processes Methods 0.000 description 4
- 238000004642 transportation engineering Methods 0.000 description 4
- 238000003287 bathing Methods 0.000 description 2
- 238000010411 cooking Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 208000008425 Protein Deficiency Diseases 0.000 description 1
- 230000004308 accommodation Effects 0.000 description 1
- 239000003570 air Substances 0.000 description 1
- 239000011449 bricks Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 materials Substances 0.000 description 1
- 239000000203 mixtures Substances 0.000 description 1
- 239000011901 water Substances 0.000 description 1
Abstract
Description
[technical field]
The present invention relates to a kind of temporary building, be specifically related to the technical field of a kind of movable plank house space layout system.
[background technology]
In the time of modern urban construction or open-air engineer operation, the staff needs to settle to stay temporarily, is accompanied by the continuous appearance of recent years such as natural calamities such as earthquake, floods especially, and the victims of the disaster that need interim arrangement to shift also need the interim lodging of settling.Common brick and tile temporary building is low in long-acting rate of construction period, and the transportation construction cost is bigger, and movable plank house people occur satisfying for the temporary building demand.
Chinese patent numbers 200910102231.2 discloses a kind of folding type movable board house; The technology that it adopted comprises base plate, front wall, Hou Qiang, Zuo Qiang, You Qiang, left roof, right roof and roof frame; Through the assembly between each body of wall that is rotationally connected; This invention can fold the reduction cost of transportation in transportation like this, and house, assembling back is firmly easy to use.But scheme that should technology provided is being installed complicatedly, and Along with people's material and culture water article improve simultaneously, and people are not only to be satisfied with accommodation demands for the lodge building, simultaneously also hope satisfy bathing, the regions module of cooking of cooking.
[summary of the invention]
For solving above deficiency, the present invention provides a kind of movable plank house space layout system, and this system can install its all component modularization standardization very simply set by step, and 2 employee can be accomplished whole movable plank house in about 3 hours, and installing/dismounting is extremely simple.Simultaneously through the module combinations rational deployment with the inner space be separated between 2 Living Areas, parlor, washroom and kitchen with satisfy people to live, eat, requirement such as bathing.
Problem to be solved by this invention: how existing movable plank house rationalizes layout with the inner space, how to improve the efficient of movable plank house installing/dismounting simultaneously, and each assembly is convenient to transportation simultaneously.
The technical scheme that the present invention adopted is: a kind of movable plank house space layout system is characterized in that being made up of module section, coupling part and funtion part; Wherein module section comprises on-gauge plate, short slab, long band luffer boards, short band luffer boards, roofing slab, set square, the door of normal size, and various bodies of wall can dispose all kinds standard module as required; The coupling part comprises side column, column, eaves girder, long limit eaves, spine, minor face eaves, spine top cover, eaves pillar, long struts are formed down, and all module sections can be through the draw-in groove clamping of linkage; Funtion part is made up of washroom lavatory basin, flush toilet, bathtub, gas-cooker, kitchen lavatory basin.
The whole system outside is divided into front wall, Hou Qiang, Zuo Qiang, right wall and roof parts, and the inner space is divided into two bedrooms, a parlor, eaves, a washroom, a kitchen functional area through the interval.
Its characteristic of described a kind of movable plank house space layout system; Described front wall is by a side column that places both sides and a root post; Its bottom through expansion screw be connected with ground fix after; In the draw-in groove of column and side column, snap in on-gauge plate, long band luffer boards and on-gauge plate from top to bottom in the front wall left side, snap in door on wall wall right side and in the draw-in groove of column and side column, snap in short slab, short band luffer boards, on-gauge plate then from top to bottom.
Its characteristic of described a kind of movable plank house space layout system; Described Zuo Qiang is connected fixedly side column, long struts, side column, eaves pillar by spacing through expansion screw from back to front successively with right wall with ground, in the draw-in groove of side column and long struts, snap in 3 on-gauge plates and set square from top to bottom successively at Zuo Qiang and right wall rear side then; Snap in on-gauge plate, long band luffer boards, on-gauge plate, set square in the side column in the middle part of Zuo Qiang and right wall and the draw-in groove of long struts from top to bottom successively.
Its characteristic of described a kind of movable plank house space layout system; Described back wall from left to right is connected fixedly side column, column, side column by spacing through expansion screw successively with ground, in the draw-in groove of the side column of the left and right sides and pillar, snap in on-gauge plate successively from top to bottom then, length is with luffer boards and on-gauge plate.
Its characteristic of described a kind of movable plank house space layout system; Described bedroom district and other functional areas partition walls; From left to right two long struts line centers are connected the fixed length pillar through expansion screw with ground; Both sides lean on position of center line to snap in door respectively, snap in two short slabs, on-gauge plate, set square then from top to bottom successively.
Its characteristic of described a kind of movable plank house space layout system, described bedroom is interval at a distance from snapping in 4 on-gauge plates from top to bottom successively through the draw-in groove between long struts and column.
Its characteristic of described a kind of movable plank house space layout system; Centerline is connected vertical columns and long struts through expansion screw with ground to the left side, bedroom in the front wall left side with the functional areas, kitchen in described washroom; In column and long struts draw-in groove, snap in door, snap in two short slabs, on-gauge plate, set square then from top to bottom successively near bedroom one end.
Its characteristic of described a kind of movable plank house space layout system, described its roof parts fixing spine on long struts, before and after spine is divided the roof from high in the end two; Required roofing slab is snapped in the spine draw-in groove successively; Block exists then before the roof, the right and left fixed length limit eaves, the fixing minor face eaves of block the right and left before the roof; And then the eaves girder draw-in groove is inserted in roofing slab and fixing under the front and back end, roof, and then fixedly spine top cover is gone up on the spine top.
Beneficial effect of the present invention: the present invention is through each components of modularization; Be convenient to the movable plank house installation and removal; Can whole system be installed in 3 hours through 2 staff of Validity Test, simultaneously rational deployment carried out in the movable plank house inner space and divide to satisfy the inner inhabitation personnel of temporary building living standard.
Further understand characteristic of the present invention and technology contents for making, see accompanying drawing of the present invention and embodiment for details, yet appended graphic only for reference and explanation usefulness is not to be that the present invention is limited.
[description of drawings]
Fig. 1 front wall structure chart of the present invention;
Fig. 2 the present invention left side wall construction figure;
The right wall construction figure of Fig. 3 the present invention;
Wall construction figure behind Fig. 4 the present invention;
Fig. 5 built-in function administrative division map of the present invention;
101-on-gauge plate among the figure; The 102-short slab; The long band of 103-luffer boards; The short band of 104-luffer boards; The 105-door; The 106-set square; The 107-roofing slab; The 201-side column; The 202-column; Eaves girder under the 203-; The long limit of 204-eaves; The 205-spine; 206-minor face eaves; 207-spine top cover; 208-eaves pillar; The 209-long struts; 301-washroom lavatory basin; The 302-flush toilet; The 303-bathtub; The 304-gas-cooker; 305-kitchen lavatory basin; The 401-bedroom; The 402-parlor; The 403-eaves; The 404-washroom; The 405-kitchen.
[specific embodiment]
Below in conjunction with accompanying drawing and embodiment the present invention is described further.
It is made up of a kind of movable plank house space layout system module section, coupling part and funtion part; Wherein module section comprises 101-on-gauge plate, 102-short slab, the long band of 103-luffer boards, the short band of 104-luffer boards, 107-roofing slab, 106-set square, the 105-door of normal size, and various bodies of wall can dispose all kinds standard module as required; The coupling part comprises that the long limit of eaves girder under 201-side column, 202-column, the 203-, 204-eaves, 205-spine, 206-minor face eaves, 207-spine top cover, 208-eaves pillar, 209-long struts form, and all module sections can pass through the draw-in groove clamping of linkage; Funtion part is made up of 301-washroom lavatory basin, 302-flush toilet, 303-bathtub, 304-gas-cooker, 305-kitchen lavatory basin.
The whole system outside is divided into front wall, Hou Qiang, Zuo Qiang, right wall and roof parts, and the inner space is divided into two 401-bedrooms, a 402-parlor, 403-eaves, a 404-washroom, a 405-kitchen functional area through the interval.
Front wall is by the 201-side column that places both sides and a 202-column; Its bottom through expansion screw be connected with ground fix after; In the draw-in groove of 202-column and 201-side column, snap in 101-on-gauge plate, 103-long band luffer boards and 101-on-gauge plate from top to bottom in the front wall left side, snap in the 105-door on wall wall right side and in the draw-in groove of 202-column and 201-side column, snap in 102-short slab, the short band of 104-luffer boards, 101-on-gauge plate then from top to bottom.
Zuo Qiang is connected fixedly 201-side column, 209-long struts, 201-side column, 208-eaves pillar by spacing through expansion screw from back to front successively with right wall with ground, in the draw-in groove of 201-side column and 209-long struts, snap in 3 101-on-gauge plates and 106-set square from top to bottom successively at Zuo Qiang and right wall rear side then; Snap in 101-on-gauge plate, the long band of 103-luffer boards, 101-on-gauge plate, 106-set square in the 201-side column in the middle part of Zuo Qiang and right wall and the draw-in groove of 209-long struts from top to bottom successively.
Back wall from left to right is connected fixedly 201-side column, 202-column, 201-side column by spacing through expansion screw successively with ground, in the draw-in groove of the 201-of left and right sides side column and 202-pillar, snap in 101-on-gauge plate, 103-long band luffer boards and 101-on-gauge plate then successively from top to bottom.
401-bedroom district and other functional areas partition walls; From left to right two 209-long struts line centers are connected fixedly 209-long struts through expansion screw with ground; Both sides lean on position of center line to snap in the 105-door respectively, snap in two 102-short slabs, 101-on-gauge plate, 106-set square then from top to bottom successively.
The interval draw-in groove at a distance between logical 209-long struts and 202-column in bedroom snaps in 4 101-on-gauge plates from top to bottom successively.
Centerline is connected fixedly 202-column and 209-long struts through expansion screw with ground to the left side, bedroom in the front wall left side with functional areas, 405-kitchen in the 404-washroom; In 202-column and 209-long struts draw-in groove, snap in the 105-door, snap in two 102-short slabs, 101-on-gauge plate, 106-set square then from top to bottom successively near 401-bedroom one end.
Roof parts fixing 205-spine on the 209-long struts; The 205-spine is divided two of front and back from high in the end with the roof; Required 107-roofing slab is snapped in 205-spine draw-in groove successively, before the roof block then at the fixing long limit of the 203-eaves of the right and left, the fixing 206-minor face eaves of block the right and left before the roof; And then the eaves girder draw-in groove is inserted in 107-roofing slab and fixing under the front and back end, roof, and then fixedly 207-spine top cover is gone up on 205-spine top.
The present invention is through each components of modularization; Be convenient to the movable plank house installation and removal; Can whole system be installed in 3 hours through 2 staff of Validity Test, simultaneously rational deployment carried out in the movable plank house inner space and divide to satisfy the inner inhabitation personnel of temporary building living standard.
Yet the preferable feasible embodiment of above-mentioned only the present invention, non-so limitation protection domain of the present invention is done various distortion or is applied mechanically all within this technical scheme protection domain according to the foregoing description.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010514768.2A CN102454220B (en) | 2010-10-21 | 2010-10-21 | A kind of spatial layout system of prefabricated house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010514768.2A CN102454220B (en) | 2010-10-21 | 2010-10-21 | A kind of spatial layout system of prefabricated house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102454220A true CN102454220A (en) | 2012-05-16 |
CN102454220B CN102454220B (en) | 2016-03-02 |
Family
ID=46037861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010514768.2A CN102454220B (en) | 2010-10-21 | 2010-10-21 | A kind of spatial layout system of prefabricated house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102454220B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317114A (en) * | 2015-10-27 | 2016-02-10 | 重庆光煦科技有限公司 | board house having corridor structure |
CN107605049A (en) * | 2017-09-01 | 2018-01-19 | 浙江夏远信息技术有限公司 | A kind of movable plank house |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20004665U1 (en) * | 2000-03-14 | 2000-09-14 | Kusan Andre | Prefabricated house made of panels |
CN1584233A (en) * | 2004-06-07 | 2005-02-23 | 佛山市耀达建材贸易有限公司 | Building structure and installing method for two-layer movable panel house |
CN101360868A (en) * | 2006-02-17 | 2009-02-04 | 哈伯德知识产权有限公司 | Wall system |
CN201424753Y (en) * | 2009-02-27 | 2010-03-17 | 深圳市雅泰组合房屋有限公司 | Center pillar structure of combined house |
CN201546460U (en) * | 2009-11-19 | 2010-08-11 | 东莞巨千家具有限公司 | Multifunctional field house |
-
2010
- 2010-10-21 CN CN201010514768.2A patent/CN102454220B/en active IP Right Grant
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20004665U1 (en) * | 2000-03-14 | 2000-09-14 | Kusan Andre | Prefabricated house made of panels |
CN1584233A (en) * | 2004-06-07 | 2005-02-23 | 佛山市耀达建材贸易有限公司 | Building structure and installing method for two-layer movable panel house |
CN101360868A (en) * | 2006-02-17 | 2009-02-04 | 哈伯德知识产权有限公司 | Wall system |
CN201424753Y (en) * | 2009-02-27 | 2010-03-17 | 深圳市雅泰组合房屋有限公司 | Center pillar structure of combined house |
CN201546460U (en) * | 2009-11-19 | 2010-08-11 | 东莞巨千家具有限公司 | Multifunctional field house |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317114A (en) * | 2015-10-27 | 2016-02-10 | 重庆光煦科技有限公司 | board house having corridor structure |
CN107605049A (en) * | 2017-09-01 | 2018-01-19 | 浙江夏远信息技术有限公司 | A kind of movable plank house |
Also Published As
Publication number | Publication date |
---|---|
CN102454220B (en) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2634132C2 (en) | Method and system for building construction | |
US6625937B1 (en) | Modular building and method of construction | |
US4891919A (en) | Containerized transportable house | |
AU2013220923B2 (en) | Height adjustable shipping container | |
Downing et al. | The bungalows of Buffalo | |
US8291647B2 (en) | Self-contained structure configurable as a shipping container and as a dwelling | |
US7765745B2 (en) | Reusable worker housing and methods relating thereto | |
ES2253225T3 (en) | Modular structure for building, and manufacturing method. | |
US4759160A (en) | Prefabricated concrete buildings with monolithic roof, wall, and floor members | |
CN102561727B (en) | Process for providing emergency housing for a plurality of displaced people | |
CN104204373A (en) | Prefabricated module for a building | |
WO2007109306A2 (en) | Rapidly deployable modular building and methods | |
CN103485414B (en) | Prefabricated assembled type steel structure house building system and construction method thereof | |
AU2014100244A4 (en) | A prefabricated steel structural building system and construction method thereof | |
CN203924344U (en) | Building block and the modular architectural on the middle and senior level with this building block | |
US20100126082A1 (en) | Prefabricated service pod | |
CN101338628A (en) | Assembled anti-knock movable house | |
US20080256882A1 (en) | System for attaching prefabricated architectural panels | |
Van Lengen | The barefoot architect: a handbook for green building | |
EP1801319A1 (en) | Public hygiene building | |
WO2015089602A1 (en) | Reversible module co-ordination system for buildings | |
CN102003082B (en) | Combined box-type house and mounting method thereof | |
CN102359208A (en) | Oblique curtain wall system and installation method thereof | |
US20100180518A1 (en) | Emergency Habitat for Catastrophes | |
EP1908888A2 (en) | Modular buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190222 Address after: 314400 No. 11 Tingchao Road, Jiaxing City, Zhejiang Province, Jianshan New District, Haining City Patentee after: Zhejiang Xinyuan Purification Equipment Co., Ltd. Address before: 310000 Dongjiamen No. 18, Sandun Town, Xihu District, Hangzhou City, Zhejiang Province Patentee before: Zhejiang Xinyuan Color Steel Co.,Ltd. |
|
TR01 | Transfer of patent right |