CN1217815C - Method for announcing line idle condition through shaft counter - Google Patents

Method for announcing line idle condition through shaft counter Download PDF

Info

Publication number
CN1217815C
CN1217815C CN 01117230 CN01117230A CN1217815C CN 1217815 C CN1217815 C CN 1217815C CN 01117230 CN01117230 CN 01117230 CN 01117230 A CN01117230 A CN 01117230A CN 1217815 C CN1217815 C CN 1217815C
Authority
CN
China
Prior art keywords
evaluating apparatus
signal code
timing point
highway section
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01117230
Other languages
Chinese (zh)
Other versions
CN1375421A (en
Inventor
安德烈亚斯·默廷
哈特维格·奥姆斯泰德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to CN 01117230 priority Critical patent/CN1217815C/en
Publication of CN1375421A publication Critical patent/CN1375421A/en
Application granted granted Critical
Publication of CN1217815C publication Critical patent/CN1217815C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The present invention relates to a method for announcing line idle conditions through a shaft counting. In order to announce (F/B) idle or busy conditions of a section of roads (1, 2), values which are continuously obtained through shaft counting are no more transmitted to a counter (A1), which is replaced by transmitting only two signal codes (T2, T2<*>) corresponding to each train (Z). A first signal code (T2) during a first shaft of the train passes through and another signal code (T2<*>) after the train completely passes through are solved from the two signal codes of one counting point. If sensor signals or counting pulses of the next wheel don't appear in scheduled time, then the second signal code is transported. Differing from the prior art, the method of the present invention has special restrictions on data quantities which are transmitted and evaluated, and therefore, the cost can be greatly reduced particularly during data wireless transmission to a shaft counter. Furthermore, the transmission safety can be improved when using corresponding narrow bands to transmit wired data.

Description

Carry out the method for line idle intelligence aids by the meter axle
Technical field
The present invention relates to a kind of method by calculating shaft value circular track clear situation.This method is open in DE4308237A1.
Background technology
In DE4308237A1, reported a kind of method that drives wheel counting apparatus, in the method relevant adjacent highway section ceases to be busy that produces on timing point and the meter axle pulse that the line is busy have been delivered in the local wheel counting apparatus in a distant place.The pulse of meter axle produces the sensor signal of sending after the response by the sensor on the circuit to the wheel that crosses from the side and forms.The timing point that is provided with pretreatment unit converts the sensor signal that coefficient paired wheel sensor sends to the count pulse relevant with travel direction.Counting machine transmission meter axle pulse to a distant place is by telecommunication line or adopts the wireless means of corresponding signal code to realize.According to the instruction of DE4308237A1, when a train by or be about to enter under highway section when maybe needing to come into one's own, the counting machine of estimating usefulness only transmits the meter axle pulse of distant place timing point at every turn.The data transmission between interrupt counter and the distant place timing point then outside during this period of time, and circular monitors that the highway section is occupied.
In by the DE4308237A1 disclosed method, do not carry out permanent and just between counting machine and distant place timing point, carry out data transmission as required.This is good especially when carrying out wireless data transmission, because the transmission path of permanent existence needn't be set; But in fact also can be not in this way, but the communication link that replaces by setting up between counting machine and distant place timing point as required fetches the realization data transmission.Can only in the time need monitoring, keep this communicating to connect to the highway section of passing highway.
Summary of the invention
The objective of the invention is that this paper is begun the described method of part and do further improvement, make it in big as far as possible time range transmission information between the timing point sum counter.Transmission cost when carrying out wireless data transmission is descended once again, and can also make thus when cable data transmits owing to the data total amount of transmitting reduces to improve safety of data transmission.
The objective of the invention is to realize by a kind of method by calculating shaft value circular track clear situation, this method utilization is detecting the rail sensor of the train wheel that crosses and is being located at pretreatment unit and the evaluating apparatus of on the timing point sensor signal being estimated on the timing point, wherein, pretreatment unit is according to the sensor signal of identification axletree, interrelate and it is counted being no more than the axletree of predetermined minimum interval and coupler in logic, evaluating apparatus is after identifying coupler top, produce the travel direction fwd highway section circular that the line is busy, and when in the predetermined shortest time, other axletree not occurring, the circular that the count results of each coupler is used to produce the highway section free time of crossing, and with its storage to be used for highway section, front free time circular after a while, wherein, when being discerned, coupler top forms a signal code, the formation of this code is with whether to discern its travel direction in identification in the primary shaft relevant, when the identification travel direction, all transmit this code to evaluating apparatus at every turn, evaluating apparatus is used for monitoring travel direction fwd highway section, on the contrary, when not having travel direction recognition result input evaluating apparatus, evaluating apparatus will monitor adjacent highway section on two travel direction, and wherein, pretreatment unit is analyzed the time sequence of sensor signal or consequent count pulse, see whether they are continuous in given at interval shortest time in the minimum advancement speed predetermined by train and greatest axis, surpassing this minimum during continuous time, form with signal code is imported one or more evaluating apparatus with current axle count results, so that the free time in highway section that inspection is crossed and fwd highway section circular state.According to the present invention, for circular only needs in principle to two data codes of affiliated counting machine transmission from the highway section of each timing point is idle and the line is busy, the line is busy and make second circular ceases to be busy wherein can to make first circular.In the theme of prior art, do not transmit online calculating shaft value, but replace the mark on transmission train primary shaft, also the complete calculating shaft value enter counter of junction between the vehicle that separately the timing point place is crossed to counting machine.
In optimal way of the present invention, store checking out the current timing point that is in idle circular state in highway section, front.
In addition,, store on the timing point of calculating shaft value determining, and this calculating shaft value is transferred to the evaluating apparatus that the free time circular state in next highway section is checked at after a while time point from this timing point according to optimal way of the present invention.
According to optimal way of the present invention, when for the first time identifying the effect of sensor or identifying the primary shaft of train or during the primary shaft of train connection place, relevant therewith signal code is sent to evaluating apparatus, so that at least one highway section that on travel direction, is in correlated count point back circular that carries out that the line is busy, perhaps described signal code is sent in the evaluating apparatus so that monitor adjacent highway section in both sides.
In a kind of optimal way of the present invention, by the sensor signal of a plurality of timing points of a shared pretreatment unit or evaluating apparatus evaluation adjacent setting spatially.
In another kind of optimal way of the present invention, a plurality of evaluating apparatus are set, and evaluating apparatus is separately positioned on the space on the position near timing point adjacent on one or more spaces.
In optimal way of the present invention, signal code is by being located at data conductor or the electric power conductor transmission between timing point and the evaluating apparatus, or by the bus system that timing point is connected with the evaluating apparatus transmission of leading, or by being located at as required between timing point and at least one evaluating apparatus or permanent that exist and/or communicating to connect of setting up as required carried out transmission over radio.
In a kind of optimal way of the present invention, by for sending and/or the received signal code is set serial number and/or timestamp, signal code is transported at least one evaluating apparatus and/or the signal code of transmission is stored in the evaluating apparatus from timing point.
In optimal way of the present invention, for signal code is transported at least one evaluating apparatus from timing point, add the sign that evaluating apparatus is determined for this signal code, and evaluating apparatus only will be used for estimating for its signal code of determining, perhaps for signal code is transported at least one evaluating apparatus from timing point, for this signal code adds for the indication counter sign of each timing point in source as a result, and the signal code that evaluating apparatus only will come from preset count point is used for evaluation.
According to the present invention, under the situation of the timing point sign of adding each transmission, receive described signal code by evaluating apparatus.
Though in DE3431171C2, disclose the content that between central evaluating apparatus and most of timing point, does not have the permanent data transmission equally.But different is will to be temporarily stored on the timing point at the calculating shaft value that timing point obtains in the document, and calls these information as required from central evaluating apparatus.Can be implemented as a plurality of timing points thus and a mono-only is set by the shared central evaluating apparatus of these timing points.In order forever to understand the actual conditions of the train axle that crosses on the timing point next door, should periodically transmit each count results to central evaluating apparatus by enabling counting.Thus, central evaluating apparatus must call by the timing point on the highway section of its supervision in short as far as possible time gap, so that the calculating shaft value of being determined by timing point is provided.Owing to need permanent operation wheel counting apparatus, so will transmit on the total amount and the amount that on each counting machine, the loads data of as much almost.Therefore not factor according to minimizing cost-cutting.
Description of drawings
Describe the present invention in detail below in conjunction with the embodiment that describes in the accompanying drawing.Shown in the accompanying drawing:
Fig. 1-the 4th, train by the surrounding time point cross the line idle in three highway sections and busy scenario and
Fig. 5 shows the effect of wheel sensor to affiliated pretreatment unit.
The specific embodiment
Track section shown in Fig. 1-4 is made of highway section 1-3; Train Z travels on this track section.Described three highway sections are by timing point ZP1-ZP4 boundary, and each is made of two staggered wheel sensores in part the track circuit switching device in these highway sections in known manner.Wheel sensor produces response to the wheel that crosses from the side, and the pretreatment unit VV1-VV4 that therefore is provided with on the timing point time of sending is gone up overlapping sensor signal.These pretreatment units convert the sensor signal of importing to can be for the count pulse relevant with travel direction of set evaluating apparatus A1-A3 use.The hypothesis that has set four axles among the figure with locomotive Z is corresponding, the pretreatment unit VV1 among Fig. 1 to the counting of four axles more than pretreatment unit VV3; The situation of rolling when illustrating that train is pushed ahead, and the calculating shaft value that will at every turn obtain join with the corresponding mark of pretreatment unit in.
Suppose among Fig. 1 that the primary shaft of train Z travels towards timing point ZP2 forward.When in identifying two sensors one is at first influenced or when the primary shaft that identifies locomotive influences two sensors on the timing point ZP2 simultaneously, the order pretreatment unit VV2 evaluating apparatus A3 in a highway section 2 backward sends signal code T2, provides this highway section thus the line is busy circular.Relevant with the type of code " a) at first effect, b) primary shaft " is, the form that code T2 also can current potential is sent to the highway section of crossing.In this case, the result of triggering code T2 is not corresponding with travel direction.The capital B of highway section below relevant highway section that the line is busy in the accompanying drawings circulates a notice of represented, and idle circular is represented with capital F.
Can be as shown in Figure 1, by existing data or electric power conductor between timing point and the evaluating apparatus but also can by one independently bus system carry out the transmission of signal code.Equally, also can carry out transmission over radio to signal code by communicating to connect of between timing point and distant place evaluating apparatus, setting up as required.Therefore, according to the multiplex needs that on the basis of safety, may occur, can carry out shunt and communicate to connect.
Can form by for example one of a permanent radio circuit that exists or temporary transient a plurality of open radiowave channel that is provided with does not in addition have the user to connect with open circuited code to communicate by letter.If in the total device of track, to wheel signal and ceases to be busy and the line is busy that circular is handled, then do not need to transmit described information to the calculating shaft value device in a distant place.
When the axletree in locomotive Z back crosses timing point ZP2, though pretreatment unit VV2 determines in the driving process the counting of the axle that crosses according to wherein sensor signal of input and determine this travel direction, its output is not transported to carrying out among the evaluating apparatus A1 and A3 that orbital surveillance is provided with.Pretreatment unit VV2 also calculates the size of the time gap between the adjacent axletree except the calculating shaft value of train and its travel direction of timing point ZP2 passed in calculating.Compare by time value with storage, the time point when pretreatment unit VV2 can determine to estimate train Z fully by timing point ZP2, wherein the maximum range value that allows between the adjacent axletree of Cun Chu time value and the slowest railway car is relevant.This situation is shown among Fig. 2.Can the train that one row travel at a slow speed be divided into a plurality of coupler (achsverbund) in logic according to time standard.Each train can be drawn more than two codes like this, but the time density of code is limited by the time value of storing.
By the train Z that identification is crossed fully, the evaluating apparatus A1 transmission signals code T2 in pretreatment unit highway section 1 rearwards *, in this code, transmitted the calculating shaft value of determining.Evaluating apparatus A1 compares this calculating shaft value with the calculating shaft value that obtains from timing point ZP1.If consistent from two calculating shaft values that pretreatment unit obtains, then evaluating apparatus A1 will send the circular F of 1 free time of highway section.
Because pretreatment unit VV2 has stored with VV3 and has limited the timing point ZP2 in highway section 2 and the different calculating shaft values of ZP3, so keep the highway section 2 circular B that the line is busy of back.When highway section 2 was idle subsequently, pretreatment unit VV2 will be with signal code T2 *Form transmit the count value that it obtains to evaluating apparatus A3 after train Z crosses.It is unimportant in principle this situation when to occur.Therefore next fixed calculating shaft value can be stored among the pretreatment unit VV2, and send it in the evaluating apparatus according to the order of evaluating apparatus A3 after this, or the calculating shaft value result is sent to evaluating apparatus A3, and keep at this at previous time point.
Train continues to move forward in Fig. 3, and its primary shaft crosses timing point ZP3.Pretreatment unit VV3 under this point discerns the train axle, and sends relevant with it signal code T3 so that monitor fwd highway section 3 to evaluating apparatus A3.Evaluating apparatus A3 sends highway section, front 3 instruction that the line is busy in view of the above, and wherein this process is to carry out according to signal code, carries out unimportant after still the calculating shaft value of pretreatment unit VV3 and VV4 storage being compared.The highway section 2 circular B that the line is busy that keeps the back.
In Fig. 4, train Z is fully by timing point ZP3.Under the situation of the next count pulse of no future, pretreatment unit VV3 will send signal code T3 to evaluating apparatus A3 *Only need compare the timing point ZP2 in the highway section 2 of qualification back and the count results of ZP3 now.According to setting, this count results should be consistent with the calculating shaft value that obtains from affiliated pretreatment unit.Evaluating apparatus A3 provides the circular F of 2 free time of highway section of back in view of the above.By timing point ZP4 and evaluating apparatus A3 determine fully that at train the count results of pretreatment unit VV3 and VV4 keeps the fwd highway section 3 circular B that the line is busy before consistent.
If train Z is not fully by timing point ZP3, but by this timing point the time, stop, though pretreatment unit VV3 is not when the next sensor signal in future or count pulse arrive so, the calculating shaft value result's who will representative have obtained signal code T2 *Be transported among the evaluating apparatus A3.But circular and the no show of 2 free time of the highway section of back, this is because the different calculating shaft values of pretreatment unit VV2 and VV3 have been sent into evaluating apparatus A3.If train Z moves once again, then pretreatment unit VV3 will send the signal code T2 of renewal.But this does not have meaning because the still circular of two highway sections 2 and 3 the line is busy.If all the other axles of train are final by timing point ZP3, pretreatment unit VV3 will transmit another signal code T2 to evaluating apparatus A3 *, this is suitable for determining the consistent situation of calculating shaft value of pretreatment unit VV2 and VV3, at this moment can make highway section, the back circular of 2 free time.
If the train Z that stops is in the reversing sense motion, then will at first send highway section 2 and the 3 signal code T2 that the line is busy circulates a notice of equally by timing point ZP3 the time.When fully by timing point ZP3, pretreatment unit VV3 will carry signal code T2 to evaluating apparatus A3 *Evaluating apparatus A3 will compare from the calculating shaft value result that pretreatment unit VV3 and VV4 are transferred to it, and is emitted in the circular of the line idle in the highway section of crossing on the travel direction 3 when count results is consistent.If obtain the count results identical by timing point ZP2 and pretreatment unit VV2 fully when train continues to move forward, then can produce the highway section circular of 2 free time at this moment the earliest with pretreatment unit VV3.
In the above-described embodiments, think that the wheel sensor on each timing point all works to relative pretreater.But also can consider under situation about preferably timing point closely being provided with one by one, a plurality of timing points to be worked to a shared pretreatment unit.This can be the situation for example in multi-thread highway section the time.At this moment pretreatment unit can constitute like this, that is, its residing position can be with each evaluating apparatus that is used for monitoring each highway section of further delivering to from the count results of or another timing point under this timing point.
Fig. 5 represents the deployment scenarios of timing point ZP5-ZP8 on four rail sections 11,12,13,14.When timing point ZP5 and ZP8 act on the pretreatment unit VV5 that is provided with separately and VV8, timing point ZP6 and ZP7 will act on its shared pretreatment unit VV6/7.Timing point ZP5 and ZP8 also can control pretreatment unit VV6/7 in theory; But because must passing, the wheel sensor of timing point ZP5 and ZP8 just can guide shared pretreatment unit VV6/7 into below rail, so generally do not do like this.In order particularly when equipping again or changing the equipment that has existed, to avoid on roadbed, carrying out such work, be equipped with pretreatment unit separately for timing point ZP5 and ZP8 in the embodiment shown in fig. 5.
Suppose that in Fig. 5 pretreatment unit and not shown being used to are carried out the evaluating apparatus that the highway section monitors and be communicated with by radio circuit, wherein for the transmission signals code, each only with each under evaluating apparatus set up the short time and communicate to connect.At every turn by which with how many timing points are arranged to shared pretreatment unit generation effect, be actually structure by line facility and timing point on rail deployment scenarios and preliminary election is given.
Particularly, the count results that provides by pretreatment unit is provided on radio circuit if desired, then should preferably add additional information in the data of each transmission, the transmission data that this information can be unique identify the evaluating apparatus of reception to determine into it and these data are from where.Be the additional sign of the data of transmission then for each data source and each data sink.The data that preferably will at every turn transmit deposit evaluating apparatus in signal accepter sign then.In order at any time correct calculating shaft value to be compared mutually during idle circular in the highway section, further preferably be continuous numbering of data setting and/or timestamp, when from the pretreatment unit of a timing point to evaluating apparatus transmission data and/or when it receives data, can discern according to numbering and/or timestamp.By means of this timestamp can guarantee in evaluating apparatus, can unexpectedly not count old, to current insignificant calculating shaft value.
The method of the invention can be preferred for needing to monitor by the circulation calculating shaft value place of highway section ceases to be busy and engaged condition.Ad hoc proposal adopts the mode of transmission calculating shaft value on wireless link, and this is because only need carry out the data transmission of very short time according to instruction of the present invention.It is low that short time data transfer ratio permanent data is transmitted in energy aspect cost, and particularly this advantage is more obvious in the transmitting device of Driven by Solar Energy.Certainly, the present invention also is preferred for the occasion that timing point linked to each other with evaluating apparatus by supply line or bus line.In this case, not to resemble at present in the shortest time, a plurality of data of each actual count state representative to be sent into evaluating apparatus, but only train primary shaft and the data of last are listed in.This means that can transmit these data with lower data transfer rate (than the arrowband) and the time that prolongs, this produces beneficial effect to the transmission safety performance.

Claims (13)

1. method by calculating shaft value circular track clear situation, it utilizes at timing point (ZP1, ZP2) detect the rail sensor of the train wheel that crosses on and be located at the pretreatment unit (VV1 that on the timing point sensor signal is estimated, VV2) and evaluating apparatus (A1, A3), it is characterized in that
Described pretreatment unit (VV1 VV2) according to the sensor signal of identification axletree, interrelates and it is counted being no more than the axletree of predetermined minimum interval and coupler in logic,
Described evaluating apparatus (A1, A3) after identifying coupler top, produce travel direction fwd highway section (2) circular that the line is busy, and when in the predetermined shortest time, other axletree not occurring, the count results of each coupler is used to produce the idle circular in highway section (1) that crosses, and with its storage to be used for highway section, front (2) free time circular after a while, wherein
When being discerned, coupler top forms a signal code (T2), the formation of this code (T2) is with whether to discern its travel direction in identification in the primary shaft relevant, when the identification travel direction, all transmit this signal code (T2) to evaluating apparatus (A3) at every turn, described evaluating apparatus (A3) is used for monitoring travel direction fwd highway section (2), on the contrary, there be not travel direction recognition result input evaluating apparatus (A1, A3) time, described evaluating apparatus (A1, A3) will monitor highway section (1 adjacent on two travel direction, 2), and wherein
Described pretreatment unit (VV2) is analyzed the time sequence of sensor signal or consequent count pulse, see they the minimum advancement speed predetermined and greatest axis by train in given at interval shortest time whether continuous and
Surpassing this minimum during continuous time, with signal code (T2 *) form current axle count results is imported one or more evaluating apparatus (A1 A3), circulates a notice of state so that check the highway section (1) cross and the free time of fwd highway section (2).
2. method according to claim 1 is characterized in that, stores on the timing point (ZP3) that the existence of the idle circular state in highway section, front (2) is tested.
3. method according to claim 1, it is characterized in that, store on the timing point (ZP2) of calculating shaft value determining, and this calculating shaft value is transferred to the evaluating apparatus (A3) that the free time circular state of next highway section (2) is checked at after a while time point from this timing point (ZP2).
4. method according to claim 1, it is characterized in that, when for the first time identifying the effect of sensor or identifying the primary shaft of train or during the primary shaft of train connection place, relevant therewith signal code (T2) is sent to evaluating apparatus (A3), so that at least one highway section (2) that on travel direction, is in correlated count point (ZP2) back circular that carries out that the line is busy, perhaps described signal code (T2) is sent to evaluating apparatus (A1, A3) in so that monitor adjacent highway section (1,2) in both sides.
5. method according to claim 1 is characterized in that, by a plurality of timing points (ZP6, sensor signal ZP7) of a shared pretreatment unit (VV6/VV7) or evaluating apparatus evaluation adjacent setting spatially.
6. method according to claim 1 is characterized in that, a plurality of evaluating apparatus are set, and (A1, A2 A3), and are separately positioned on evaluating apparatus on the space that (ZP1 is on position ZP3) near adjacent timing point on one or more spaces.
7. method according to claim 1 is characterized in that, signal code (T2, T2 *T3, T3 *) by being located at data conductor or the electric power conductor transmission between timing point and the evaluating apparatus.
8. method according to claim 1 is characterized in that, signal code (T2, T2 *T3, T3 *) by the bus system that timing point is connected with the evaluating apparatus transmission of leading.
9. method according to claim 1 is characterized in that, signal code (T2, T2 *T3, T3 *) by being located at as required between timing point and at least one evaluating apparatus or permanent that exist and/or communicating to connect of setting up as required carried out transmission over radio.
10. according to the described method of one of claim 1 to 9, it is characterized in that, by for sending and/or the received signal code is set serial number and/or timestamp, signal code is transported at least one evaluating apparatus and/or the signal code of transmission is stored in the evaluating apparatus from timing point.
11. method according to claim 10, it is characterized in that, for signal code is transported at least one evaluating apparatus from timing point, for this signal code adds the sign that evaluating apparatus is determined, and evaluating apparatus only will be used for estimating for its signal code of determining.
12. method according to claim 11, it is characterized in that, for signal code is transported at least one evaluating apparatus from timing point, for this signal code adds for the indication counter sign of each timing point in source as a result, and the signal code that evaluating apparatus only will come from preset count point is used for evaluation.
13. method according to claim 12 is characterized in that, under the situation of the timing point sign of adding each transmission, receives described signal code by evaluating apparatus.
CN 01117230 2001-03-15 2001-03-15 Method for announcing line idle condition through shaft counter Expired - Fee Related CN1217815C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01117230 CN1217815C (en) 2001-03-15 2001-03-15 Method for announcing line idle condition through shaft counter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01117230 CN1217815C (en) 2001-03-15 2001-03-15 Method for announcing line idle condition through shaft counter

Publications (2)

Publication Number Publication Date
CN1375421A CN1375421A (en) 2002-10-23
CN1217815C true CN1217815C (en) 2005-09-07

Family

ID=4662677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01117230 Expired - Fee Related CN1217815C (en) 2001-03-15 2001-03-15 Method for announcing line idle condition through shaft counter

Country Status (1)

Country Link
CN (1) CN1217815C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101386306B (en) * 2007-09-11 2011-08-10 上海宝信软件股份有限公司 Axle counting sensing device
EP2862778B1 (en) * 2013-10-15 2017-01-04 Bayern Engineering GmbH & Co. KG Method for generating measurement results from sensor signals
DK2899093T3 (en) * 2014-01-27 2018-08-13 Thales Man & Services Deutschland Gmbh Redundancy switching of detection points
CN105270442B (en) * 2014-07-26 2019-07-12 刁心玺 Information transferring method, power consumption control method and device and system between a kind of section
RU2770968C1 (en) * 2021-07-29 2022-04-25 Константин Александрович Рябко Rolling stock of mine suspended monorail

Also Published As

Publication number Publication date
CN1375421A (en) 2002-10-23

Similar Documents

Publication Publication Date Title
KR101450257B1 (en) Method and device for detecting the occupied or free status of a section of track
CN101804823B (en) Method and device for automatically controlling railway route entry
CA2136378C (en) Cab signal apparatus and method
RU2652319C1 (en) Method of regulation of train movement on running line
CN1217815C (en) Method for announcing line idle condition through shaft counter
DE19630575A1 (en) System for the semi-continuous control of track-guided vehicles
CN109398420A (en) Suspension monorail location recognition method and identification sensor mounting structure
RU2438905C1 (en) System for control of railway station limit non-occupancy
RU2362697C1 (en) Device for control of freeness of station sections of track
RU2503564C1 (en) System of train separation at spans
RU2694679C1 (en) Train control method
EP0443438B1 (en) Method and device for warning persons in the track area via a high frequency communications channel
RU2457133C2 (en) System of train separation
RU2514384C1 (en) Semi-automatic blocking system for length-limited railway hauls
JP7311854B2 (en) Control section length measuring device and control section length measuring system for railroad crossing controller
ES2234518T3 (en) PROCEDURE FOR FREE ROAD SIGNALING THROUGH THE AXIS COUNT.
RU2762453C1 (en) Method for determining the freedom from rolling stock of track sections on a railway stretch
EP0979765A2 (en) Method for transmitting the counting value from a counting point to a central evaluation device
RU2337033C2 (en) Open track section control method
RU2273585C1 (en) Method of checking passage of train with its full complement
RU2791777C1 (en) System for interval control of train traffic
CN115535030B (en) Switch state detection method and device based on switch close value zero crossing number
RU2738487C1 (en) Method of trains control on sections with electric traction
KR100730372B1 (en) Signal control system and method of the same for a train
RU2277054C1 (en) Automatic cab signaling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee