CN1195122C - Building and traffic system - Google Patents

Building and traffic system Download PDF

Info

Publication number
CN1195122C
CN1195122C CNB981175678A CN98117567A CN1195122C CN 1195122 C CN1195122 C CN 1195122C CN B981175678 A CNB981175678 A CN B981175678A CN 98117567 A CN98117567 A CN 98117567A CN 1195122 C CN1195122 C CN 1195122C
Authority
CN
China
Prior art keywords
building
highway
highways
buildings
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB981175678A
Other languages
Chinese (zh)
Other versions
CN1207432A (en
Inventor
秦国光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Century Garden Real Estate Development Co., Ltd.
Original Assignee
秦国光
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 秦国光 filed Critical 秦国光
Priority to CNB981175678A priority Critical patent/CN1195122C/en
Publication of CN1207432A publication Critical patent/CN1207432A/en
Application granted granted Critical
Publication of CN1195122C publication Critical patent/CN1195122C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a design scheme of a building and traffic system used for cities or centralized residential areas or expressways. The building and traffic system is characterized in that the tops of buildings are connected to form highways; highways and subways built under the ground of the buildings are connected with the highways built on the tops of the buildings; both kinds of highways can be simultaneously communicated with a ground road network or a subway network; thus, the buildings and the highways are combined into the integration; in addition, elevated train passages can also be arranged on side surfaces of the tops of the buildings. Compared with the existing building structure, the present invention has the advantages of full utilization of overground and underground space, land resource saving and farthest reservation of human activity space and environmental space.

Description

Building and traffic system
The present invention is a kind of building and traffic system design scheme that is used for city or centralized residence district or speedway, it has fundamentally changed people's thinking in building and traffic general arrangement at present, propose a kind of brand-new will building and design concept that traffic combines, improved the space availability ratio and the function of use of system greatly.
From human The development of architecture course, the major function of building is to provide the fixedly shelter of keeping out wind and rain to people, and road side is to provide from one place to another instrument fast and easily for people.So road and building always separately build up, this fundamental method is always along continuing till now.At present, though people can consider the construction of road, simultaneously with regard to design scheme when building constructure or a city, both separately design for they, be a planar design, the consequence that it causes is that space availability ratio is not high, wasted a large amount of land resources, limit and destroyed the environment of human living and caused difficulty to city development from now on, brought inconvenience also for simultaneously people's trip, these all are the urgency problems to be solved that faced our today.
Purpose of the present invention designs at existing problem in the above-mentioned human social development just a kind of novel building that is used for city or centralized residence district or speedway and traffic system design scheme is provided, it has fundamentally changed people's thinking in building and traffic general arrangement at present, propose a kind of brand-new will building and design concept that traffic combines, improved the space availability ratio and the function of use of system greatly.
The objective of the invention is to realize by following measure:
This kind building and traffic system, its system's design feature is that building and highway unification are carried out general arrangement, fully realizing on both function bases, maximally utilise ground and underground space, save land resources, the space and the environment space that keep mankind's activity to greatest extent, specifically the top of building is linked together and constitute highway, and the underground structure of building get down the highway to connect and be in the same place with subway, above-mentioned two class highways can communicate with ground highway network or MTR network simultaneously.So just building and highway are combined into one, are very easy to activity of human beings.In addition, can also be provided with the elevated trains passage in the top-side of building.And the part of the underground structure of building can be divided into two to three layers, and get down the highway can be arranged on building under the bottom or its side.
The drawing of accompanying drawing is described as follows:
Fig. 1 is the design scheme schematic diagram of system of the present invention
Fig. 2-4 is the sectional view of system of the present invention shown in Figure 1
Fig. 5-6 is the vertical view of system of the present invention shown in Figure 1
Below with reference to drawings and Examples system of the present invention is further described:
Shown in accompanying drawing 1-6, this kind building and traffic system are that the top with building 2 links together and constitutes highway 1, vehicle just can drive to another building from a building aloft like this, and the type of building can be the building of office building, esidential building, warehouse and factory floor etc. or various functions.Simultaneously, also made up ground on the face of land of building 2 below 3 and got down the highway 7 and subway 5, all kinds of buildings are also linked together, this two classes highway can communicate with ground highway network or MTR network simultaneously.In addition, the top-side at building 2 also is provided with elevated trains passage 4.The part that makes up below 3 on the face of land of building 2 can be divided into two to three layers.And get down the highway 7 can be arranged on constructure ground 3 under the bottom or the side.When getting down the highway 7 in the underground structure part of building when being arranged on the side of building, as shown in Figure 2, the underground parking lot 9 of building under the building, the locality get down the highway 7 be arranged on building under when underground, as Fig. 3, shown in 4, side parking lot 9 buildings are in the side of building 2, subway 5 then always be arranged on parking lot 9 under, needs that can be convenient for people to go on a journey like this.When building building, facilities such as municipal pipeline 8, greenbelt 10 can also be finished together.Shown in accompanying drawing 5,6, available this system design scheme couples together each centralized residence district and constitutes the comprehensive advantage of a complete community structure with abundant realization system of the present invention.
The present invention compares with the existing building general layout to have and can utilize fully on the ground and underground sky Between, save land resource, keep to greatest extent the excellent of the space of mankind's activity and environment space The point.

Claims (4)

1. build and traffic system for one kind, it is characterized in that: the top of building is linked together and constitute highway, and the underground structure of building get down the highway and subway, get down the highway in ground and subway will link together, above-mentioned two class highways communicate with ground highway network or MTR network simultaneously.
2. building according to claim 1 and traffic system is characterized in that: the top-side at building is provided with the elevated trains passage.
3. building according to claim 1 and traffic system is characterized in that: the part at the underground structure of building is divided into two to three layers, ground get down the highway be arranged on building under the bottom or its side.
4. according to claim 1 or 3 described building and traffic systems, it is characterized in that: in the underground structure part of building, get down the highway when being arranged on the side of building, build the parking lot under the building, the locality get down the highway be arranged on building under the time, side parking lot building is in the side of building, and the ground iron rule be arranged on the parking lot under.
CNB981175678A 1998-08-25 1998-08-25 Building and traffic system Expired - Fee Related CN1195122C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB981175678A CN1195122C (en) 1998-08-25 1998-08-25 Building and traffic system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB981175678A CN1195122C (en) 1998-08-25 1998-08-25 Building and traffic system

Publications (2)

Publication Number Publication Date
CN1207432A CN1207432A (en) 1999-02-10
CN1195122C true CN1195122C (en) 2005-03-30

Family

ID=5225590

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB981175678A Expired - Fee Related CN1195122C (en) 1998-08-25 1998-08-25 Building and traffic system

Country Status (1)

Country Link
CN (1) CN1195122C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505592A (en) * 2011-11-03 2012-06-20 上海同济城市规划设计研究院 Design method for street reform

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1271044A (en) * 1999-04-17 2000-10-25 刘思进 Subway station on ground
CN100354474C (en) * 2003-02-27 2007-12-12 秦国光 Traffic and architecture
CN1249302C (en) * 2003-09-28 2006-04-05 董国良 Full spatial urban road system and traffic method using same
CN100351468C (en) * 2004-04-28 2007-11-28 董国良 Full stereoscopic city road system and traffic method using said system
CN101074584A (en) * 2006-05-19 2007-11-21 沈琼钊 Connected combined building group
CN105756405B (en) * 2016-03-16 2018-08-31 张戈 A kind of fitting method and device of space and environment road
CN108560993A (en) * 2018-04-24 2018-09-21 上海市隧道工程轨道交通设计研究院 Building and garage composite structure and application process under a kind of sandwich type lid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505592A (en) * 2011-11-03 2012-06-20 上海同济城市规划设计研究院 Design method for street reform

Also Published As

Publication number Publication date
CN1207432A (en) 1999-02-10

Similar Documents

Publication Publication Date Title
Ryan et al. Accessibility of neotraditional neighborhoods: A review of design concepts, policies, and recent literature
CN101405458A (en) Hexagonal roadway system and traffic control system thereof
WO2008009189A1 (en) A land saving and energy saving, unblocked ecological urban system with ordered space
CN1195122C (en) Building and traffic system
Cervero et al. Rail access modes and catchment areas for the BART system
CN110700318A (en) Intercity railway underground station of track area top integration development
US6561727B1 (en) Ergonomic hybrid transit access corridor particularly for town and urban centers
CN2921090Y (en) Commercial platform bridge
CN109779295A (en) A kind of Urban Space Characteristics planning and designing system
CN1523184A (en) Novel construction and traffic system
CN211395746U (en) Intercity railway underground station of track area top integration development
CN2869104Y (en) Parallel overhead expressway
CN209261302U (en) A kind of across street parking overline bridge of combined multifunctional
Gündel Low carbon neighborhood: Walking and cycling priority urban design
CN100354474C (en) Traffic and architecture
CN205640679U (en) Distributing type solar energy electronic road sign device
Huang et al. Integration of multi-modal travel in historical campus-The case of Wuhan University
CN1165891A (en) Ring-like urban road network
CN111196202A (en) Mobile house planning method under unmanned technology background
Bian Analysis on the Development of Tokyo Rail Transit and Its Enlightenment to Chengdu
Shi Study of the leftover space in the city based on reutilization: take the space under elevated road in Shanghai as an example
CN212983936U (en) Platform canopy structure
Furlan Doha, Qatar
Lock Housing and transport
Urio A Community Gateway Crossing the Threshold into Annapolis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING CENTURY REAL ESTATE DEVELOPMENT CO., LTD

Free format text: FORMER OWNER: QIN GUOGUANG

Effective date: 20070518

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20070518

Address after: 100054 Beijing District of Xuanwu District city street moboyuan right in building 6, No. 1203

Patentee after: Beijing Century Garden Real Estate Development Co., Ltd.

Address before: 100045, 1 Ren Jen street, Beijing, Xuanwu

Patentee before: Qin Guoguang

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050330

Termination date: 20170825

CF01 Termination of patent right due to non-payment of annual fee