CN105756405B - A kind of fitting method and device of space and environment road - Google Patents

A kind of fitting method and device of space and environment road Download PDF

Info

Publication number
CN105756405B
CN105756405B CN201610150071.9A CN201610150071A CN105756405B CN 105756405 B CN105756405 B CN 105756405B CN 201610150071 A CN201610150071 A CN 201610150071A CN 105756405 B CN105756405 B CN 105756405B
Authority
CN
China
Prior art keywords
overhead type
construction plane
architectural construction
air
space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610150071.9A
Other languages
Chinese (zh)
Other versions
CN105756405A (en
Inventor
张戈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610150071.9A priority Critical patent/CN105756405B/en
Publication of CN105756405A publication Critical patent/CN105756405A/en
Application granted granted Critical
Publication of CN105756405B publication Critical patent/CN105756405B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H14/00Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption

Abstract

The invention discloses the fitting methods and device of a kind of space and environment road, belong to technical field of buildings.The fitting method of space of the present invention and environment road includes the following steps:Overhead type architectural construction plane is built in the lower section of space, forms two secondary flats that can be passed through and park cars;The first monitoring system is set at the entrance and the environment path connected of overhead type architectural construction plane;The right of way signal of the entrance of overhead type architectural construction plane and environment road is sent to control system by the first monitoring system;The setting signal lamp at the entrance and environment path connected of overhead type architectural construction plane;Control system, which is sent according to right of way signal to signal lamp, becomes modulating signal, controls vehicle pass-through.The fitting method of space of the present invention and environment road makes vehicle be in overhead type architectural construction plane, and the different kinds of roads in architectural environment with motor vehicles and life crowd are not present on an Earth surface plane, avoid injury accident.

Description

A kind of fitting method and device of space and environment road
Technical field
The present invention relates to technical field of buildings, more particularly to the fitting method and dress of a kind of space and environment road It sets.
Background technology
For a long time, our well known cities and towns and city, city and city, city belt road and Urban Streets road, Unicom road and down town turnpike road, urban express way, tunnel road between each main building of architecture ensemble Transport hub road is shunted with crossings on different level overpass and city;The work(such as the public business in city, education, medical treatment, administration, storage It can the construction area divided roadways of type groups of building, block road and groups of building inside the functional form groups of building of city residential houses Various unicom roads, convenience-for-people Entertainment Plaza, afforestation road between Zhong Lou and building etc., there are some problems:Problem One) road and motor vehicles:Planning arrangement, the through-rate of vehicle and the traffic of social public transport road are stagnated volume, are handed over The distributing position of ventilating signal lamp, the reasonability, normalization and integrality, urban road gardens of distance and road sign Afforest safety and the aesthetics of configuration;The construction form of highway layout is indicated with construction construction quality and surface road traffic Mark, graticule it is clear with it is complete etc., when wherein some link goes wrong, can both damage accident;Problem two) it is motor-driven Vehicle and architectural environment:All kinds of groups of building in city are that crowd mainly lives and movable space environment;Between building and building Parking space, afforestation area, Entertainment Plaza and motor vehicle and Route for pedestrians, present situation architectural environment is distributed in interval region In different kinds of roads and motor vehicles and life crowd be to collectively reside on an Earth surface plane, when one link of any of which Mistake occurs, will result in injury accident.
Invention content
The present invention provides a kind of fitting method and device of space and environment road, solves or part solves now Different kinds of roads and motor vehicles and life crowd in technology in present situation architectural environment are to collectively reside in an Earth surface plane On, when one link of any of which occurs mistake, can both damage accident the technical issues of.
In order to solve the above technical problems, the present invention provides the fitting method of a kind of space and environment road include with Lower step:Overhead type architectural construction plane is built in the lower section of space, forms two secondary flats that can be passed through and park cars; By the entrance of the overhead type architectural construction plane and the environment path connected;In the overhead type architectural construction plane Entrance and the first monitoring system of setting at the environment path connected;The overhead type is built structure by first monitoring system The right of way signal of the entrance and the environment road of making plane is sent to control system;In the overhead type architectural construction plane Entrance and the environment path connected at setting signal lamp;The control system is according to the right of way signal to the signal Lamp, which is sent, becomes modulating signal, controls vehicle pass-through.
Further, motor vehicles ascending and descending parking is arranged in any one position above the overhead type architectural construction plane Device, the overhead type architectural construction plane top are arranged at motor vehicles ascending and descending parking device and the environment path connected.
Further, the second monitoring system is set in the overhead type architectural construction plane, the overhead type is built Vehicle parking signal is sent to the control system in formation level.
Further, the vehicle pass-through signal and second that the control system is sent according to first monitoring system monitor The vehicle parking signal that system is sent sends lifting signal to the motor vehicles ascending and descending parking device, by the vehicle automatic transportation In to overhead type architectural construction plane or it is transported out overhead type architectural construction plane.
Further, first monitoring system and the second monitoring system include:Camera, setting are built in the overhead type It builds at the entrance and the environment path connected of formation level and in the overhead type architectural construction plane.
Further, the control system includes:Central controller is connect with first monitoring system and signal lamp.
Further, the fitting method of the space and environment road further includes:In the space and institute It states and ventilating system is set in overhead type architectural construction plane, the ventilating system is connect with the control system.The ventage System includes:Central ventilated vertical shaft is arranged in the space;Hot-air air outlet is arranged in the space, institute Hot-air air outlet to be stated to be connected to the central ventilated vertical shaft, the hot-air air outlet goes out to be provided with air mass monitor, The air mass monitor is connect with the control system, and air signal is sent to the control by the air mass monitor System processed is provided with ventilation valve at the hot-air air outlet, and the ventilation valve is connect with the control system, the control system System controls the open and-shut mode of the ventilation valve according to the air signal;Cold air air inlet, setting in the space and In overhead type architectural construction plane, the cold air air inlet is connected to the central ventilated vertical shaft, the cold air air inlet Place is provided with filter.
Based on identical inventive concept, the adapting device the present invention also provides a kind of space and environment road includes: Central controller;Overhead type architectural construction plane, in the lower section of the space, formation can pass through and park cars and is secondary Plane, the entrance of the overhead type architectural construction plane and the environment path connected;First monitoring system is arranged described With at the environment path connected, first monitoring system controls the entrance of overhead type architectural construction plane with the center Device connects;Second monitoring system is arranged in the overhead type architectural construction plane, and second monitoring system is controlled with the center Device connection processed;Signal lamp is arranged at the entrance and the environment path connected of the overhead type architectural construction plane, described Signal lamp is connect with the central controller;Motor vehicles ascending and descending parking device is arranged in the overhead type architectural construction plane Any one position in side, the motor vehicles ascending and descending parking device are connect with the central controller.
Further, first monitoring system and the second monitoring system include:Camera, setting are built in the overhead type It builds at the entrance and the environment path connected of formation level and in the overhead type architectural construction plane.
Further, the adapting device of the space and environment road further includes:In the space and institute It states and ventilating system is set in overhead type architectural construction plane, the ventilating system is connect with the control system;The ventage System includes:Central ventilated vertical shaft is arranged in the space;Hot-air air outlet is arranged in the space, institute Hot-air air outlet to be stated to be connected to the central ventilated vertical shaft, the hot-air air outlet goes out to be provided with air mass monitor, The air mass monitor is connect with the control system, and air signal is sent to the control by the air mass monitor System processed is provided with ventilation valve at the hot-air air outlet, and the ventilation valve is connect with the control system, the control system System controls the open and-shut mode of the ventilation valve according to the air signal;Cold air air inlet, setting in the space and In overhead type architectural construction plane, the cold air air inlet is connected to the central ventilated vertical shaft, the cold air air inlet Place is provided with filter.
The fitting method of space provided by the invention and environment road is built overhead type in the lower section of space and is built Formation level is built, two secondary flats that can be passed through and park cars are formed, by the entrance and environment of overhead type architectural construction plane The first monitoring system, the first prison is arranged at the entrance and environment path connected of overhead type architectural construction plane in path connected The right of way signal of the entrance of overhead type architectural construction plane and environment road is sent to control system by control system, in overhead type The entrance of architectural construction plane and setting signal lamp at environment path connected, control system are sent out according to right of way signal to signal lamp Send change modulating signal, control vehicle pass-through, vehicle is made be in overhead type architectural construction plane, the different kinds of roads in architectural environment and Motor vehicles and life crowd are not present on an Earth surface plane, and injury accident is avoided.
Description of the drawings
Fig. 1 is the flow diagram of space provided in an embodiment of the present invention and the fitting method of environment road;
Fig. 2 is the structural schematic diagram of space provided in an embodiment of the present invention and the adapting device of environment road.
Specific implementation mode
Referring to Fig. 1, the fitting method of a kind of space provided in an embodiment of the present invention and environment road includes following step Suddenly:
Step 1, overhead type architectural construction plane 4 is built in the lower section of the space 5, vehicle can be passed through and be parked to formation Two secondary flats.
Step 2, by the entrance of the overhead type architectural construction plane 4 and the environment path connected.
Step 3, the first prison of setting at the entrance of the overhead type architectural construction plane 4 and the environment path connected Control system.
Step 4, first monitoring system is by the entrance of the overhead type architectural construction plane 4 and the environment road Right of way signal be sent to control system.
Step 5, the setting signal at the entrance of the overhead type architectural construction plane 4 and the environment path connected Lamp.
Step 6, the control system, which is sent according to the right of way signal to the signal lamp, becomes modulating signal, and control vehicle is logical Row.
Step 1 is discussed in detail.
Any one position setting motor vehicles ascending and descending parking device 6, the frame above the overhead type architectural construction plane 4 It, can be in the frame with the environment path connected at 4 top setting motor vehicles ascending and descending parking device 6 of empty formula architectural construction plane The entrance vehicle of empty formula architectural construction plane 4 is crossed when mostly occurring traffic congestion, by motor vehicles in the operation of each orientation and steady, safety Be parked in specific stand, save the time, improve safety.
Second monitoring system is set in the overhead type architectural construction plane 4, by the overhead type architectural construction plane 4 Interior vehicle parking signal is sent to the control system.The control system is logical according to the vehicle that first monitoring system is sent The vehicle parking signal that row signal and the second monitoring system are sent sends lifting signal to the motor vehicles ascending and descending parking device 6, It will be in the vehicle automatic transportation to overhead type architectural construction plane 4.
Step 3 is discussed in detail.
First monitoring system and the second monitoring system include:Camera.
The camera be arranged the entrance in the overhead type architectural construction plane 4 at the environment path connected and In the overhead type architectural construction plane 4.The camera is by the entrance of the overhead type architectural construction plane 4 and environment road Vehicle condition in road connectivity part and the overhead type architectural construction plane 4 is sent to the central controller.
Step 4 is discussed in detail.
The control system includes:Central controller.
The central controller is connect with first monitoring system and signal lamp, and the central controller receives described the The entrance of the overhead type architectural construction plane 4 of one monitoring system and the right of way signal of the environment road, the center Controller is received controls the signal lamp change lamp according to the control signal that first monitoring system is sent.
The fitting method of space of the present invention and environment road further includes:
Ventilating system, the ventilating system are set in the space 5 and in the overhead type architectural construction plane 4 It is connect with the control system.
The ventilating system includes:Central ventilated vertical shaft 1, hot-air air outlet 2 and cold air air outlet 3.
The central ventilated vertical shaft 1 is fixed in the space 5.Specifically, in the present embodiment, described Central ventilated vertical shaft 1, which is bolted, to be arranged in the space 5, in other embodiments, the central ventilated Vertical shaft 1 can be otherwise as described in being fixed at pivot pin in space 5.
The hot-air air outlet 2 is fixed in the space 5.Specifically, in the present embodiment, described Hot-air air outlet 2, which is bolted, to be arranged in the space 5, and in other embodiments, the hot-air goes out It air port 2 can be otherwise as described in being fixed at pivot pin in space 5.The hot-air air outlet 2 with it is described Central ventilated vertical shaft 1 is connected to, and the hot-air air outlet 2, which goes out, is provided with air mass monitor, the air mass monitor It is connect with the control system, air signal is sent to the control system, the hot-air by the air mass monitor Ventilation valve is provided at air outlet, the ventilation valve is connect with the control system, and the control system is believed according to the air The open and-shut mode of number control ventilation valve.
The cold air air inlet 3 is fixed in the space 5 and overhead type architectural construction plane 4.Specifically Ground, in the present embodiment, the cold air air inlet 3 are bolted setting and are built in the space 5 and overhead type It builds in formation level 4, in other embodiments, the cold air air inlet 3 can be set in such as pivot pin fixation otherwise It sets in the space 5 and overhead type architectural construction plane 4.The cold air air inlet 3 and the central ventilated vertical shaft 1 It is connected to, filter is provided at the cold air air inlet 3.
Referring to Fig. 2, it is based on identical inventive concept, the present invention provides a kind of adapting device of space and environment road Including:Central controller, overhead type architectural construction plane 4, the first monitoring system, the second monitoring system, signal lamp and motor vehicle Ascending and descending parking device 6.
The overhead type architectural construction plane 4 forms two that can pass through and park cars in the lower section of the space 5 Secondary flat, entrance and the environment path connected of the overhead type architectural construction plane 4.
Entrance and environment road company in the overhead type architectural construction plane 4 is arranged in first monitoring system Logical place, first monitoring system are connect with the central controller.
Second monitoring system is arranged in the overhead type architectural construction plane 4, second monitoring system with it is described Central controller connects.
The signal lamp is arranged at the entrance and the environment path connected of the overhead type architectural construction plane 4, The signal lamp is connect with the central controller.
Any one position, the machine is arranged above the overhead type architectural construction plane 4 in motor vehicles ascending and descending parking device 6 Motor-car ascending and descending parking device 6 is connect with the central controller.
The structure of the first monitoring system and the second monitoring system is discussed in detail.
First monitoring system and the second monitoring system include:Camera.
The camera is fixed at the entrance of the overhead type architectural construction plane 4 and the environment path connected In place and the overhead type architectural construction plane 4.Specifically, in the present embodiment, the camera, which is bolted, sets It sets at the entrance and the environment path connected of the overhead type architectural construction plane and the overhead type architectural construction is flat In face 4, in other embodiments, the camera can overhead type be built as described in being fixed at pivot pin otherwise It builds at the entrance and the environment path connected of formation level 4 and in the overhead type architectural construction plane 4.The camera It will be at the entrance of the overhead type architectural construction plane 4 and environment path connected and in the overhead type architectural construction plane 4 Vehicle condition be sent to the central controller.
The adapting device of space of the present invention and environment road further includes:Ventilating system.
In the space with ventilating system is set in the overhead type architectural construction plane, the ventilating system with The control system connection.
The ventilating system includes:Central ventilated vertical shaft 1, hot-air air outlet 2 and cold air air outlet 3.
The central ventilated vertical shaft 1 is fixed in the space 5.Specifically, in the present embodiment, described Central ventilated vertical shaft 1, which is bolted, to be arranged in the space 5, in other embodiments, the central ventilated Vertical shaft 1 can be otherwise as described in being fixed at pivot pin in space 5.
The hot-air air outlet 2 is fixed in the space 5.Specifically, in the present embodiment, described Hot-air air outlet 2, which is bolted, to be arranged in the space 5, and in other embodiments, the hot-air goes out It air port 2 can be otherwise as described in being fixed at pivot pin in space 5.The hot-air air outlet 2 with it is described Central ventilated vertical shaft 1 is connected to, and the hot-air air outlet 2, which goes out, is provided with air mass monitor, the air mass monitor It is connect with the control system, air signal is sent to the control system, the hot-air by the air mass monitor Ventilation valve is provided at air outlet 2, the ventilation valve is connect with the control system, and the control system is believed according to the air The open and-shut mode of number control ventilation valve.
The cold air air inlet 3 is fixed in the space 5 and overhead type architectural construction plane 4.Specifically Ground, in the present embodiment, the cold air air inlet 3 are bolted setting and are built in the space 5 and overhead type It builds in formation level 4, in other embodiments, the cold air air inlet 3 can be set in such as pivot pin fixation otherwise It sets in the space 5 and overhead type architectural construction plane 4.The cold air air inlet 3 and the central ventilated vertical shaft 1 It is connected to, filter is provided at the cold air air inlet 3.
The embodiment of the present invention is introduced in order to become apparent from, is introduced from the application method of the embodiment of the present invention below.
Overhead type architectural construction plane 4 is built in the lower section of space 5, formation can pass through and park cars and is secondary flat Face makes vehicle be in overhead type architectural construction plane 4, and the different kinds of roads in architectural environment are with motor vehicles and life crowd It is not present on an Earth surface plane, avoids injury accident.By the entrance of overhead type architectural construction plane 4 and environment road Camera is arranged at the entrance and environment path connected of overhead type architectural construction plane 4 in connection, and camera builds overhead type The entrance and the vehicle pass-through signal at environment path connected for building formation level 4 are sent to central controller, central controller It is sent to signal lamp according to right of way signal and becomes modulating signal, when entrance and the environment path connected of overhead type architectural construction plane 4 When place's vehicle congestion is excessive, overhead type architectural construction plane 4 exports signal lamp greening, and environment signal light path reddens, makes to make somebody a mere figurehead Vehicle in formula architectural construction plane 4 passes through as early as possible, avoids congestion.Any one position above overhead type architectural construction plane 4 Motor vehicles ascending and descending parking device is set, above overhead type architectural construction plane at setting motor vehicles ascending and descending parking device 6 with it is described Environment path connected, can the entrance vehicle of overhead type architectural construction plane cross mostly occur traffic congestion when, be in by motor vehicles The operation of each orientation and it is steady, safety be parked in specific stand, save the time, improve safety.It is built in overhead type It builds and camera is set in formation level 4, vehicle parking signal in overhead type architectural construction plane 4 is sent to central control by camera Device processed.The vehicle pass-through signal and vehicle parking signal that central controller is sent according to camera are to motor vehicles ascending and descending parking device 6 send lifting signals, and vehicle automatic transportation is interior or be transported out overhead type architectural construction plane to overhead type architectural construction plane 4 4.When temperature inside central air shaft 1 is higher than outdoor temperature, temperature difference can make hot-air pass through hot-air air outlet 2, Cold air can form the chimney of an air Natural Circulation from the bottom to top by cold air air inlet 3 in central ventilated vertical shaft 1 Effect;Under the Natural Circulation movement effect of this hot and cold air, it can attract and export and be detained inside space 5 Waste heat air.Wherein, it is equipped in every group of cold air air outlet 3 through air mass monitor, to form a kind of energy It is enough to monitor the waste heat air for being present in the delay of architecture indoor space, by being arranged in all spaces or architectural environment Ventilating system, by controllable discharge architecture indoor space, at the same pass through at cold air air inlet 3 be arranged filter cleaning Introduce the outdoor natural cold air of building.In exhaust equipment in hot-air air outlet 2, it is also equipped with flue gas induction alarm device With the switch panel that can carry out manually or set automatic adjustment according to the size to interior space rate of air circulation;When passing through heat When air in air air outlet 2 has perceived smog by flue gas induction alarm device, alarm signal can be sent to central controller, Central controller can all discharge the switch panel of hot-air air outlet and cold air air inlet automatically, make air directly by simultaneously Smog alert is sent out to building's management center.Filter is installed in cold air air inlet 2, to filter and ensure from outdoor Into the pure and fresh and healthy of air, the air quality of space 5 and space environment is fundamentally improved in this way, reaches and makes one The purpose of health;When the inside of space 5 hair biomass burning, by central ventilated vertical shaft 1, hot-air air outlet 2, cold Air air inlet 3 formed hot and cold air circulation streams, can by object burn generate high-temperature flue gas hot-air rise simultaneously Under the power effect of inspiration cold air, is run through central ventilated vertical shaft 1 and be discharged outside building body, effectively prevented with height The diffusion and sprawling of warm flash burn flue gas, completely eliminate because high temperature flash burn flue gas can box haul diffusion cause large area to fire The possibility of fire and casualty accident is burnt, ultimately formed, safety of life and property, reduction fire-fighting fire extinguishing can be ensured to realize With the purpose of second of man-made disaster caused by water.
The fitting method of space provided by the invention and environment road is built overhead type in the lower section of space and is built Formation level is built, two secondary flats that can be passed through and park cars are formed, by the entrance and environment of overhead type architectural construction plane The first monitoring system, the first prison is arranged at the entrance and environment path connected of overhead type architectural construction plane in path connected The right of way signal of the entrance of overhead type architectural construction plane and environment road is sent to control system by control system, in overhead type The entrance of architectural construction plane and setting signal lamp at environment path connected, control system are sent out according to right of way signal to signal lamp Send change modulating signal, control vehicle pass-through, vehicle is made be in overhead type architectural construction plane, the different kinds of roads in architectural environment and Motor vehicles and life crowd are not present on an Earth surface plane, and injury accident is avoided.
It should be noted last that the above specific implementation mode is merely illustrative of the technical solution of the present invention and unrestricted, Although being described the invention in detail with reference to example, it will be understood by those of ordinary skill in the art that, it can be to the present invention Technical solution be modified or replaced equivalently, without departing from the spirit of the technical scheme of the invention and range, should all cover In the scope of the claims of the present invention.

Claims (9)

1. the fitting method of a kind of space and environment road, which is characterized in that include the following steps:
Overhead type architectural construction plane (4) is built in the lower section of the space (5), forms two that can pass through and park cars Secondary flat;
By the entrance of the overhead type architectural construction plane (4) and the environment path connected;
The first monitoring system is set at the entrance and the environment path connected of the overhead type architectural construction plane (4);
First monitoring system believes the entrance of the overhead type architectural construction plane (4) and the current of the environment road Number it is sent to control system;
The setting signal lamp at the entrance and the environment path connected of the overhead type architectural construction plane (4);
The control system, which is sent according to the right of way signal to the signal lamp, becomes modulating signal, controls vehicle pass-through;
Any one position setting motor vehicles ascending and descending parking device (6), the frame above the overhead type architectural construction plane (4) It is arranged above empty formula architectural construction plane (4) at motor vehicles ascending and descending parking device (6) and the environment path connected.
2. the fitting method of space according to claim 1 and environment road, it is characterised in that:
Second monitoring system is set in the overhead type architectural construction plane (4), it will be in the overhead type architectural construction plane Vehicle parking signal is sent to the control system.
3. the fitting method of space according to claim 2 and environment road, it is characterised in that:
The vehicle that the vehicle pass-through signal and the second monitoring system that the control system is sent according to first monitoring system are sent It parks signal and sends lifting signal to the motor vehicles ascending and descending parking device (6), by the vehicle automatic transportation to overhead type Architectural construction plane (4) is interior or is transported out overhead type architectural construction plane (4).
4. the fitting method of space according to claim 1 and environment road, which is characterized in that first monitoring System and the second monitoring system include:
Camera is arranged at the entrance and the environment path connected of the overhead type architectural construction plane and described aerial In formula architectural construction plane (4).
5. the fitting method of space according to claim 1 and environment road, which is characterized in that the control system Including:
Central controller is connect with first monitoring system and signal lamp.
6. the fitting method of space according to claim 1 and environment road, which is characterized in that further include:
In the space with the overhead type architectural construction plane (4) in be arranged ventilating system, the ventilating system with The control system connection;
The ventilating system includes:
Central ventilated vertical shaft (1), setting is in the space (5);
Hot-air air outlet (2), setting is in the space (5), the hot-air air outlet (2) and the central ventilated Vertical shaft (1) is connected to, and the hot-air air outlet (2) goes out to be provided with air mass monitor, the air mass monitor and institute Control system connection is stated, air signal is sent to the control system, the hot-air outlet air by the air mass monitor It is provided with ventilation valve at mouth (2), the ventilation valve is connect with the control system, and the control system is according to the air signal Control the open and-shut mode of the ventilation valve;
Cold air air inlet (3), setting is in the space (5) and overhead type architectural construction plane (4), the cold air Air inlet is connected to the central ventilated vertical shaft (1), and filter is provided at the cold air air inlet (3).
7. the adapting device of a kind of space and environment road, which is characterized in that including:
Central controller;
Overhead type architectural construction plane (4), in the lower section of the space (5), formation can pass through and park cars and is secondary flat Face, entrance and the environment path connected of the overhead type architectural construction plane (4);
First monitoring system is arranged at the entrance and the environment path connected of the overhead type architectural construction plane (4), First monitoring system is connect with the central controller;
Second monitoring system, in the overhead type architectural construction plane (4), second monitoring system is controlled with the center for setting Device connection processed;
Signal lamp is arranged at the entrance and the environment path connected of the overhead type architectural construction plane (4), the letter Signal lamp is connect with the central controller;
Motor vehicles ascending and descending parking device (6), setting any one position above the overhead type architectural construction plane (4) are described Motor vehicles ascending and descending parking device (6) is connect with the central controller.
8. the adapting device of space according to claim 7 and environment road, which is characterized in that first monitoring System and the second monitoring system include:
Camera is arranged at entrance and the environment path connected of the overhead type architectural construction plane (4) and described In overhead type architectural construction plane (4).
9. the adapting device of space according to claim 7 and environment road, which is characterized in that further include:
Ventilating system, the ventilating system are set in the space (5) and in the overhead type architectural construction plane (4) It is connect with the control system;
The ventilating system includes:
Central ventilated vertical shaft (1), setting is in the space (5);
Hot-air air outlet (2), setting is in the space (5), the hot-air air outlet (2) and the central ventilated Vertical shaft (1) is connected to, and the hot-air air outlet (2) goes out to be provided with air mass monitor, the air mass monitor and institute Control system connection is stated, air signal is sent to the control system, the hot-air outlet air by the air mass monitor It is provided with ventilation valve at mouth (2), the ventilation valve is connect with the control system, and the control system is according to the air signal Control the open and-shut mode of the ventilation valve;
Cold air air inlet (3), setting is in the space (5) and overhead type architectural construction plane (4), the cold air Air inlet is connected to the central ventilated vertical shaft (1), and filter is provided at the cold air air inlet (3).
CN201610150071.9A 2016-03-16 2016-03-16 A kind of fitting method and device of space and environment road Active CN105756405B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610150071.9A CN105756405B (en) 2016-03-16 2016-03-16 A kind of fitting method and device of space and environment road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610150071.9A CN105756405B (en) 2016-03-16 2016-03-16 A kind of fitting method and device of space and environment road

Publications (2)

Publication Number Publication Date
CN105756405A CN105756405A (en) 2016-07-13
CN105756405B true CN105756405B (en) 2018-08-31

Family

ID=56333350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610150071.9A Active CN105756405B (en) 2016-03-16 2016-03-16 A kind of fitting method and device of space and environment road

Country Status (1)

Country Link
CN (1) CN105756405B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1195122C (en) * 1998-08-25 2005-03-30 秦国光 Building and traffic system
CN1773062A (en) * 2004-11-11 2006-05-17 张戈 New ecological construction form capable of regulating indoor air temperature and preventing fire smoke
CN100410446C (en) * 2004-12-09 2008-08-13 汪剑 Communication facility with integrated function of pedestrian street crossing fast public transit and parking and method thereof
CN201498100U (en) * 2009-08-19 2010-06-02 淮海工学院 Automatic service system of parking lot
CN102409891A (en) * 2011-08-25 2012-04-11 卢泉生 Design scheme of pedestrian-vehicle passage building on urban road
CN202679884U (en) * 2012-06-04 2013-01-16 艾默生网络能源有限公司 Cabinet air conditioner ventilation quantity adjusting device and modularization data center
CN103276926A (en) * 2013-01-30 2013-09-04 梁嘉麟 Construction site arranged above elevated road, provided with stereo garage and used for communal facilities and simplifying form of construction site
CN203821911U (en) * 2013-11-07 2014-09-10 陈仁多 Urban road overhead garden business parking building
CN204186128U (en) * 2014-08-16 2015-03-04 葛建秋 Parking food and drink building, garden, urban road overhead

Also Published As

Publication number Publication date
CN105756405A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN203452826U (en) Ventilating system used for city underground annular tunnel
CN203829832U (en) Washing air purifier
CN108038812A (en) A kind of municipal tunnel intelligent comprehensive commander's managing and control system based on deep layer intergration model
CN107096305A (en) A kind of city haze controlling device and administering method based on street lamp
KR102254976B1 (en) Public facilities for evacuation in case of disaster and fine dust
CN105256982A (en) Underground stereo parking garage and natural ventilation method thereof
CN105756405B (en) A kind of fitting method and device of space and environment road
CN207130778U (en) A kind of pipe gallery gravity-flow ventilation booth for integrating manhole
KR20130055872A (en) System and method for parking control using smart streetlight based on cim/bim
CN105258267A (en) Mechanical ventilation device and method for underground stereo garage
CN205227660U (en) Underground stereo garage mechanical ventilation equipment
JP2001295237A (en) Antifog/fog extinguishing device by constructing fog protecting space and spraying dehumidified and heated air into foggy space with blower to extinguish fog
CN208416597U (en) The top shaft structure in gravity-flow ventilation tunnel
CN206923428U (en) Aerial sprinkle water and spray dust suppression device
CN202730575U (en) Double-layer elevated road network special for small-size automotive vehicles
KR102229507B1 (en) Pollutant removal and entry blocking system in underground parking lot
CN204783084U (en) Compound ground runner band corridor firebreak device
CN107387146A (en) Rail traveling region of subway station natural draught system, heat extraction and Tunnel Ventilation System and method
CN104847148B (en) Natural ventilation system of underground stereo garage
CN104929672B (en) Compound underground ring corridor fire prevention isolation device and method
CN1773062A (en) New ecological construction form capable of regulating indoor air temperature and preventing fire smoke
CN206809926U (en) A kind of city haze controlling device based on street lamp
CN207093113U (en) Rail traveling region of subway station natural draught system, heat extraction and Tunnel Ventilation System
CN207485061U (en) Intercommunication underground parking
CN204877523U (en) Compound ground runner band corridor fire prevention isolating device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant