CN2921090Y - Commercial platform bridge - Google Patents
Commercial platform bridge Download PDFInfo
- Publication number
- CN2921090Y CN2921090Y CN 200620024658 CN200620024658U CN2921090Y CN 2921090 Y CN2921090 Y CN 2921090Y CN 200620024658 CN200620024658 CN 200620024658 CN 200620024658 U CN200620024658 U CN 200620024658U CN 2921090 Y CN2921090 Y CN 2921090Y
- Authority
- CN
- China
- Prior art keywords
- overpass
- bridge
- commercial
- utility
- house
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model belongs to the technology field of the urban building, in particular to a commercial overpass, which solves the problems of singularity of the present overpass structure and the difficulty of reflecting the economy value in prior art. The commercial overpass comprises up and down steps, a bridge body, a bridge deck, and guardrail. Rooms are provided in the middle of the bridge deck and pedestrian passage is arranged at the both sides of the rooms. The room is multi-floor structure and advertising boards are installed on top of the room. The beneficial effects of the utility model are: 1. the functions and the applications of the overpass are various, which not only solves the traffic problem of the pedestrian distribution, but also provides a small commercial space; 2. the overpass reflects economy value, promotes the economic development, enlarges the employment, increases the employment probabilities; 3. the overpass explores a new consumption market and provides a new place for recreation and entertainment.
Description
Technical field
The utility model belongs to the technical field of City Building, specifically is a kind of commercial overline bridge.
Background technology
In modern city, because the needs of traffic, a lot of places all are provided with overline bridge.Traditional overline bridge is made of upper and lower step, the body of a bridge, bridge floor etc., and its function just is confined to pedestrian's shunting of traffic aspect.The economic interests of overline bridge are difficult to embody like this, and its space wastes, and the overline bridge self-value is underutilized.
Summary of the invention
The utility model is single in order to solve in the prior art day bridge construction, and economic worth is difficult to problems such as embodiment, and a kind of business activity that can be used for is provided, the commercial overline bridge of promoting economic development.
The utility model is to adopt following technical scheme to realize: commercial overline bridge comprises up/down steps, the body of a bridge, bridge floor, guardrail.The overline bridge deck centre is provided with the house, and the walkway is established in the both sides, house.The house is a sandwich construction.Advertisement boards is established at the top, house.
Overline bridge described in the utility model can be widely used in the crossroad, the junction of three roads, both sides of highway.The body of a bridge of overline bridge, up/down steps surface structure are similar to existing overline bridge, but that physical properties such as its mechanical loading, intensity require is higher.
The beneficial effects of the utility model:
1, overline bridge function, purposes variation had both solved the traffic problems of pedestrian's shunting, can provide a small-sized business activity space for the city again;
2, embody self economic worth of overline bridge, promoted expanding economy, enlarged the employment field, increased the probability of people's employment;
3, the exploitation in new consumption place provides the new place to go of amusement and recreation for people.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model
Fig. 2 is a plan structure schematic diagram of the present utility model
Among the figure: 1-up/down steps, the 2-body of a bridge, 3-bridge floor, 4-guardrail, 5-house, 6-advertisement boards, 7-walkway.
The specific embodiment
In conjunction with the accompanying drawings embodiment of the present utility model is described further, present embodiment is to be used for illustrating of the present utility model, rather than the utility model is done any restriction.
Commercial overline bridge comprises up/down steps 1, the body of a bridge 2, bridge floor 3, guardrail 4.Overline bridge bridge floor 3 central authorities are provided with house 5, and walkway 7 is established in 5 both sides, house.House 5 is a sandwich construction.Advertisement boards 6 is established at 5 tops, house.
Claims (3)
1, a kind of commercial overline bridge comprises up/down steps (1), the body of a bridge (2), bridge floor (3), guardrail (4), it is characterized in that overline bridge bridge floor (3) central authorities are provided with house (5), and walkway (7) is established in both sides, house (5).
2, commercial overline bridge according to claim 1 is characterized in that described house (5) is a sandwich construction.
3, commercial overline bridge according to claim 1 and 2 is characterized in that top, house (5) establishes advertisement boards (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620024658 CN2921090Y (en) | 2006-06-08 | 2006-06-08 | Commercial platform bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620024658 CN2921090Y (en) | 2006-06-08 | 2006-06-08 | Commercial platform bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2921090Y true CN2921090Y (en) | 2007-07-11 |
Family
ID=38253568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620024658 Expired - Fee Related CN2921090Y (en) | 2006-06-08 | 2006-06-08 | Commercial platform bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2921090Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296877A (en) * | 2011-05-16 | 2011-12-28 | 储诚五 | Multi-layer crossing-over type building compounding transportation, commerce and landscape |
CN103103916A (en) * | 2012-12-13 | 2013-05-15 | 刘世海 | Pedestrian bridge |
CN103114518A (en) * | 2012-12-13 | 2013-05-22 | 刘世海 | Illustration advertising type overline bridge convenient to use |
CN105421214A (en) * | 2015-11-11 | 2016-03-23 | 中国矿业大学 | Rotary composite sightseeing commercial overbridge in bustling street |
CN106906734A (en) * | 2017-03-16 | 2017-06-30 | 阮保国 | Multi-functional overpass |
CN107130509A (en) * | 2017-06-26 | 2017-09-05 | 厦门中平公路勘察设计院有限公司 | A kind of different formed steel construction overpass |
CN107806005A (en) * | 2017-11-01 | 2018-03-16 | 马涛 | Overpass building structure |
-
2006
- 2006-06-08 CN CN 200620024658 patent/CN2921090Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296877A (en) * | 2011-05-16 | 2011-12-28 | 储诚五 | Multi-layer crossing-over type building compounding transportation, commerce and landscape |
CN103103916A (en) * | 2012-12-13 | 2013-05-15 | 刘世海 | Pedestrian bridge |
CN103114518A (en) * | 2012-12-13 | 2013-05-22 | 刘世海 | Illustration advertising type overline bridge convenient to use |
CN105421214A (en) * | 2015-11-11 | 2016-03-23 | 中国矿业大学 | Rotary composite sightseeing commercial overbridge in bustling street |
CN106906734A (en) * | 2017-03-16 | 2017-06-30 | 阮保国 | Multi-functional overpass |
CN107130509A (en) * | 2017-06-26 | 2017-09-05 | 厦门中平公路勘察设计院有限公司 | A kind of different formed steel construction overpass |
CN107806005A (en) * | 2017-11-01 | 2018-03-16 | 马涛 | Overpass building structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2921090Y (en) | Commercial platform bridge | |
Banai | Pandemic and the planning of resilient cities and regions | |
Loukaitou‐Sideris | Cracks in the city: Addressing the constraints and potentials of urban design | |
US7866910B2 (en) | Community intermodal transit system | |
Al-Kodmany | Placemaking with tall buildings | |
Innocent et al. | Urban play as catalyst for social wellbeing post-pandemic | |
Ockman | What is democratic architecture?: the public life of buildings | |
Jang et al. | A study on courtyard apartment types in South Korea from the 1960s to 1970s | |
CN1195122C (en) | Building and traffic system | |
Alshammari | New strategic approaches for implementing intelligent streetscape towards livable streets in City of Riyadh | |
Sheng et al. | Commercial Value Assessment of “Grey Space” under Overpasses: Analytic Hierarchy Process | |
CN204343747U (en) | The dolly parking lot in overhead, a kind of street | |
Hu et al. | Reflections on New Urbanism at the COVID-19 Pandemic Background—Urban Health Research | |
Alotaibi et al. | Tall buildings, high expectations, towering responsibilities: Critically considering skyscrapers, urbanism and sustainability | |
Parhizgar | Towards a Sustainable Neighbourhood: Turning the Vision into Reality | |
Transit | Transit-Oriented Development (TOD) Guidelines | |
Abdel-Aziz et al. | Reshaping the urban experience: Prospects for digital streetscape towards better livability in public spaces | |
Shi | Study of the leftover space in the city based on reutilization: take the space under elevated road in Shanghai as an example | |
Eley | Absolutely positively Wellington: a model for smart growth | |
Marinic | Constructed otherness: Remaking space in American suburbia | |
Jiao | Using Deconstructive Design Process Framework to Reactivate Lost Spaces Based On Human Perspective—Green Space Beside Dominion Road Flyover, Auckland, New Zealand | |
Özdil | Reclaiming land for Downtown Parks in Dallas | |
Lee | Fit Cities: How Active Design Can Build Healthier and More Sustainable Communities | |
Hernandez | Social Equity Through Design | |
CN2500748Y (en) | Passenger foot-bridge shop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |