CN2921090Y - Commercial platform bridge - Google Patents

Commercial platform bridge Download PDF

Info

Publication number
CN2921090Y
CN2921090Y CN 200620024658 CN200620024658U CN2921090Y CN 2921090 Y CN2921090 Y CN 2921090Y CN 200620024658 CN200620024658 CN 200620024658 CN 200620024658 U CN200620024658 U CN 200620024658U CN 2921090 Y CN2921090 Y CN 2921090Y
Authority
CN
China
Prior art keywords
overpass
bridge
commercial
utility
house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620024658
Other languages
Chinese (zh)
Inventor
肖川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620024658 priority Critical patent/CN2921090Y/en
Application granted granted Critical
Publication of CN2921090Y publication Critical patent/CN2921090Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the technology field of the urban building, in particular to a commercial overpass, which solves the problems of singularity of the present overpass structure and the difficulty of reflecting the economy value in prior art. The commercial overpass comprises up and down steps, a bridge body, a bridge deck, and guardrail. Rooms are provided in the middle of the bridge deck and pedestrian passage is arranged at the both sides of the rooms. The room is multi-floor structure and advertising boards are installed on top of the room. The beneficial effects of the utility model are: 1. the functions and the applications of the overpass are various, which not only solves the traffic problem of the pedestrian distribution, but also provides a small commercial space; 2. the overpass reflects economy value, promotes the economic development, enlarges the employment, increases the employment probabilities; 3. the overpass explores a new consumption market and provides a new place for recreation and entertainment.

Description

Commercial overline bridge
Technical field
The utility model belongs to the technical field of City Building, specifically is a kind of commercial overline bridge.
Background technology
In modern city, because the needs of traffic, a lot of places all are provided with overline bridge.Traditional overline bridge is made of upper and lower step, the body of a bridge, bridge floor etc., and its function just is confined to pedestrian's shunting of traffic aspect.The economic interests of overline bridge are difficult to embody like this, and its space wastes, and the overline bridge self-value is underutilized.
Summary of the invention
The utility model is single in order to solve in the prior art day bridge construction, and economic worth is difficult to problems such as embodiment, and a kind of business activity that can be used for is provided, the commercial overline bridge of promoting economic development.
The utility model is to adopt following technical scheme to realize: commercial overline bridge comprises up/down steps, the body of a bridge, bridge floor, guardrail.The overline bridge deck centre is provided with the house, and the walkway is established in the both sides, house.The house is a sandwich construction.Advertisement boards is established at the top, house.
Overline bridge described in the utility model can be widely used in the crossroad, the junction of three roads, both sides of highway.The body of a bridge of overline bridge, up/down steps surface structure are similar to existing overline bridge, but that physical properties such as its mechanical loading, intensity require is higher.
The beneficial effects of the utility model:
1, overline bridge function, purposes variation had both solved the traffic problems of pedestrian's shunting, can provide a small-sized business activity space for the city again;
2, embody self economic worth of overline bridge, promoted expanding economy, enlarged the employment field, increased the probability of people's employment;
3, the exploitation in new consumption place provides the new place to go of amusement and recreation for people.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model
Fig. 2 is a plan structure schematic diagram of the present utility model
Among the figure: 1-up/down steps, the 2-body of a bridge, 3-bridge floor, 4-guardrail, 5-house, 6-advertisement boards, 7-walkway.
The specific embodiment
In conjunction with the accompanying drawings embodiment of the present utility model is described further, present embodiment is to be used for illustrating of the present utility model, rather than the utility model is done any restriction.
Commercial overline bridge comprises up/down steps 1, the body of a bridge 2, bridge floor 3, guardrail 4.Overline bridge bridge floor 3 central authorities are provided with house 5, and walkway 7 is established in 5 both sides, house.House 5 is a sandwich construction.Advertisement boards 6 is established at 5 tops, house.

Claims (3)

1, a kind of commercial overline bridge comprises up/down steps (1), the body of a bridge (2), bridge floor (3), guardrail (4), it is characterized in that overline bridge bridge floor (3) central authorities are provided with house (5), and walkway (7) is established in both sides, house (5).
2, commercial overline bridge according to claim 1 is characterized in that described house (5) is a sandwich construction.
3, commercial overline bridge according to claim 1 and 2 is characterized in that top, house (5) establishes advertisement boards (6).
CN 200620024658 2006-06-08 2006-06-08 Commercial platform bridge Expired - Fee Related CN2921090Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620024658 CN2921090Y (en) 2006-06-08 2006-06-08 Commercial platform bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620024658 CN2921090Y (en) 2006-06-08 2006-06-08 Commercial platform bridge

Publications (1)

Publication Number Publication Date
CN2921090Y true CN2921090Y (en) 2007-07-11

Family

ID=38253568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620024658 Expired - Fee Related CN2921090Y (en) 2006-06-08 2006-06-08 Commercial platform bridge

Country Status (1)

Country Link
CN (1) CN2921090Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296877A (en) * 2011-05-16 2011-12-28 储诚五 Multi-layer crossing-over type building compounding transportation, commerce and landscape
CN103103916A (en) * 2012-12-13 2013-05-15 刘世海 Pedestrian bridge
CN103114518A (en) * 2012-12-13 2013-05-22 刘世海 Illustration advertising type overline bridge convenient to use
CN105421214A (en) * 2015-11-11 2016-03-23 中国矿业大学 Rotary composite sightseeing commercial overbridge in bustling street
CN106906734A (en) * 2017-03-16 2017-06-30 阮保国 Multi-functional overpass
CN107130509A (en) * 2017-06-26 2017-09-05 厦门中平公路勘察设计院有限公司 A kind of different formed steel construction overpass
CN107806005A (en) * 2017-11-01 2018-03-16 马涛 Overpass building structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296877A (en) * 2011-05-16 2011-12-28 储诚五 Multi-layer crossing-over type building compounding transportation, commerce and landscape
CN103103916A (en) * 2012-12-13 2013-05-15 刘世海 Pedestrian bridge
CN103114518A (en) * 2012-12-13 2013-05-22 刘世海 Illustration advertising type overline bridge convenient to use
CN105421214A (en) * 2015-11-11 2016-03-23 中国矿业大学 Rotary composite sightseeing commercial overbridge in bustling street
CN106906734A (en) * 2017-03-16 2017-06-30 阮保国 Multi-functional overpass
CN107130509A (en) * 2017-06-26 2017-09-05 厦门中平公路勘察设计院有限公司 A kind of different formed steel construction overpass
CN107806005A (en) * 2017-11-01 2018-03-16 马涛 Overpass building structure

Similar Documents

Publication Publication Date Title
CN2921090Y (en) Commercial platform bridge
Banai Pandemic and the planning of resilient cities and regions
Loukaitou‐Sideris Cracks in the city: Addressing the constraints and potentials of urban design
US7866910B2 (en) Community intermodal transit system
Al-Kodmany Placemaking with tall buildings
Innocent et al. Urban play as catalyst for social wellbeing post-pandemic
Ockman What is democratic architecture?: the public life of buildings
Jang et al. A study on courtyard apartment types in South Korea from the 1960s to 1970s
CN1195122C (en) Building and traffic system
Alshammari New strategic approaches for implementing intelligent streetscape towards livable streets in City of Riyadh
Sheng et al. Commercial Value Assessment of “Grey Space” under Overpasses: Analytic Hierarchy Process
CN204343747U (en) The dolly parking lot in overhead, a kind of street
Hu et al. Reflections on New Urbanism at the COVID-19 Pandemic Background—Urban Health Research
Alotaibi et al. Tall buildings, high expectations, towering responsibilities: Critically considering skyscrapers, urbanism and sustainability
Parhizgar Towards a Sustainable Neighbourhood: Turning the Vision into Reality
Transit Transit-Oriented Development (TOD) Guidelines
Abdel-Aziz et al. Reshaping the urban experience: Prospects for digital streetscape towards better livability in public spaces
Shi Study of the leftover space in the city based on reutilization: take the space under elevated road in Shanghai as an example
Eley Absolutely positively Wellington: a model for smart growth
Marinic Constructed otherness: Remaking space in American suburbia
Jiao Using Deconstructive Design Process Framework to Reactivate Lost Spaces Based On Human Perspective—Green Space Beside Dominion Road Flyover, Auckland, New Zealand
Özdil Reclaiming land for Downtown Parks in Dallas
Lee Fit Cities: How Active Design Can Build Healthier and More Sustainable Communities
Hernandez Social Equity Through Design
CN2500748Y (en) Passenger foot-bridge shop

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee