CN117634736A - Engineering supervision monitoring system - Google Patents

Engineering supervision monitoring system Download PDF

Info

Publication number
CN117634736A
CN117634736A CN202311593840.9A CN202311593840A CN117634736A CN 117634736 A CN117634736 A CN 117634736A CN 202311593840 A CN202311593840 A CN 202311593840A CN 117634736 A CN117634736 A CN 117634736A
Authority
CN
China
Prior art keywords
engineering
construction
management module
supervision
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311593840.9A
Other languages
Chinese (zh)
Inventor
区如海
王继农
潘妙兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengzhi Project Management Co ltd
Original Assignee
Chengzhi Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengzhi Project Management Co ltd filed Critical Chengzhi Project Management Co ltd
Priority to CN202311593840.9A priority Critical patent/CN117634736A/en
Publication of CN117634736A publication Critical patent/CN117634736A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of engineering construction, in particular to an engineering supervision monitoring system which comprises a material management module, a drawing management module, a quality management module, a problem processing module, a data acquisition module and a data storage module. The invention can realize the system and convenient supervision and monitoring operation on the engineering materials, the engineering progress and the penetrating quality in the engineering construction process respectively by arranging the material management module, the drawing management module and the quality management module, not only can realize real-time and accurate monitoring operation, but also can realize automatic recording and backup, thereby effectively reducing the time spent on supervision in the three aspects, improving the supervision and monitoring efficiency and ensuring the stable construction of engineering.

Description

Engineering supervision monitoring system
Technical Field
The invention relates to a monitoring system, in particular to an engineering supervision monitoring system.
Background
The supervision of the engineering is often the first line of operation and responsible personnel for fulfilling supervision contracts and construction supervision engineering. Besides the technical scheme and quality supervision management in the process of checking (batch) construction, the engineering supervision should also take responsibility of supervision and management on the construction behavior in the process of construction, and all supervision works of engineering need to be responsible, and besides supervision and management personnel playing quality and progress in the process of construction, coordination and management on the construction site are also responsible. Plays a very important role in the whole engineering.
At present, the supervision work in the engineering construction process is heavy, and a great deal of time is required for the engineering supervision to participate in each link of engineering construction, so that the supervision and monitoring purposes of the engineering construction can be achieved. However, the personal energy of engineering supervision personnel is limited, and as engineering is continuously carried out, the workload of engineering supervision is gradually increased, so that engineering supervision cannot realize timely solution to engineering materials, engineering progress, engineering quality and problems in engineering construction process, and the normal construction of engineering can be greatly influenced, and hidden danger is caused to the later quality of engineering, which is not beneficial to the realization of engineering supervision functions. Therefore, the invention provides an engineering supervision monitoring system for optimizing the operation of engineering supervision monitoring, and ensuring stable and good engineering construction.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides an engineering supervision monitoring system.
In order to solve the technical problems, the invention provides the following technical scheme:
an engineering supervision monitoring system comprises a material management module, a drawing management module, a quality management module, a problem processing module, a data acquisition module and a data storage module;
the material management module is used for recording the types, the amounts, the prices, the manager and the storage positions of engineering materials entering a construction site, monitoring the amount of the materials left in the construction site, checking and supplementing the materials according to the design amount of the engineering materials, and realizing the management function of the engineering construction materials;
the drawing management module is used for issuing the drawing according to the working procedures and the progress of engineering construction, and recording and backing up the engineering progress of the engineering construction according to the drawing;
the quality management module is used for sampling, detecting and collecting results of engineering quality in the engineering construction process and engineering quality after the engineering construction is finished, the quality management module is realized by the self-checking of a construction party and the detection of a third party, and the quality management module is realized in a random sampling inspection mode for the quality detection in the construction process;
the problem processing module is used for recording and collecting problems generated in the construction process, delegating related appointed personnel to process the appointed problems, and uploading processed results to the problem processing module;
the data acquisition module is used for acquiring various data generated in the operation process of the engineering supervision monitoring system on one hand, and on the other hand, acquiring text, picture and video information in the operation process of carrying out the on-site supervision on the construction site on the other hand;
the data storage module is used for collecting, summarizing and arranging data generated by the engineering supervision and monitoring system and is used for carrying out unified archiving and electronic storage operation by the industry professionals.
As a preferable technical scheme of the invention, the concrete implementation of the material management module comprises the following steps:
s11: firstly, a material management module forms a material ordering list according to the construction progress and the construction material requirement, and issues the material ordering list to a purchasing person to form a material purchasing task;
s12: then, purchasing personnel purchases construction materials according to the issued material purchasing task, and submits notes and expenses generated in the purchasing process to a material management module;
s13: then, the purchased construction materials are transported to a construction site, the engineering supervision checks the purchased construction materials according to the ordered orders, and the appointed construction materials are placed at the appointed positions, so that the purchase management of the materials is completed;
s14: and finally, as the construction is carried out, the construction materials are continuously consumed, the consumed construction materials are checked after the engineering supervision is carried out for a specified time, the required material amount is increased or decreased according to the construction progress in the material management module, and the material purchasing task is issued again, so that the sufficient construction materials on the construction site are ensured, and the site construction is not influenced.
As a preferable technical scheme of the invention, the paperless drawing system is adopted in the realization of the drawing management module, and the engineering supervision can conveniently send out the appointed drawing to the receiver by using the drawing management module, the drawing sending time and the engineering construction progress can be determined according to the drawing sending time to monitor, so that the monitoring effect of the engineering supervision is effectively improved.
As a preferable technical scheme of the invention, the detection operation of the quality management module on engineering quality comprises the following steps:
s21: firstly, after project engineering is determined and a worker is started, an engineering supervision monitoring system determines an internal self-checking person and a third party detection mechanism and inputs information into a quality management module;
s22: then, after the project progress reaches a specified amount, the quality management module calls the construction content in the drawing management module, determines the project progress and the project required to detect the project, and randomly transmits the project progress and the project to an internal self-checking person or a third party detection mechanism;
s23: then, the internal self-checking personnel or a third party detection mechanism completes detection operation on the specified detection project of the project within the specified time, and the detection result is uploaded to the quality management module;
s24: and finally, the quality management module and the engineering supervision make a reply to the detection result according to engineering construction requirements, if the detection result is qualified, the engineering construction is continued, and if the detection result is unqualified, the specified remedial measure is provided.
In a preferred embodiment of the present invention, the issuing of the project detection item in step 22 may be detection by one of the internal self-checking personnel or the third party detection mechanism or detection operation of the project detection item by the internal self-checking personnel and/or the third party detection mechanism.
As a preferred technical solution of the present invention, the problems related to the processing of the problem processing module include one or more of construction reworking and maintenance problems, construction contract disputes, illegal violations, supervision and owner opinion.
As a preferable technical scheme of the invention, the data storage module needs to copy a plurality of copies of key paper materials, and needs to copy a plurality of copies of electronic stored materials, so as to ensure the perfect data storage in the engineering supervision process.
The embodiment of the invention provides an engineering supervision monitoring system, which has the following beneficial effects:
1. the invention can realize the system and convenient supervision and monitoring operation on the engineering materials, the engineering progress and the penetrating quality in the engineering construction process respectively by arranging the material management module, the drawing management module and the quality management module, not only can realize real-time and accurate monitoring operation, but also can realize automatic recording and backup, thereby effectively reducing the time spent on supervision in the three aspects, improving the supervision and monitoring efficiency and ensuring the stable construction of engineering;
2. the invention can collect and back up a large amount of data materials generated in the process of monitoring engineering and the use process of the system by arranging the data acquisition module and the data storage module, is convenient for knowing the construction condition of the engineering based on the data, can discover and solve problems in time by the data, improves the accuracy of monitoring the supervision, and can realize accurate responsibility division for the later engineering quality by taking the acquisition and the storage of the data as the basis;
3. the invention can realize timely and effective processing operation on construction reworking and maintenance problems, construction contract dispute problems, illegal and illegal problems, supervision departments, owner opinions and the like through the problem processing module, thereby reducing interference in the engineering construction process and realizing the function of managing the processing problems.
Drawings
The accompanying drawings are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate the invention and together with the embodiments of the invention, serve to explain the invention. In the drawings:
FIG. 1 is a block diagram of an engineering supervision and monitoring system of the present invention;
FIG. 2 is a flow chart of a material management module of the project supervision monitoring system of the present invention;
FIG. 3 is a flow chart of a quality management module of an engineering supervision and monitoring system of the present invention.
Detailed Description
The preferred embodiments of the present invention will be described below with reference to the accompanying drawings, it being understood that the preferred embodiments described herein are for illustration and explanation of the present invention only, and are not intended to limit the present invention.
Examples: 1-3, an engineering supervision and monitoring system comprises a material management module, a drawing management module, a quality management module, a problem processing module, a data acquisition module and a data storage module;
the material management module is used for recording the types, the amounts, the prices, the manager and the storage positions of engineering materials entering a construction site, monitoring the amount of the materials left in the construction site, checking and supplementing the materials according to the design amount of the engineering materials, and realizing the management function of the engineering construction materials;
the specific implementation of the material management module comprises the following steps:
s11: firstly, a material management module forms a material ordering list according to the construction progress and the construction material requirement, and issues the material ordering list to a purchasing person to form a material purchasing task;
s12: then, purchasing personnel purchases construction materials according to the issued material purchasing task, and submits notes and expenses generated in the purchasing process to a material management module;
s13: then, the purchased construction materials are transported to a construction site, the engineering supervision checks the purchased construction materials according to the ordered orders, and the appointed construction materials are placed at the appointed positions, so that the purchase management of the materials is completed;
s14: and finally, as the construction is carried out, the construction materials are continuously consumed, the consumed construction materials are checked after the engineering supervision is carried out for a specified time, the required material amount is increased or decreased according to the construction progress in the material management module, and the material purchasing task is issued again, so that the sufficient construction materials on the construction site are ensured, and the site construction is not influenced.
The drawing management module is used for issuing the drawing according to the working procedures and the progress of engineering construction and recording and backing up the engineering progress of the engineering construction according to the drawing, the paperless drawing system is adopted in the implementation of the drawing management module, and the engineering supervision can conveniently issue and receive personnel for appointed drawing through the use of the drawing management module, the drawing issuing time and the engineering construction progress is determined according to the drawing issuing time to monitor, so that the monitoring effect of the engineering supervision is effectively improved;
the quality management module is used for sampling, detecting and collecting results of engineering quality in the engineering construction process and engineering quality after the engineering construction is finished, the quality management module is realized by the self-checking of a construction party and the detection of a third party, and the quality management module is realized in a random sampling inspection mode for the quality detection in the construction process;
the quality management module detects engineering quality and comprises the following steps:
s21: firstly, after project engineering is determined and a worker is started, an engineering supervision monitoring system determines an internal self-checking person and a third party detection mechanism and inputs information into a quality management module;
s22: then, when the project progress reaches a specified amount, the quality management module calls construction content in the drawing management module, determines the project progress and projects needing to detect the project, and randomly issues the project progress and projects to an internal self-checking person or a third party detection mechanism, wherein the issuing of one project detection project can be the detection of one of the internal self-checking person or the third party detection mechanism or the common detection operation of the internal self-checking person and the third party detection mechanism on one project detection project;
s23: then, the internal self-checking personnel or a third party detection mechanism completes detection operation on the specified detection project of the project within the specified time, and the detection result is uploaded to the quality management module;
s24: and finally, the quality management module and the engineering supervision make a reply to the detection result according to engineering construction requirements, if the detection result is qualified, the engineering construction is continued, and if the detection result is unqualified, the specified remedial measure is provided.
The problem processing module is used for recording and collecting problems generated in the construction process, appointing related appointed personnel to process the appointed problems, and uploading processed results to the problem processing module, wherein the problems related to the processing of the problem processing module comprise one or more of construction reworking and maintenance problems, construction contract dispute problems, illegal violation problems, supervision departments and owner opinions;
the data acquisition module is used for acquiring various data generated in the operation process of the engineering supervision monitoring system on one hand, and on the other hand, acquiring text, picture and video information in the operation process of carrying out the on-site supervision on the construction site on the other hand;
the data storage module is used for collecting, summarizing and arranging data generated by the engineering supervision monitoring system, and carrying out unified archiving and electronic storage operation by industry professionals, the data storage module is used for copying a plurality of key paper materials, and for electronic storage materials, a plurality of backup requirements are needed, so that the data storage in the engineering supervision process is perfect.
The foregoing description is only a preferred embodiment of the present invention, and the present invention is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present invention has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The engineering supervision monitoring system is characterized by comprising a material management module, a drawing management module, a quality management module, a problem processing module, a data acquisition module and a data storage module;
the material management module is used for recording the types, the amounts, the prices, the manager and the storage positions of engineering materials entering a construction site, monitoring the amount of the materials left in the construction site, checking and supplementing the materials according to the design amount of the engineering materials, and realizing the management function of the engineering construction materials;
the drawing management module is used for issuing the drawing according to the working procedures and the progress of engineering construction, and recording and backing up the engineering progress of the engineering construction according to the drawing;
the quality management module is used for sampling, detecting and collecting results of engineering quality in the engineering construction process and engineering quality after the engineering construction is finished, the quality management module is realized by the self-checking of a construction party and the detection of a third party, and the quality management module is realized in a random sampling inspection mode for the quality detection in the construction process;
the problem processing module is used for recording and collecting problems generated in the construction process, delegating related appointed personnel to process the appointed problems, and uploading processed results to the problem processing module;
the data acquisition module is used for acquiring various data generated in the operation process of the engineering supervision monitoring system on one hand, and on the other hand, acquiring text, picture and video information in the operation process of carrying out the on-site supervision on the construction site on the other hand;
the data storage module is used for collecting, summarizing and arranging data generated by the engineering supervision and monitoring system and is used for carrying out unified archiving and electronic storage operation by the industry professionals.
2. An engineering supervision monitoring system according to claim 1, wherein the specific implementation of the material management module comprises the following steps:
s11: firstly, a material management module forms a material ordering list according to the construction progress and the construction material requirement, and issues the material ordering list to a purchasing person to form a material purchasing task;
s12: then, purchasing personnel purchases construction materials according to the issued material purchasing task, and submits notes and expenses generated in the purchasing process to a material management module;
s13: then, the purchased construction materials are transported to a construction site, the engineering supervision checks the purchased construction materials according to the ordered orders, and the appointed construction materials are placed at the appointed positions, so that the purchase management of the materials is completed;
s14: and finally, as the construction is carried out, the construction materials are continuously consumed, the consumed construction materials are checked after the engineering supervision is carried out for a specified time, the required material amount is increased or decreased according to the construction progress in the material management module, and the material purchasing task is issued again, so that the sufficient construction materials on the construction site are ensured, and the site construction is not influenced.
3. The engineering supervision monitoring system according to claim 1, wherein the paper-free drawing system is adopted for the realization of the drawing management module, and the engineering supervision can conveniently send and receive the designated drawing through the use of the drawing management module, and the drawing sending time and the engineering construction progress can be determined according to the drawing sending time to monitor, so that the monitoring effect of the engineering supervision is effectively improved.
4. An engineering supervision monitoring system according to claim 1, wherein the quality management module detects engineering quality, comprising the steps of:
s21: firstly, after project engineering is determined and a worker is started, an engineering supervision monitoring system determines an internal self-checking person and a third party detection mechanism and inputs information into a quality management module;
s22: then, after the project progress reaches a specified amount, the quality management module calls the construction content in the drawing management module, determines the project progress and the project required to detect the project, and randomly transmits the project progress and the project to an internal self-checking person or a third party detection mechanism;
s23: then, the internal self-checking personnel or a third party detection mechanism completes detection operation on the specified detection project of the project within the specified time, and the detection result is uploaded to the quality management module;
s24: and finally, the quality management module and the engineering supervision make a reply to the detection result according to engineering construction requirements, if the detection result is qualified, the engineering construction is continued, and if the detection result is unqualified, the specified remedial measure is provided.
5. The system of claim 4, wherein the issuing of the project test item in the step 22 is performed by one of an internal self-test person or a third party test facility or by both the internal self-test person and the third party test facility.
6. The project supervision monitoring system according to claim 1, wherein the problems addressed by the problem handling module include one or more of construction rework and maintenance problems, construction contract dispute problems, illegal violation problems, regulatory authorities, and owner opinion.
7. The project supervision monitoring system according to claim 1, wherein the data storage module is required to copy a plurality of copies of the critical paper data, and is required to copy a plurality of copies of the electronic stored data, so as to ensure perfect data preservation in the project supervision process.
CN202311593840.9A 2023-11-27 2023-11-27 Engineering supervision monitoring system Pending CN117634736A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311593840.9A CN117634736A (en) 2023-11-27 2023-11-27 Engineering supervision monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311593840.9A CN117634736A (en) 2023-11-27 2023-11-27 Engineering supervision monitoring system

Publications (1)

Publication Number Publication Date
CN117634736A true CN117634736A (en) 2024-03-01

Family

ID=90015726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311593840.9A Pending CN117634736A (en) 2023-11-27 2023-11-27 Engineering supervision monitoring system

Country Status (1)

Country Link
CN (1) CN117634736A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109492876A (en) * 2018-10-15 2019-03-19 鼎宸建设管理有限公司 A kind of assembled architecture production and construction management module information system
CN111340328A (en) * 2020-01-08 2020-06-26 江苏苏科建设项目管理有限公司 Construction engineering quality supervision method
CN112561399A (en) * 2020-12-29 2021-03-26 南昌路兴交通工程监理咨询有限公司 Supervision method for construction quality in project supervision
CN113487172A (en) * 2021-07-02 2021-10-08 南昌路兴交通工程监理咨询有限公司 Project supervision method
CN114449198A (en) * 2022-01-27 2022-05-06 周璨 Intelligent monitoring system for project supervision
CN115829414A (en) * 2022-12-26 2023-03-21 上海建科工程咨询有限公司 AI technology-based concrete structure engineering quality supervision auxiliary app
CN116307623A (en) * 2023-05-16 2023-06-23 襄阳云上家建筑装饰工程有限公司 Supervision system for home decoration quality control
CN116777282A (en) * 2023-06-26 2023-09-19 中铁一局集团有限公司 Construction quality management system
CN117078209A (en) * 2023-08-31 2023-11-17 广东科瑞工程管理有限公司 Method, system and device for managing supervision project and computer storage medium

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109492876A (en) * 2018-10-15 2019-03-19 鼎宸建设管理有限公司 A kind of assembled architecture production and construction management module information system
CN111340328A (en) * 2020-01-08 2020-06-26 江苏苏科建设项目管理有限公司 Construction engineering quality supervision method
CN112561399A (en) * 2020-12-29 2021-03-26 南昌路兴交通工程监理咨询有限公司 Supervision method for construction quality in project supervision
CN113487172A (en) * 2021-07-02 2021-10-08 南昌路兴交通工程监理咨询有限公司 Project supervision method
CN114449198A (en) * 2022-01-27 2022-05-06 周璨 Intelligent monitoring system for project supervision
CN115829414A (en) * 2022-12-26 2023-03-21 上海建科工程咨询有限公司 AI technology-based concrete structure engineering quality supervision auxiliary app
CN116307623A (en) * 2023-05-16 2023-06-23 襄阳云上家建筑装饰工程有限公司 Supervision system for home decoration quality control
CN116777282A (en) * 2023-06-26 2023-09-19 中铁一局集团有限公司 Construction quality management system
CN117078209A (en) * 2023-08-31 2023-11-17 广东科瑞工程管理有限公司 Method, system and device for managing supervision project and computer storage medium

Similar Documents

Publication Publication Date Title
CN113780990A (en) Cloud intelligence manufacturing platform based on artificial intelligence production management mode and processing method
KR101683441B1 (en) Mobile based completion inspection method and system
US7813827B2 (en) System and method for an on-line jurisdiction manager
CN110766528A (en) Client credit self-evaluation factory real-time intelligent analysis management system
CN107766457A (en) A kind of thermal power plant's operation management system and its task executing method
US9165316B2 (en) System and process for monitoring, control and withdrawal of consumable items in a production environment
US20160300195A1 (en) System and Method for Managing a Product Life Cycle
Hall et al. The value of downstream traceability in food safety management systems: an empirical examination of product recalls
CN112215370A (en) Electronic inspection system and mobile terminal
CN110111082B (en) Random shooting method for field checking work
CN117634736A (en) Engineering supervision monitoring system
KR101227880B1 (en) Manufacturing diagnosis system and method on information processing of the system
CN115809769A (en) Construction machinery equipment management method and system
CN115170993A (en) AR acquisition and analysis-based on-site inspection method and system for waste gas treatment equipment
TW202113748A (en) Intelligent waste discharging and clearing method initiating, by an institutional organization, a waste discharging and clearing request to a clearing platform
CN109902942A (en) Change management method, device and storage medium on a kind of cell house decoration inspection line
TWI708198B (en) Intelligent matching method of industrial waste
CN114186815A (en) Cost early warning method, device and equipment
CN113537919A (en) Newly-built commodity room pre-sale fund supervisory systems
Wang et al. Application of IoT and Big Data Technology in Digital Testing Platforms
CN113554192B (en) Equipment check stopping management method and system and equipment check point management method and system
TWM587313U (en) Construction history management system
JP2004295473A (en) Quality control in iso 9001 and customer fulfillment system
TWM646838U (en) Information asset management system for automatic software compliance analysis
CN114358722A (en) Enterprise production management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination