CN115809769A - Construction machinery equipment management method and system - Google Patents

Construction machinery equipment management method and system Download PDF

Info

Publication number
CN115809769A
CN115809769A CN202211467091.0A CN202211467091A CN115809769A CN 115809769 A CN115809769 A CN 115809769A CN 202211467091 A CN202211467091 A CN 202211467091A CN 115809769 A CN115809769 A CN 115809769A
Authority
CN
China
Prior art keywords
information
construction machinery
machinery equipment
management
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211467091.0A
Other languages
Chinese (zh)
Inventor
李光如
顾海霞
卫天笑
徐磊
郑爱伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jinyu Machinery Co ltd
Original Assignee
Shanghai Jinyu Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jinyu Machinery Co ltd filed Critical Shanghai Jinyu Machinery Co ltd
Priority to CN202211467091.0A priority Critical patent/CN115809769A/en
Publication of CN115809769A publication Critical patent/CN115809769A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method and a system for managing construction machinery equipment, which comprises the following steps: acquiring construction machinery equipment information and construction machinery equipment part information thereof; the electronic chip is used for carrying out association binding with the information of the parts of the construction machinery equipment; acquiring first related information of each process uploaded by each management user; acquiring second related information collected in the electronic chip after the association; determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information; the invention has the following beneficial effects: the management report about the construction machinery equipment can be determined through the first relevant information of each process uploaded by each management user and the second relevant information collected in the correlated electronic chip, the problems that the large construction machinery equipment is lagged in management, and the historical working strength and the maintenance cannot be counted are effectively solved, and effective data are provided for the fact that whether the large construction machinery equipment can be transformed and reused.

Description

Construction machinery equipment management method and system
Technical Field
The invention relates to the technical field of safety management of construction machinery equipment, in particular to a construction machinery equipment management method and a construction machinery equipment management system.
Background
Large-scale construction machinery equipment, particularly a tower crane, belongs to a major hazard source, major accidents of group death and group damage easily occur, and great safety risks exist in the construction processes of equipment installation, use, disassembly and the like, so the relevant national standards stipulate the service life of the large-scale construction machinery equipment, the service life refers to the working cycle number of the equipment, the working cycle number is difficult to effectively count, the number can only be roughly estimated as year, and the equipment is forcibly scrapped after the year; the service life of the equipment is calculated from the factory, the calculation is not scientific, the hiring rate of some equipment is high, the overtime is often caught up with, and the actual working cycle times far exceed the service life calculated according to the normal service time; the idle time of some devices is long due to market competition and other reasons, and the actual working cycle times are far lower than the life cycle calculated according to the normal use time; therefore, the equipment is forced to be scrapped scientifically according to the specified age, and the practical service life of the construction machinery equipment and the maintenance record must be effectively supervised to calculate the service life of the construction machinery equipment according to the practical service life.
The existing products for managing the inventory of construction machinery and parts and the safety management of the construction machinery have the following defects: (1) The existing product lacks the function of counting the working time of the equipment; (2) The authenticity of data such as maintenance submitted by property units is lack of effective supervision; (3) And two types of products used by property right units need to enter two systems, and two types of hardware equipment are used, so that the system is easy to confuse and make mistakes, and the enterprise cost is increased.
Disclosure of Invention
In view of the above-mentioned drawbacks of the prior art, an object of the present invention is to provide a method and a system for managing construction machinery, which are used to solve the problem of lack of real and effective supervision for construction machinery in the prior art.
The embodiment of the invention provides a construction machinery equipment management method, which comprises the following steps: acquiring construction machinery equipment information and construction machinery equipment part information thereof; the electronic chip is used for carrying out association binding with the information of the parts of the construction machinery equipment; acquiring first related information of each process uploaded by each management user; acquiring second related information collected in the electronic chip after the association; and determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information.
The embodiment of the invention also provides a construction machinery equipment management system, which comprises an information acquisition module, a data processing module and a data processing module, wherein the information acquisition module is used for acquiring the construction machinery equipment information and the construction machinery equipment part information thereof; acquiring first related information of each process uploaded by each management user; acquiring second related information collected in the electronic chip after the association; the information association module is used for associating and binding the electronic chip and the information of the parts of the construction machinery equipment; and the report determining module is used for determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information.
An embodiment of the present invention further provides a server, including: at least one processor; and a memory communicatively coupled to the at least one processor; wherein the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the construction machine management method as described above.
Embodiments of the present invention also provide a computer-readable storage medium storing a computer program that, when executed by a processor, implements the construction machine management method as described above.
Compared with the prior art, the embodiment of the invention has the main differences and the effects that: the management report about the construction machinery equipment can be determined through the first relevant information of each flow uploaded by each management user and the second relevant information collected in the correlated electronic chip, so that the problems that the large construction machinery equipment is lagged in management and the historical working strength and the maintenance cannot be counted are effectively solved, effective data is provided for the large construction machinery equipment whether to be transformed and reused, the problem that most property right units lack effective management tools for the equipment is also solved, the management level of the equipment property right units is favorably improved, and the industrial behaviors of the construction machinery equipment are standardized.
As a further improvement, the construction machinery equipment information comprises equipment name, specification, model, manufacturer, factory date and equipment number, and the construction machinery equipment part information comprises part name, specification, model, manufacturer and factory date.
As a further improvement, the users comprise management users and supervision users, the management users comprise property right units, installation units, maintenance units, labor units, construction units, supervision units and detection units, and the supervision users comprise construction machinery equipment supervision departments.
According to the scheme, the first relevant information about each flow of the construction machinery equipment is uploaded to the system through a property right unit, an installation unit, a maintenance unit, a labor unit, a construction unit, a supervision unit and a detection unit, and then a management report about the construction machinery equipment generated by the system is checked through a supervision department of the construction machinery equipment, so that supervision and management of the construction machinery equipment are realized.
As a further improvement, the user can set up a branch office by himself under the registered account number, and add a personnel account number and a password.
As a further improvement, the first related information of each process uploaded by each management user includes at least one of the following information: picture, video, text, sound, location and time information.
As a further improvement, the second relevant information collected in the correlated electronic chip comprises construction mechanical equipment part information and attendance time of an operator in a cab.
As a further improvement, after determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information, the method comprises the following steps: and acquiring the supervision information fed back by the supervision user after checking various management reports.
According to the scheme, whether each flow of the construction machinery equipment meets the use standard or not is obtained according to the supervision information fed back after the supervision user checks various management reports, and whether the service life of the construction machinery equipment exceeds the service life of the construction machinery equipment or not can be obtained, so that the service efficiency of the construction machinery equipment is improved.
Drawings
Fig. 1 is a flowchart of a construction machine management method in a first embodiment of the present invention;
fig. 2 is a flowchart of a construction machine management method according to a second embodiment of the present invention;
fig. 3 is a schematic view of a construction machine management system according to a third embodiment of the present invention;
FIG. 4 is a schematic diagram of an electronic device in a fourth embodiment of the invention;
fig. 5 is a schematic diagram of an information transmission framework between devices of the present invention.
Detailed Description
The embodiments of the present invention are described below with reference to specific embodiments, and other advantages and effects of the present invention will be easily understood by those skilled in the art from the disclosure of the present specification. The invention is capable of other and different embodiments and of being practiced or of being carried out in various ways, and its several details are capable of modification in various respects, all without departing from the spirit and scope of the present invention. It is to be noted that the features in the following embodiments and examples may be combined with each other without conflict.
It should be noted that the drawings provided in the following embodiments are only for illustrating the basic idea of the present invention, and the components related to the present invention are only shown in the drawings rather than drawn according to the number, shape and size of the components in actual implementation, and the type, quantity and proportion of the components in actual implementation may be changed freely, and the layout of the components may be more complicated.
A first embodiment of the present invention relates to a construction machine management method. The process is shown in fig. 1, and specifically comprises the following steps:
step 101, acquiring construction machinery equipment information and construction machinery equipment part information thereof;
specifically, the information of the construction machinery equipment comprises an equipment name, a specification, a model, a manufacturer, a delivery date and an equipment number, and the information of the parts of the construction machinery equipment comprises a part name, a specification, a model, a manufacturer and a delivery date.
And 102, performing association binding on the information of the parts of the construction machinery equipment by using the electronic chip.
Specifically, the electronic chip is adhered (or welded) to a component of the construction machinery.
In practical application, a construction machinery equipment property right unit logs in a main control unit, a subordinate mechanism is added, related managers and operators are added, equipment information is entered, the operators log in the main control unit according to account numbers and passwords, an electronic chip is bound with information of parts of construction machinery equipment, and then the electronic chip is installed on the related parts of the construction machinery equipment.
Step 103, acquiring first related information of each process uploaded by each management user.
Specifically, the users comprise management users and supervision users, the management users comprise property right units, installation units, maintenance units, labor units, construction units, supervision units and detection units, the supervision users comprise supervision departments of construction machinery equipment, the users can set up branch institutions by themselves under registered accounts, personnel accounts and passwords are added, and first related information of each process uploaded by each management user comprises at least one item of the following information: picture, video, text, sound, location and time information.
In practical application, after a leasing contract of the construction machinery equipment is signed, a property right unit logs in a main control unit and records contract related information, wherein the contract related information comprises leased equipment information, a leasing party name, a project address, a leasing term, contract amount, a payment mode and the like;
a construction unit logs in a main control unit, project information is established, the project information comprises project names, project addresses and the like, and equipment property right units, installation units, supervision units, maintenance units and labor unit information are selected and added in a database;
before the equipment enters a field for installation, an installation unit logs in a main control unit, searches for a project name, enters the project, fills and uploads related declaration data of the equipment to be installed, wherein the declaration data comprises a qualification certificate of the installation unit, a related personnel list and certificate, an installation contract, a scheme approval table, a construction scheme special for hoisting machinery installation (disassembly) engineering and the like, and when all data construction units and a supervision unit are approved to be qualified, the installation unit informs a supervision department in a written form;
a property right unit logs in a main control unit, makes a library registration on equipment to be installed, activates and senses a part electronic chip of the equipment going out of a library through terminal equipment, and makes the library registration on the part;
after the installation unit finishes the installation and debugging of the equipment, an installer activates an electronic chip of a part of the induction equipment through the terminal equipment, shoots a relevant photo and audio-visual data and uploads the photo and audio-visual data to the main control unit to finish the installation self-checking work and applies for equipment detection to the detection unit, the detection unit arranges the detection personnel to detect the equipment on site after receiving the equipment detection application, activates the electronic chip of the part of the induction equipment through the terminal equipment, shoots a photo and audio-visual data of a relevant detection part and uploads the photo and audio-visual data to the main control unit, if all the detection items are qualified, the detection unit can directly print a check list on a cloud server (or can butt a platform of the detection unit and print the check list from the platform of the detection unit) and provide a qualified detection report; if an unqualified item exists, a detector clicks the unqualified item to submit the rectification, selects or inputs an unqualified reason, an installation unit carries out rectification after receiving a rectification notification, after the rectification is finished, the installation personnel activates an electronic chip at a sensing part through terminal equipment, enters a rectification task, clicks a rectification reply, shoots the rectified photo and audio-video data and uploads the picture and audio-video data to a main control unit, after the detection unit receives the reply and verifies the qualification, a check table is printed to provide a qualified detection report, and the equipment can be used after obtaining the qualified inspection report;
the maintenance unit logs in the terminal equipment, activates the induction electronic chip, shoots relevant part photos and audio-visual data and uploads the relevant part photos and the audio-visual data to the main control unit, and completes maintenance tasks;
when the equipment is planned to stop using, a construction unit starts a work stop order, logs in a main control unit before the equipment is disassembled, completes the equipment and moves back, and the equipment enters a moving back state;
after receiving the stop work order, the installation unit logs in the main control unit and declares the relevant data of equipment disassembly, and after the construction and supervision unit passes the audit, the installation unit informs the supervision department in a written form and organizes and arranges the equipment disassembly work;
the title unit logs in the main control unit to carry out warehousing operation on the equipment when the equipment returns to the field, the induction electronic chip is activated through the terminal equipment, the equipment parts are warehoused, after the equipment is warehoused, the title unit maintains part of the parts, the induction electronic chip can be activated through the terminal equipment in the maintenance process and the maintenance result, and the maintained parts are shot by pictures and videos and uploaded to the main control unit;
all pictures, audio-visual data, statistical reports and the like generated in each process are stored in the main control unit, a user can log in the main control unit to check, download and print related data under the authority of each account, the system comprises the main control unit, an electronic chip and reading and writing equipment, and information transmission among the equipment is shown in figure 5.
And 104, acquiring second relevant information collected in the electronic chip after the association.
Specifically, the second related information collected in the electronic chip after the correlation includes construction machinery part information and attendance time of an operator in a cab, wherein the operator is a person who operates the construction machinery.
In practical application, after an equipment operator passes the verification of a construction and supervision unit, a labor unit logs in a main control unit, relevant data is input and submitted, an operator account is added and bound with the equipment, the equipment operator activates and senses an electronic chip in a cab through terminal equipment to complete attendance and attendance checking, the main control unit automatically counts the working time of the operator (namely the working time of the construction machinery equipment), the attendance is also the basis for calculating the wages and overtime fees of the operator, if the equipment breaks down, the operator can directly report the repair through the terminal equipment, or pictures and audio-visual data are shot and uploaded to the main control unit.
And step 105, determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information.
In practical application, a construction unit logs in a main control unit, issues equipment regular inspection, maintenance tasks, special inspection tasks, rectification tasks, maintenance tasks and the like, can perform examination and assessment on various tasks, and a system automatically performs statistics on the completion rate, rectification contents and maintenance contents of various tasks to form various statistical tables.
According to the embodiment, the management report about the construction machinery equipment can be determined through the first relevant information of each flow uploaded by each management user and the second relevant information collected in the correlated electronic chip, so that the problems that the large construction machinery equipment is lagged in management, and the historical working strength and the maintenance cannot be counted are effectively solved, effective data is provided for whether the large construction machinery equipment can be transformed and reused, the problem that most property rights units lack effective management tools for the equipment is also solved, the management level of the equipment property rights units is favorably improved, and the industrial behaviors of the construction machinery equipment are standardized.
A second embodiment of the present invention relates to a construction machine management method, and the second embodiment is a detailed discussion of the first embodiment as a whole, and the main detailed discussion is that: in the second embodiment of the present invention, an embodiment is defined, and this embodiment discusses a specific process of acquiring the monitoring information fed back by the monitoring user after viewing various management reports.
Referring to fig. 2, the present embodiment includes the following steps:
steps 201 to 205 are similar to steps 101 to 105 in the first embodiment, and are not repeated herein.
And step 206, acquiring the monitoring information fed back by the monitoring user after checking various management reports.
In practical application, a supervision department logs in the main control unit, can check and verify various data submitted by construction and installation units, check the completion rate of maintenance tasks, check detailed records of equipment maintenance, issue correction notifications, and inquire and download various statistical tables.
According to the embodiment, whether each flow of the construction machinery equipment meets the use standard or not can be obtained according to the supervision information fed back after the supervision user checks various management reports, and whether the service life of the construction machinery equipment exceeds the service life of the construction machinery equipment or not can be obtained, so that the service efficiency of the construction machinery equipment is improved.
A third embodiment of the present invention relates to a construction machine management system, and referring to fig. 3, the construction machine management system includes:
the information acquisition module is used for acquiring the information of the construction machinery equipment and the information of parts of the construction machinery equipment; acquiring first related information of each process uploaded by each management user; acquiring second related information collected in the electronic chip after the association;
the information association module is used for associating and binding the electronic chip and the information of the parts of the construction machinery equipment;
and the report determining module is used for determining a management report related to the construction machinery equipment according to the first relevant information and the second relevant information.
It should be understood that this embodiment is a system example corresponding to the first embodiment, and may be implemented in cooperation with the first embodiment. The related technical details mentioned in the first embodiment are still valid in this embodiment, and are not described herein again in order to reduce repetition. Accordingly, the related-art details mentioned in the present embodiment can also be applied to the first embodiment.
It should be noted that each module referred to in this embodiment is a logical module, and in practical applications, one logical unit may be one physical unit, may be a part of one physical unit, and may be implemented by a combination of multiple physical units. In addition, in order to highlight the innovative part of the present invention, elements that are not so closely related to solving the technical problems proposed by the present invention are not introduced in the present embodiment, but this does not indicate that other elements are not present in the present embodiment.
A fourth embodiment of the present invention relates to a server, and please refer to fig. 4, which includes:
at least one processor; and a memory communicatively coupled to the at least one processor; wherein the memory stores instructions executable by the at least one processor to enable the at least one processor to perform the construction machine equipment management method as above.
Where the memory and processor are connected by a bus, the bus may comprise any number of interconnected buses and bridges, the buses connecting together one or more of the various circuits of the processor and the memory. The bus may also connect various other circuits such as peripherals, voltage regulators, power management circuits, and the like, which are well known in the art, and therefore, will not be described any further herein. A bus interface provides an interface between the bus and the transceiver. The transceiver may be one element or a plurality of elements, such as a plurality of receivers and transmitters, providing a means for communicating with various other apparatus over a transmission medium. The data processed by the processor is transmitted over a wireless medium via an antenna, which further receives the data and transmits the data to the processor.
The processor is responsible for managing the bus and general processing and may also provide various functions including timing, peripheral interfaces, voltage regulation, power management, and other control functions. And the memory may be used to store data used by the processor in performing operations.
A fifth embodiment of the invention relates to a computer-readable storage medium, in which a computer program is stored which, when being executed by a processor, carries out the above-mentioned method embodiments.
That is, as can be understood by those skilled in the art, all or part of the steps in the method according to the above embodiments may be implemented by a program instructing related hardware, where the program is stored in a storage medium and includes several instructions to enable a device (which may be a single chip, a chip, or the like) or a processor (processor) to execute all or part of the steps in the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
In summary, according to the invention, the management report about the construction machinery equipment can be determined through the first related information of each process uploaded by each management user and the second related information collected in the associated electronic chip, so that the problems that the management of the large construction machinery equipment is lagged, the historical working strength and the maintenance cannot be counted are effectively solved, effective data is provided for the reconstruction and the reutilization of the large construction machinery equipment, the problem that most property right units lack effective management tools for the equipment is also solved, the management level of the equipment property right units is favorably improved, and the industrial behaviors of the construction machinery equipment are standardized. Therefore, the invention effectively overcomes various defects in the prior art and has high industrial utilization value.
The foregoing embodiments are merely illustrative of the principles and utilities of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (10)

1. A construction machine device management method characterized by comprising the steps of:
acquiring construction machinery equipment information and construction machinery equipment part information thereof;
the electronic chip is used for carrying out association binding with the information of the parts of the construction machinery equipment;
acquiring first related information of each process uploaded by each management user;
acquiring second related information collected in the electronic chip after the association;
and determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information.
2. The construction machine management method according to claim 1, characterized in that: the construction machinery equipment information comprises an equipment name, a specification, a model, a manufacturer, a delivery date and an equipment number, and the construction machinery equipment part information comprises a part name, a specification, a model, a manufacturer and a delivery date.
3. The construction machine management method according to claim 1, characterized in that: the users comprise management users and supervision users, the management users comprise property right units, installation units, maintenance units, labor units, construction units, supervision units and detection units, and the supervision users comprise supervision departments of construction machinery equipment.
4. A construction machine management method according to claim 3, characterized in that: the user can set up a branch office by himself under the registered account number, and add the personnel account number and the password.
5. The construction machine management method according to claim 1, characterized in that: the first related information of each process uploaded by each management user comprises at least one item of the following information:
picture, video, text, sound, location and time information.
6. The construction machine management method according to claim 1, characterized in that: and the second related information collected in the electronic chip after the correlation comprises the information of the parts of the construction machinery equipment and the attendance time of the operator in the cab.
7. The construction machine management method according to claim 3, characterized in that: after determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information, the method comprises the following steps:
and acquiring the supervision information fed back by the supervision user after checking various management reports.
8. A construction machine device management system characterized in that: the method comprises the following steps:
the information acquisition module is used for acquiring the information of the construction machinery equipment and the information of parts of the construction machinery equipment; acquiring first related information of each process uploaded by each management user; acquiring second related information collected in the electronic chip after the association;
the information association module is used for associating and binding the electronic chip and the information of the parts of the construction machinery equipment;
and the report determining module is used for determining a management report about the construction machinery equipment according to the first relevant information and the second relevant information.
9. A server, comprising:
at least one processor; and the number of the first and second groups,
a memory communicatively coupled to the at least one processor; wherein, the first and the second end of the pipe are connected with each other,
the memory stores instructions executable by the at least one processor to enable the at least one processor to perform a construction machine equipment management method as claimed in any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, wherein the computer program, when executed by a processor, implements a construction machine management method according to any one of claims 1 to 7.
CN202211467091.0A 2022-11-22 2022-11-22 Construction machinery equipment management method and system Pending CN115809769A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211467091.0A CN115809769A (en) 2022-11-22 2022-11-22 Construction machinery equipment management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211467091.0A CN115809769A (en) 2022-11-22 2022-11-22 Construction machinery equipment management method and system

Publications (1)

Publication Number Publication Date
CN115809769A true CN115809769A (en) 2023-03-17

Family

ID=85483740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211467091.0A Pending CN115809769A (en) 2022-11-22 2022-11-22 Construction machinery equipment management method and system

Country Status (1)

Country Link
CN (1) CN115809769A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117474527A (en) * 2023-11-28 2024-01-30 北京都朗信息科技有限公司 Building construction safety standard assessment method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117474527A (en) * 2023-11-28 2024-01-30 北京都朗信息科技有限公司 Building construction safety standard assessment method
CN117474527B (en) * 2023-11-28 2024-05-24 北京都朗信息科技有限公司 Building construction safety standard assessment method

Similar Documents

Publication Publication Date Title
US7474218B2 (en) Method and system of asset identification and tracking for enterprise asset management
CN113780990A (en) Cloud intelligence manufacturing platform based on artificial intelligence production management mode and processing method
CN111506662A (en) Data collection system for enterprise fixed asset arrangement based on block chain
CN110580572B (en) Product life-span traceability system
CN104992308A (en) Enterprise informatization management system
CN109472550B (en) Human error prevention method and device for million-kilowatt nuclear power station and terminal equipment
JP2008071242A (en) Construction site management system
US20220343292A1 (en) System and method of documenting aircraft parts condition, repair, and overhaul
CN112308244A (en) Nuclear power station maintenance license management and control method and device, storage medium and terminal equipment
CN115809769A (en) Construction machinery equipment management method and system
CN104408575A (en) Enterprise operation data management system and method
CN111861347A (en) Material management system and method for building engineering
CN109886628A (en) Handling of goods and materials platform and method
CN112990829A (en) Asset management system based on block chain
CN110599368A (en) DBM intelligent building management tool
CN106487799A (en) Facility information storage system based on cloud platform
CN116362535A (en) Dual pre-control method and device for risk classification management and control and hidden trouble investigation
CN112651583A (en) Fixed asset checking method and device, mobile terminal and storage medium
CN115271670A (en) Management method and system based on mobile terminal and electronic equipment
CN113344518A (en) Project management system
JP2020095493A (en) Facility inspection support program, facility inspection support method, and facility inspection support system
KR102621130B1 (en) System Scaffold Management System and Management Method
TWI715037B (en) Checking method for product inspection
TWI722431B (en) Authorization method for data editing authority of product item
WO2017200499A1 (en) Integrated software and hardware systems for lifelong cost optimization for storage equipment and healthy and safe environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination