CN114449198A - Intelligent monitoring system for project supervision - Google Patents
Intelligent monitoring system for project supervision Download PDFInfo
- Publication number
- CN114449198A CN114449198A CN202210100090.6A CN202210100090A CN114449198A CN 114449198 A CN114449198 A CN 114449198A CN 202210100090 A CN202210100090 A CN 202210100090A CN 114449198 A CN114449198 A CN 114449198A
- Authority
- CN
- China
- Prior art keywords
- module
- engineering
- monitoring
- acceptance
- technician
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 102
- 239000000463 material Substances 0.000 claims abstract description 130
- 238000000034 method Methods 0.000 claims description 14
- 238000010276 construction Methods 0.000 claims description 13
- 238000010586 diagram Methods 0.000 claims description 7
- 238000012790 confirmation Methods 0.000 claims description 6
- 238000007726 management method Methods 0.000 abstract description 19
- 230000000694 effects Effects 0.000 abstract description 15
- 238000012550 audit Methods 0.000 abstract description 5
- 238000001514 detection method Methods 0.000 description 9
- 238000011161 development Methods 0.000 description 6
- 230000003203 everyday effect Effects 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 230000003111 delayed effect Effects 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N5/00—Details of television systems
- H04N5/76—Television signal recording
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/70—Information retrieval; Database structures therefor; File system structures therefor of video data
- G06F16/71—Indexing; Data structures therefor; Storage structures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/70—Information retrieval; Database structures therefor; File system structures therefor of video data
- G06F16/78—Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/10—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
Abstract
The invention relates to the technical field of project supervision, in particular to an intelligent monitoring system for project supervision, which comprises a monitoring module, a database module, a management module and a feedback module, wherein the monitoring module is used for monitoring a project; the monitoring module is used as a basis for project supervision intelligent monitoring; the database module is used for classifying the information of the monitoring module; the management module is used for analyzing and checking the information after the information classification; the feedback module is used for managing the collection urging and the field control of the module; through setting up two parts of material storehouse control and engineering on-the-spot control in the monitoring module, shoot the record to the material quantity of material storehouse inside one day to shoot the record to engineering progress in engineering on-the-spot one day, generate the contrast report to the material quantity of material storehouse in one day through the material contrast in the database module afterwards, audit material contrast report and engineering pattern through management module, improved the effect of engineering supervision efficiency.
Description
Technical Field
The invention relates to the technical field of project supervision, in particular to an intelligent monitoring system for project supervision.
Background
Project supervision requires control of construction period, project quality and project safety according to relevant laws, regulations, technical standards, relevant contracts and documents. The project supervision aims to ensure that the project construction quality reaches the standard, improve the project safety coefficient and the project construction level and fully exert the investment benefit.
The construction site range is huge, a supervision team needs to check and examine a plurality of project points, and the project check and acceptance process needs to detect data of the project points; because the engineering range is huge, the number of places needing to be detected is large, and the detection data needing to be recorded is large, so that the data can be missed; because engineering supervision work load is huge, be difficult to accomplish every day and carry out the engineering acceptance, can cause the pile up of engineering data, the engineering supervision of present is difficult to accomplish simultaneously that the technical staff examines and checks corresponding engineering area, causes the engineering supervision error.
The intelligent monitoring system comprises a mobile input device, an internal cloud and a supervision control end, wherein the mobile input device is used for inputting detection data, the internal cloud is in communication connection with the mobile input device and used for storing the detection data, the supervision control end is in communication connection with the internal cloud and used for comparing the detection data, the mobile input device comprises a positioning module, a fingerprint verification module and a time recording module, the fingerprint verification module is arranged in the mobile input device and connected with the positioning module, and the time recording module is arranged in the mobile input device and connected with the fingerprint verification module; the invention has the effects of improving the accuracy and the safety of the detection data; however, the technical scheme does not solve the problem that the detected data is provided for corresponding technicians for auditing, and the technicians are required to find the detected parts in huge data and monitoring videos, so that the engineering supervision program is complex.
In view of this, the invention provides an intelligent monitoring system for engineering supervision, which solves the technical problems.
Disclosure of Invention
In order to make up the deficiency of the prior art, the invention provides an engineering supervision intelligent monitoring system, which monitors the material data in a material library and the progress of an engineering site through the material library and the engineering site in a monitoring module, compares the material provided in the material library with the original material quantity of the material library through the material comparison in a database module, generates process drawings before and after construction through an engineering pattern, submits reports generated through the material comparison to a master module and a technician module through a management module, submits the engineering pattern to the technician module, audits the engineering pattern and the material comparison report through a technician, submits the audits to the master module, and carries out engineering acceptance through the master module, thereby ensuring the division of engineering areas and ensuring the engineering progress of corresponding areas audited by professional technicians, the effect of the project supervision program is simplified.
The invention relates to an intelligent monitoring system for project supervision, which comprises a monitoring module, a database module, a management module and a feedback module, wherein the monitoring module is used for monitoring a project; the monitoring module is used as a basis for project supervision intelligent monitoring; the database module is used for classifying the information of the monitoring module; the management module is used for analyzing and checking the information after the information classification; the feedback module is used for managing the collection urging and the field control of the module;
the monitoring module comprises material library monitoring and engineering site monitoring; the material warehouse monitoring is used for monitoring materials required by site construction of the storage engineering; the project site monitoring is used for monitoring the project progress;
the database module comprises material comparison and engineering patterns; the material comparison is used for generating a material comparison report according to the material usage within one day of the monitoring shooting of the material library; the engineering pattern generates and compares an engineering initial diagram and an engineering end diagram within one day of monitoring and shooting of an engineering site;
the management module comprises a technician module and a supervisor module; the technician module comprises information identification, time recording and data judgment and is used for technician identity identification, time recording and data judgment, and ensuring that the engineering pattern and the material are compared and transmitted to corresponding technicians; the supervisor module comprises information identification and engineering acceptance and is used for supervisor identity confirmation and engineering acceptance confirmation; the correlation exists between the technician module and the supervisor module, and the result of data judgment in the technician module is submitted to the supervisor module;
the feedback module comprises a multimedia device; the multimedia equipment is used for publishing the acceptance result of the supervisor project; the multimedia is arranged on an engineering site.
In the prior art, the construction site range is huge, a supervision team needs to check and examine a plurality of project sites, and data detection needs to be carried out on the project sites in the process of checking and accepting the projects; because the engineering range is huge, the number of places needing to be detected is large, and the detection data needing to be recorded is large, so that the data can be missed; because the work load of project supervision is huge, project acceptance is difficult to be carried out every day, and the accumulation of project data can be caused, and meanwhile, the current project supervision is difficult to carry out acceptance examination on corresponding project areas by technical personnel, so that errors occur in the project supervision;
therefore, the invention records the material usage in one day in the material library by setting two parts of material library monitoring and engineering site monitoring in a monitoring module, records the amount of the materials taken out in one day, records the engineering progress in one day in the engineering site, summarizes the initial material amount, the material taking-out amount and the calculated residual material amount in the material library in one day by comparing the materials in the database module according to the amount of the materials taken out in one day to obtain a material usage comparison report, generates an engineering initial time pattern and an engineering end time pattern in one day by an engineering pattern, then transmits the material comparison to a technician module and a project end time pattern of a master management module, transmits the engineering pattern to the technician module only, then transmits the technician module to the technician module by an information identification function in the technician module after confirming the identity information, the management module transmits the engineering pattern and the material generated in the engineering area corresponding to the technician module in a contrast manner, then the technician verifies the engineering pattern and the material in a contrast manner, the verified result is input into data judgment, meanwhile, the time of the data judgment is recorded through the time record in the technician module, then, the technician module transmits the information submitted by the technician to the supervisor module, after the supervisor identifies and confirms the identity through the information identification in the supervisor module, the data judgment result submitted by the technician module and the material submitted in the database module are judged, the result is submitted in engineering acceptance, and then the result of the engineering acceptance is published through multimedia of the engineering field, so that the development of the construction progress of the engineering field is realized, and the engineering acceptance can be ensured every day through the process, meanwhile, the corresponding project areas are checked and accepted by technicians, the project checking and accepting efficiency is improved, and the project supervision precision is improved.
Preferably, the feedback module further comprises an acceptance prompt, the feedback module is controlled by the main control module, and the acceptance prompt connects the time records of the engineering acceptance and the technician module in the main control module in series; when the project acceptance through the supervisor module is confirmed to project supervision on the same day, when the data submitted by the technician module is not judged in the project acceptance, the supervisor module can make the feedback module send acceptance reminding to the time record in the technician module through the project acceptance, the acceptance reminding makes the reminding function in the time record in the technician module exert the benefit, send task reminding through the technician module, make the technician judge the task in the data judgment, thereby the project acceptance efficiency is improved, and the project supervision effect is improved.
Preferably, the feedback module further comprises an acceptance prompt, the feedback module is controlled by the main control module, and the acceptance prompt connects the time records of the engineering acceptance and the technician module in the main control module in series; when the project acceptance through the supervisor module is confirmed to project supervision on the same day, when the data submitted by the technician module is judged to be lacked in the project acceptance, the supervisor module can improve the project acceptance to cause the feedback module to send acceptance reminding to the time record in the technician module, the acceptance reminding makes the reminding function in the time record in the technician module exert the benefit, the task reminding is sent through the technician module, the technician is caused to judge the task in the data judgment, thereby improving the project acceptance efficiency and improving the project supervision effect.
Preferably, the monitoring module conducts sound through the multimedia device; the database module also comprises a safety module; the safety module directly connects the engineering site monitoring in the monitoring module and the multimedia in the feedback module in series; the data video is transmitted to the database module through the engineering field monitoring in the monitoring module, the video is analyzed through the database module, the video with potential safety hazards is transmitted to the multimedia equipment of the feedback module through the safety module to be played, so that technical personnel in the engineering field can know the potential safety hazards, the engineering progress is prevented from being delayed through reducing the potential safety hazards in the engineering field, the engineering development progress is improved, the engineering supervision is more perfect, and the engineering supervision effect is improved.
Preferably, the project acceptance in the supervisor module has an option of performing subsequent material replenishment, and the project acceptance sends a task of the subsequent material replenishment to the time record in the technician module; when the technician leaves or is on hold, the condition that the follow-up supervisor module does not perform project acceptance due to the fact that the technician does not judge and do not reply data in the technician module is avoided, the supervisor module can firstly confirm the project acceptance and simultaneously apply for follow-up supplementary materials, then the technician conducts audit through tasks added in time records in the technician module, the audit result is transmitted to the supervisor module through data judgment, and then the supervisor module adds the supplementary materials into the project acceptance, so that the project supervision efficiency is improved, and the project supervision delay caused by individuals is avoided.
Preferably, the storage validity period of the material comparison and the engineering pattern in the database module is one day, and the project acceptance in the supervisor module can modify the material comparison and the engineering pattern validity period in the database module; in order to monitor the engineering field and the material library for a long time by the monitoring module and avoid insufficient space storage in the database module, the material comparison and the engineering pattern in the database module need to be automatically deleted, and the subsequent new video or audio cannot be automatically stored by the database module, so that the validity period of the material comparison and the engineering pattern storage in the database module is guaranteed to be one day, and the database module can effectively process the video or audio transmitted by the monitoring module; when the project acceptance in the supervisor module needs to be subjected to subsequent material supplement, if the supervisor module can not modify the material comparison and the project pattern validity period in the database module, when a subsequent technician performs data judgment through the technician module, the project acceptance function can not be performed due to the lack of the material comparison and the project pattern, therefore, the original monitoring data in the database module can be deleted by setting the project acceptance in the supervisor module, the supervision data record is reserved, the engineering supervision fault tolerance rate is improved, and the engineering supervision effect is improved.
The invention has the following beneficial effects:
1. according to the invention, two parts of material library monitoring and engineering field monitoring in the monitoring module are arranged, the material usage amount in one day in the material library is shot and recorded, the engineering progress in one day in the engineering field is shot and recorded, and then a comparison report is generated for the material usage amount in the material library in one day through material comparison in the database module, so that the effects of automatically generating the engineering material comparison report and the engineering pattern are realized.
2. According to the invention, the data video is transmitted to the database module through the engineering site monitoring in the monitoring module, the video is analyzed through the database module, and the video with potential safety hazard is transmitted to the multimedia of the feedback module through the safety module to be played, so that a technician in the engineering site can know the potential safety hazard, and the delay of the engineering progress is avoided by reducing the potential safety hazard in the engineering site, thereby improving the engineering development progress, improving the engineering supervision and improving the engineering supervision effect.
Drawings
The invention is further described with reference to the following figures and embodiments.
FIG. 1 is a block diagram of an intelligent monitoring system for project supervision according to the present invention;
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
As shown in fig. 1, the intelligent monitoring system for project supervision according to the present invention includes a monitoring module, a database module, a management module and a feedback module; the monitoring module is used as a basis for project supervision intelligent monitoring; the database module is used for classifying the information of the monitoring module; the management module is used for analyzing and checking the information after the information classification; the feedback module is used for managing the collection urging and the field control of the module;
the monitoring module comprises material library monitoring and engineering site monitoring; the material warehouse monitoring is used for monitoring materials required by site construction of the storage engineering; the project site monitoring is used for monitoring the project progress;
the database module comprises material comparison and engineering patterns; the material comparison is used for generating a material comparison report according to the material usage within one day of the monitoring shooting of the material library; the engineering pattern generates and compares an engineering initial diagram and an engineering end diagram within one day of monitoring and shooting of an engineering site;
the management module comprises a technician module and a supervisor module; the technician module comprises information identification, time recording and data judgment and is used for technician identity identification, time recording and data judgment, and ensuring that the engineering pattern and the material are compared and transmitted to corresponding technicians; the supervisor module comprises information identification and engineering acceptance and is used for supervisor identity confirmation and engineering acceptance confirmation; the correlation exists between the technician module and the supervisor module, and the result of data judgment in the technician module is submitted to the supervisor module;
the feedback module comprises a multimedia device; the multimedia equipment is used for publishing the acceptance result of the supervisor project; the multimedia is arranged on an engineering site;
in the prior art, the construction site range is huge, a supervision team needs to check and examine a plurality of project sites, and data detection needs to be carried out on the project sites in the process of checking and accepting the projects; because the engineering range is huge, the number of places needing to be detected is large, and the detection data needing to be recorded is large, so that the data can be missed; because the work load of project supervision is huge, project acceptance is difficult to be carried out every day, and the accumulation of project data can be caused, and meanwhile, the current project supervision is difficult to carry out acceptance examination on corresponding project areas by technical personnel, so that errors occur in the project supervision;
therefore, the invention records the material usage amount in one day in the material library by setting two parts of material library monitoring and engineering site monitoring in a monitoring module, records the amount of the material taken out in one day, records the engineering progress in one day in the engineering site, summarizes the initial material amount, the material taking-out amount and the calculated residual material amount in the material library in one day by comparing the materials in a database module according to the amount of the material taken out in one day to form a material usage comparison report, generates an engineering initial time pattern and an engineering end time pattern in one day by engineering patterns, then transmits the material comparison to a technician module and a project end module of a supervisor management module, transmits the engineering patterns to the technician module only, then after a technician confirms identity information by an information identification function in the technician module, the management module transmits the engineering pattern and the material generated in the engineering area corresponding to the technician module in a contrast manner, then the technician verifies the engineering pattern and the material in a contrast manner, the verified result is input into data judgment, meanwhile, the time of the data judgment is recorded through the time record in the technician module, then, the technician module transmits the information submitted by the technician to the supervisor module, after the supervisor identifies and confirms the identity through the information identification in the supervisor module, the data judgment result submitted by the technician module and the material submitted in the database module are judged, the result is submitted in engineering acceptance, and then the result of the engineering acceptance is published through multimedia of the engineering field, so that the development of the construction progress of the engineering field is realized, and the engineering acceptance can be ensured every day through the process, meanwhile, the corresponding project area is checked and accepted by a technician, the project checking and accepting efficiency is improved, and the project supervision precision is improved.
As an embodiment of the invention, the time record in the technician module has a reminding function, and after the database module transmits the material comparison and the engineering pattern to the management module, the time record has a time limit, and the technician can be reminded through the management module after the time record reaches the time limit; in the engineering supervision process, because the busy condition can appear in the technician, under this situation, the technician forgets or delays to log in the management module, carry out data judgement to the data that the database module uploaded, thereby engineering supervision has been delayed, add the warning function in the time record in the technician module, forget to judge the back at the technician, in time remind the technician to carry out the inspection judgement of engineering pattern and material contrast, the engineering supervision of having avoided the technician to delay the present day, thereby improve engineering acceptance efficiency, improve engineering supervision effect.
As an implementation mode of the invention, the feedback module also comprises an acceptance prompt, the feedback module is controlled by the main control module, and the acceptance prompt connects the time records of the engineering acceptance and the technician module in the main control module in series; when the project acceptance through the supervisor module is confirmed to project supervision on the same day, when the data submitted by the technician module is not judged in the project acceptance, the supervisor module can make the feedback module send acceptance reminding to the time record in the technician module through the project acceptance, the acceptance reminding makes the reminding function in the time record in the technician module exert the benefit, send task reminding through the technician module, make the technician judge the task in the data judgment, thereby the project acceptance efficiency is improved, and the project supervision effect is improved.
As an embodiment of the present invention, the monitoring module conducts sound through a multimedia device; the database module also comprises a safety module; the safety module directly connects the engineering site monitoring in the monitoring module and the multimedia in the feedback module in series; the data video is transmitted to the database module through the engineering field monitoring in the monitoring module, the video is analyzed through the database module, the video with potential safety hazards is transmitted to the multimedia equipment of the feedback module through the safety module to be played, so that technical personnel in the engineering field can know the potential safety hazards, the engineering progress is prevented from being delayed through reducing the potential safety hazards in the engineering field, the engineering development progress is improved, the engineering supervision is more perfect, and the engineering supervision effect is improved.
As an embodiment of the present invention, the supervisor module has an option for subsequent material replenishment, and the project acceptance sends the task of subsequent material replenishment to the time record in the technician module; when the technician asks for leave or is in rest, the condition that the subsequent main module does not perform engineering acceptance due to the fact that the technician does not judge and answer data in the technician module is avoided, the main module can firstly confirm the engineering acceptance and simultaneously apply for subsequent supplementary materials, then the technician performs auditing through tasks added in time records in the technician module, audited results are transmitted to the main module through data judgment, and then the main module adds the supplementary materials into the engineering acceptance, so that the engineering supervision efficiency is improved, and the delay of engineering supervision caused by individuals is avoided.
As an embodiment of the invention, the storage validity period of the material comparison and the engineering pattern in the database module is one day, and the project acceptance in the supervisor module can modify the material comparison and the engineering pattern validity period in the database module; in order to monitor the engineering field and the material library for a long time by the monitoring module and avoid insufficient space storage in the database module, the material comparison and the engineering pattern in the database module need to be automatically deleted, and the subsequent new video or audio cannot be automatically stored by the database module, so that the validity period of the material comparison and the engineering pattern storage in the database module is guaranteed to be one day, and the database module can effectively process the video or audio transmitted by the monitoring module; when the engineering acceptance in the supervisor module appears and needs to carry out follow-up supplementary material, if the supervisor module can not modify material contrast and engineering pattern validity period in the database module, when follow-up technician carries out data judgement through the technician module, will cause the engineering acceptance function to go on owing to lack material contrast and engineering pattern, consequently, the setting is responsible for the engineering acceptance in the module and can delete the original monitoring data in the database module, the data record of keeping the supervision, the fault tolerance of engineering supervision has been reached and has been improved, the effect of engineering supervision is improved.
The specific working process is as follows:
the method comprises the steps of setting a material library monitoring part and an engineering site monitoring part in a monitoring module, shooting and recording the material usage amount in one day in a material library, recording the material taking amount in one day, shooting and recording the engineering progress in one day in an engineering site, summarizing the initial material amount in the material library in one day, the material taking amount and the calculated residual material amount into a material usage comparison report according to the material comparison in a database module according to the material taking amount in one day, generating an engineering initial time pattern and an engineering end time pattern in one day through engineering patterns, transmitting the material comparison to a technician module and a supervisor module of a management module, transmitting the engineering patterns to the technician module only, and after confirming identity information by a technician through an information identification function in the technician module, the management module transmits the engineering pattern and the material generated in the engineering area corresponding to the technician module in a contrast manner, then the technician verifies the engineering pattern and the material in a contrast manner, the verified result is input into data judgment, meanwhile, the time of the data judgment is recorded through the time record in the technician module, then, the technician module transmits the information submitted by the technician to the supervisor module, after the supervisor identifies and confirms the identity through the information identification in the supervisor module, the data judgment result submitted by the technician module and the material submitted in the database module are judged, the result is submitted in engineering acceptance, and then the result of the engineering acceptance is published through multimedia of the engineering field, so that the development of the construction progress of the engineering field is realized, and the engineering acceptance can be ensured every day through the process, meanwhile, the corresponding project areas are checked and accepted by technicians, the project checking and accepting efficiency is improved, and the project supervision precision is improved; in order to monitor the engineering field and the material library for a long time by the monitoring module and avoid insufficient space storage in the database module, the material comparison and the engineering pattern in the database module need to be automatically deleted, and the subsequent new video or audio cannot be automatically stored by the database module, so that the validity period of the material comparison and the engineering pattern storage in the database module is guaranteed to be one day, and the database module can effectively process the video or audio transmitted by the monitoring module; when the engineering acceptance in the supervisor module appears and needs to carry out follow-up supplementary material, if the supervisor module can not modify material contrast and engineering pattern validity period in the database module, when follow-up technician carries out data judgement through the technician module, will cause the engineering acceptance function to go on owing to lack material contrast and engineering pattern, consequently, the setting is responsible for the engineering acceptance in the module and can delete the original monitoring data in the database module, the data record of keeping the supervision, the fault tolerance of engineering supervision has been reached and has been improved, the effect of engineering supervision is improved.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. An intelligent monitoring system for project supervision comprises a monitoring module, a database module, a management module and a feedback module; the method is characterized in that: the monitoring module is used as a basis for project supervision intelligent monitoring; the database module is used for classifying the information of the monitoring module; the management module is used for analyzing and checking the information after the information classification; the feedback module is used for managing the collection urging and the field control of the module;
the monitoring module comprises material library monitoring and engineering site monitoring; the material warehouse monitoring is used for monitoring materials required by site construction of the storage engineering; the project site monitoring is used for monitoring the project progress;
the database module comprises material comparison and engineering patterns; the material comparison is used for generating a material comparison report according to the material usage within one day of the monitoring shooting of the material library; the engineering pattern generates and compares an engineering initial diagram and an engineering end diagram within one day of monitoring and shooting of an engineering site;
the management module comprises a technician module and a supervisor module; the technician module comprises information identification, time recording and data judgment and is used for identifying the identity of a technician, auditing the time recording and judging the data and ensuring that the engineering pattern and the material are compared and transmitted to the corresponding technician; the supervisor module comprises information identification and engineering acceptance and is used for supervisor identity confirmation and engineering acceptance confirmation; the correlation exists between the technician module and the supervisor module, and the result of data judgment in the technician module is submitted to the supervisor module;
the feedback module comprises a multimedia device; the multimedia equipment is used for publishing the acceptance result of the supervisor project; the multimedia is arranged on an engineering site.
2. The intelligent monitoring system for project supervision according to claim 1, characterized in that: the feedback module also comprises a check and acceptance reminder, the feedback module is controlled by the main pipe module, and the check and acceptance reminder connects the time record of the engineering check and acceptance and the time record of the technician module in the main pipe module in series.
3. The intelligent monitoring system for project supervision according to claim 2, characterized in that: the feedback module also comprises a check and acceptance reminder, the feedback module is controlled by the main pipe module, and the check and acceptance reminder connects the time record of the engineering check and acceptance and the time record of the technician module in the main pipe module in series.
4. The project supervision intelligent monitoring system according to claim 3, characterized in that: the monitoring module conducts sound through the multimedia equipment; the database module also comprises a safety module; the safety module directly connects the engineering field monitoring in the monitoring module and the multimedia in the feedback module in series.
5. The project supervision intelligent monitoring system according to claim 4, characterized in that: the project acceptance in the supervisor module has an option to perform subsequent material replenishment, and the project acceptance sends the task of the subsequent material replenishment to the time record in the technician module.
6. The project supervision intelligent monitoring system according to claim 5, characterized in that: the storage validity period of the material comparison and the engineering pattern in the database module is one day, and the engineering acceptance in the supervisor module can modify the material comparison and the engineering pattern validity period in the database module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210100090.6A CN114449198A (en) | 2022-01-27 | 2022-01-27 | Intelligent monitoring system for project supervision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210100090.6A CN114449198A (en) | 2022-01-27 | 2022-01-27 | Intelligent monitoring system for project supervision |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114449198A true CN114449198A (en) | 2022-05-06 |
Family
ID=81369741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210100090.6A Pending CN114449198A (en) | 2022-01-27 | 2022-01-27 | Intelligent monitoring system for project supervision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114449198A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117474487A (en) * | 2023-11-06 | 2024-01-30 | 青矩技术股份有限公司 | Engineering material inspection method, device, equipment and storage medium |
CN117634736A (en) * | 2023-11-27 | 2024-03-01 | 成致项目管理有限公司 | Engineering supervision monitoring system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104639880A (en) * | 2013-11-06 | 2015-05-20 | 深圳中兴力维技术有限公司 | Method and system for video monitoring and centralized recording in GPRS network environment |
US20170053244A1 (en) * | 2015-08-22 | 2017-02-23 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
CN207455934U (en) * | 2017-09-26 | 2018-06-05 | 杭州第九区科技有限公司 | One kind can monitor Hot water units and distributed Hot water units management control system |
CN109165813A (en) * | 2018-07-24 | 2019-01-08 | 广东海外建设监理有限公司 | The Supervision of construction quality in project supervision |
CN109726457A (en) * | 2018-12-17 | 2019-05-07 | 深圳市中行建设工程顾问有限公司 | A kind of overall process intelligence engineering supervisory information managing and control system |
US20190220936A1 (en) * | 2015-08-22 | 2019-07-18 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
CN110363876A (en) * | 2019-07-16 | 2019-10-22 | 安徽求是工程建设咨询有限公司 | A kind of intelligent monitor system for project supervision |
CN113554347A (en) * | 2021-08-10 | 2021-10-26 | 臧运芬 | Big data platform plan management system for project overall planning plan |
-
2022
- 2022-01-27 CN CN202210100090.6A patent/CN114449198A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104639880A (en) * | 2013-11-06 | 2015-05-20 | 深圳中兴力维技术有限公司 | Method and system for video monitoring and centralized recording in GPRS network environment |
US20170053244A1 (en) * | 2015-08-22 | 2017-02-23 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
US20190220936A1 (en) * | 2015-08-22 | 2019-07-18 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
CN207455934U (en) * | 2017-09-26 | 2018-06-05 | 杭州第九区科技有限公司 | One kind can monitor Hot water units and distributed Hot water units management control system |
CN109165813A (en) * | 2018-07-24 | 2019-01-08 | 广东海外建设监理有限公司 | The Supervision of construction quality in project supervision |
CN109726457A (en) * | 2018-12-17 | 2019-05-07 | 深圳市中行建设工程顾问有限公司 | A kind of overall process intelligence engineering supervisory information managing and control system |
CN110363876A (en) * | 2019-07-16 | 2019-10-22 | 安徽求是工程建设咨询有限公司 | A kind of intelligent monitor system for project supervision |
CN113554347A (en) * | 2021-08-10 | 2021-10-26 | 臧运芬 | Big data platform plan management system for project overall planning plan |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117474487A (en) * | 2023-11-06 | 2024-01-30 | 青矩技术股份有限公司 | Engineering material inspection method, device, equipment and storage medium |
CN117634736A (en) * | 2023-11-27 | 2024-03-01 | 成致项目管理有限公司 | Engineering supervision monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114449198A (en) | Intelligent monitoring system for project supervision | |
CN108062296A (en) | A kind of method and system of measurement verification calibration data result specification intelligent processing | |
CN106327087A (en) | Test task assignment method | |
CN111666464A (en) | Project document cooperation management system and method based on cloud service | |
CN110555630B (en) | Data processing method and device | |
CN110088744A (en) | A kind of database maintenance method and its system | |
CN111872589B (en) | Welding test control method, system, computer storage medium and equipment | |
CN108269059B (en) | Data management system | |
CN112734394A (en) | Project supervision information management method based on Internet of things | |
CN114862280B (en) | Carbon emission data processing method and device based on block chain | |
CN111698121A (en) | SNMP trap alarm test method and related device | |
CN207070219U (en) | Projects supervision system based on video monitoring | |
CN101477653A (en) | Processing method and system for data quality | |
CN116245410A (en) | Inspection and detection reporting system and method for oil and gas storage and transportation equipment | |
CN113761854A (en) | Method and device for realizing train control data processing | |
CN102184336A (en) | Method and system for GMP (Good Manufacturing Practice) validation automation in pharmaceutical industry | |
CN111222928A (en) | Method and system for monitoring enterprise standard invoicing | |
CN111428890A (en) | Cabinet maintenance management method, system and device | |
CN112506788A (en) | Method and device for automatically monitoring microservice interface and storage medium | |
CN110728492A (en) | Demand change management method and system | |
CN112396396B (en) | Whole vehicle test spot inspection system based on WeChat applet | |
CN110990247A (en) | Test system for validity of unattended issuing system | |
CN111814145A (en) | Request verification method and device based on log acquisition and computer equipment | |
CN116701522B (en) | File cabinet classified data visualization method and device and electronic equipment | |
CN111339079A (en) | Airworthiness certification process and data management method and architecture for complex electronic hardware |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |