CN109726457A - A kind of overall process intelligence engineering supervisory information managing and control system - Google Patents

A kind of overall process intelligence engineering supervisory information managing and control system Download PDF

Info

Publication number
CN109726457A
CN109726457A CN201811544428.7A CN201811544428A CN109726457A CN 109726457 A CN109726457 A CN 109726457A CN 201811544428 A CN201811544428 A CN 201811544428A CN 109726457 A CN109726457 A CN 109726457A
Authority
CN
China
Prior art keywords
construction
time
construction part
supervisor
database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811544428.7A
Other languages
Chinese (zh)
Inventor
高建午
张承跃
王友建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhonghang Construction Engineering Consultant Co Ltd
Original Assignee
Shenzhen Zhonghang Construction Engineering Consultant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhonghang Construction Engineering Consultant Co Ltd filed Critical Shenzhen Zhonghang Construction Engineering Consultant Co Ltd
Priority to CN201811544428.7A priority Critical patent/CN109726457A/en
Publication of CN109726457A publication Critical patent/CN109726457A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of overall process intelligence engineering supervisory information managing and control systems, it is related to a kind of project supervision technical field, solves the problems, such as the schedule that supervisor can not be allowed to understand when process carries out, it includes central processing unit, it is stored with construction partially and required time database is completed in the construction the time required to corresponding construction completion, be stored with construction part and be corresponding to it complete construction when matched three-dimensional visualization model construction partial 3-D Visualization Model database, acquire the three-dimensional panorama data acquisition device of the three-dimensional panorama data for partial 3-D panoramic view data of constructing in construction site, three-dimensional panorama data are converted as the conversion equipment of three-dimensional visualization model, and, it is stored with supervisor's mobile phone database of project supervision personnel's cell-phone number, short message prompt device.The present invention has the effect of the progress issue for facilitating supervisor more accurately to understand corresponding construction part.

Description

A kind of overall process intelligence engineering supervisory information managing and control system
Technical field
The present invention relates to a kind of project supervision technical fields, more particularly, to a kind of overall process intelligence engineering supervisory information pipe Control system.
Background technique
With nation-building field reform gradually in-depth, building legislation it is gradually perfect, construction supervision system has become One legal primary institution of China's engineering construction field, management are with a very important position in engineering construction.But it is existing The management of Project Supervision information, most of is all to fill in various tables manually, the artificial transmitting and management for carrying out information.It adopts It with this way to manage, can not accomplish standardized management, can not accomplish the integration and full low efficiency that is shared, and managing of information Under, it is at high cost.
Chinese patent literature CN105913341A discloses a kind of Project Supervision approaches to IM and system, packet It includes: construction project is decomposed into different critical processes;After the requirements for starting construction for reaching each critical process, according to described Management is carried out in the preset management process of critical process, acceptance specification, working approaches of surveillance and measure, and described in acquisition File needed for critical process work is filed;Detect all critical processes work it is equal at the end of, described in completion The supervisory information management of construction project works.It can be improved the efficiency of management, reduce management cost, solve and manually carry out letter The problem of transmitting and management of breath can not accomplish standardized management.But there is also certain deficiencies for it, only to crucial in project supervision The documentation of process is filed and is managed, and the solution of whole Engineering Supervision informationization is not provided, to work The emphasis such as examination & approval link, management link in journey management do not carry out intelligent conversion.
Although prior art among the above can be completed during having the following deficiencies: above-mentioned project supervision in process It allows supervisor to understand in time afterwards, but supervisor can not be allowed to understand the schedule when process carries out, there are also improved Space.
Summary of the invention
The object of the present invention is to provide there is the progress for facilitating supervisor more accurately to understand corresponding construction part to ask The overall process intelligence engineering supervisory information managing and control system of the effect of topic.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of overall process intelligence engineering supervisory information managing and control system, including central processing unit, it is characterized in that: overall process intelligence engineering Supervisory information managing and control system further includes the construction completion for being stored with construct part and corresponding construction completion required time Required time database, be stored with construction part and be corresponding to it when completing construction matched three-dimensional visualization model apply The Ministry of worker divides three-dimensional visualization model database, acquires the three-dimensional panorama data of construction partial 3-D panoramic view data in construction site Three-dimensional panorama data acquisition device converts three-dimensional panorama data as the conversion equipment of three-dimensional visualization model, and, it is stored with work Supervisor's mobile phone database of journey supervisor's cell-phone number, short message prompt device;
The working time t1 of each construction part of the real-time record storage of central processing unit is as dividend, while to correspond to construction portion It is divided into query object and inquires the required time t2 of corresponding construction part in database the time required to construction is completed as divisor, Calculate completed percentage n1;
While three-dimensional panorama data, conversion equipment acquisition correspondence that central processing unit is acquired by three-dimensional panorama data acquisition device It constructs the three-dimensional visualization model of part, is at the same time that query object transfers can in construction partial 3-D with corresponding construction part Construction partial 3-D Visualization Model when completion depending on changing model database is constructed, the three-dimensional for calculating corresponding construction part can The ratio n2 of construction partial 3-D Visualization Model when completing construction is accounted for depending on changing model;
If n1=n2, central processing unit transfers the cell-phone number of the supervisor in supervisor's mobile phone database and passes through short message Suggestion device notifies the corresponding construction part of supervisor is estimated can complete in the time of planning;
If n1 > n2, central processing unit transfers the cell-phone number of the supervisor in supervisor's mobile phone database and passes through short message Suggestion device notifies the corresponding estimated completion that needs an extension in construction part of supervisor;
If n1 < n2, central processing unit transfers the cell-phone number of the supervisor in supervisor's cell-phone number database and by short Letter suggestion device notifies the estimated time completion that can shift to an earlier date in planning in the corresponding construction part of supervisor.
Using the above scheme, the available corresponding completion of database the time required to being completed by central processing unit, construction Ratio n1, and pass through central processing unit, construction partial 3-D Visualization Model database, three-dimensional panorama data acquisition device, turn The construction partial 3-D that the three-dimensional visualization model that changing device can obtain corresponding construction part accordingly accounts for when completing construction can Whether the ratio n2 depending on changing model can effectively analyze construction part can be by by the comparison of completed percentage n1 and ratio n2 It is completed according to planning, and corresponding supervisor is notified by short message prompt device, supervisor's mobile phone database in time.
Preferably, overall process intelligence engineering supervisory information managing and control system further include be stored with construction part and it is right therewith The construction time started database of time when the construction answered starts, time computing module of delaying;
Extension time computing module calculates the corresponding construction part extension time according to following formula;
T=t2/n2-t2;
T is the time required to the construction of corresponding construction part is completed;
T2 is that corresponding construction part is delayed the time;
Central processing unit is that query object database the time required to construction is completed transfers out corresponding construction with corresponding construction part Part required time t2, while being accounted for the three-dimensional visualization model that corresponding construction part is the corresponding construction part of query object acquisition The ratio n2 for completing construction partial 3-D Visualization Model when construction, when calculating the completion after delaying according to above formula Between, and the time that will delay notifies corresponding supervisor by short message prompt device.
Using the above scheme, construction portion can occur by construction time started database, time computing module of delaying The extension time that can be expected that when dividing estimated delay notifies to arrive in time by short message prompt device corresponds to supervisor.
Preferably, overall process intelligence engineering supervisory information managing and control system further includes the construction being stored with there are ordinal relation Part order database, pre-set time computing device;
If construction part, which occurs, in n1 < n2 to be fulfiled ahead of schedule, pre-set time computing device is calculated according to following formula: T2 =t2-t1/n2;
Then central processing unit is partially that query object database the time required to construction is completed transfers out corresponding apply with corresponding construction T2 the time required to the Ministry of worker point, while the working time t1 of each construction part of storage is obtained in real time, it calculates and applies according to above formula The pre-set time that the Ministry of worker point fulfils ahead of schedule, while being transferred out with corresponding construction partial query object in construction part order database Next construction part, by it is next construction part construction information and pre-set time simultaneously pass through short message prompt device notify it is right Answer supervisor.
Using the above scheme, can occur by the setting of construct part order database, pre-set time computing device Construction part can notify in time corresponding supervisor by short message prompt device when fulfiling ahead of schedule.
Preferably, further including raw material position needed for being stored with construction part and corresponding construction part position Construction partial information database, climb displacement device, be stored with transport raw material vehicle average speeds transport vehicle it is average Running speed database;
Central processing unit is query object in construction part to fulfil next construction part corresponding to construction part ahead of schedule Information database transfers out construction part material position as starting point, and corresponding construction part position leads to as terminal Overtravel computing device calculates corresponding stroke distances as dividend, to transfer in transport vehicle average speeds database In transport vehicle average speeds as divisor, haulage time T3 needed for calculating transport vehicle, and in advance in current construction Time T3 time announcement is partially completed to supervisor in case in preparing next process in advance.
Using the above scheme, pass through the partial information database, climb displacement device, transport vehicle average speeds number of constructing Under can effectively obtaining the time of raw material transport according to the setting in library, central processing unit and when carry out the transport of raw material to guarantee The transport that raw material can be reduced at the beginning of a construction part, improves whole construction efficiency.
Preferably, further including verbal announcement module;
If central processing unit also will start verbal announcement module while prompting corresponding supervisor by short message prompt device Corresponding supervisor is accordingly prompted.
Using the above scheme, it can not be notified in time by short message prompt device by the setting of verbal announcement module In the case where corresponding supervisor, corresponding supervisor is further notified by way of voice.
Preferably, the verbal announcement module is voice prompting device.
Using the above scheme, since verbal announcement module is voice prompting device, it can guarantee the same of voice prompting effect When, reduce corresponding cost.
Preferably, the short message prompt device is short message prompt device.
Using the above scheme, since short message prompt device is short message prompt device, can subtract while guaranteeing short message prompt Few corresponding cost.
In conclusion the invention has the following advantages: completing required time data by central processing unit, construction Library, construction partial 3-D Visualization Model database, three-dimensional panorama data acquisition device, conversion equipment obtain the complete of construction part It can be completed in planning time at whether progress is estimated, and timely by supervisor's mobile phone database, short message prompt device Notify corresponding supervisor.
Detailed description of the invention
Fig. 1 is the system block diagram one of overall process intelligence engineering supervisory information managing and control system of the present invention.
Fig. 2 is the system block diagram two of overall process intelligence engineering supervisory information managing and control system of the present invention.
In figure, 1, central processing unit;2, database the time required to construction is completed;3, construction partial 3-D Visualization Model number According to library;4, three-dimensional panorama data acquisition device;5, conversion equipment;6, supervisor's mobile phone database;7, short message prompt device;8, Construction time started database;9, extension time computing module;10, construction part order database;11, pre-set time calculates dress It sets;12, construction partial information database;13, climb displacement device;14, transport vehicle average speeds database;15, voice Notification module.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
As described in Figure 1, a kind of overall process intelligence engineering supervisory information managing and control system disclosed in the present embodiment, including centre Device 1 is managed, overall process intelligence engineering supervisory information managing and control system further includes being stored with construction part and corresponding having constructed At required time construction complete the time required to database 2, be stored with construction part and be corresponding to it completion construction when institute The construction partial 3-D Visualization Model database 3 for the three-dimensional visualization model matched acquires partial 3-D of constructing in construction site The three-dimensional panorama data acquisition device 4 of the three-dimensional panorama data of panoramic view data converts three-dimensional panorama data as three-dimensional visualization mould The conversion equipment 5 of type, and, it is stored with supervisor's mobile phone database 6, the short message prompt device of project supervision personnel's cell-phone number 7, wherein three-dimensional panorama data acquisition device 4 is 360 degree of full-view cameras, can be 400 or so squares without blind monitoring area coverage Rice is equipped with a fish eye lens, possesses 360 degree of panoramic views, 360 degree full-view cameras can replace more commonly Video camera, has accomplished seamless monitoring, and conversion equipment 5 preferably draws corresponding three-dimensional visualization according to three-dimensional panorama data information automatically The software of model, the preferred short message prompt device of short message prompt device 7.
The following are the performance for judging each construction part according to the above technical characteristic and how to notify supervisor The process of member.
The working time t1 of each construction part of the real-time record storage of central processing unit 1 is as dividend, while with correspondence Construction part is query object inquires corresponding construction part the time required to completion of constructing required time t2 work in database 2 For divisor, completed percentage n1 is calculated.
Central processing unit 1 passes through three-dimensional panorama data, the conversion equipment 5 that three-dimensional panorama data acquisition device 4 acquires simultaneously The three-dimensional visualization model of corresponding construction part is obtained, is at the same time that query object is transferred in construction portion with corresponding construction part Divide the construction partial 3-D Visualization Model when completion construction of three-dimensional visualization model database 3, calculates corresponding construction portion The three-dimensional visualization model divided accounts for the ratio n2 of construction partial 3-D Visualization Model when completing construction.
If n1=n2, central processing unit 1 is transferred the cell-phone number of the supervisor in supervisor's mobile phone database 6 and is led to Crossing short message suggestion device 7 notifies the corresponding construction part of supervisor is estimated can complete in the time of planning.
If n1 > n2, central processing unit 1 is transferred the cell-phone number of the supervisor in supervisor's mobile phone database 6 and is led to It crosses short message suggestion device 7 and notifies the corresponding estimated completion that needs an extension in construction part of supervisor.
If n1 < n2, central processing unit 1 is transferred the cell-phone number of the supervisor in supervisor's cell-phone number database and is led to It crosses short message suggestion device 7 and notifies the estimated time completion that can shift to an earlier date in planning in the corresponding construction part of supervisor.
It is further to consider occurring constructing when part is delayed and the specific time of extension still notified to arrive Supervisor, overall process intelligence engineering supervisory information managing and control system further include being stored with construction part and corresponding construction The construction time started database 8 of time when beginning, time computing module 9 of delaying;Time computing module 9 delay according to following Formula calculates corresponding construction part and delays the time;T=t2/n2-t2;T is the time required to the construction of corresponding construction part is completed;T2 is Delay the time corresponding construction part.
Central processing unit 1 is that query object database 2 the time required to construction is completed is transferred out pair with corresponding construction part Should construct part required time t2, while take corresponding construction part as the three-dimensional visualization of the corresponding construction part of query object acquisition Model accounts for the ratio n2 of construction partial 3-D Visualization Model when completing construction, calculates according to above formula complete after delaying At the time, and the time that will delay notifies corresponding supervisor by short message prompt device 7.
To avoid can not notifying in place for short message prompt device 7, overall process intelligence engineering supervisory information managing and control system is also wrapped Include verbal announcement module 15;If central processing unit 1 can also while prompting corresponding supervisor by short message prompt device 7 15 couples of verbal announcement module corresponding supervisors of starting are accordingly prompted, and the verbal announcement module 15 is voice prompting device.
Further, it is contemplated that when appearance construction part is fulfiled ahead of schedule, supervisor can be allowed to understand it and shifted to an earlier date The concrete condition of completion, overall process intelligence engineering supervisory information managing and control system further include the construction portion being stored with there are ordinal relation Divide sequential data base 10, pre-set time computing device 11;If construction part, which occurs, in n1 < n2 to be fulfiled ahead of schedule, in advance Time computing device 11 is calculated according to following formula: T2=t2-t1/n2;Then central processing unit 1 is inquiry with corresponding construction part Object database 2 the time required to construction is completed transfers out t2 the time required to corresponding construction part, while it is each to obtain storage in real time The working time t1 of construction part calculates the pre-set time that construction part is fulfiled ahead of schedule according to above formula, while with correspondence Construction partial query object transfers out next construction part in construction part order database 10, by the construction of next construction part Information and pre-set time pass through the notice of short message prompt device 7 to corresponding supervisor simultaneously.
Further, it is contemplated that for convenience of when construction part is fulfiled ahead of schedule, next construction portion can be arranged in time The raw material divided carries out, and overall process intelligence engineering supervisory information managing and control system further includes that raw material institute needed for being stored with construction part is in place It sets and corresponds to the construction partial information database 12 of construction part position, climb displacement device 13, be stored with transport original The transport vehicle average speeds database 14 of truck average speeds.
Central processing unit 1 is query object in construction to fulfil next construction part corresponding to construction part ahead of schedule Partial information database 12 transfers out construction part material position as starting point, and corresponding construction part position is as eventually Point calculates corresponding stroke distances as dividend, to transfer in transport vehicle average row speed by climb displacement device 13 Transport vehicle average speeds in degree database 14 are as divisor, haulage time T3 needed for calculating transport vehicle, and in advance Time T3 time announcement is partially completed to supervisor in current construction in case in preparing next process in advance.
The whole course of work is as follows:
Database 2, construction partial 3-D Visualization Model database the time required to being completed first by central processing unit 1, construction 3, whether three-dimensional panorama data acquisition device 4, conversion equipment 5 obtain the schedule of construction part it is expected that can be in planning time Interior completion, and corresponding supervisor is notified by supervisor's mobile phone database 6, short message prompt device 7 in time.
When construction part occur can delay, pass through construction time started database 8, time computing module 9 of delaying In time by the time announcement of extension to corresponding supervisor.
When construction part occur can fulfil ahead of schedule, calculated by construction part order database 10, pre-set time Device 11, construction partial information database 12, climb displacement device 13, transport vehicle average speeds database 14 can notify Properly prepare the progress of next construction part to supervisor.
And to guarantee prompt in place, prompts, avoid in conjunction with the combination of verbal announcement module 15 and short message prompt device 7 The phenomenon that staff omits.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (7)

1. a kind of overall process intelligence engineering supervisory information managing and control system, including central processing unit (1), it is characterized in that: overall process intelligence Can project supervision information managing and control system further include be stored with construction part and it is corresponding construction complete the time required to applying Work completes required time database (2), is stored with construction part and matched three-dimensional visible when completing construction that is corresponding to it Change the construction partial 3-D Visualization Model database (3) of model, acquire partial 3-D panoramic view data of constructing in construction site The three-dimensional panorama data acquisition device (4) of three-dimensional panorama data converts three-dimensional panorama data as the conversion of three-dimensional visualization model Device (5), and, it is stored with supervisor's mobile phone database (6), the short message prompt device (7) of project supervision personnel's cell-phone number;
The working time t1 of each construction part of the real-time record storage of central processing unit (1) is applied as dividend, while with correspondence The Ministry of worker is divided into query object and makees in the required time t2 that construction completes to inquire corresponding construction part in required time database (2) For divisor, completed percentage n1 is calculated;
Central processing unit (1) passes through three-dimensional panorama data, the conversion equipment that three-dimensional panorama data acquisition device (4) acquire simultaneously (5) three-dimensional visualization model of corresponding construction part is obtained, is at the same time that query object is transferred in applying with corresponding construction part The Ministry of worker divides the construction partial 3-D Visualization Model when completion construction of three-dimensional visualization model database (3), calculates correspondence The three-dimensional visualization model of construction part accounts for the ratio n2 of construction partial 3-D Visualization Model when completing construction;
If n1=n2, central processing unit (1) is transferred the cell-phone number of the supervisor in supervisor's mobile phone database (6) and is led to Crossing short message suggestion device (7) notifies the corresponding construction part of supervisor is estimated can complete in the time of planning;
If n1 > n2, central processing unit (1) is transferred the cell-phone number of the supervisor in supervisor's mobile phone database (6) and is led to It crosses short message suggestion device (7) and notifies the corresponding estimated completion that needs an extension in construction part of supervisor;
If n1 < n2, central processing unit (1) is transferred the cell-phone number of the supervisor in supervisor's cell-phone number database and is passed through Short message prompt device (7) notifies the estimated time completion that can shift to an earlier date in planning in the corresponding construction part of supervisor.
2. a kind of overall process intelligence engineering supervisory information managing and control system according to claim 1, it is characterized in that: overall process intelligence Energy project supervision information managing and control system further includes applying for time when being stored with construction part and corresponding construction beginning Work time started database (8) delays time computing module (9);
Extension time computing module (9) calculates the corresponding construction part extension time according to following formula;
T=t2/n2-t2;
T is the time required to the construction of corresponding construction part is completed;
T2 is that corresponding construction part is delayed the time;
Central processing unit (1) is that query object database (2) the time required to construction is completed is transferred out pair with corresponding construction part Should construct part required time t2, while take corresponding construction part as the three-dimensional visualization of the corresponding construction part of query object acquisition Model accounts for the ratio n2 of construction partial 3-D Visualization Model when completing construction, calculates according to above formula complete after delaying At the time, and the time that will delay notifies corresponding supervisor by short message prompt device (7).
3. a kind of overall process intelligence engineering supervisory information managing and control system according to claim 1, it is characterized in that: overall process intelligence Can project supervision information managing and control system further include be stored with there are the construction part order database (10) of ordinal relation, in advance when Between computing device (11);
If construction part, which occurs, in n1 < n2 to be fulfiled ahead of schedule, pre-set time computing device (11) is according to following formula meter It calculates: T2=t2-t1/n2;
Then central processing unit (1) is that query object database (2) the time required to construction is completed is transferred out with corresponding construction part T2 the time required to corresponding construction part, while the working time t1 of each construction part of storage is obtained in real time, according to above formula meter The pre-set time that construction part is fulfiled ahead of schedule is calculated, while with corresponding construction partial query object in construction part order database (10) next construction part is transferred out, the construction information of next construction part and pre-set time are filled by short message prompt simultaneously (7) notice is set to corresponding supervisor.
4. a kind of overall process intelligence engineering supervisory information managing and control system according to claim 1, it is characterized in that: further including depositing The construction partial information database (12) of raw material position needed for containing construction part and corresponding construction part position, Climb displacement device (13), the transport vehicle average speeds database for being stored with transport raw material vehicle average speeds (14);
Central processing unit (1) is query object in construction portion to fulfil next construction part corresponding to construction part ahead of schedule Information database (12) are divided to transfer out construction part material position as starting point, corresponding construction part position is as whole Point calculates corresponding stroke distances as dividend by climb displacement device (13), is averagely driven a vehicle with transferring in transport vehicle Transport vehicle average speeds in speed data library (14) are as divisor, haulage time T3 needed for calculating transport vehicle, and Time T3 time announcement is partially completed to supervisor in current construction in case in preparing next process in advance in advance.
5. a kind of overall process intelligence engineering supervisory information managing and control system according to claim 1, it is characterized in that: further including language Sound notification module (15);
If while prompting corresponding supervisor by short message prompt device (7), it is logical also to will start voice for central processing unit (1) Know that module (15) accordingly prompts corresponding supervisor.
6. a kind of overall process intelligence engineering supervisory information managing and control system according to claim 5, it is characterized in that: the voice Notification module (15) is voice prompting device.
7. a kind of overall process intelligence engineering supervisory information managing and control system according to claim 1, it is characterized in that: the short message Suggestion device (7) is short message prompt device.
CN201811544428.7A 2018-12-17 2018-12-17 A kind of overall process intelligence engineering supervisory information managing and control system Pending CN109726457A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811544428.7A CN109726457A (en) 2018-12-17 2018-12-17 A kind of overall process intelligence engineering supervisory information managing and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811544428.7A CN109726457A (en) 2018-12-17 2018-12-17 A kind of overall process intelligence engineering supervisory information managing and control system

Publications (1)

Publication Number Publication Date
CN109726457A true CN109726457A (en) 2019-05-07

Family

ID=66297685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811544428.7A Pending CN109726457A (en) 2018-12-17 2018-12-17 A kind of overall process intelligence engineering supervisory information managing and control system

Country Status (1)

Country Link
CN (1) CN109726457A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111785153A (en) * 2020-05-23 2020-10-16 中兵勘察设计研究院有限公司 Engineering project display method, device and system based on electronic map
CN114449198A (en) * 2022-01-27 2022-05-06 周璨 Intelligent monitoring system for project supervision
CN117173613A (en) * 2023-09-15 2023-12-05 中国铁路广州局集团有限公司 Intelligent management system and method for whole process informatization of engineering construction project

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO932746D0 (en) * 1992-07-31 1993-07-30 Texas Instruments Inc PROCEDURE AND DEVICE FOR COMPUTER CONTROLLED MANUFACTURE OF THREE-DIMENSIONAL GOODS OUT OF COMPUTER DATA
JP2000305992A (en) * 1999-04-22 2000-11-02 National House Industrial Co Ltd System for carry-in management of material to construction site
US20040196282A1 (en) * 2003-02-14 2004-10-07 Oh Byong Mok Modeling and editing image panoramas
JP2008004075A (en) * 2006-05-26 2008-01-10 Asahi Kasei Homes Kk Construction information management system for building
CN101681385A (en) * 2007-05-04 2010-03-24 阿瑟·A.·克利普费尔 Computer code and method for designing multi-family dwelling
CN102968679A (en) * 2011-08-31 2013-03-13 巫协森 Automatic guiding method and system of engineer operation
CN103267708A (en) * 2013-05-29 2013-08-28 重庆市计量质量检测研究院 Rapid detection method for noble metal
CN103649974A (en) * 2011-03-21 2014-03-19 塔雷科·莫哈梅德·莫哈梅德·赫加兹 System and method for schedule optimization
CN104678954A (en) * 2015-01-23 2015-06-03 中国长江三峡集团公司 Dam safety intelligent monitoring and pre-warning system based on full life circle and method thereof
TWM535357U (en) * 2016-09-13 2017-01-11 Giei Engineering Co Ltd Construction history monitoring management system guided by engineering planning
CN106503896A (en) * 2016-10-21 2017-03-15 中国化学工程第六建设有限公司 Construction equipment management method based on BIM technology
CN106779502A (en) * 2017-02-20 2017-05-31 上海振华重工(集团)股份有限公司 The Internet of Things and dispatching method and device of movable mechanical equipment
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN108470315A (en) * 2018-02-11 2018-08-31 浙江联建工程设计有限公司 Project progress monitor system based on BIM

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO932746D0 (en) * 1992-07-31 1993-07-30 Texas Instruments Inc PROCEDURE AND DEVICE FOR COMPUTER CONTROLLED MANUFACTURE OF THREE-DIMENSIONAL GOODS OUT OF COMPUTER DATA
JP2000305992A (en) * 1999-04-22 2000-11-02 National House Industrial Co Ltd System for carry-in management of material to construction site
US20040196282A1 (en) * 2003-02-14 2004-10-07 Oh Byong Mok Modeling and editing image panoramas
JP2008004075A (en) * 2006-05-26 2008-01-10 Asahi Kasei Homes Kk Construction information management system for building
CN101681385A (en) * 2007-05-04 2010-03-24 阿瑟·A.·克利普费尔 Computer code and method for designing multi-family dwelling
CN103649974A (en) * 2011-03-21 2014-03-19 塔雷科·莫哈梅德·莫哈梅德·赫加兹 System and method for schedule optimization
CN102968679A (en) * 2011-08-31 2013-03-13 巫协森 Automatic guiding method and system of engineer operation
CN103267708A (en) * 2013-05-29 2013-08-28 重庆市计量质量检测研究院 Rapid detection method for noble metal
CN104678954A (en) * 2015-01-23 2015-06-03 中国长江三峡集团公司 Dam safety intelligent monitoring and pre-warning system based on full life circle and method thereof
TWM535357U (en) * 2016-09-13 2017-01-11 Giei Engineering Co Ltd Construction history monitoring management system guided by engineering planning
CN106503896A (en) * 2016-10-21 2017-03-15 中国化学工程第六建设有限公司 Construction equipment management method based on BIM technology
CN106779502A (en) * 2017-02-20 2017-05-31 上海振华重工(集团)股份有限公司 The Internet of Things and dispatching method and device of movable mechanical equipment
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN108470315A (en) * 2018-02-11 2018-08-31 浙江联建工程设计有限公司 Project progress monitor system based on BIM

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王梅节: "基于BIM技术在工程项目进度管理中的应用研究——以青海大学附属医院为例", 《中国优秀硕士学位论文全文数据库》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111785153A (en) * 2020-05-23 2020-10-16 中兵勘察设计研究院有限公司 Engineering project display method, device and system based on electronic map
CN114449198A (en) * 2022-01-27 2022-05-06 周璨 Intelligent monitoring system for project supervision
CN117173613A (en) * 2023-09-15 2023-12-05 中国铁路广州局集团有限公司 Intelligent management system and method for whole process informatization of engineering construction project
CN117173613B (en) * 2023-09-15 2024-03-29 中国铁路广州局集团有限公司 Intelligent management system and method for whole process informatization of engineering construction project

Similar Documents

Publication Publication Date Title
CN109726457A (en) A kind of overall process intelligence engineering supervisory information managing and control system
CN108470315A (en) Project progress monitor system based on BIM
CN110322147A (en) A kind of Project Supervision approaches to IM and system
CN109543992A (en) Intelligent polling method, device, intelligent terminal and server
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN107240164A (en) The data processing of security cruising inspection system and device
CN110443480B (en) Construction progress monitoring and early warning method and system
CN105930920A (en) Logistics distribution management method and logistics distribution management apparatus
CN108267670B (en) Distribution network fault study and judgment early warning system and implementation method thereof
CN107239868A (en) End message processing method and processing device for security cruising inspection system
CN108046073A (en) A kind of elevator network monitoring system for things
CN109903019A (en) Project progress monitor system based on BIM
CN109670673A (en) Production of Strip Mine managing and control system
CN109214040A (en) A kind of fabricated construction real-time monitoring system and method based on BIM
CN107214834A (en) A kind of cloth control system and method for material distributing machine
CN109636183A (en) A kind of multiplexing kind recruitment coordinated management method and system based on big data
CN110070284A (en) A kind of wisdom beam course management system based on BIM technology
CN105108094A (en) Cutting method and system for improving cutting precision of slab casting machine
CN101201916A (en) Method for monitoring operation of weather modification
CN106296133A (en) Schedule monitoring device for laboratory engineering construction
CN109062092A (en) Weather monitoring system
CN110335021A (en) A kind of overall process intelligence engineering supervisory information managing and control system
CN110049047A (en) A kind of power communication maintenance is self-service to permit to handle system
CN201853355U (en) Urban traffic self-adaptive control device
CN206210118U (en) A kind of live signal timing system based on pressure sensor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190507