CN107766457A - A kind of thermal power plant's operation management system and its task executing method - Google Patents
A kind of thermal power plant's operation management system and its task executing method Download PDFInfo
- Publication number
- CN107766457A CN107766457A CN201710888251.1A CN201710888251A CN107766457A CN 107766457 A CN107766457 A CN 107766457A CN 201710888251 A CN201710888251 A CN 201710888251A CN 107766457 A CN107766457 A CN 107766457A
- Authority
- CN
- China
- Prior art keywords
- equipment
- management
- management module
- module
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 87
- 238000005516 engineering process Methods 0.000 claims abstract description 48
- 238000007726 management method Methods 0.000 claims description 347
- 238000012423 maintenance Methods 0.000 claims description 119
- 238000004519 manufacturing process Methods 0.000 claims description 56
- 230000008439 repair process Effects 0.000 claims description 41
- 230000007812 deficiency Effects 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 12
- 230000009466 transformation Effects 0.000 claims description 11
- 230000002159 abnormal effect Effects 0.000 claims description 7
- 230000000737 periodic effect Effects 0.000 claims description 5
- 230000007547 defect Effects 0.000 description 111
- 230000006870 function Effects 0.000 description 74
- 230000008569 process Effects 0.000 description 47
- 238000007689 inspection Methods 0.000 description 42
- 238000004458 analytical method Methods 0.000 description 36
- 241000196324 Embryophyta Species 0.000 description 26
- 238000010276 construction Methods 0.000 description 26
- 230000000875 corresponding effect Effects 0.000 description 22
- 238000011156 evaluation Methods 0.000 description 18
- 239000000463 material Substances 0.000 description 17
- 230000008859 change Effects 0.000 description 16
- 230000008030 elimination Effects 0.000 description 15
- 238000003379 elimination reaction Methods 0.000 description 15
- 239000003921 oil Substances 0.000 description 15
- 238000013439 planning Methods 0.000 description 15
- 238000012795 verification Methods 0.000 description 14
- 238000013461 design Methods 0.000 description 13
- 238000012544 monitoring process Methods 0.000 description 13
- 239000000126 substance Substances 0.000 description 13
- 238000002360 preparation method Methods 0.000 description 12
- 238000012360 testing method Methods 0.000 description 12
- 230000005611 electricity Effects 0.000 description 10
- 230000007613 environmental effect Effects 0.000 description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 10
- 239000000446 fuel Substances 0.000 description 9
- 238000001514 detection method Methods 0.000 description 8
- 238000002474 experimental method Methods 0.000 description 8
- 230000008520 organization Effects 0.000 description 8
- 238000012545 processing Methods 0.000 description 8
- 238000012986 modification Methods 0.000 description 7
- 230000004048 modification Effects 0.000 description 7
- 238000011056 performance test Methods 0.000 description 7
- 239000013589 supplement Substances 0.000 description 7
- 238000012549 training Methods 0.000 description 7
- 239000003245 coal Substances 0.000 description 6
- 238000012790 confirmation Methods 0.000 description 6
- 238000011161 development Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 239000000178 monomer Substances 0.000 description 6
- 238000013480 data collection Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 229910052739 hydrogen Inorganic materials 0.000 description 5
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 4
- 238000012550 audit Methods 0.000 description 4
- 230000033228 biological regulation Effects 0.000 description 4
- 238000013070 change management Methods 0.000 description 4
- 238000003745 diagnosis Methods 0.000 description 4
- 239000007789 gas Substances 0.000 description 4
- 238000010438 heat treatment Methods 0.000 description 4
- 239000001257 hydrogen Substances 0.000 description 4
- 230000006872 improvement Effects 0.000 description 4
- 238000005259 measurement Methods 0.000 description 4
- 238000004886 process control Methods 0.000 description 4
- 238000003908 quality control method Methods 0.000 description 4
- 230000004044 response Effects 0.000 description 4
- 238000012552 review Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 238000002485 combustion reaction Methods 0.000 description 3
- 239000000498 cooling water Substances 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 230000009970 fire resistant effect Effects 0.000 description 3
- 230000008676 import Effects 0.000 description 3
- 238000002955 isolation Methods 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 238000005070 sampling Methods 0.000 description 3
- 239000010736 steam turbine oil Substances 0.000 description 3
- 229910018503 SF6 Inorganic materials 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000003749 cleanliness Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000002596 correlated effect Effects 0.000 description 2
- 238000000354 decomposition reaction Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000011234 economic evaluation Methods 0.000 description 2
- 238000004817 gas chromatography Methods 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000011835 investigation Methods 0.000 description 2
- 238000012946 outsourcing Methods 0.000 description 2
- -1 part Substances 0.000 description 2
- 238000007639 printing Methods 0.000 description 2
- 239000000047 product Substances 0.000 description 2
- 230000001172 regenerating effect Effects 0.000 description 2
- 238000004171 remote diagnosis Methods 0.000 description 2
- 238000009666 routine test Methods 0.000 description 2
- 238000001228 spectrum Methods 0.000 description 2
- SFZCNBIFKDRMGX-UHFFFAOYSA-N sulfur hexafluoride Chemical compound FS(F)(F)(F)(F)F SFZCNBIFKDRMGX-UHFFFAOYSA-N 0.000 description 2
- 229960000909 sulfur hexafluoride Drugs 0.000 description 2
- 230000009469 supplementation Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 1
- 206010061619 Deformity Diseases 0.000 description 1
- 208000033999 Device damage Diseases 0.000 description 1
- VTLYFUHAOXGGBS-UHFFFAOYSA-N Fe3+ Chemical compound [Fe+3] VTLYFUHAOXGGBS-UHFFFAOYSA-N 0.000 description 1
- 238000012773 Laboratory assay Methods 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- HSFWRNGVRCDJHI-UHFFFAOYSA-N alpha-acetylene Natural products C#C HSFWRNGVRCDJHI-UHFFFAOYSA-N 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000004587 chromatography analysis Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010835 comparative analysis Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000005261 decarburization Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000004870 electrical engineering Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 125000002534 ethynyl group Chemical group [H]C#C* 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
- 229910001447 ferric ion Inorganic materials 0.000 description 1
- 238000011049 filling Methods 0.000 description 1
- 239000003546 flue gas Substances 0.000 description 1
- 239000003517 fume Substances 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000010721 machine oil Substances 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 239000010705 motor oil Substances 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000005453 pelletization Methods 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 230000000069 prophylactic effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 241000894007 species Species 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000000547 structure data Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 208000024891 symptom Diseases 0.000 description 1
- 208000011580 syndromic disease Diseases 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a kind of thermal power plant's operation management system and its task executing method, system includes equipment and technology account standardized management module and operational standardization management module;The equipment and technology account standardized management module includes equipment/part management module, the equipment/part management module includes equipment/components information storehouse and equipment/parts Classification Management module, the equipment/parts Classification Management module uses multiclass classification, each next stage classification is contained in corresponding upper level classification, the equipment/components information storehouse is associated with the equipment/parts Classification Management module, so that it is determined that in the equipment/components information storehouse each equipment/parts classification information;The standardized management module definition is directed to the normalizing operation information of thermal power plant's operation, by associating the information in the equipment and technology account standardized management module, generates specific recording documents and/or assignment instructions.
Description
Technical field
The present invention relates to thermal power plant's digital management, more particularly to a kind of thermal power plant's operation management system and its tasks carrying
Method.
Background technology
Thermal power plant abbreviation thermal power plant, it is the factory by the use of combustible (such as coal) as fuel production electric energy.It is modern
The thermal power plant of change is the factory of a huge and complicated production electric energy and heat energy, and it has higher to production, environmental protection, safety
It is required that and in-plant equipment species it is various, monitoring, maintenance, maintenance task weight, so as to operation management is proposed it is very high will
Ask.Currently realize that digitized factory management is a kind of universal trend by computer system, and pass through Digital Realization height
One important prerequisite of effect management is the standardization of management system and flow, and sound can be greatly improved on the premise of standardization
Answer speed and driving more reasonably handling process.On the other hand, standardization is needed based on all relevant information (equipment to factory
Information, personal information, operation information etc.) there is a framework that is complete and easy to use and expanding, for thermal power plant, if
Standby and its parts information managements are just particularly important.
Equipment and its parts are that a manufacturing enterprise is indispensable, for a manufacturing enterprise, especially thermal power plant
For, equipment and its parts have it is thousands of, how to have managed equipment and its parts to enterprise security, stably, low cost
Operation plays the role of and its important, and further have influence on downstream industry's management standardization realizes difficulty.Power plant sets at present
Standby and its parts management can use KKS (power plant identify system) coding scheme, be intactly to cover the advantages of the system
Cover all devices and parts of power plant;One is the system too complex in terms of shortcoming, and only trained professional is
It can use, for management standardization, this needs the project that crew mobilizes, and most of participants is familiar with KKS coding bodies
System, practical operation difficulty are big;Second, KKS codings are typically all to carry out unified planning design by designing institute for specific plant, no
Same factory's coding is inconsistent, and the digital management system established accordingly does not often also just possess versatility, so as to public in group
Being promoted between subordinate each subsidiary factory of department needs to change larger, can greatly increase the management cost of power plant;Third, setting based on KKS codings
Standby Classification Management is not suitable with the use habit of domestic technique personnel, KKS code index table subsystems code, unit code and
Component code, wherein system code up to 4000 is a plurality of, and unit code and component code only 100 or so respectively, is
Irrespective of size classification is too thin, and equipment and component classification are very little.
In view of this, establish it is a set of meet domestic power plant technical staff use habit, and have the digitlization of versatility concurrently
Management system is that those skilled in the art have a technical problem to be solved, and this requires and relied in rational equipment control
And the normalized by definition of foundation on its basis.
The content of the invention
In view of above-mentioned technical problem, the invention provides a kind of thermal power plant's operation management system to include equipment and technology account
Standardized management module and standardized management module;The equipment and technology account standardized management module includes equipment/parts
Management module, the equipment/part management module include equipment/components information storehouse and equipment/parts Classification Management mould
Block, the equipment/parts Classification Management module use multiclass classification, and each next stage classification is contained in corresponding upper one
In level classification, the equipment/components information storehouse is associated with the equipment/parts Classification Management module, so that it is determined that
The classification information of each equipment/parts in the equipment/components information storehouse;The operational standardization management module defines pin
To the normalizing operation information of thermal power plant's operation, by associating the information in the equipment and technology account standardized management module,
Generate specific recording documents and/or assignment instructions.
Further, the equipment and technology account standardized management module also includes technical parameter management module, the skill
Art parameter management module includes parameter library and parameterized template management module, and the parameterized template management module is according to each equipment/zero
Member characteristic, the associated technical parameters item in the parameter library is extracted, form specific technical parameter template, equipment/zero
Equipment/parts in component information storehouse select its corresponding its parameter information of technical parameter template definition.
Further, all or part of base at the highest level of the multiclass classification of the equipment/parts Classification Management module
Classified in specialty.
Further, the highest level of the multiclass classification of the equipment/parts Classification Management module include steam turbine profession,
Boiler specialty, electrical primary specialty, electric secondary specialty, instrument control specialty, environmental protection specialty, fuel specialty, water specialty of changing, fire-fighting are special
One or more in industry, heating and ventilating discipline, Civil Specialities.
Further, the highest level of the multiclass classification of the equipment/parts Classification Management module includes common apparatus.
Further, the classification side below the highest level of the multiclass classification of the equipment/parts Classification Management module
Formula is based on the one or more in device properties, control system, equipment composition, part, component.
Further, the next stage of the steam turbine profession be divided into turbine body, steam turbine auxiliary equipment, speed control device,
Shared device.
Further, the next stage of the boiler specialty is divided into boiler body, air preheater, wind and smoke road, Fan Equipment, compensation
It is device, powder manufacturing apparatus, coal pulverizer, feeder, dry deslagging and pebble coal conveying device, wet-type deslagging device, combustion system equipment, warm
Wind device, slag-blowing equipmemt, petrol station, fume afterheat utilize equipment.
Further, the next stage of the electrical primary specialty is divided into generator, exciter, transformer, detection means, change
It is frequency device, breaker, disconnecting switch, contactor, fuse, arrester, voltage transformer, current transformer, electrical lead, electronic
Mechanical, electrical gas disk cabinet, other low-voltage electrical apparatuses.
Further, the next stage of the electric secondary specialty is divided into booster stations system relay protection and measure and control device, hair
Change group open it is standby become protection and measure and control device, excitation, house power protection, fault oscillograph and range unit, automatic safety device,
UPS DC chargers battery, electric measuring instrument, communication, remote automation device, relay, experimental check instrument.
Further, the next stage of the instrument control specialty is divided into control system, measuring transducer, detection switch, temperature and surveyed
Amount, magnetic valve, on the spot special instrument, meter, reference instrument instrument.
Further, the next stage of the environmental protection specialty is divided into denitration device, deduster equipment, desulphurization plant, decarburization are set
Standby, environmental protection universal device.
Further, the next stage of the fuel specialty is divided into unloading/vehicle device, induction system, sampling and preparing system, feed and set
It is standby, equipment for removing ferric ion, the broken equipment of sieve, stacker-reclaimer, dust pelletizing system, weighing system, coal bunker equipment, engineering truck, oil depot system, clear
Sweep and coal water system, ship loader, fuel common apparatus.
Further, the next stage of the common apparatus be divided into gearbox, suspension and support, air compressor, pipeline, valve,
Container class, filter screen, heat exchanger, pump class.
Further, the operational standardization management module includes following one or more:
Equipment operation standard management module, it is used for the inter-related task and document of management equipment operation;
Plant maintenance standardized management module, it is used for the inter-related task and text of management equipment periodic maintenance and repair based on condition of component
Shelves;
Overhaul of the equipments standardized management module, it is used for the inter-related task and document of management equipment maintenance;
Equipment deficiency standardized management module, it is used for the inter-related task of management equipment abnormal conditions and document;
Technological transformation project standardized management module is produced, it is used for the inter-related task and document that manage capital expenditures project;
And
Technical supervision standardized management module, it is used for the inter-related task and document that manage safety production technique supervision.
Further, the content of the overhaul of the equipments standardized management module includes repairing preceding preparation, maintenance process control, inspection
Repair summary and evaluation etc..
Further, the content of the equipment deficiency standardized management module include lack defect fill in and submit, defect it is true
Recognize, defect hang-up, defect processing, defect extension, defect examination, defect explanation, account association, defect statistics, defect examination, lack
Fall into analysis, significant deficiency management etc..
Further, the content of the production technological transformation project standardized management module includes the project application, the project implementation, item
Mesh is summarized and evaluation etc. afterwards.
Further, in addition to input module, external command information is received by the input module, normalized
During operation, the operational standardization management module calls the equipment and technology account standardized management according to external command information
Information in module, generate specific recording documents and/or assignment instructions.
Further, in addition to output module, the note that the output module generates the operational standardization management module
Record document and/or assignment instructions output are sent to receiving terminal.
Further, the equipment and technology account standardized management module also includes organizational structure management module, described group
Stretching frame structure management module includes personal information storehouse and personal management module, and the personal management module carries out group to personnel and set
Put, and personnel and/or personnel's group are associated with equipment/parts in the equipment/components information storehouse.
Further, the equipment and technology account standardized management module also includes management map module, the map pipe
Reason module includes plant area's map office and installation site management module, and the installation site management module is according to equipment/zero
The actual installation position of equipment/parts in part information bank, it is associated with the relevant position in plant area's map office.
Present invention also offers a kind of task executing method of above-mentioned thermal power plant's operation management system, including:Operation standard
Change management module according to the instruction request or time set received, the corresponding task come in trigger criteria operation information and life
Into output data.
The present invention has expanded operation management and has been related on its basis using equipment and technology account standardized management module as core
Various aspects, realize thermal power plant's standardized management, particular technique effect includes:
1st, equipment/parts classification meets the use habit of domestic technique personnel, and can cover all of thermal power plant
Equipment/parts.
2nd, the operation such as the inquiries of equipment/parts, addition, modification, renewal is compared simpler easily with KKS coding schemes
With.
3rd, complete plant information, including equipment/parts, personnel, plant area's geography, management system etc. are provided.
4th, on the basis of using equipment and technology account standardized management module as core, mould is managed by operational standardization
Block, the factors such as people that factory is related to, machine, material, method, ring are accomplished to the management of unified standard, have there is the work in every in power plant
Zhang Keyi, have that mark can follow, everyone has responsibility, response quickly.
Design, concrete structure and the caused technique effect of the present invention are described further below with reference to accompanying drawing, with
It is fully understood from the purpose of the present invention, feature and effect.
Brief description of the drawings
Fig. 1 is the system block diagram of the preferred embodiment of the present invention;
Fig. 2 is electricity power enterprise's equipment condition monitoring and diagnosis system schematic diagram in the preferred embodiment of the present invention;
Fig. 3 is electricity power enterprise's equipment state overhauling implementing procedure system figure in the preferred embodiment of the present invention.
Embodiment
In the description of embodiments of the present invention, it is to be understood that term " on ", " under ", "front", "rear", " left side ",
The orientation of the instruction such as " right side ", " vertical ", " level ", " top ", " bottom ", " interior ", " outer ", " clockwise ", " counterclockwise " or position are closed
It is based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplified description, rather than instruction
Or imply that signified device or element must have specific orientation, with specific azimuth configuration and operation, therefore be not understood that
For the limitation to invention.Accompanying drawing be schematic diagram or concept map, the relation between each several part thickness and width, and each several part it
Between proportionate relationship etc., it is not completely the same with its actual value.
Fig. 1 shows thermal power plant's operation management system block diagram of the preferred embodiment of the present invention, including input
Module, equipment and technology account standardized management module, operational standardization management module and output module.The present embodiment is with equipment skill
Art account standardized management module is core, remaining functional module is configured on its basis, so as to realize to Power Plant Equipment
Optimization, the standardized management integrally runed.
Equipment and technology account standardized management module includes equipment/part management module, technical parameter management module, group
Stretching frame structure management module and management map module.
Equipment/part management module includes equipment/components information storehouse and equipment/parts Classification Management module, if
Standby/parts Classification Management module uses multiclass classification, and each next stage classification is contained in corresponding upper level classification,
Equipment/components information storehouse is associated with equipment/parts Classification Management module, so that it is determined that equipment/components information storehouse
In each equipment/parts classification information, i.e., each equipment/parts are sub-divided under specific classification.
In the present embodiment, the highest level of the multiclass classification of equipment/parts Classification Management module is based primarily upon specialty and entered
Row classification, it is preferable that steam turbine profession, boiler specialty, electrical primary specialty, electric secondary specialty, instrument control specialty, ring can be included
Protect specialty, fuel specialty, change water specialty, fire-fighting specialty, heating and ventilating discipline, Civil Specialities, while according to the actual conditions of thermal power plant,
Also " common apparatus " is added in classification at the highest level in the present embodiment, that is, forming there are 12 first-level class, as shown in table 1.
Device properties, control system, equipment composition, part, component can be used for next stage or follow-up classification, this needs foundation
Equipment under each professional classification is specifically formed, and the present embodiment configures according to the conventional equipment of thermal power plant, and preferably above-mentioned part is special
Classification settings at different levels under industry classification, see the table below 2 to table 9, it possesses stronger versatility while meets domestic technique personnel's
Use habit, technical staff need not learn complicated KKS codings, you can easily equipment/parts are added, changed,
Inquiry, the standardized management for after provide strong support.
Table 1:Equipment/parts first-level class table
Table 2:Steam turbine profession equipment/parts classification chart
Table 3:Boiler professional equipment/parts classification chart
Table 4:Electrical primary professional equipment/parts classification chart
Table 5:Electric secondary professional equipment/parts classification chart
Table 6:Instrument control professional equipment/parts classification chart
Table 7:Environmentally friendly professional equipment/parts classification chart
Table 8:Fuel professional equipment/parts classification chart
Table 9:Common apparatus/parts classification chart
Technical parameter management module includes parameter library and parameterized template management module, and parameterized template management module foundation is respectively set
Standby/parts feature, the associated technical parameters item in parameter library is extracted, forms specific technical parameter template, equipment/parts
Equipment/parts in information bank select its corresponding its parameter information of technical parameter template definition.Table 10 and table 11 arrange respectively
The technical parameter mould of steamer specialty → turbine body → main oil pump and boiler specialty → air preheater → rotary regenerative air heater is gone out
Plate, different equipment/parts can use corresponding technical parameter template to carry out Data Enter.
Table 10:Main oil pump technical parameter template
Table 11:Rotary regenerative air heater technical parameter template
Parameter name | Data type | Length | Unit |
Pattern | string | 50 | |
Root diameter | decimal | 10 | mm |
Spinner velocity | decimal | 10 | rpm |
The kind of drive | string | 50 | |
Upper bearing (metal) bearing designation | string | 50 | |
Lower bearing bearing designation | string | 50 | |
Petrol station model | string | 50 | |
Reduction box model | string | 50 | |
Flue gas resistance | decimal | 10 | Pa |
First air collateral resistance | decimal | 10 | Pa |
Secondary Air collateral resistance | decimal | 10 | Pa |
Organizational structure management module includes personal information storehouse and personal management module, and personal management module is according to company management
Framework carries out the division of all kinds of groups to all personnel, sets corresponding personnel's group, such as production management department, operation department,
And production management department's next stage can further be set to the portions such as production management portion, Planning Department, production department, operation department of raw skill portion
Door group, operation department next stage is further set into equipment portion, maintenance portion, fuel portion, combustion de- portion, O&M portion, Chinese Ministry of Environmental Protection etc.
Department's group;Teams and groups, such as electric class, boiler class, steam turbine class can be divided according to specialty simultaneously.Also, by personnel and/or personnel
Group is associated with equipment/parts in the equipment/components information storehouse, so as to be provided for rights management and personnel's responsibility system
Basis.
Management map module includes plant area's map office and installation site management module, and installation site management module is according to setting
The actual installation position of equipment/parts in standby/components information storehouse is related to the relevant position in plant area map office by it
Connection.It can be taken various forms for the data in plant area's map office, all installation positions are such as recorded in the form of word tag
Put, or mark position coordinate is come with the plan in each region or record position coordinate is come with plant area's 3D models, herein
It is not limited.
By the setting in equipment and technology account standardized management module, equipment/parts in thermal power plant are done excellent
Change classification, and have recorded detailed equipment/parts parameter information, facilitate technical staff's looking into for equipment/parts
Ask and manage, further each equipment/parts are associated with infield, person liable, and it is unified to constitute complete specifications
Information source, as core, the implementation to the overall operation standardization of ultra-large group (the numerous power plant of subordinate) provides heavily fortified point
Real basis and guarantee.
Operational standardization management module unified management thermal power plant normalizing operation content, its (data storage area) stored record
Have standardization document, a specification, establishing criteria document and specification define for thermal power plant's operation normalizing operation information simultaneously
Standardization task instruction set is established, it generates specific record based on the information in equipment and technology account standardized management module
Document and/or assignment instructions.According to different standardization business, the present embodiment includes following submodule (feature submodule
Be not limited to it is set forth below, can increase according to the actual requirements personalization module configuration):
1st, equipment operation standard management module, it is used for the inter-related task and document of management equipment operation;Relate generally to
Personnel, technology and management content include:
(1) two ticket:Work ticket, operation order.
(2) three systems:Shift system, tours of inspection system, equipment routine test and switching system.
(3) director on duty:Watch time, the director of operation area, refer to long value, secondary value long (unit length) or operation class
It is long.
(4) main equipment:Refer to steam turbine, boiler and generator.
(5) main auxiliary equipment:Refer to the device damage or in the case where itself and stand-by equipment are all ineffective, can directly lead
Availability, security, reliability, the economy of main equipment is caused to reduce or cause the equipment of environmental pollution.
(6) operation monitoring:Operations staff is grasped using unit scattered control system (DCS), field instrument or other means
A kind of behavior of equipment state.
(7) operation operation:A kind of change equipment running status that operations staff is carried out for the specific production purpose of realization
Behavior.
(8) accident treatment:When jeopardizing personal or equipment safety emergency, for rapid rescue personnel, isolation event
Hinder equipment and adjust the operating process of the method for operation.
(9) routine test:To examine the health status of equipment, by the experiment of specified period progress.
(10) periodically switching:By specified period rotation operational outfit and the state of stand-by equipment.
(11) great experiment:It is related to generating set main equipment, main auxiliary equipment and influences unit safety stable operation, ring
Protect the experiment of index qualified discharge.
(12) production management department:It is responsible for the department of the management such as production technology, plan, contract, such as production management portion, planning
Portion, production department, raw skill portion.
(13) equipment control department:It is responsible for the department of the repair and maintenances such as production equipment, facility, building, such as equipment portion, inspection
Repair the departments such as portion, fuel portion, combustion de- portion, O&M portion, Chinese Ministry of Environmental Protection.
(14) department is run:Be responsible for production equipment, the department of system operation management, as operation portion, Power Generation Section, fuel portion,
The departments such as O&M portion, Chinese Ministry of Environmental Protection.
2nd, plant maintenance standardized management module, it is used for the inter-related task and document of management equipment maintenance.
The content of plant maintenance standardized management module includes periodic maintenance and repair based on condition of component.
Equipment periodic maintenance maintenance is on the basis of equipment routing inspection management is carried out, according to the principle and equipment of prophylactic repair
Inspection result determines maintenance content, maintenance period, and a kind of equipment control mode that strict facilities and equipments according to plan are safeguarded;Its mesh
Be reasonably extension device time between overhauls(TBO), keep the equipment general level of the health.
Repair based on condition of component refers to use advanced Condition Monitoring Technology and diagnostic management system, according to the data of monitoring, frequency spectrum,
Figure, image, by comparing, analyzing its running status variation tendency, the early stage sign of failure is identified, to trouble location, seriously
Degree and development trend judge, and then according to the importance of equipment, the cost of overhaul, security, economy comprehensive analysis, comment
Estimate the state of equipment, so that it is determined that the maintenance mode on the optimal maintenance opportunity of equipment, part, and repair schedule and scheme are proposed,
Enrich into year monthly repair schedule and complete.
Repair based on condition of component is suitable for electricity power enterprise's equipment, and for example all kinds of pumps of especially important auxiliary equipment, blower fan, coal pulverizer etc. are set
Standby
Maintenance and high pressure electrical equipment.With the implementation of constituent parts repair based on condition of component, repair based on condition of component is as a kind of management mould
The implementation of formula, repair based on condition of component is risen to a kind of way to manage and maintenance model from maintenance mode.Repair based on condition of component contains failure
Maintenance, periodic inspection, the Trinitarian maintenance complex optimum pattern of repair based on condition of component.
Based on Unit account of plant, by relevant device repair based on condition of component information, (fault early warning system information, equipment off-line are simple
Inspection data, on-line operation data are put with precision) uniformly it is attached in specific equipment, form comprehensive targetedly analysis and judge
Database, simultaneously for the company for possessing up to a hundred power plant, identical equipment is easily real by Unit account of plant platform search rule
Now comparative analysis function, the technical force for concentrating single power plant's individual equipment are the big data of whole corporate level to score simultaneously
Analysis, can more embody the raising of reliability and economy that repair based on condition of component is brought.
Fig. 2 shows electricity power enterprise's equipment condition monitoring and diagnosis system schematic diagram, wherein:
Benchmark analysis is analysis operational factor, defect, economy, the feature of environmental protection, non-stop statistics, frequency spectrum map analysis and forms week
Report or monthly magazine.
Analytical standard is based on various kinds of equipment point inspection standard, technical standard, economic index analysis, national environmental protection index mark
Standard etc..
Datum drift is the automatic, standardized calculation and comparison on the basis of model, is compared instead of artificial.Reduce artificial meter
The workload of calculation and the error for reducing artificial operating mode estimation.Deviation calculating is not only carried out, reasonable set rule is gone back, avoids reporting by mistake,
Rationally judge whether exception.
Our factory's manual analysis, Remote diagnosis and the analysis of advanced expert diagnostic system are included based on case study.Its
Expert system can combine the fault database and knowledge base of our factory, provide the possible fault cues of equipment, and provide corresponding measure.
Fault mode and diagnostic knowledge after confirmation constantly can be run up in system.
The contrast of same type units problem can be realized between similar unit, same category of device easily based on remote diagnosis system
It is compared analysis.
The status of equipment that investigation analytical standard includes weekly, monthly can in systems be collected, be counted, a mesh
So, data are provided for decision-making to support, analysis report can be readily achieved.
Whether equipment administers effective, if finding the reason for real can reflect from system in real time.
Fig. 3 shows electricity power enterprise's equipment state overhauling implementing procedure system figure.
3rd, overhaul of the equipments standardized management module, it is used for the inter-related task and document of management equipment maintenance.
Overhaul of the equipments standardized management module is served as theme with producing business, is established one and is applied to group, region company, electricity
Factory's entirety management regulation, meet Pyatyi safety in production actual management demand, foundation is standardized as with group, examined with reference to not commensurate
Repair management standardization and implement experience, standardized by overhaul management, overhaul file structure, service work intellectuality, realize inspection
Repair process quality control, reduce basic staff workload, improve the efficiency of management, reduce management cost, and be suitable to and group company
" overhaul management module " to be organically blended with domestic power plant's existing information system.
The construction of this programme is based on Unit account of plant basis, as the unique mark of the information interaction of each module, utilizes shifting
Dynamic terminal carries out Data Collection and service information record.
Realized and overhauled showing in real time for each stage performance by platform, platform push is every to be needed to carry out the work, complete
Reminded into work according to flow to pending personnel, avoid work from omitting, while to provide reference to management level decision-makings at different levels
Foundation.
The realization of above-mentioned function, it is necessary to controlling file to carry out structuring in maintenance process, it is main include maintenance file bag,
Repair schedule preparation table, maintenance meeting summary, quality surveillance point quality inspection planning chart etc., it is real by the application of mobile terminal
Sharing for existing service information, facilitates the calling of service information, reduces worker workload, eventually through the mark for overhauling each link
Standardization realizes maintenance one-key start in systems using information-based means as drop point.
The particular technique content of overhaul management module includes:
1) preceding preparation is repaiied
1.1) preparation prospectus is overhauled
According to standardization document《Overhaul preparation prospectus》Form, examined on line.
This document is controlled as timing node, and prepare performance with each stage is associated by operation system, automatically
Collect every preparation progress and performance.And pending personnel are sent with work prompting.
1.2) preceding detection is repaiied, assesses and analyzes
Examining and analyzing report, supervision plan before reporting, repair including operating analysis before repairing.
1.2.1 operating analysis report before) repairing
According to standardization document《Operating analysis report before repairing》Form, automatically from database crawl needed for parameter, according to
Given computation rule, numerical value is automatically generated, write analysis report.In addition, safety evaluatio, technical supervision, section are called automatically
The special examinations such as energy diagnosis are pinpointed the problems, the content that manual entry requires supplementation with, and are formed final preceding operating analysis of repairing and are reported.
1.2.2 examining and analyzing report before) repairing
According to standardization document《Examining and analyzing report before repairing》Form, call monthly defect analysis, importing to hang up automatically and lack
Sunken, anti-accident measures scheme, the special examinations such as safety evaluatio, technical supervision, diagnosis of energy saving are called to pinpoint the problems, manual entry
The content required supplementation with, form final examining and analyzing report.
1.2.3 preceding performance test) is repaiied
According to standardisation requirements, production management department determines before repairing/repaiied rear performance test project, implements after being examined on line.
Index and parameter Structure of need in report, can mutually be called in other modules.Performance test report original copy with
Document form uploads.
1.2.4) special detection, evaluation item
Index and parameter Structure of need in report, can mutually be called in other modules.Special examining report original copy with
Document form uploads.
1.2.5) technical supervision plan
Parsed according to technical supervision relevant criterion, technical supervision project automatically generates during maintenance, and collects to structuring
Project charter in, supervision project implement and check and accept implementation process management.
1.3) organization is overhauled
To maintenance, organization carries out structuring, realizes that service work is pushed to responsible person concerned.
Maintenance organization after examination & approval can form official document, and be transmitted according to the requirement of setting.
1.4) overhauling project establishment, examination & verification and adjustment
The inspection standard project library of structuring is established according to inspection standardization requirement.
Inspection standard project is called automatically, overhauling project java standard library containing every maintenance content, acceptance criteria, responsibility specialty,
Work day, check and accept grade, W/H points.Projects auto-associating overhauls file bag.Project of standard development increases and decreases, and performs approval process.
Overhaul nonstandard project generation:Nonstandard item source include repeated defects, hang up defect, equipment alteration, technological transformation project,
Peace is commented and anti-accident measures rectification requires, technical supervision rectification project, technical specialist/professional institution and manufacturing firm suggestion and
It is required that, special examination result etc..
Called automatically from remaining relevant sub-module of operational standardization management module with beginning a project.System possesses personnel's hand
The function of dynamic supplement overhauling project.
Overhauling project performs approval process on line after collecting automatically, and approval process realizes that pictorialization is shown after terminating.
Maintenance goes into operation first 60 days, according to newfound problem in performance test result and overhauling project set-up procedure to maintenance
Project is adjusted, and project after final version is adjusted, by standardization document《Overhauling project change management process》The item of structuring
Mesh Request for Change, perform independent approval process.
1.5) outsourcing contract and material requirements
Maintenance goods and materials plan can automatically generate in systems, and related personnel can enter according to cost of overhaul accounting to goods and materials plan
Row adjustment.
The flow that the execution of contract is set according to production capital expenditure standardized module performs.
By chart or other forms, show in real time contract signing situation, expense using progress, purchase of goods and materials progress, enter
Storehouse outbound situation etc..
Technical protocol can be consulted in systems in contract, be easy to related personnel to carry out maintenance process management and examination.
1.6) service technique file prepares
According to standardization document《Overhaul management of file packet program》、《Technical scheme and special measure management program》、《Quality
Supervision and control program》Deng management requirement, collect the maintenance document needed for completing automatically.
1.6.1 file bag) is overhauled
Required according to standardized format, Structured Design is carried out to maintenance file bag, and possess that overhauling project is selected, file
Guarantee the repair free of charge and order examination & approval function.
Project of standard development is used as normative document bag with single devices and autonomous system establishment maintenance file bag after examination & approval.Will mark
Quasi- file bag forms normative document parcel after collecting.Maintenance directly invokes every time, without being examined again.Normative document is guaranteed the repair free of charge
Order execution approval process.
Nonstandard project maintenance file bag is examined afterwards according to the establishment of file bag form.
Normative document bag and nonstandard item file bag are called, this maintenance file bag is generated, is aggregated into file Bao Qing automatically
It is single.
Quality inspection points onsite application mobile terminal carries out an acceptance inspection and data acquisition in file bag.
1.6.2) quality inspection planning chart
Maintenance file bag, focus technology measure scheme based on structuring, reference standard document《Repair quality supervision W,
H point quality inspection planning charts》Form, collect generation quality inspection planning chart automatically.
1.6.3) network inspection figure
Reference standard template, work out network.
Network should be easy to use, authorized personnel by simple training with regard to can use this function carry out network adjustment and
It is perfect.Information realization Online statistics and the displayings such as network progress is checked and accepted according to quality inspection points, work ticket termination.
1.6.4) equipment stops labour management
Possess workflow examination and approval, push function.
1.6.5) equipment alteration application
Call plant maintenance module unusual fluctuation management.
1.6.6) maintenance safety measure
Reference standard document《Maintenance safety administrative provisions》Form, safety management specification is called, form maintenance safety pipe
Reason regulation, and establish and associate with overhauling project, maintenance safety measure is associated with risk storehouse, and safety management requirement is implemented into maintenance
During project assignment.
Possess workflow examination and approval, push function.
1.6.7) key project technical measures and scheme
Reference standard template, to measure and scenario-frame, correlation module function, establishment emphasis can be called as needed
Project Technical measure and scheme.
Possess workflow examination and approval, push function.
Onsite application mobile terminal carries out process control, examination and data acquisition.
1.6.8) all kinds of on-the-spot record forms of maintenance
Integrate the on-the-spot record form used during every maintenance, as restricted clearance job login table, all kinds of warnings sign,
Acceptance of scaffolding quality certification etc., realization associates with work ticket, to be used at any time during overhauling.
Information of mobile terminal typing is realized, possesses attachment upload capability, and reference format supplement relative contents can be called.
1.7) Work tool and maintenance auxiliary equipment prepare
According to standardization document《Overhaul auxiliary equipment administrative provisions》, by maintenance Work tool inspection, maintenance support facility etc.
Preparing content structuring, to realize examination & approval stream, check that standard is generated after confirming checks form, for achieving.Special equipment closes
Join equipment/part management module.
Inspection situation is confirmed using mobile terminal, and forms closed loop.
1.8) overhaul management handbook
According to standardization document《Overhaul management handbook》Form, it is automatic to call correlation module file, generate file, content bag
Contain:Maintenance duration, maintenance task, overhaul target, maintenance organization, network progress chart, repair preceding analysis overview, overhaul management system
Degree and guide compilation, main ginseng repair personnel's address list, service and emergency guide (including the correspondent party such as medical treatment, fire-fighting, defendance in factory
Formula) etc. content.
Possesses message push function.
1.9) prepare to check meeting before repairing
System can automatically extract overhaul management related data, key generation maintenance meeting leading references.
Require, go into operation first 3 months according to directive/guide, monthly organize a preparation inspection, the inspection for forming structuring is recorded
Will, there is closed loop management function, it is desirable to which person liable feeds back implementation of conditions and reminded.
1.9.1) spare parts and components and material order, arrival situation, and the maintenance spare parts and components of supplement buying in time.
1.9.2) overhaul Work tool, overhaul the inspection repairing and keeping situation of support facility.
1.9.3) the establishment situation of capital equipment and system work ticket, if shipped row department for review.
1.9.4) the maintenance file preparation such as technical measures, safety measure, maintenance file bag.
1.9.5 scheme and quarantine measures establishment situation) are shut down.
1.9.6) overhauling project adjustment situation.
1.9.7) maintainer's configuration work preparation.
Go into operation first 7 days, production management department, which organizes, repaiies preceding preparation report-back meeting, and preparation before repairing finally is examined
Look into.The meeting summary of structuring is formed, there is closed loop management function, it is desirable to which person liable feeds back implementation of conditions and reminded.
1.10) management is overhauled
System possesses the function that management participates in maintenance process management.
System is implemented with reference to the supervision specifications of project and (each file, implementation process increase management examination & approval, checks and accepts link).
System has flow configuration feature, can be according to whether employing the approval node of management increase and decrease workflow.
2) maintenance process controls
2.1) safety management
Correlation module is called, it is main to enter factory's formality, mechanism of WSO etc. including outsourcing service provider, and in maintenance process sternly
Lattice implement the requirements in System of Safe Production Management.
2.2) operating reserves is overhauled
According to standardization document《FIXED MANAGEMENT and scene isolation provide》Relevant requirement, generate every FIXED MANAGEMENT and existing
Card is implemented in field isolation.Site layout project situation feeds back execution information by mobile terminal, and possesses the work(of closed loop management implementation status
Energy.
Find there is omission in service work, in supplement or change, workflow examination and approval, corresponding summary file (knot can be achieved
Calculate, file etc.) change automatically.
After determining halt mode and requiring, generation normative document is required according to directive/guide, there is workflow examination and approval function, and can disappear
Breath push, execution is issued, and there is closed loop function.
System programming count untreated defect (containing hanging up), execution overhauling project change before shutting down, implementation process examination & approval, with
And the automatic change of corresponding file (clearing, filing etc.).
Commencement report, which possesses, examines function on line.
2.3) regular meeting and workshop are overhauled
System possesses maintenance regular meeting conferencing function, can automatically extract overhaul management related data, key generation meeting money
Material.
Function includes:
2.3.1) system notifies personnel participating in the meeting automatically.Personnel participating in the meeting should include production management, maintenance, operation department head
And the department head such as special work, safety supervision, logistics.Contractor project leader, supervisor director, equipment manufacturing technology people
Members etc. are by management through specialized department department notice.
2.3.2) system collects automatically:Each professional repair schedule statistics and deviation are shown;Work ticket counts;It is ongoing
Project;Overhaul goods and materials arrival situation;Overhaul goods and materials expense service condition etc..
2.3.3 the problem of) being found in the supervision and check such as repair quality, safety and rectification situation.
2.3.4) closed-loop control is realized in meeting summary notice and execution.
System possesses special meeting function, capital equipment disintegrates, reassemble before, reference standard special project measure, production management
Department should organize professional and technical personnel, technical specialist, equipment manufacturing technical staff etc. to hold workshop, audit measure.
To the substantial equipment problem pinpointed the problems, with reference to main equipment, workshop is organized.System, which possesses before displaying is repaiied, repaiies
The functions such as picture is compared afterwards, measurement data is shown.Skilled addressee supplements the report of Improving Equipment disassembling analysis.
2.4) overhauling project changes
As overhauling project changes, by standardization document《Overhauling project change management process》Perform, reference standard
Document《Overhauling project modification application list》Template, perform approval process.
Automatically generate Xiang Mingda inventory.
2.5) maintenance duration controls
Project schedule plan only needs the on-stream time of each professional (teams and groups) director's entry item, plan time, and system is certainly
Dynamic generation plannet progress chart.
Project process real-time exhibition, checked and accepted according to W/H points, work ticket implementation status schedule programming count, will be actual
Progress contrasts automatically with target advance.
2.6) disassembling analysis
Disassembling analysis report possesses photo upload function, possesses photo editing function, and associate device machine account on platform;
On-site data gathering (picture, record of examination etc.) can be realized by mobile terminal, and mark is encoded to equipment KKS,
Collect automatically in report, analyze to form disassembling analysis report with reference to professional.
2.7) quality control
With reference to inspection of quality control point in overhauling project (file bag, each arrangement and method for construction measure), correlated quality inspector
Key point is checked and accepted using mobile terminal gathered data (shooting photo, record overhaul data etc.), is synchronized to system.
Inspection of quality personnel at different levels require according to directive/guide, perform the acceptance process of correlation (i.e.:Assign the authority of corresponding personnel
And closed loop trigger condition).Quality inspection points, which are checked and accepted, to be possessed to inspector's positioning and picture collection function, it is ensured that inspector scene is other
Stand or repetition measurement in place.
The key point of this flow is the mobile terminal operation of onsite acceptance, passes through the number of corresponding authority personnel's mobile terminal
According to typing, the essential information of maintenance process is formed.
Because maintenance craft and technical conditions etc. limit, when being unable to reach quality criteria requirements, by standardization document《It is not inconsistent
Close item application/processing list》Make a report on, file an application and formulate corrective action.Can not still solve problem after such as implementing, by standardization text
Shelves《Non-Compliance management program》Perform, can give way reception through auditing approval.Structuring Non-Compliance management business.
2.8) commissioning of individual system
2.8.1) before monomer test run, perform valve transmission test card flow and valve position is proofreaded
Standard valve transmission inventory is established, and uses structured format.Important valve system possesses automatic data collection total travel
Time function.
2.8.2) commissioning of individual system planning
Structuring commissioning of individual system plan.
Level of organization commissioning of individual system plan, specify action, timing node and perform requirement, it is determined that it is expected that when grid-connected
Between, after examination & approval, task push is carried out, issues execution, and closed loop management.
2.8.3) monomer preliminary operation
Valve, motor etc. (each system equipment is individually listed) equipment monomer carries out preliminary operation, issues monomer preliminary operation inventory, each negative
Duty people handles monomer preliminary operation request slip, and request slip possesses work ticket double check function.
Monomer preliminary operation relating operation operation order.
2.8.4) the execution of preliminary operation application
Structuring preliminary operation applications management business.
Standardization document is pressed by maintenance department《Unit branch and a whole set of startup test run management program》It is required that and by standardization text
Shelves《Equipment preliminary operation request slip》Preliminary operation application is proposed, walks approval process.
2.8.5) commissioning of individual system execution
Commissioning of individual system plan items performance is fed back item by item, and evaluation is made to commissioning result, according to evaluation situation, is entered
Row subsequent closed loop.
2.9) cold conditions is checked and accepted
Structuring cold conditions acceptance evaluation table.
By standardization document《Cold conditions acceptance evaluation table》Evaluated, unit cold conditions preliminary assessment opinion is formed, it is determined that being
Whether no unit possesses overall startup condition, and every problem possesses closed loop management function.
Maintenance department point specialty, which is made, tells somebody what one's real intentions are.
According to structured stencil, each specialty carries out maintenance completion and told somebody what one's real intentions are.
Situation is checked and accepted according to cold conditions to determine to start the time.
After examination & approval, propose to start, experiment application, walk after approval process reporting scheduling under line.
2.10) it is a whole set of to start experiment and test run
Execution is issued after a whole set of startup plan for trial operation of establishment, projects are held using mobile terminal by corresponding authority personnel feedback
Market condition.
Structuring is a whole set of to start plan for trial operation.
The confirmation item by item of a whole set of entry condition.In the form of mission dispatching, implementation status is fed back by corresponding authority personnel.
2.11) maintenance is completed
System possesses unit maintenance completion report of construction work structuring function.System captures maintenance key index automatically, negative by correlation
It is perfect to blame people's supplement.Completion report of construction work key content supports the functions such as On-line Fuzzy inquiry, longitudinal direction contrast.
3) maintenance is summarized and evaluated
Maintenance, which is summarized, includes herein below:Generality test, repair rear performance test, hot evaluation meeting, complete operating analysis
Report, maintenance summary is completed, completes to summarize after level of factory is repaiied, complete maintenance file.The push of above task is realized, to pending personnel
Send prompting.Final report and evaluation use structured form.
3.1) maintenance is summarized
Structuring is summarized in maintenance.
Including repair rear performance test, hot evaluation, repair rear operating analysis report, repair after overhaul final report etc..
By systems such as SIS (safety instrumented systems), realize that automatic data collection and computing function, including project complete feelings
Condition statistics, work day statistics, expense statistics, operating index, comparing etc., personnel's manual calculations are reduced as far as possible, improve number
According to accuracy and objectivity.Related personnel need to be only analyzed result.
3.2) file consolidation is overhauled
The kind, technical data that is fully booked (drawing, code etc.) modification and perfection is guaranteed the repair free of charge including maintenance file, repaiies rear leftover problem analysis
And control measure, overhauling project are perfect, maintenance archive etc..
It is automatic to collect maintenance file bag, technical data (drawing, code etc.), overhauling project etc., at the same in implementation procedure with
The difference of valid document collects the reference perfect as above-mentioned file.
Filing data according to archiving requirements can classify to collect automatically, as unusual fluctuation, maintenance file bag, safe practice are told somebody what one's real intentions are
Deng.
3.3) evaluated after overhauling
Structuring evaluation table, according to above-mentioned evaluation table, report region company.The data combination personnel for needing to make a report on fill in and
System captures generation automatically, is filled in by related personnel and examination & approval are carried out after analysis and improvement forms final report.
4th, equipment deficiency standardized management module, it is used for the inter-related task of management equipment abnormal conditions and document.
Equipment deficiency standardized management module realize overall goal be using power equipments defect standardized management specification as
Foundation, establish comprising DTC, syndrome code, reason code, the standard failure storehouse of measure code, utilize the information chemical industry such as mobile terminal
Tool, filled in by quick, accurate, the standardization of defect, work ticket, the process control such as measure ticket association, defect elimination inspection of quality are real
Existing defect Accurate classification statistics and analysis, and major defect is associated to overhaul of the equipments standardized management module, equipment and technology platform
Account standardized management module.Concrete scheme and requirement are as follows:
1) defect report key message
Defect report numbering, Level, defect classification, defective locations, defect description, defect elimination teams and groups, defect elimination specialty, discovery
People, teams and groups, defect elimination information are found, information and counter-measure, extension information is hung up, defect elimination people, temporal information, defect cause, repaiies
Before repair rear picture, defect explanation, spare part information.
2) defect is filled in and submitted
Accurately filling in for defect is great for defect Macro or mass analysis, equipment dependability evaluative meaning.The core that defect is filled in
It is required that it is:Defect equipment accurate positioning;Defect Description standard;Defect elimination content is accurate.
2.1) defect equipment is accurately positioned with Unit account of plant equipment:
It can realize that defect equipment is accurately positioned with Unit account of plant equipment by three approach.First, according to the said equipment skill
The equipment that the classifying rules of art machine account standardized management module can quick and precisely find out existing defects;Second, to electric power factory equipment
Sign Board increases 2 D code information, patrol officer by mobile scanning terminal EIC equipment identification code (Unit account of plant Quick Response Code) on the spot,
Defect phenomenon picture is shot, realizes that defect is accurate, in real time, quickly fill in;Third, for without site inspection or confirm find
Defect, the KKS codings in control system, system background auto-associating management equipment machine account coding are filled in, or pass through integrated level of factory
Supervisory information system SIS pictures and Unit account of plant Quick Response Code one-to-one relationship, directly find presence in monitoring system picture
The equipment of defect, by the direct location equipment of shortcut, quick raising personnel fill in speed.
2.2) defect Description standard fills in scheme:
DTC in fault database, symptom digital content are transferred in only selection during defect is filled in, and are carried out additional notes if necessary, are supported
Generation defect description is aided according to fault database.Upload defect picture (if necessary), Level, disfigurement discovery people, find when
Between, defect elimination time restriction etc. automatically generates by system.
3) defect confirmation
After maintenance teams and groups receive defect information, confirmed according to existing information.Divide defect to receive, retract, application is hung
Rise and wait three kinds of situations.Rollback includes rollback department and retracted to run, and maintenance teams and groups, which retract, can only select the special work of this department's specialty, specially
Work, which retracts, to be run or is circulated by equipment division of labor responsibility to other teams and groups or specialty.
4) defect is hung up
Defect is because treating spare part, waiting to shut down, treat the factors such as low ebb, equipment to be stopped, and when need to really hang up, maintenance teams and groups propose to hang up
Application, reason, the ad hoc inspection and repair measure that should be taken etc. hung up are indicated, the special work examination & verification of maintenance department, maintenance measure is supplemented, it is determined that hanging
The time limit is played, is committed to operation portion, operation portion is checked and approved hanging up the defects of applying.Hang-up is such as disagreed, then again to defect
Examination & verification is submitted;Such as agree to hang up, then supplement perfect operation Pre-control measures, and defect is hung up.After possessing conditions to release, operation
Department, the special work of maintenance department, teams and groups personnel can activate the defect, into the normal handling process of defect.
Hang up defect class to be shut down, can auto-associating into the Project charter of overhaul of the equipments standardized management module,
Triggering generates some projects charter in overhaul of the equipments standardized management module.
Hang up defect and treat spare part class, associate goods and materials plan application and materials needed coding, system swashs automatically after goods and materials arrival
Live and remind person liable to start defect elimination program.
Hang up defect and treat low ebb class outstanding work page top set, remind related personnel at any time according to load condition coordination at
Reason.
5) defect processing
Defect confirmation forms work order task after receiving, and task distribution, defect elimination people are carried out by corresponding teams and groups squad leader or technician
Member is connected to related job ticket, Preventive Control of Dangerous Spot card etc. after work order, performs work ticket flow.
When needing to carry out unusual fluctuation in defect processing, association creates unusual fluctuation shortcut, and postorder carries out the related procedure of unusual fluctuation management.
The process of telling somebody what one's real intentions are can upload pictures, voice etc. safely in defect processing.
Defect elimination content may be selected to transfer the contents such as reason code in fault database, measure code, fill in key index data if necessary.
Defect report can the related content such as related job ticket, material requistion, can whole retrospect defect elimination process.
6) defect is delayed
Defect extension request can not be proposed by defect elimination teams and groups complete the stipulated time the defects of.According to Level by tieing up
Shield department and the specially work point level examination & verification approval of production management department's specialty.
7) defect is checked and accepted
According to defect importance, uploading device disintegration photo, rear photo is repaiied.Defect system is checked and accepted, and a kind of defect performs three
Level is checked and accepted;The two special works of class defect equipment control department (specific responsibility), operation department main value are checked and accepted;Three class defects run department's main value or
Inspection is checked and accepted.
8) defect is handed over
Take provisional measure elimination and it is possible to the defects of occurring again;After defect expressivity, equipment state is not up to
The optimum target of defect elimination, and equipment still needs to Follow-up observation;Three kinds of situations such as significant deficiency need to stay defect to hand over by defect elimination director,
It is easy to the timely tracking equipment state of operations staff.Defect explanation auto-associating to operation is relieved in record.
9) machine account associates
The special work of equipment control department or specific responsibility people check and accept defect link, in addition to necessary onsite acceptance link, to defect report
Integrality, accuracy be responsible for, and according to the alternative association of defect importance to equipment and technology account standardized management module.
10) defect statistics
Programming count is realized according to defect report key message;The year-on-year of defect, ring ratio, machine are realized according to defect statistics result
To analytic functions such as marks between group, the system page can show same category of device defect cause classification accounting statistics.Key index includes:Disappear
Lack rate, promptness rate, repeated defects, defect reduced rate, significant deficiency accounting etc..
11) defect is examined
Defect management standard check is partial structured in factory, and examination data is realized to automatic crawl, and and mesh in systems
Mark data are compared, and realize that defect examination calculates automatically with reward.
12) significant deficiency management
Significant deficiency is with message mode automatic push to production management department and related management personnel, using limit priority
Not, taken the lead processing by production management department.
When significant deficiency eliminates, " three arrange a case " (safety measure, technical measures, organiztion measure and construction party can be associated
Case), examine on line of going forward side by side, can check online.
13) defect analysis
Counted according to defects count, trend, type, defect elimination content etc., data are captured by system automatically, for management
Personnel's analyzing defect provides accurate data basis.
Defect analysis carries out approval process after making a report on, as defect regular meeting content.
14) mobile office
The usable mobile terminals such as defect is filled in, defect is submitted, inspection of quality are completed.Defect workflow realizes mobile terminal
Function is consistent with PC ends.
5th, technological transformation project standardized management module is produced, it is used for the inter-related task of administrative skill transformation project and document.
Technological transformation project standardized management module is produced using production capital expenditure standardized management specification as foundation, is adopted
With the method for project management, served as theme with actual production business, pass through project management standards, management file structure, management
Flow work is intelligent, makes capital expenditures project from proposing that (being initiated from conductive suggestion), feasibility study audit, declare, criticize
Again, management and control on the line of project verification, implementation, the acceptance of work and evaluation overall process, this module mainly strengthen projects account valuation pipe
The management and control of reason, project economics analysis, the project implementation process and onsite acceptance etc..Improve the quality of improvement project, safety,
Investment and reliability.By flexible mobile office application, improve the efficiency of management, and with the existing other information of group and power plant
System organically blends, and realizes engineering project total factor, Whole Course Management.
The construction of this programme is encoded based on unified standardized equipment, as the mark of the information interaction of each module, and
Data Collection and engineering project information are carried out using mobile terminal.Enter upper turn of line to the management file of structuring by platform
Examination & approval, showing in real time for each stage performance of engineering project is realized, platform pushes need according to management process automatic orientation to people
Carry out, pending work, and reminded, avoid work from omitting, to provide reference frame to management level decision-makings at different levels.According to
Power plant carries out the characteristics of large-scale technological transformation project during annual plan repair, by this module and overhaul of the equipments standardized management mould
Block depth integration, the amended subject First-phase planning and preparations stage is prepared to blend with unit scheduled overhaul.
Above-mentioned function is realized, it is necessary to be carried out to all kinds of management programs in the project implementation process, administrative provisions, file template
Procedure, structuring, mobile terminal can also realize the shared of project information, convenient to call.
The files such as project application examination & approval, implementation process management, conclusion and comment need to be carried out structuring by this module.Module construction
Consider project management flow and simple interface, opening, flexibility, focus on operation interface hommization, focus on user's operating body
Test, using the technology of autgmentability, module leaves expansion interface function.
1) project application
Project application content is carried out structuring by this module.Money investigation, the project application are received in proposition, project from the project plan
Table is worked out, application for developing is worked out and evaluation, the establishment of project reconstruction tentative programme and investment estimate, the project plan are set up the project and examined etc.
Carried out on process all on-line.
1.1) project planning is with preparing
Equipment control department and other relevant departments combine field apparatus technology status, technical-economic index, safety in production
Subject matter and weak link etc. present in situation, equipment operation, propose the amended subject of next year implementing plan.It is above-mentioned
Item source, in the design of the system other modules, set " being included in change " to identify, system can according to mark automatic or manual by
Project is collected in amended subject list, and professional carries out perfect to project data.
Production division, which fills in, reports bulleted list, and production management department collects project, the screening programme that organizes a discussion, improves and repair
Change and carried out on the process all on-lines such as bulleted list, factory leader examination & verification project.Will《Change and buy retail project summary sheet》Structuring,
Realize that automatic clustering, automatic numerical computations, joint examination, approval process can check.
1.2) project application for developing is worked out
The amended subject of next year implementing plan through factory department's approval and project of buying retail, production management department's tissue are related
Technical staff works out application for developing, capital expenditures declaration form, project application table of buying retail.This module declares capital expenditures
Table, project application table of buying retail, economic evaluation of a project data measure and calculate table, application for developing key summary content structuring, application for developing,
Feasibility study is evaluated file and uploaded as annex, enters the journey examination & approval of line upstream to the above information paper of each project.Establishing criteria
It is required that being configured, system carries out rank classification automatically according to project estimation, sets project data required item.Item file can be
Region company, group company's examination & verification are pushed on line, and sets " audit opinion " to fill in and " rollbacks " perfect modification function.
Link is worked out in application for developing, this module focuses on project economics analysis, construction costs budget management, mainly will
《Economic evaluation of a project data measure and calculate table》、《Construction costs budget table》Structuring, the content that must be filled in as project data.Together
Shi Jiang《Economic assessment of construction projects method and parameter》、《Thermal power project Guidance Rule》、《Thermal power project Quota design refers to cost
Index》、《Power construction engineering valuating engineering work load with bill》、《Power construction engineering synopsis data structure》Etc. normative document data
In import modul, in order to feasibility study, authorized personnel consults reference at any time.
1.3) project is reported and assigned
The form that collects of standardization calls each project data brief introduction, duration, implements time, budgetary estimate, specialty, property automatically
The information such as matter, rank, collect project estimation etc. automatically.Project summary sheet and projects data on deck after, tied plus last year
Turn project, 3 years Rolling Plannings, line reports factory leader to examine, and administrative office in a factory can review, enclose administrative office in a factory can decision-making summary file, on line just
Formula reports region company.
Region company audits the project that each factory reports, and collects arrangement on line, and upper co-director understands decision-making examination & approval, and co-director can review
By enclosing co-director and decision-making summary file, group company is formally reported on line.
Adjustment, the addition of single project, Xiang Mingda examination & approval can be carried out on line in project year.
Group's level item, region company level item, project is made by oneself in factory, realize that classification is assigned on line.
2) project implementation
Production management department region company is given an written reply after group's rank, region company level item, and according to region
Make the Item Detail of total cost distribution in the factory of company's reply by oneself, an annual technological transformation project summary table, system are formed in system
Planning of construction periods network is automatically generated, the page shows most succinct item entry, and projects can click on expansion, and display is all detailed
Information, reference frame is provided for technological transformation project general arrangement decision-making.
Each data can directly invoke the data in other modules in project flow.Each post personnel can carry out whole to project
Retrospect and supervision.
2.1) project implementation tissue
According to the project given an written reply, production management department is to each project technical routine director, by major project tissue
Mechanism structure, different tissues mechanism form (line organization, functional system, straight line functional system, matrix system), input are selected as needed
Staff list, system automatically generate《Project management organization》Figure.
2.2) projects design and evaluation
This module sets Project design and management of appraising function, uploads annex to Preliminary design, construction drawing design, can perform
Procedure is examined on line, and meeting summary, which uploads, to be preserved.Will《Compulsory provisions of engineering construction standards》(Electric Project Section),《Fire
Electrical engineering Guidance Rule》With《Economical and environment-friendly coal-fired power plant standard》Etc. in standard criterion File Technology data import modul,
Technical staff is facilitated to consult reference.
2.3) Project decomposition
When equipment control department is reached under project, system automatically generates project WBS (work breakdown structure (WBS)) number, in this module
Engineering project gives tacit consent to automatic work structure decomposition for civil engineering, installation, equipment, other (two levels), and production management department is according to project
Situation, continue to decompose to three-level, level Four, Pyatyi ... as needed, production management department's manual allocation budget simultaneously selects to set up the project
No. WBS.
2.4) examination & approval of approving and initiate a project
Equipment control department clicks directly on submission project verification application, carries out project demand for services plan according to that can set up the project No. WBS
Approval process.System realizes that arrival is automatically reminded to, examination & approval progress shows in real time.
After the completion of in flow of approving and initiate a project factory, system automatic push task to purchase bidding personnel, carry out project bid text
Part is made a joint checkup and MRP is declared.The special work of production management department Maintenance Significant Items buying, bidding work progress in system (are
System automatically generates progress chart).Module possesses the upload of project purchasing technical specification, examination & approval function.
2.5) project purchasing
2.5.1) bidding document joint examination
Project leader's establishment technique authority file, established project is associated, initiate the meeting of bidding document (technical specifications)
Examine and ratify.Production management department technical economy personnel are responsible for working out business contract file, associate established project, are made a joint checkup and criticized
It is accurate.
2.5.2) procurement scheme confirms and examined
Established project is associated, project leader proposes projects, MRP;Production management department determines buying
Mode, will《Triple big decision-making approval forms》Structuring, system, which automatically generates administrative office in a factory, can go up meeting documentation, upper after printing to purchase
Meeting.Meeting is safeguarded to handling of goods and materials platform after passing through carries out workflow examination and approval.
2.5.3) bidding process
Carried out in existing e-commerce platform.
2.5.4) contract approval
Contract approval performs in law works system.
2.6) work progress management
2.6.1) project kickoff applications management
To the application documents structuring that goes into operation, the project verification of project leader's associated item is single, initiates commencement report list approval process.
2.6.2) project to outsource safety management
Call the related specification of safety management.
2.6.3) Project Cost Management
Other information system data is called, displaying contract signing situation, Office Of Contract Settlements situation, contract progress confirm ratio,
Complete investment to be contrasted with project reply budgetary estimate, project leader proposes engineering, the goods and materials meter supplemented according to remaining cost
Draw, to improve Project Cost completion rate.Realize engineering cost dynamic management and control.
2.6.4) project construction quality management
Inspection of quality control point in integration project (file bag, each arrangement and method for construction measure), correlated quality inspector use
Mobile terminal gathered data (shooting photo, record overhaul data etc.) checks and accepts key point, is synchronized to system.Quality inspection points, which are checked and accepted, to be possessed
To inspector's positioning and picture collection function, it is ensured that the other station in inspector scene or repetition measurement in place, such as to disguised engineering
Check and accept, the equipment inspection of incoming merchandise, " upload of taking pictures " is used as acceptance process necessary condition, otherwise system is given tacit consent to examination and do not conformed to automatically
Lattice.The key point of this flow is the mobile terminal operation of onsite acceptance, is recorded by the data of corresponding authority personnel's mobile terminal
Enter, form the essential information of construction quality process.
The function and overhaul of the equipments standardized management module are consistent by the way of.
2.6.5) project scheduling management
Project process real-time exhibition in the form of project separation, situation schedule programming count is checked and accepted according to W/H points,
Or project leader's manual maintenance, actual progress is contrasted automatically with target advance.
The function and overhaul of the equipments standardized management module are consistent by the way of.
2.6.6) Xiang Mingda
Project design and construction change management (quantities, engineering project, schedule, construction bar are set in the present system
Part), by associated documents structuring, realize workflow examination and approval on line.Foundation during as auditing for construction completion account.
The function and overhaul of the equipments standardized management module are consistent by the way of.
2.6.7) cold conditions examination and debugging management
Cold conditions Acceptance application is proposed by equipment control department or item cost accounting unit, production management department's tissue is checked and accepted, right
Project under construction is evaluated, in this module inner structure standardization document《Amended subject cold conditions acceptance evaluation table》, it is complete on line
Into workflow examination and approval, possesses closed loop management function to every problem.Volume is repaiied to code, system diagram by operation department, training to employee
Situations such as instruction, is fed back on line.
Establishment a whole set of start issues execution after plan for trial operation is examined, projects are anti-by corresponding authority personnel using mobile terminal
Present implementation status.Structuring is a whole set of to start plan for trial operation.The confirmation item by item of a whole set of entry condition.In the form of mission dispatching, by phase
Authority personnel are answered to feed back implementation status.
The function and overhaul of the equipments standardized management module are consistent by the way of.
2.6.8) project construction management
System possesses the function that management participates in variation management.System with reference to project supervision specifications implement (each file,
Implementation process increase management examination & approval, check and accept link).System has flow configuration feature, can be according to whether employing management increase and decrease work
Make the approval node flowed.
The function and overhaul of the equipments standardized management module are consistent by the way of.
3) project conclusion and rear evaluation
3.1) project final acceptance of construction
File structure is checked and accepted into final acceptance of construction list, final acceptance of construction report, completion summary etc., realize stream of being signed after examination on line
Journey, module possess performance test material upload, check and accept the functions such as material upload.System possesses in examination and problem typing be present, pushes away
Deliver to project leader, supervise time limit to rectify and improve closed loop management function.
The final account for completed project single upload of department of project management goalkeeper's working and contracting unit establishment to system, production management department (or
Engage engineering cost consultation corporations) project completed amount inventory and the bill of quantities of contract signing are subjected to contrast examination, as
The foundation of the last final account for completed project of Project contract.
System possesses final acceptance of construction report, project completion is summarized, post project evaluation is reported in report from a liner and serves grade company's function.
3.2) completion information is filed
Module possesses completion information extract function, sets inventory to generate pdf document according to system after project leader's confirmation
Printing, transfer archive office.
4) project report management
Possess by region company, the capital expenditures monthly magazine of group company, quarterly report, the set form form of annual report or user
The function of self-defined report, user can create the form of oneself demand.
According to the demand of group, region company and power plant's three-level management, system possesses the online of various standard formses and reported
Function.
The end of the year, some project are not completed when need to carry down, and button of carrying down are selected in system, system is reported next year automatically
Generated in table.
5) project quality guarantee period management
System is automatic to calculate quality guarantee expiration time according to date of substantial completion, the quality guarantee number of days inputted, set in advance to
Related personnel pushes the reminder message function that expires, and sets project defect in quality guarantee period to collect automatically (by equipment deficiency standardization pipe
Module is managed to call), defect processing flow closed loop management function, final acceptance result, the foundation as quality guarantee gold clearing.
6th, technical supervision standardized management module
Technical supervision standardized management module for the purpose of production safety management, is with technical supervision management method and skill
Art supervision standard is foundation, specification technique supervision and management, realizes the online management and control of technological supervision work overall process.
Analytic technique supervision and management standard, establishing techniques supervision project library, it is daily to implement to overhauling project, regular working etc.
In work;Technical supervision standard index and product practice or test data are contrasted, initiate supervision alarm, strengthening process prison
Superintend and direct, facilitated technique supervision and management standardization, standardization.Comprehensive, complete technical supervision system is dissolved into business procedure, realized
Technical supervision reaches safety first, puted prevention first, advanced pre-control, closed loop pipe with producing the integrated services such as real-time, production management
Reason.System supports group, region company, thermal technology institute technical supervision differentiated control function.
Technology standardization supervision and management module, realizes following functions in safe production management system:
(1) technical supervision network
Managed according to technical supervision three-level network dynamic, support three-level network personnel amendment examination & approval function.Three-level network into
Member presses post setting, associates job duty, and authorizing personnel, the division of labor are set using structuring, support concern information to press Division of labour at post
Push function.
Personal information:Accredited registration (containing credentials, technical ability certificate), can check in mobile terminal, realize certificate expiration
Remind, accredited coverage rate statistics and early warning.All personnel's information category system share content, technical supervision three-level network information about firms
It is put under the uniform management, not repeatedly typing, is called herein for information.
(2) technical supervision instrument and meter management
Technical supervision instrument and meter includes laboratory instrument and other professional techniques supervision instrument and meter, laboratory
Including chemical laboratory, Experiment of Thermophysics room, electrical laboratory, metal laboratory etc..
Instrument and meter management requires to carry out structured management according to technical supervision, is provided with instrument and meter and purchases, verify, make
With, repair, scrap Whole Course Management.Instrument and meter verification is expired and given warning in advance, ensures the validity of instrument and meter, verification report
Accuse and scanning originals upload or OCR identification technologies can be achieved.
Laboratory room managing includes technical supervision management:
(a) instrument and meter account
Comprising:Title, instrument and meter model, measurement range, allowable error, detection limit, accuracy class, factory number, life
Produce producer, the time of making the product, check-verifying period, round of visits, use state, maintenance record, person liable etc.
(b) instrument and meter data
Comprising:Instrument and meter operation instructions, operational procedure etc., are uploaded with PDF format, and support is checked and downloaded online
(c) instrument and meter is examined
Comprising:Inspection plan and survey report.Censorship instrument verification report uploaded with PDF format, important key message with
Structuring form typing.Censorship plan can be automatically generated by round of visits, and possess prompting function.
(d) (verification) report is tested
Comprising:Report uses structuring sheet format, possesses the instrument for carrying standard report, possesses report import feature.
(long-term plan, which can use not land, directly uploads platform, as expanded function).(experiment) is verified in instrucment and meter plant and includes regular work
Make management module.
(3) technical supervision standard
Technical supervision concerned countries standard and industry standard by the unified renewal of thermal technology institute and upload, and download online can be achieved,
Fuzzy query.Relevant criterion in factory is safeguarded by personnel in factory.
Group's technical supervision standard is parsed, establishing techniques supervision project library, implements to overhauling project, regular working
Deng in routine work.
(4) technical supervision training
Existing technical supervision exam pool is loaded onto in system, technical supervision online training is realized, sets a question, tests oneself, going over examination papers.
Simultaneity factor supports Standard Courseware to upload and share.
System possesses personnel's online training statistics.
(5) technical supervision plan
Technical supervision planning management structuring, enterprise technology supervision work is formulated online according to group, company, electricity power enterprise
Planning and annual plan, examine on line of going forward side by side, report, closed loop management function.
Supervision planning item establishes project of standard development storehouse, and system possesses supervision plan and collects function automatically, and is flowed according to management
Journey possesses task push function.
Electricity power enterprise's professional supervision plan includes herein below:
(a) technical supervision organization and have perfect network, combination technology supervision mixed-media network modules mixed-media.
(b) supervision and management standard, technical standard norm-setting, reschedule, with reference to system documentation management function, upload collection
Group, company standard.
(c) staff training plan, combination technology training contents, line upper tube reason is uniformly entered.
(d) technical supervision regular works plan, generation mission dispatching related personnel are performed.
(e) the technical supervision project plan that should carry out during overhauling, realizes closed loop management.
(f) supervision is examined and determine with instrument and meter and planned, and is reminded in advance, instrument check completion rate is counted, to technical supervision instrument
Instrument carries out life-cycle management.
(g) plan is assessed in technical supervision self-assessment, dynamic chek and check, is realized to report on line and is collected function.
(h) the Monitor Problems improvement plan such as technical supervision early warning, dynamic chek.
(i) technical supervision regular working, programof meeting, meeting summary is completed on line and uploads and realize the contents such as Working Measures
Closed loop management.
(6) monitoring indicators Realtime Alerts
Technical supervision INDEX MANAGEMENT structuring, realize that technical supervision index parameter tests data progress with SIS data, examination (reality)
Real-time statistics are compared, and can exceeded monitoring indicators be carried out with warning reminding, task push, realize closed loop management.
Power plant's alarm quantity and rectification completion rate programming count are realized, can be divided according to supervised classification, specialty, teams and groups etc.
Class counts.
By taking chemical supervision as an example:
Chemical real-time oversight data source:SIS system in-line meter data;Laboratory assay data.According to each monitoring indicators,
Online statistics, warning information push, rectification list is supported quickly to fill in functions such as (generations).As electric generator inner cooling water PH, electrical conductivity,
The real-time monitoring and supervisory content such as Cu2+.
Algorithmic rule is set, rejects the improper parameter of instrument, exceeded parameter push person liable is checked, manual sampling
Testing result verification needs input system, as instrument fault causes, Online statistics data can be modified, perform review procedure.And
The instrument fault time is counted and calculated into instrument operational percentage.
Supervision form unifies form according to group, possesses automatic data collection and collects computing function, execution is audited step by step
Function.Table 12 is the statement form so that electric generator inner cooling water detects as an example.
Table 12:Electric generator inner cooling water detection supervision form
(7) supervision strategy
Realize using technical supervision standard as foundation, it is regular with the supervision of big maintenance job, the supervision of operation regular working, maintenance
The implementation and supervision function for the technical standard that four kinds of supervision types are served as theme is supervised in work supervision, real time data.Supervision project is automatic
Association is to equipment operation standard management module, plant maintenance standardized management module, overhaul of the equipments standardized management module etc.
Management module.
Based on technical supervision project of standard development storehouse, with reference to work such as unit maintenance, regular working, regular maintenances, by skill
Art supervision and management day-to-day.
It can uniformly be collected according to technical supervision project, and statistic of classification can be carried out.
(8) warning function
By the technical supervision forewarning management specification of standardization and related form structuring, three-level early warning identification is included daily
In supervision and management and assessment mode.
The problem of by designing institute to being found in supervisory service, proposes and signs and issues in time as requested pre-alert notification list, is issued to
Related electricity power enterprise, while make a copy for group company, region company.Early warning generation carries out message to responsible person concerned after issuing and pushed away
Send, improvement plan is formulated according to early warning content in factory, the rectification link of early warning is tracked online, including early warning confirms, be pre-
Link, each links such as alert arrangement, early warning rectification, early warning examination limit management in limited time, and what link was exceeded the time limit remind or by initiating
Unit carries out inspection processing, and early warning, which is checked and accepted to perform, checks and accepts formality (possessing implementing result attachment upload capability), and examination finishes laggard
Row is put on record, and realizes that statistic of classification collects function.
In technical supervision administrative standard, each professional three-level early warning rule, association online data, test report;It can be achieved three
Level early warning automatic start.
By taking chemical supervision as an example, three-level early warning rule:
1) two level early warning
1.1) Steam Condenser Leak, treatment measures are ineffective, cause water and steam quality deteriorate emergency shutdown or scaling on the heating surface of boiler,
Corrosion, steam turbine salt crust.
1.2) Water Vapor Quality is abnormal, reaches tertiary treatment setting, recovers normal not within the defined time.(system is certainly
Dynamic triggering)
1.3) cleanliness factor is unqualified in steam turbine oil, fire resistant oil, still starts unit.
2) three-level early warning
2.1) Water Vapor Quality is abnormal, reaches two stage treatment setting, recovers normal not within the defined time.(system is certainly
Dynamic triggering)
2.2) steam turbine oil of operating unit, fire resistant oil cleanliness factor are detected unqualified, steamer by specified period twice in succession
Water content is more than 100mg/L in machine oil, does not take treatment measures.(system triggers automatically)
2.3) dielectric oil chromatographic analysis acetylene content exceeds demand value, and total hydrocarbon content and gas production rate are simultaneously more than attention
Value, does not take treatment measures.(system triggers automatically)
2.4) requirement of standard is not supervised by chemical branch art, insulating oil, sulfur hexafluoride gas sampling point to electrical equipment
Analysis.(including regular working, unreachable position, system triggers automatically)
2.5) primary chemical in-line meter (condensate hydrogen conductivity, feedwater hydrogen conductivity, pH tables or direct conductivity table,
Main steam hydrogen conductivity table, stove water pH tables) work is abnormal, and does not take treatment measures more than 7 days.(system triggers automatically)
2.6) Boiler Chemical unit is unsatisfactory for DL/T977 regulations, and cleaning process is not involved in supervising
(9) technical supervision form, quarterly report and speed report
Provided according to technical supervision standard, realize technical supervision report structure, possess crucial number in technical supervision report
According to programming count and collect.
According to group, region company and power plant's three-level management demand, system design possesses technical supervision quarterly report and existed with speed report
Line reporting functions, speed report format structureization design.Speed report event range establishes project of standard development storehouse, reports region company, skill in limited time
Art service unit, group company.
Realize the professional technique supervision form such as energy-conservation, steam turbine, metal, thermal technology, environmental protection, chemistry, electric, boiler, heat supply
Index programming count collects, reported.
Technical supervision, which is reported, uses structured stencil, and each professional form in template collects, statistics automatically generates.
System, which possesses, to be contrasted to the technical supervision index of each factory of company, collects function, and region corporate user can be to institute
The index of Xia Ge factories is analyzed and supervised.The problem of level of factory, region company, group exist to technical supervision can initiate to supervise and manage work(
Can, supervisor's event realizes that closed loop manages in limited time.
All forms or speed report report and set approval process on line.
(10) technical supervision machine account
Include equipment and technology machine account standardized management module.
Realize technical supervision inspection record, technical supervision specialty report digital management, by prison equipment inventory and machine account,
Supervise test report record, operation maintenance report and record, service bulletin and record, supervision and management documentation.All supervision
Account uses structured document, including third party's reporting critical index and core data to use Structure data entry, simultaneously
It is for future reference to scan original paper upload, supports multistage bidding assessment.
By taking chemical supervision as an example, account includes:Power plant chemistry laboratory analytical instrument instrument list, power plant chemistry are changed online
Learn instrument list, power plant chemistry laboratory instrument and on-line chemical monitoring instrument and safeguard machine account, subsidiary engine oil tech account, steam
Quality monthly magazine, Water Vapor Quality monthly magazine, Water Vapor Quality monthly magazine, main on-line chemical monitoring instrument accuracy rate quarterly report, steam turbine oil supervision report
Table, fire resistant oil quality surveillance form, the oil consumption of transformer oil oil quality and abnormal conditions form, transformer oil dissolved gas
Analytical statement, hydrogen quality supervision statistical report form, insulating oil characteristic gas chromatography chemical examination record, insulating oil quality analysis
Record, insulating oil characteristic gas chromatography chemical examination record, sulfur hexafluoride quality surveillance detection record, unit maintenance heating power is tested to set
Standby fouling, salification and etch chemistries check machine account.
(11) problem inspection and rectification
Power plant's (specialty) checks oneself problem, real-time oversight alarm, thermal technology institute dynamic chek problem, three-level early warning problem, higher level
Supervisor's problem etc. supports closed loop management function, and problem rectification, which is implemented, possesses related documentary evidence attachment upload capability.Level of factory, area
The problem of domain company, group exist to technical supervision can initiate supervisor's function, set the time limit to manage rectification problem, carry in advance
Wake up, problem of implementation statistic of classification function.
Relevant regulations are managed according to technical supervision and management requires, it is different the problem of type configured according to practical business it is corresponding
Approval process.
Input module and output module pass through as operation management system in the present embodiment and the primary interface of extraneous communication
Input module receives external command information, inquiry, modification, renewal instruction such as database, or specific task please
The instruction such as ask.Output module will perform the data output generated after request to the receiving terminal of outside, and terminal object can be aobvious
Showing device, such as display, projector or intelligent terminal, such as mobile phone, tablet personal computer, with short message, mail
Etc. form, or even the acousto-optic devices such as broadcast, signal lamp are can also be, be not limited herein.
As it was previously stated, operational standardization management module records have the document and instruction set for meeting factory normalization requirement, its
Instruction request is received by input module, carrys out the corresponding task of triggering command concentration, or is performed by way of clocked flip
Corresponding task in instruction set, and related data is sent to related personnel/personnel's group.
Below by taking plant maintenance task as an example, this is described further.When equipment routing inspection personnel discovering device A performances drop
Low, detection data are inputted operation management system by it by input module, after operational standardization management module receives the data, its
In plant maintenance standardized management module judge device A need carry out maintenance downtime, so as to trigger the maintenance task of device A,
According to the standardization document to prestore, generation maintenance task list, including facility information, installation site, maintenance personnel, maintenance
Subtask of operating process, service time and correlation etc., the content of subtask include notice Standardization instrument management module
Make its trigger corresponding task notice production division, notice equipment and technology account standardized management module make its recording equipment state and
Repair.After task production, system sends information to related personnel, such as repairs teams and groups, production team by output module
Deng.Production division receives task, performs and shuts down to coordinate maintenance work, maintenance teams and groups carry out the guarantor of device A after task is received
Support work, the practical operation of maintenance according to the standardization document to be prestored in system requirement (can simultaneously by operational procedure together
It is sent to actual operator), after completing to maintain, corresponding information is passed through into input module input system.Plant maintenance standardizes
Management module can terminate after above- mentioned information is received and record current device A maintenance task, can similarly notify to set again
For operation standard management module so that in device A normal operation input, and notify equipment and technology account standardized management
Module is with recording equipment A status information.Whole process has Zhang Keyi, has that mark can follow, everyone has responsibility, response quickly.
In above-mentioned example, equipment routing inspection personnel can also directly submit the maintenance of device A to ask by input module, to touch
The associative operation for sending out follow-up.If the current maintenance of device A is a time-based maintenance task, then after time conditions are met,
The associative operation of the automatic triggering following of meeting.
The operation similar with example above is dispersed throughout in all kinds of work of thermal power plant, it can be seen that passes through the present embodiment
Operation management system, effectively the daily operation of power plant can be accomplished to standardize, greatly improve the overall effect of power plant
Rate and security.And the operation management system of the present embodiment has very strong versatility, can easily be transplanted to different electricity
Factory, addition of the technical staff for equipment/parts, modification, inquiry, renewal etc. is than the system using KKS codings more
It is convenient and it can be readily appreciated that and be more conducive to realize subordinate numerous power plant in group company's management layer the homogeneous classification management of equipment
The coded system used in itself without to change electric power factory equipment repeatedly, otherwise easily cause live nameplate drawing control logic
Chaotic potential safety hazard occurs.It can be effectively controlled and be lifted using the operation management system management cost of the present embodiment.
Preferred embodiment of the invention described in detail above.It should be appreciated that one of ordinary skill in the art without
Creative work can is needed to make many modifications and variations according to the design of the present invention.Therefore, all technologies in the art
Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical scheme, all should be in the protection domain being defined in the patent claims.
Claims (10)
1. a kind of thermal power plant's operation management system, it is characterised in that including equipment and technology account standardized management module and operation
Standardized management module;The equipment and technology account standardized management module includes equipment/part management module, described to set
Standby/part management module includes equipment/components information storehouse and equipment/parts Classification Management module, equipment/zero
Part Classification Management module uses multiclass classification, and each next stage classification is contained in corresponding upper level classification, described to set
Standby/components information storehouse is associated with the equipment/parts Classification Management module, so that it is determined that the equipment/parts
The classification information of each equipment/parts in information bank;The operational standardization management module is defined for thermal power plant's operation
Normalizing operation information, by associating the information in the equipment and technology account standardized management module, generate specific record
Document and/or assignment instructions.
2. thermal power plant's operation management system as claimed in claim 1, it is characterised in that the equipment and technology account standardization pipe
Reason module also includes technical parameter management module, and the technical parameter management module includes parameter library and parameterized template management mould
Block, the parameterized template management module extract the associated technical parameters in the parameter library according to each equipment/parts feature
, form specific technical parameter template, equipment/parts in the equipment/components information storehouse select its corresponding skill
Art parameterized template defines its parameter information.
3. thermal power plant's operation management system as claimed in claim 1, it is characterised in that the equipment/parts Classification Management
The highest level of the multiclass classification of module is all or part of to be classified based on specialty.
4. thermal power plant's operation management system as claimed in claim 1, it is characterised in that the equipment/parts Classification Management
The highest level of the multiclass classification of module includes common apparatus.
5. thermal power plant's operation management system as claimed in claim 1, it is characterised in that the operational standardization management module bag
Include following one or more:
Equipment operation standard management module, it is used for the inter-related task and document of management equipment operation;
Plant maintenance standardized management module, it is used for the inter-related task and document of management equipment periodic maintenance and repair based on condition of component;
Overhaul of the equipments standardized management module, it is used for the inter-related task and document of management equipment maintenance;
Equipment deficiency standardized management module, it is used for the inter-related task of management equipment abnormal conditions and document;
Technological transformation project standardized management module is produced, it is used for the inter-related task of administrative skill transformation project and document;And
Technical supervision standardized management module, it is used for the inter-related task and document that manage safety production technique supervision.
6. thermal power plant's operation management system as claimed in claim 1, it is characterised in that also including input module, by described
Input module receives external command information, and in normalized operation, the operational standardization management module refers to according to outside
Information is made, the information in the equipment and technology account standardized management module is called, generates specific recording documents and/or task
Instruction.
7. thermal power plant's operation management system as claimed in claim 1, it is characterised in that also including output module, the output
The output of recording documents and/or assignment instructions or be sent to receiving terminal that module generates the operational standardization management module.
8. thermal power plant's operation management system as claimed in claim 1, it is characterised in that the equipment and technology account standardization pipe
Reason module also includes organizational structure management module, and the organizational structure management module includes personal information storehouse and personal management mould
Block, the personal management module carries out group setting to personnel, and personnel and/or personnel's group are believed with the equipment/parts
Equipment/parts in breath storehouse are associated.
9. thermal power plant's operation management system as claimed in claim 1, it is characterised in that the equipment and technology account standardization pipe
Reason module also includes management map module, and the management map module includes plant area's map office and installation site management module, institute
State actual installation position of the installation site management module according to equipment/parts in the equipment/components information storehouse, by its with
Relevant position in plant area's map office is associated.
10. the task executing method of thermal power plant's operation management system as described in claim 1-9 is any, it is characterised in that behaviour
Make standardized management module according to the instruction request or time set received, corresponding come in trigger criteria operation information
It is engaged in and generates output data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710888251.1A CN107766457A (en) | 2017-09-27 | 2017-09-27 | A kind of thermal power plant's operation management system and its task executing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710888251.1A CN107766457A (en) | 2017-09-27 | 2017-09-27 | A kind of thermal power plant's operation management system and its task executing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107766457A true CN107766457A (en) | 2018-03-06 |
Family
ID=61266720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710888251.1A Pending CN107766457A (en) | 2017-09-27 | 2017-09-27 | A kind of thermal power plant's operation management system and its task executing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107766457A (en) |
Cited By (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108388996A (en) * | 2018-03-08 | 2018-08-10 | 青岛东方深蓝信息科技股份有限公司 | A kind of scientific research service integration management system |
CN108416571A (en) * | 2018-03-08 | 2018-08-17 | 青岛东方深蓝信息科技股份有限公司 | A kind of application method of scientific research service integration management system |
CN108919770A (en) * | 2018-09-19 | 2018-11-30 | 国网浙江省电力有限公司嘉兴供电公司 | Substation operation status information centralized monitoring system |
CN109214704A (en) * | 2018-09-26 | 2019-01-15 | 广东电网有限责任公司 | A kind of distributed intelligence operation platform, method, apparatus and readable storage medium storing program for executing |
CN109538311A (en) * | 2018-09-21 | 2019-03-29 | 浙江大学 | Control performance method of real-time towards steam turbine in high-end power generating equipment |
CN110110963A (en) * | 2019-04-02 | 2019-08-09 | 国网江西省电力有限公司电力科学研究院 | A kind of distribution network engineering overall process management-control method of data-driven |
CN110443381A (en) * | 2019-07-01 | 2019-11-12 | 中国工程物理研究院激光聚变研究中心 | Large-scale science apparatus reliability information management method and system |
CN110443500A (en) * | 2019-08-06 | 2019-11-12 | 国家电投集团江西电力有限公司分宜发电厂 | A kind of work method for pushing and system based on the power plant capital construction phase |
CN110929060A (en) * | 2018-09-20 | 2020-03-27 | 中国石油化工股份有限公司 | Memory, refinery sealed point ledger generation method and equipment |
CN111079960A (en) * | 2019-12-27 | 2020-04-28 | 中国人民解放军32181部队 | Automatic identification system of maintenance equipment |
CN111079583A (en) * | 2019-12-03 | 2020-04-28 | 三门核电有限公司 | Fire control combustible material intelligent management terminal |
CN111291462A (en) * | 2018-12-06 | 2020-06-16 | 西门子股份公司 | Device and method for generating pipeline and instrument diagram P & ID of power plant |
CN111444164A (en) * | 2020-03-27 | 2020-07-24 | 广西电网有限责任公司河池供电局 | Method for establishing substation equipment monitoring information base based on equipment monitoring information specification |
CN111769995A (en) * | 2020-08-07 | 2020-10-13 | 威胜集团有限公司 | Instrument terminal management method, system, mobile terminal and readable storage medium |
CN111861150A (en) * | 2020-06-30 | 2020-10-30 | 南京华盾电力信息安全测评有限公司 | Technology supervision standardization method, system and technology supervision plan making method |
CN112052965A (en) * | 2020-09-03 | 2020-12-08 | 浙江大唐乌沙山发电有限责任公司 | Visual electric power equipment online management system and management method |
CN112050277A (en) * | 2020-09-17 | 2020-12-08 | 云南能投达诺智能科技发展有限公司 | Construction method of intelligent laboratory heating and ventilation system |
CN112183991A (en) * | 2020-09-22 | 2021-01-05 | 广东电网有限责任公司 | Power plant data management method and system, electronic equipment and storage medium |
CN112183931A (en) * | 2020-08-28 | 2021-01-05 | 上海建工四建集团有限公司 | Building takeover acceptance method based on building information three-dimensional model |
CN112288304A (en) * | 2020-11-06 | 2021-01-29 | 江苏物联网研究发展中心 | High-adaptability maintenance management system |
CN112330267A (en) * | 2020-10-19 | 2021-02-05 | 优利德(江苏)化工有限公司 | Chemical plant production operation management system |
CN112462164A (en) * | 2020-10-30 | 2021-03-09 | 深圳市合众清洁能源研究院 | Intelligent test system of well low-voltage plate cabinet |
CN112613066A (en) * | 2020-12-02 | 2021-04-06 | 北京华能新锐控制技术有限公司 | Internet information management system based on large-scale wind power plant |
CN112697961A (en) * | 2019-10-23 | 2021-04-23 | 中国石油化工股份有限公司 | Sealing point detection system |
CN113110263A (en) * | 2021-05-24 | 2021-07-13 | 国网湖北省电力有限公司直流运检公司 | Intelligent management and control system for operation and inspection operation of converter station |
CN113253691A (en) * | 2021-06-18 | 2021-08-13 | 武汉科迪智能环境股份有限公司 | Equipment management method and device |
CN113359647A (en) * | 2021-06-30 | 2021-09-07 | 信利(仁寿)高端显示科技有限公司 | Automatic monitoring method and system for equipment point inspection data |
CN113404560A (en) * | 2021-05-21 | 2021-09-17 | 华电电力科学研究院有限公司 | Thermal power plant unit maintenance chemical inspection method and handheld auxiliary system |
CN113627802A (en) * | 2021-08-13 | 2021-11-09 | 西安热工研究院有限公司 | Method for calculating number of wind field fault defect-eliminating shutdown stations on line based on defect list |
CN114116918A (en) * | 2021-11-23 | 2022-03-01 | 西安热工研究院有限公司 | Power generation group technology standard digital management method, system, equipment and storage medium |
CN114255002A (en) * | 2021-12-14 | 2022-03-29 | 深圳供电局有限公司 | Unit outage management system |
CN114372712A (en) * | 2022-01-11 | 2022-04-19 | 安徽恒科信息技术有限公司 | Supervision task management system based on process |
CN115293549A (en) * | 2022-07-28 | 2022-11-04 | 深圳市华汇数据服务有限公司 | Intelligent supervision and evaluation method and system based on digital government affair system |
CN115860278A (en) * | 2023-02-27 | 2023-03-28 | 深圳市利和兴股份有限公司 | Motor assembly production management method and system based on data analysis |
CN115879748A (en) * | 2023-03-01 | 2023-03-31 | 多链互联信息科技南京有限公司 | Enterprise informatization management integration platform based on big data |
CN116805204A (en) * | 2023-08-24 | 2023-09-26 | 超网实业(成都)股份有限公司 | Intelligent plant monitoring method and system |
CN117057588A (en) * | 2023-10-11 | 2023-11-14 | 南方电网调峰调频发电有限公司信息通信分公司 | Monitoring management method and system for operation and maintenance of power grid |
CN117094659A (en) * | 2023-07-10 | 2023-11-21 | 中国化学工程第六建设有限公司 | Integrated chemical engineering ground pipeline welding management system and method |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005215314A (en) * | 2004-01-29 | 2005-08-11 | Mitsubishi Heavy Ind Ltd | Simulation apparatus, know-how information recording apparatus, method for extraction of maintenance operation know-how, and simulation method for maintenance operation of nuclear plant |
CN101763576A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Power plant enterprise asset management (EAM) system with Qcode module and Qcode access method thereof |
EP2551990A2 (en) * | 2011-06-27 | 2013-01-30 | The Boeing Company | Situational awareness for an electrical distribution system |
CN103077442A (en) * | 2013-01-01 | 2013-05-01 | 大唐林州热电有限责任公司 | Information shielding method for whole fire coal inspection and acceptance process of thermal power plant |
CN103258256A (en) * | 2013-04-12 | 2013-08-21 | 国家电网公司 | Cable line condition monitoring multi-dimensional visual management platform |
CN103984333A (en) * | 2014-06-04 | 2014-08-13 | 北京京能高安屯燃气热电有限责任公司 | Monitoring and management system for power plant |
CN104808632A (en) * | 2015-04-23 | 2015-07-29 | 华电国际山东信息管理有限公司 | Automatic acquisition and processing system for fire coal heterogeneous data sources of thermal power plants |
CN105187771A (en) * | 2015-07-31 | 2015-12-23 | 山东创德软件技术有限公司 | Plant-level comprehensive supervision platform |
CN106022730A (en) * | 2016-05-31 | 2016-10-12 | 华电国际宁夏新能源发电有限公司 | Movable cooperative working platform system based on wind power generation operation maintenance and operation method thereof |
CN106096852A (en) * | 2016-06-20 | 2016-11-09 | 中国神华能源股份有限公司 | A kind of mobile working system of power plant |
CN106296077A (en) * | 2016-08-01 | 2017-01-04 | 中国水利电力物资集团有限公司 | A kind of Power Plant Equipment storage management method based on RFID of Internet-of-things technology and system |
CN106529839A (en) * | 2016-12-16 | 2017-03-22 | 华北电力科学研究院有限责任公司 | Classification method and system for auxiliary devices of thermal power plant |
-
2017
- 2017-09-27 CN CN201710888251.1A patent/CN107766457A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005215314A (en) * | 2004-01-29 | 2005-08-11 | Mitsubishi Heavy Ind Ltd | Simulation apparatus, know-how information recording apparatus, method for extraction of maintenance operation know-how, and simulation method for maintenance operation of nuclear plant |
CN101763576A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Power plant enterprise asset management (EAM) system with Qcode module and Qcode access method thereof |
EP2551990A2 (en) * | 2011-06-27 | 2013-01-30 | The Boeing Company | Situational awareness for an electrical distribution system |
CN103077442A (en) * | 2013-01-01 | 2013-05-01 | 大唐林州热电有限责任公司 | Information shielding method for whole fire coal inspection and acceptance process of thermal power plant |
CN103258256A (en) * | 2013-04-12 | 2013-08-21 | 国家电网公司 | Cable line condition monitoring multi-dimensional visual management platform |
CN103984333A (en) * | 2014-06-04 | 2014-08-13 | 北京京能高安屯燃气热电有限责任公司 | Monitoring and management system for power plant |
CN104808632A (en) * | 2015-04-23 | 2015-07-29 | 华电国际山东信息管理有限公司 | Automatic acquisition and processing system for fire coal heterogeneous data sources of thermal power plants |
CN105187771A (en) * | 2015-07-31 | 2015-12-23 | 山东创德软件技术有限公司 | Plant-level comprehensive supervision platform |
CN106022730A (en) * | 2016-05-31 | 2016-10-12 | 华电国际宁夏新能源发电有限公司 | Movable cooperative working platform system based on wind power generation operation maintenance and operation method thereof |
CN106096852A (en) * | 2016-06-20 | 2016-11-09 | 中国神华能源股份有限公司 | A kind of mobile working system of power plant |
CN106296077A (en) * | 2016-08-01 | 2017-01-04 | 中国水利电力物资集团有限公司 | A kind of Power Plant Equipment storage management method based on RFID of Internet-of-things technology and system |
CN106529839A (en) * | 2016-12-16 | 2017-03-22 | 华北电力科学研究院有限责任公司 | Classification method and system for auxiliary devices of thermal power plant |
Non-Patent Citations (2)
Title |
---|
戴胜策: ""某火电厂企业物资管理系统的设计与实现"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
王申 等: ""电厂设备管理系统的研究与应用"", 《电力信息化》 * |
Cited By (49)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108416571A (en) * | 2018-03-08 | 2018-08-17 | 青岛东方深蓝信息科技股份有限公司 | A kind of application method of scientific research service integration management system |
CN108388996A (en) * | 2018-03-08 | 2018-08-10 | 青岛东方深蓝信息科技股份有限公司 | A kind of scientific research service integration management system |
CN108919770A (en) * | 2018-09-19 | 2018-11-30 | 国网浙江省电力有限公司嘉兴供电公司 | Substation operation status information centralized monitoring system |
CN110929060A (en) * | 2018-09-20 | 2020-03-27 | 中国石油化工股份有限公司 | Memory, refinery sealed point ledger generation method and equipment |
CN109538311A (en) * | 2018-09-21 | 2019-03-29 | 浙江大学 | Control performance method of real-time towards steam turbine in high-end power generating equipment |
CN109538311B (en) * | 2018-09-21 | 2020-08-04 | 浙江大学 | Real-time monitoring method for control performance of steam turbine in high-end power generation equipment |
CN109214704A (en) * | 2018-09-26 | 2019-01-15 | 广东电网有限责任公司 | A kind of distributed intelligence operation platform, method, apparatus and readable storage medium storing program for executing |
CN111291462A (en) * | 2018-12-06 | 2020-06-16 | 西门子股份公司 | Device and method for generating pipeline and instrument diagram P & ID of power plant |
CN111291462B (en) * | 2018-12-06 | 2023-08-08 | 西门子能源国际公司 | Apparatus and method for generating piping and instrumentation maps P & ID for power plants |
CN110110963A (en) * | 2019-04-02 | 2019-08-09 | 国网江西省电力有限公司电力科学研究院 | A kind of distribution network engineering overall process management-control method of data-driven |
CN110443381A (en) * | 2019-07-01 | 2019-11-12 | 中国工程物理研究院激光聚变研究中心 | Large-scale science apparatus reliability information management method and system |
CN110443500A (en) * | 2019-08-06 | 2019-11-12 | 国家电投集团江西电力有限公司分宜发电厂 | A kind of work method for pushing and system based on the power plant capital construction phase |
CN112697961A (en) * | 2019-10-23 | 2021-04-23 | 中国石油化工股份有限公司 | Sealing point detection system |
CN111079583A (en) * | 2019-12-03 | 2020-04-28 | 三门核电有限公司 | Fire control combustible material intelligent management terminal |
CN111079960A (en) * | 2019-12-27 | 2020-04-28 | 中国人民解放军32181部队 | Automatic identification system of maintenance equipment |
CN111444164A (en) * | 2020-03-27 | 2020-07-24 | 广西电网有限责任公司河池供电局 | Method for establishing substation equipment monitoring information base based on equipment monitoring information specification |
CN111444164B (en) * | 2020-03-27 | 2023-03-21 | 广西电网有限责任公司河池供电局 | Method for establishing substation equipment monitoring information base based on equipment monitoring information standard |
CN111861150A (en) * | 2020-06-30 | 2020-10-30 | 南京华盾电力信息安全测评有限公司 | Technology supervision standardization method, system and technology supervision plan making method |
CN111769995B (en) * | 2020-08-07 | 2023-08-15 | 威胜集团有限公司 | Meter terminal management method, system, mobile terminal and readable storage medium |
CN111769995A (en) * | 2020-08-07 | 2020-10-13 | 威胜集团有限公司 | Instrument terminal management method, system, mobile terminal and readable storage medium |
CN112183931A (en) * | 2020-08-28 | 2021-01-05 | 上海建工四建集团有限公司 | Building takeover acceptance method based on building information three-dimensional model |
CN112052965A (en) * | 2020-09-03 | 2020-12-08 | 浙江大唐乌沙山发电有限责任公司 | Visual electric power equipment online management system and management method |
CN112050277A (en) * | 2020-09-17 | 2020-12-08 | 云南能投达诺智能科技发展有限公司 | Construction method of intelligent laboratory heating and ventilation system |
CN112183991A (en) * | 2020-09-22 | 2021-01-05 | 广东电网有限责任公司 | Power plant data management method and system, electronic equipment and storage medium |
CN112330267A (en) * | 2020-10-19 | 2021-02-05 | 优利德(江苏)化工有限公司 | Chemical plant production operation management system |
CN112462164A (en) * | 2020-10-30 | 2021-03-09 | 深圳市合众清洁能源研究院 | Intelligent test system of well low-voltage plate cabinet |
CN112288304A (en) * | 2020-11-06 | 2021-01-29 | 江苏物联网研究发展中心 | High-adaptability maintenance management system |
CN112613066B (en) * | 2020-12-02 | 2023-08-29 | 华能新能源股份有限公司 | Internet information management system based on large-scale wind power plant |
CN112613066A (en) * | 2020-12-02 | 2021-04-06 | 北京华能新锐控制技术有限公司 | Internet information management system based on large-scale wind power plant |
CN113404560A (en) * | 2021-05-21 | 2021-09-17 | 华电电力科学研究院有限公司 | Thermal power plant unit maintenance chemical inspection method and handheld auxiliary system |
CN113110263A (en) * | 2021-05-24 | 2021-07-13 | 国网湖北省电力有限公司直流运检公司 | Intelligent management and control system for operation and inspection operation of converter station |
CN113253691A (en) * | 2021-06-18 | 2021-08-13 | 武汉科迪智能环境股份有限公司 | Equipment management method and device |
CN113253691B (en) * | 2021-06-18 | 2021-09-14 | 武汉科迪智能环境股份有限公司 | Equipment management method and device |
CN113359647A (en) * | 2021-06-30 | 2021-09-07 | 信利(仁寿)高端显示科技有限公司 | Automatic monitoring method and system for equipment point inspection data |
CN113627802A (en) * | 2021-08-13 | 2021-11-09 | 西安热工研究院有限公司 | Method for calculating number of wind field fault defect-eliminating shutdown stations on line based on defect list |
CN114116918B (en) * | 2021-11-23 | 2024-03-01 | 西安热工研究院有限公司 | Digital management method, system, equipment and storage medium for power generation group technical standard |
CN114116918A (en) * | 2021-11-23 | 2022-03-01 | 西安热工研究院有限公司 | Power generation group technology standard digital management method, system, equipment and storage medium |
CN114255002A (en) * | 2021-12-14 | 2022-03-29 | 深圳供电局有限公司 | Unit outage management system |
CN114372712A (en) * | 2022-01-11 | 2022-04-19 | 安徽恒科信息技术有限公司 | Supervision task management system based on process |
CN115293549B (en) * | 2022-07-28 | 2023-08-25 | 深圳市华汇数据服务有限公司 | Intelligent supervision and evaluation method and system based on digital government affair system |
CN115293549A (en) * | 2022-07-28 | 2022-11-04 | 深圳市华汇数据服务有限公司 | Intelligent supervision and evaluation method and system based on digital government affair system |
CN115860278A (en) * | 2023-02-27 | 2023-03-28 | 深圳市利和兴股份有限公司 | Motor assembly production management method and system based on data analysis |
CN115860278B (en) * | 2023-02-27 | 2023-04-28 | 深圳市利和兴股份有限公司 | Motor assembly production management method and system based on data analysis |
CN115879748A (en) * | 2023-03-01 | 2023-03-31 | 多链互联信息科技南京有限公司 | Enterprise informatization management integration platform based on big data |
CN117094659A (en) * | 2023-07-10 | 2023-11-21 | 中国化学工程第六建设有限公司 | Integrated chemical engineering ground pipeline welding management system and method |
CN116805204A (en) * | 2023-08-24 | 2023-09-26 | 超网实业(成都)股份有限公司 | Intelligent plant monitoring method and system |
CN116805204B (en) * | 2023-08-24 | 2023-12-01 | 超网实业(成都)股份有限公司 | Intelligent plant monitoring method and system |
CN117057588A (en) * | 2023-10-11 | 2023-11-14 | 南方电网调峰调频发电有限公司信息通信分公司 | Monitoring management method and system for operation and maintenance of power grid |
CN117057588B (en) * | 2023-10-11 | 2024-01-23 | 南方电网调峰调频发电有限公司信息通信分公司 | Monitoring management method and system for operation and maintenance of power grid |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107766457A (en) | A kind of thermal power plant's operation management system and its task executing method | |
Kanneganti et al. | Specification of energy assessment methodologies to satisfy ISO 50001 energy management standard | |
Panda et al. | Technological capability assessment of a firm in the electricity sector | |
US20030074244A1 (en) | Distributed energy technology assurance | |
Ayoub et al. | Risk based life cycle assessment conceptual framework for energy supply systems in large buildings | |
Thonemann et al. | Handling of Multi‐Functionality in Life Cycle Assessments for Steel Mill Gas Based Chemical Production | |
Ghaleb et al. | Assessing the impact of maintenance practices on asset's sustainability | |
Colla et al. | Assessing the efficiency of the off-gas network management in integrated steelworks | |
Mueller | Missing the spark: An investigation into the low adoption paradox of combined heat and power technologies | |
KR100584903B1 (en) | System for real time controlling driving data of power plant | |
CN117557305A (en) | Digital management method and system for carbon emission in demonstration area | |
Noori et al. | Exploring the emergence of waste recovery and exchange in industrial clusters | |
Milovanović et al. | Efficiency of condensing thermal power plant as a complex system—An algorithm for assessing and improving energy efficiency and reliability during operation and maintenance | |
CN113592611A (en) | Integrated management system for centralized acquisition and supervision of garbage incineration enterprises | |
Al Mashaqbeh et al. | Hybrid Framework of, EWGM-FMEA, Analytical Hierarchy Process and Risk Balance Score Card for Risks Assessment in Energy Sector | |
Zhang | Analysis of a construction small-projects rework reduction program for a capital facility | |
Zatsarinnaya et al. | An automated software package creation for energy consumption accounting | |
Martínez-Sánchez et al. | An Approach for Energy and Cost Savings for a Seafood Processing Plant | |
Ullah et al. | Industrial Energy Management System: Design of a Conceptual Framework using IoT and Big Data | |
McGovern et al. | Implementation of an ISO 50001 energy management system using Lean Six Sigma in an Irish dairy: a case study | |
Zhang et al. | Research on electric energy measurement system based on intelligent sensor data in artificial intelligence environment | |
Hudedmani et al. | Energy Audit: an initiative to energy conservation | |
NGUYEN | An Exploratory Study of Material Flow Cost Accounting: A Case of Coal-Fired Thermal Power Plants in Vietnam | |
Ionescu et al. | Implementing an Energy Management System | |
Strugar | Journal of Quality and System Engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |