CN106529839A - Classification method and system for auxiliary devices of thermal power plant - Google Patents

Classification method and system for auxiliary devices of thermal power plant Download PDF

Info

Publication number
CN106529839A
CN106529839A CN201611166797.8A CN201611166797A CN106529839A CN 106529839 A CN106529839 A CN 106529839A CN 201611166797 A CN201611166797 A CN 201611166797A CN 106529839 A CN106529839 A CN 106529839A
Authority
CN
China
Prior art keywords
subsidiary engine
equipment
class
subsystem
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611166797.8A
Other languages
Chinese (zh)
Inventor
赵振宁
白翎
李金晶
孙志春
李媛园
刘启民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Original Assignee
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, North China Electric Power Research Institute Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611166797.8A priority Critical patent/CN106529839A/en
Publication of CN106529839A publication Critical patent/CN106529839A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention provides a classification method and system for auxiliary devices of a thermal power plant and relates to the technical field of the power plant. The system comprises a data obtaining device which is used for obtaining system data of the thermal power plant; a data statistic device which is used for carrying out statics on the devices of the thermal power plant, the functions of the devices, influences on a production process and influences on production cleaning performance according to the system data; a device division device which is used for dividing the devices according to functions and classes, thereby obtaining various classes of devices; a parameter obtaining device which is used for obtaining classification parameters of the devices, wherein the classification parameters are preset set according to the functions, the influences on the production process and the influences on the production cleaning performance; and a device classification device which is used for classifying the various classes of devices according to the classification parameters. According to the method and the system, the auxiliary devices are classified, and demands of DL/T 793-2012 are expanded, thereby forming a more complete technical system and enabling an application range to be relatively wide.

Description

A kind of stage division and system of the subsidiary engine equipment of thermal power plant
Technical field
The present invention, with regard to power plant's technical field, especially with regard to the sorting technique of the equipment of thermal power plant, is concretely one Plant the stage division and system of the subsidiary engine equipment of thermal power plant.
Background technology
At present, the reliability evaluation of thermal power plant refers to and unit, main frame, subsidiary engine equipment reliability of operation level is commented Valency.As the maintenance maintenance that the reliability of unit relies primarily on power plant works to maintain, thus the main purpose of reliability evaluation It is to find out the method that can lift reliability, thus production unit further can be deeply related in reliability evaluation technical research The evaluation of reliability and maintenance and repair management technique level, or production unit reliability engineering system.
In prior art, the requirement of DL/T 793-2012 is typically adopted to the evaluation of programme of Power Plant Equipment reliability, but It is which is primarily directed to unit aspect and is operated, although also relate to the evaluation to subsidiary engine, but relative to main equipment, subsidiary engine Evaluation rubric can not substantially meet the requirement of real work.Different from host groups, the subsidiary engine of power plant is many in quantity, Hen Duofu Machine also has the auxiliary device of oneself, and each auxiliary device also has auxiliary device, nested layer by layer, therefore can not possibly be all of auxiliary category The reliability that equipment or part are all studied to evaluate Power Plant Equipment.To the evaluation of programme of Power Plant Equipment reliability Research emphasis are that, and will to the subsidiary engine of power plant and its Auxiliary device is evaluated firstly the need of how research is classified to nested layer by layer subsidiary engine and its auxiliary device.
Therefore, a kind of new scheme how is researched and developed out, which can be to subsidiary engine nested layer by layer and its auxiliary device Carry out being classified and then be this area technical barrier urgently to be resolved hurrily to the reliability evaluation of thermal power plant.
The content of the invention
The invention provides the stage division and system of a kind of subsidiary engine equipment of thermal power plant, for subsidiary engine function, opposite The impact of product process and the impact to producing clean-up performance carry out complementary studies, realize the classification to subsidiary engine equipment, expand The requirement of DL/T 793-2012 is filled, more perfect technical system is made, the scope of application is more vast.
It is an object of the present invention to provide a kind of stage division of the subsidiary engine equipment of thermal power plant, methods described includes:
Obtain the system data of thermal power plant:
Equipment, the function of the equipment according to the system data statistics thermal power plant, the impact to production process And to producing the impact of clean-up performance;
The equipment is divided according to big class according to the function, obtained the equipment of each big apoplexy due to endogenous wind;
Obtain the value parameter of the equipment, the value parameter be according to the function, the impact to production process with And it is set in advance to producing the impact of clean-up performance;
The equipment of each big apoplexy due to endogenous wind is classified according to the value parameter.
It is an object of the present invention to provide a kind of hierarchy system of the subsidiary engine equipment of thermal power plant, the system includes:
Data acquisition facility, for obtaining the system data of thermal power plant:
Data statisticss device, for counted according to the system data equipment of the thermal power plant, the function of the equipment, Impact to production process and the impact to producing clean-up performance;
Equipment divides device, for being divided the equipment according to big class according to the function, obtains each big class In equipment;
Parameter obtaining device, for obtaining the value parameter of the equipment, the value parameter is according to the function, right The impact of production process and the impact to production clean-up performance are set in advance;
Sizing of equipment device, for being classified to the equipment of each big apoplexy due to endogenous wind according to the value parameter.
The beneficial effects of the present invention is, there is provided a kind of stage division and system of the subsidiary engine equipment of thermal power plant, pin Complementary studies are carried out to subsidiary engine function, the impact to production process and the impact to producing clean-up performance, is realized to auxiliary The classification of machine equipment, expands the requirement of DL/T 793-2012, makes more perfect technical system, and the scope of application is more It is vast, power station auxiliary reliability evaluation is improved, is raised the management level.
It is that the above and other objects, features and advantages of the present invention can be become apparent, preferred embodiment cited below particularly, And coordinate institute's accompanying drawings, it is described in detail below.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart of the stage division of the subsidiary engine equipment of thermal power plant provided in an embodiment of the present invention;
Particular flow sheets of the Fig. 2 for step S105 in Fig. 1;
Fig. 3 is a kind of structured flowchart of the hierarchy system of the subsidiary engine equipment of thermal power plant provided in an embodiment of the present invention;
Fig. 4 be a kind of subsidiary engine equipment of thermal power plant provided in an embodiment of the present invention hierarchy system in sizing of equipment device Structured flowchart.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Art technology technical staff knows, embodiments of the present invention can be implemented as a kind of system, device, equipment, Method or computer program.Therefore, the disclosure can be implemented as following form, i.e.,:Completely hardware, completely soft Part (includes firmware, resident software, microcode etc.), or the form that hardware and software is combined.
The abbreviation and Key Term of the present invention are introduced first.
Main frame:For Thermal generation unit, main frame is often referred to main ground equipment in generating flow process, including boiler, Steam turbine, electromotor and main transformer.
Subsidiary engine:Equipment in addition to main frame is referred to as subsidiary engine.
Power Plant Generating Equipment Reliability:Refer to equipment under prescribed conditions, in the stipulated time, complete the ability of predetermined function.
The invention provides the stage division and system of a kind of subsidiary engine equipment of thermal power plant, common subsidiary engine point at home On the basis of class method, its strong point is taken, find a kind of new subsidiary engine sorting technique, perfect subsidiary engine reliability evaluation technical system. Below with reference to some representative embodiments of the present invention, the in detail principle and spirit of the explaination present invention.Art used below Language " module " and " unit ", can be the software and/or hardware for realizing predetermined function.Although the module described by following examples Preferably with software realizing, but hardware, or the realization of the combination of software and hardware is also what is may and be contemplated.
At present, domestic common subsidiary engine sorting technique is broadly divided into three kinds:
1) divided by its function of organization in process of production:Classification side in this method and current production process Method is identical, mostly centered on a certain large-scale Important Auxiliary equipment system, with reference to some ingredients around which, purchases into son one by one System, can be present side by side, it is also possible to which series connection is present, or exist with more complicated connection in series-parallel pattern.
2) importance being worth by itself is classified:It is wherein most heavy by the center in the system divided by function Subsidiary engine is wanted, most important subsidiary engine is that most important subsidiary engine is to send in coal pulverizer and primary air fan, air and flue system such as in pulverized coal preparation system Blower fan and air-introduced machine.
3) significance level affected by its unit operation carries out device class:Maintenance centered on reliability (Reliability Centered Maintenance, RCM) is at present typically according to equipment for unit Influence of production Significance level classified and determined system Strategies of Maintenance a kind of system approach.RCM emphasizes there is important to production activity The unusual service condition of the key equipment of impact carries out early diagnosiss and early treatment, and various modes are arranged on the basis of equipment state Planned maintenance, to reach highest equipment availability and minimum maintenance cost.The development of its maintenance system about experienced Correction maintenance, preventative maintenance and prospective maintenance.
The present invention generally continues to use the requirement of DL/T 793-2012 to thermal power plant's method for evaluating reliability of subsidiary engine, but Complementary studies are carried out for status the characteristics of subsidiary engine itself and its in process of production, expands wanting for DL/T 793-2012 Ask, make more perfect technical system, the scope of application is more vast.
Different from host groups, subsidiary engine is many in quantity, and many subsidiary engines also have the auxiliary category equipment of oneself, and auxiliary category equipment is also auxiliary Category equipment, it is nested layer by layer, it is impossible to which that all of auxiliary category equipment or part are all studied.So, it is generally right The equipment of subsidiary engine is first classified, is layered, and chooses emphasis equipment therein and is furtherd investigate, and be extended with emphasis equipment, does To Points replacing surfaces.
Fig. 1 is a kind of flow chart of the stage division of the subsidiary engine equipment of thermal power plant provided in an embodiment of the present invention, is referred to Fig. 1, methods described include:
S101:Obtain the system data of thermal power plant.In a particular embodiment, as being directed to 1000MW, 600MW level great Rong Amount typical generator group, carries out classification work power plant Important Auxiliary equipment, obtains the system data of the power plant, system data first Can be the general system diagram of power plant, which includes the composition all devices of power plant, the function of each equipment, to production process Affect and the impact to production clean-up performance.
S102:The equipment of the thermal power plant, the function of the equipment are counted according to the system data, to production process Affect and the impact to production clean-up performance.
In this step, all subsidiary engines of a thermal power plant chosen are counted, is counted the title of all devices, each The function of individual equipment, the impact to production process and the impact to producing clean-up performance.In the influence process to producing, remove Outside the impact caused by the reliability of main production procedure, it is also contemplated that its own runnability and its matter to production process Amount is taken into full account.The performance of power industry production product is in addition to the quality of power supply, it is often more important which is to atmosphere pollution The impact of discharge, thus subsidiary engine is during supporting that unit carries out generating production, the requirement to subsidiary engine reliability must take into To its requirement to environmental-protecting performance.For example, such as the coal pulverizer in power plant, its function (namely self-value) is high, boiler Great subsidiary engine, cannot restart in x minutes, and the impact to production process is high, and unit energy on-load ability substantially can with coal-grinding Input ability direct ratio, has standby, and the impact to producing clean-up performance is had an impact when being the coal pulverizer pebble coal system failure.
S103:The equipment is divided according to big class according to the function, obtained the equipment of each big apoplexy due to endogenous wind.It is described Big class includes powder subsystem processed, cigarette wind subsystem, dedusting subsystem, desulphurization denitration subsystem and feedwater subsystem.
S104:The value parameter of the equipment is obtained, the value parameter is according to the function, the shadow to production process Ring and set in advance to producing the impact of clean-up performance.In a particular embodiment, value parameter include the first level, Second level, third layer level and the 4th level, the importance highest of the first level, the second level are taken second place, and the 4th level is important Property is minimum.Such as the coal pulverizer in power plant, its function (namely self-value) is high, the great subsidiary engine of boiler, cannot be in x minutes again Open, the impact to production process is high, and unit energy on-load ability substantially can put into ability direct ratio with coal-grinding, have standby, right The impact of production clean-up performance is had an impact when being the coal pulverizer pebble coal system failure, therefore the corresponding value parameter of coal pulverizer is the One level.
S105:The equipment of each big apoplexy due to endogenous wind is classified according to the value parameter.Concrete streams of the Fig. 2 for step S105 Cheng Tu, refers to Fig. 2, and the step includes:
S201:When the value parameter of the equipment is the first level, the equipment belongs to first kind subsidiary engine.As in power plant Coal pulverizer, corresponding value parameter be the first level, then coal pulverizer belong to first kind subsidiary engine.
S202:When the value parameter of the equipment is the second level, the equipment belongs to Equations of The Second Kind subsidiary engine.
S203:When the value parameter of the equipment is third layer level, the equipment belongs to the 3rd class subsidiary engine;
S204:When the value parameter of the equipment is four level, the equipment belongs to the 4th class subsidiary engine.
For powder subsystem processed, first kind subsidiary engine includes coal pulverizer and primary air fan, and the 3rd class subsidiary engine includes mill The steam air heater of the petrol station of coal machine, feeder, separator, seal fan, the petrol station of primary air fan and primary air fan.
For cigarette wind subsystem, first kind subsidiary engine includes pressure fan and air-introduced machine, and Equations of The Second Kind subsidiary engine includes empty pre- Device, the 3rd class subsidiary engine include the petrol station of the petrol station of pressure fan, the steam air heater of pressure fan and air-introduced machine, and the 4th class subsidiary engine includes sky The motor and air preheater soot blower of pre- device.
For dedusting subsystem, first kind subsidiary engine includes cleaner unit, and the 3rd class subsidiary engine includes motor.
For desulphurization denitration subsystem, first kind subsidiary engine includes circulating pump, oxidation fan, booster fan and denitration Device, Equations of The Second Kind subsidiary engine include waste water system, demister and spraying layer, and the 3rd class subsidiary engine includes that Gypsum Fibrosum excavationg pump, eddy flow are stirred Mix device, gypsum dehydration belt feeder, limestone ball mill and soot blower.
For feedwater subsystem, first kind subsidiary engine includes feed pump, and Equations of The Second Kind subsidiary engine includes oxygen-eliminating device and high pressure Heater, the 3rd class subsidiary engine include fore pump, fluid-flywheel clutch, converter plant, motor and auxiliary turbine, and the 4th class is auxiliary Machine includes steam condenser and steam trap.
As described above, be the present invention provide a kind of thermal power plant subsidiary engine equipment stage division, for subsidiary engine function, Impact to production process and the impact to producing clean-up performance carry out complementary studies, realize and subsidiary engine equipment is divided Level, expands the requirement of DL/T 793-2012, makes more perfect technical system, and the scope of application is more vast, improves fire Controlling Auxiliaries in Power Plants reliability evaluation, raises the management level.
Although it should be noted that describe the operation of the inventive method in the accompanying drawings with particular order, this does not require that Or hint must perform these operations according to the particular order, or the operation having to carry out shown in whole could realize the phase The result of prestige.Additionally or alternatively, it is convenient to omit some steps, multiple steps are merged into a step to perform, and/or will One step is decomposed into execution of multiple steps.
After the method for describing exemplary embodiment of the invention, next, with reference to Fig. 3 to exemplary reality of the invention The hierarchy system for applying the subsidiary engine equipment of the thermal power plant of mode is introduced.The enforcement of the system may refer to the reality of said method Apply, repeat part and repeat no more.Term " module " used below and " unit ", can be the software for realizing predetermined function And/or hardware.Although the module described by following examples is preferably with software realizing, hardware, or software and hard The realization of the combination of part is also what is may and be contemplated.
Fig. 3 is a kind of structured flowchart of the hierarchy system of the subsidiary engine equipment of thermal power plant provided in an embodiment of the present invention, please be joined Fig. 3 is read, the system includes:
Data acquisition facility 100, for obtaining the system data of thermal power plant.In a particular embodiment, such as it is directed to 1000MW, 600MW level Large Copacity typical generator group, carries out classification work power plant Important Auxiliary equipment, obtains the power plant first System data, system data can be the general system diagram of power plant, which includes the composition all devices of power plant, each equipment Function, the impact to production process and to produce clean-up performance impact.
Data statisticss device 200, for the equipment according to the system data statistics thermal power plant, the work(of the equipment Energy, the impact to production process and the impact to producing clean-up performance.
In the apparatus, all subsidiary engines of a thermal power plant chosen are counted, is counted the title of all devices, each The function of individual equipment, the impact to production process and the impact to producing clean-up performance.In the influence process to producing, remove Outside the impact caused by the reliability of main production procedure, it is also contemplated that its own runnability and its matter to production process Amount is taken into full account.The performance of power industry production product is in addition to the quality of power supply, it is often more important which is to atmosphere pollution The impact of discharge, thus subsidiary engine is during supporting that unit carries out generating production, the requirement to subsidiary engine reliability must take into To its requirement to environmental-protecting performance.For example, such as the coal pulverizer in power plant, its function (namely self-value) is high, boiler Great subsidiary engine, cannot restart in x minutes, and the impact to production process is high, and unit energy on-load ability substantially can with coal-grinding Input ability direct ratio, has standby, and the impact to producing clean-up performance is had an impact when being the coal pulverizer pebble coal system failure.
Equipment divides device 300, for being divided the equipment according to big class according to the function, obtains each big The equipment of apoplexy due to endogenous wind.The big class include powder subsystem processed, cigarette wind subsystem, dedusting subsystem, desulphurization denitration subsystem and to Water subsystem.
Parameter obtaining device 400, for obtaining the value parameter of the equipment, the value parameter is according to the work( Energy, the impact to production process and the impact to production clean-up performance are set in advance.In a particular embodiment, it is classified Parameter includes the first level, the second level, third layer level and the 4th level, the importance highest of the first level, the second level Take second place, the 4th level importance is minimum.If the coal pulverizer in power plant, its function (namely self-value) are high, boiler is great auxiliary Machine, cannot restart in x minutes, and the impact to production process is high, and unit energy on-load ability substantially can put into energy with coal-grinding Power direct ratio, has standby, and the impact to producing clean-up performance is had an impact when being the coal pulverizer pebble coal system failure, therefore coal pulverizer pair The value parameter answered is the first level.
Sizing of equipment device 500, for being classified to the equipment of each big apoplexy due to endogenous wind according to the value parameter.Fig. 4 is In a kind of hierarchy system of the subsidiary engine equipment of thermal power plant provided in an embodiment of the present invention, the structured flowchart of sizing of equipment device, please join Fig. 4 is read, the device includes:
First divides device 501, for when the value parameter of the equipment is the first level, the equipment belongs to first Class subsidiary engine.If the coal pulverizer in power plant, corresponding value parameter are the first level, then coal pulverizer belongs to first kind subsidiary engine.
Second divides device 502, for when the value parameter of the equipment is the second level, the equipment belongs to second Class subsidiary engine.
3rd divides device 503, for when the value parameter of the equipment is third layer level, the equipment belongs to the 3rd Class subsidiary engine;
4th divides device 504, for when the value parameter of the equipment is four level, the equipment belongs to the 4th Class subsidiary engine.
For powder subsystem processed, first kind subsidiary engine includes coal pulverizer and primary air fan, and the 3rd class subsidiary engine includes mill The steam air heater of the petrol station of coal machine, feeder, separator, seal fan, the petrol station of primary air fan and primary air fan.
For cigarette wind subsystem, first kind subsidiary engine includes pressure fan and air-introduced machine, and Equations of The Second Kind subsidiary engine includes empty pre- Device, the 3rd class subsidiary engine include the petrol station of the petrol station of pressure fan, the steam air heater of pressure fan and air-introduced machine, and the 4th class subsidiary engine includes sky The motor and air preheater soot blower of pre- device.
For dedusting subsystem, first kind subsidiary engine includes cleaner unit, and the 3rd class subsidiary engine includes motor.
For desulphurization denitration subsystem, first kind subsidiary engine includes circulating pump, oxidation fan, booster fan and denitration Device, Equations of The Second Kind subsidiary engine include waste water system, demister and spraying layer, and the 3rd class subsidiary engine includes that Gypsum Fibrosum excavationg pump, eddy flow are stirred Mix device, gypsum dehydration belt feeder, limestone ball mill and soot blower.
For feedwater subsystem, first kind subsidiary engine includes feed pump, and Equations of The Second Kind subsidiary engine includes oxygen-eliminating device and high pressure Heater, the 3rd class subsidiary engine include fore pump, fluid-flywheel clutch, converter plant, motor and auxiliary turbine, and the 4th class is auxiliary Machine includes steam condenser and steam trap.
Although additionally, some unit moulds of the hierarchy system of the subsidiary engine equipment of thermal power plant are referred in above-detailed Block, but this division is only not enforceable.In fact, according to the embodiment of the present invention, above-described two or The feature and function of more units can embody in a unit.Equally, the feature and work(of an above-described unit Can also Further Division be to be embodied by multiple units.
Specific examples below is described in detail using this by taking 1000MW, 600MW level Large Copacity typical generator group as an example The stage division and system of the subsidiary engine equipment of bright thermal power plant is how to realize the classification to subsidiary engine.
1) obtain the general system diagram of thermal power plant, include in total figure the composition all devices of power plant, the function of each equipment, Impact to production process and the impact to producing clean-up performance.
Obtain the value parameter of the equipment, the value parameter be according to the function, the impact to production process with And it is set in advance to producing the impact of clean-up performance.
2) subsidiary engine is carried out dividing according to big class.The big class includes powder subsystem processed, cigarette wind subsystem, dedusting subsystem System, desulphurization denitration subsystem and feedwater subsystem.It is to subsidiary engine according to its functional module in process of production, i.e., system-level to open Begin to divide, decompose by big class, to ensure that the custom with power industry for many years is consistent.
3) equipment of each big apoplexy due to endogenous wind is classified according to the value parameter.
Coal-grinding is determined according to the function, the impact to production process and the impact to producing clean-up performance first The value parameter of the auxiliary equipments such as machine, pressure fan, air-introduced machine, feed pump, electric precipitation, desulphurization and denitration is the first level, therefore really The auxiliary equipments such as coal pulverizer, pressure fan, air-introduced machine, feed pump, electric precipitation, desulphurization and denitration are made for first kind subsidiary engine.Carry out weight Point investigates first kind subsidiary engine, and first kind subsidiary engine is as shown in table 1.
Table 1
The present invention chooses emphasis auxiliary equipment and is investigated, and election process of accomplishing to fan out from point to area follows following three points principle:
A. fully take into account the difference of subsidiary engine self-value:For the system with core subsidiary engine, its core subsidiary engine is seen Used as major pant item, other units are put under in core subsidiary engine as support part, such as primary air fan and coal-grinding in pulverized coal preparation system Machine is single-row, in air and gas system pressure fan and air-introduced machine single-row.For the system for not having great core subsidiary engine, it is individually regarded as One subsidiary engine, such as system for desulfuration and denitration.
B. in the influence process to producing, in addition to the impact that the reliability for main production procedure is caused, it is also contemplated that Take into full account to its own runnability and its to the quality of production process.
C. the performance of power industry production product is in addition to the quality of power supply, it is often more important which is to Air Pollutant Emission Affect, thus subsidiary engine is during supporting that unit carries out generating production, it is right that the requirement to subsidiary engine reliability must account for which The requirement of environmental-protecting performance, for the desulfurization, out of stock, dust pelletizing system particularly to boiler.
In 1000MW, 600MW level Large Copacity typical generator group, for powder subsystem processed, first kind subsidiary engine bag Include coal pulverizer and primary air fan, the 3rd class subsidiary engine includes the petrol station of coal pulverizer, feeder, separator, seal fan, First air The steam air heater of the petrol station and primary air fan of machine.
For cigarette wind subsystem, first kind subsidiary engine includes pressure fan and air-introduced machine, and Equations of The Second Kind subsidiary engine includes empty pre- Device, the 3rd class subsidiary engine include the petrol station of the petrol station of pressure fan, the steam air heater of pressure fan and air-introduced machine, and the 4th class subsidiary engine includes sky The motor and air preheater soot blower of pre- device.
For dedusting subsystem, first kind subsidiary engine includes cleaner unit, and the 3rd class subsidiary engine includes motor.
For desulphurization denitration subsystem, first kind subsidiary engine includes circulating pump, oxidation fan, booster fan and denitration Device, Equations of The Second Kind subsidiary engine include waste water system, demister and spraying layer, and the 3rd class subsidiary engine includes that Gypsum Fibrosum excavationg pump, eddy flow are stirred Mix device, gypsum dehydration belt feeder, limestone ball mill and soot blower.
For feedwater subsystem, first kind subsidiary engine includes feed pump, and Equations of The Second Kind subsidiary engine includes oxygen-eliminating device and high pressure Heater, the 3rd class subsidiary engine include fore pump, fluid-flywheel clutch, converter plant, motor and auxiliary turbine, and the 4th class is auxiliary Machine includes steam condenser and steam trap.
As described above, a kind of stage division and system of the subsidiary engine equipment of thermal power plant that the present invention is provided is, this It is bright be purpose RCM method as main thought to lift reliability, accomplish to expand subsidiary engine self performance and main flow in purpose aspect Journey environmental-protecting performance, considers self-value in division result, works, on the whole to the greatest extent in accomplishing to carry out centered on core subsidiary engine May be consistent with conventional func division result, to ensure that each several part is involved in, collaboration is operated, accomplish crew's participation.
Although additionally, some unit modules of system are referred in above-detailed, this division is only simultaneously Non-imposed.In fact, according to the embodiment of the present invention, the feature and function of above-described two or more units can To embody in a unit.Equally, the feature and function of an above-described unit can also Further Division serve as reasons Multiple units are embodying.
It is improvement on hardware (for example, to diode, crystal that clearly can distinguish for the improvement of a technology Pipe, switch etc. circuit structure improvement) or software on improvement (for the improvement of method flow).However, with technology Development, the improvement of current many method flows can be considered as directly improving for hardware circuit.Designer is almost Corresponding hardware circuit is obtained all by improved method flow is programmed in hardware circuit.Therefore, it cannot be said that one The improvement of individual method flow cannot be realized with hardware entities module.For example, PLD (Programmable Logic Device, PLD) (such as field programmable gate array (Field Programmable Gate Array, FPGA)) just It is such a integrated circuit, its logic function is determined to device programming by user.Voluntarily programmed to come one by designer Special integrated circuit is designed and made to individual digital display circuit " integrated " without asking chip maker on a piece of PLD Chip 2.And, nowadays, replacement manually makes IC chip, and " logic compiler is also used in this programming mostly instead Realizing, when it is write with program development, software compiler used is similar, and will compile for (logic compiler) " softwares Source code before also handy specific programming language writing, this is referred to as hardware description language (Hardware Description Language, HDL), and HDL is also not only a kind of, but have many kinds, such as ABEL (Advanced Boolean Expression Language)、AHDL(Altera Hardware Description Language)、 Confluence、CUPL(Cornell University Programming Language)、HDCal、JHDL(Java Hardware Description Language)、Lava、Lola、MyHDL、PALASM、RHDL(Ruby Hardware Description Language) etc., that what is most commonly used at present is VHDL (Very-High-Speed Integrated Circuit Hardware Description Language) and Verilog2.Those skilled in the art only also will be apparent to the skilled artisan that Need method flow slightly programming in logic is programmed in integrated circuit with above-mentioned several hardware description languages, it is possible to hold very much The hardware circuit of the easy accomplished logical method flow process.
Controller can be implemented in any suitable manner, and for example, controller can take such as microprocessor or process Device and storage can by the computer of the computer readable program code (such as software or firmware) of (micro-) computing device Read medium, gate, switch, special IC (Application Specific Integrated Circuit, ASIC), the form of programmable logic controller (PLC) and embedded microcontroller, the example of controller include but is not limited to following microcontroller Device:ARC625D, Atmel AT91SAM, Microchip PIC18F26K20 and Silicone Labs C8051F320, deposit Memory controller is also implemented as a part for the control logic of memorizer.
It is also known in the art that in addition to realizing controller in pure computer readable program code mode, it is complete Entirely can by by method and step carry out programming in logic cause controller with gate, switch, special IC, may be programmed The form of logic controller and embedded microcontroller etc. is realizing identical function.Therefore this controller is considered one kind Hardware component, and the device for realizing various functions to including in which can also be considered as the structure in hardware component.Or Even, can be used for realizing that the device of various functions be considered as not only being the software module of implementation method but also being Hardware Subdivision Structure in part.
System, device, module or unit that above-described embodiment is illustrated, specifically can be realized by computer chip or entity, Or by the product with certain function realizing.
For convenience of description, it is divided into various units with function when describing apparatus above to describe respectively.Certainly, implementing this The function of each unit can be realized in same or multiple softwares and/or hardware during application.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can By software plus required general hardware platform mode realizing.Based on such understanding, the technical scheme essence of the application On part that in other words prior art is contributed can be embodied in the form of software product, the computer software product Can be stored in storage medium, such as ROM/RAM, magnetic disc, CD etc., use so that a computer equipment including some instructions (can be personal computer, server, or network equipment etc.) performs some of each embodiment of the application or embodiment Method described in part.
Each embodiment in this specification is described by the way of progressive, identical similar portion between each embodiment Divide mutually referring to what each embodiment was stressed is the difference with other embodiment.Especially for system reality For applying example, as which is substantially similar to embodiment of the method, so description is fairly simple, related part is referring to embodiment of the method Part explanation.
The application can be used in numerous general or special purpose computing system environments or configuration.For example:Personal computer, clothes Business device computer, handheld device or portable set, laptop device, multicomputer system, based on the system of microprocessor, put Top box, programmable consumer-elcetronics devices, network PC, minicomputer, mainframe computer, including any of the above system or equipment Distributed computing environment etc..
The application can be described in the general context of computer executable instructions, such as program Module.Usually, program module includes execution particular task or realizes the routine of particular abstract data type, program, object, group Part, data structure etc..The application is put into practice in a distributed computing environment can also, in these distributed computing environment, by The remote processing devices connected by communication network are performing task.In a distributed computing environment, program module can be with In local and remote computer-readable storage medium including including storage device.
Although depicting the application by embodiment, it will be appreciated by the skilled addressee that the application have it is many deformation and Change is without deviating from spirit herein, it is desirable to which appended claim includes these deformations and changes without deviating from the application's Spirit.

Claims (16)

1. a kind of stage division of the subsidiary engine equipment of thermal power plant, is characterized in that, methods described includes:
Obtain the system data of thermal power plant:
According to the system data count the equipment of the thermal power plant, the function of the equipment, the impact to production process and Impact to producing clean-up performance;
The equipment is divided according to big class according to the function, obtained the equipment of each big apoplexy due to endogenous wind;
Obtain the value parameter of the equipment, the value parameter is according to the function, the impact to production process and right The impact of production clean-up performance is set in advance;
The equipment of each big apoplexy due to endogenous wind is classified according to the value parameter.
2. method according to claim 1, is characterized in that, the big class includes powder subsystem processed, cigarette wind subsystem, dedusting Subsystem, desulphurization denitration subsystem and feedwater subsystem.
3. method according to claim 2, is characterized in that, the equipment of each big apoplexy due to endogenous wind be carried out according to the value parameter Classification includes:
When the value parameter of the equipment is the first level, the equipment belongs to first kind subsidiary engine;
When the value parameter of the equipment is the second level, the equipment belongs to Equations of The Second Kind subsidiary engine;
When the value parameter of the equipment is third layer level, the equipment belongs to the 3rd class subsidiary engine;
When the value parameter of the equipment is four level, the equipment belongs to the 4th class subsidiary engine.
4. method according to claim 3, is characterized in that, the first kind subsidiary engine in the powder subsystem processed includes coal pulverizer And primary air fan, the 3rd class subsidiary engine includes the petrol station of coal pulverizer, feeder, separator, seal fan, the petrol station of primary air fan And the steam air heater of primary air fan.
5. method according to claim 3, is characterized in that, the first kind subsidiary engine in the cigarette wind subsystem includes pressure fan And air-introduced machine, Equations of The Second Kind subsidiary engine includes air preheater, the 3rd class subsidiary engine include the petrol station of pressure fan, the steam air heater of pressure fan and The petrol station of air-introduced machine, the 4th class subsidiary engine include the motor and air preheater soot blower of air preheater.
6. method according to claim 3, is characterized in that, the first kind subsidiary engine in the dedusting subsystem includes dedusting Device, the 3rd class subsidiary engine include motor.
7. method according to claim 3, is characterized in that, the first kind subsidiary engine in the desulphurization denitration subsystem includes following Ring pump, oxidation fan, booster fan and denitrification apparatus, Equations of The Second Kind subsidiary engine include waste water system, demister and spraying layer, the Three class subsidiary engines include Gypsum Fibrosum excavationg pump, swirling flow mixer, gypsum dehydration belt feeder, limestone ball mill and soot blower.
8. method according to claim 3, is characterized in that, the first kind subsidiary engine in the feedwater subsystem includes feedwater Pump, Equations of The Second Kind subsidiary engine include oxygen-eliminating device and high-pressure heater, and the 3rd class subsidiary engine includes fore pump, fluid-flywheel clutch, frequency conversion dress Put, motor and auxiliary turbine, the 4th class subsidiary engine includes steam condenser and steam trap.
9. a kind of hierarchy system of the subsidiary engine equipment of thermal power plant, is characterized in that, the system includes:
Data acquisition facility, for obtaining the system data of thermal power plant:
Data statisticss device, for the equipment according to the system data statistics thermal power plant, the function of the equipment, opposite The impact of product process and the impact to producing clean-up performance;
Equipment divides device, for being divided the equipment according to big class according to the function, obtains each big apoplexy due to endogenous wind Equipment;
Parameter obtaining device, for obtaining the value parameter of the equipment, the value parameter is according to the function, to production The impact of process and the impact to production clean-up performance are set in advance;
Sizing of equipment device, for being classified to the equipment of each big apoplexy due to endogenous wind according to the value parameter.
10. system according to claim 9, is characterized in that, the big class includes powder subsystem processed, cigarette wind subsystem, removes Dirt subsystem, desulphurization denitration subsystem and feedwater subsystem.
11. systems according to claim 10, is characterized in that, the equipment divides device to be included:
First divides device, for when the value parameter of the equipment is the first level, the equipment belongs to first kind subsidiary engine;
Second divides device, for when the value parameter of the equipment is the second level, the equipment belongs to Equations of The Second Kind subsidiary engine;
3rd divides device, for when the value parameter of the equipment is third layer level, the equipment belongs to the 3rd class subsidiary engine;
4th divides device, for when the value parameter of the equipment is four level, the equipment belongs to the 4th class subsidiary engine.
12. systems according to claim 11, is characterized in that, the first kind subsidiary engine in the powder subsystem processed includes coal-grinding Machine and primary air fan, the 3rd class subsidiary engine include the petrol station of coal pulverizer, feeder, separator, seal fan, the oil of primary air fan Stand and primary air fan steam air heater.
13. systems according to claim 11, is characterized in that, the first kind subsidiary engine in the cigarette wind subsystem includes air-supply Machine and air-introduced machine, Equations of The Second Kind subsidiary engine include air preheater, the 3rd class subsidiary engine include the petrol station of pressure fan, pressure fan steam air heater with And the petrol station of air-introduced machine, the 4th class subsidiary engine includes the motor and air preheater soot blower of air preheater.
14. systems according to claim 11, is characterized in that, the first kind subsidiary engine in the dedusting subsystem includes dedusting Device, the 3rd class subsidiary engine include motor.
15. systems according to claim 11, is characterized in that, the first kind subsidiary engine in the desulphurization denitration subsystem includes Circulating pump, oxidation fan, booster fan and denitrification apparatus, Equations of The Second Kind subsidiary engine include waste water system, demister and spraying layer, 3rd class subsidiary engine includes Gypsum Fibrosum excavationg pump, swirling flow mixer, gypsum dehydration belt feeder, limestone ball mill and soot blower.
16. systems according to claim 11, is characterized in that, the first kind subsidiary engine in the feedwater subsystem includes feedwater Pump, Equations of The Second Kind subsidiary engine include oxygen-eliminating device and high-pressure heater, and the 3rd class subsidiary engine includes fore pump, fluid-flywheel clutch, frequency conversion dress Put, motor and auxiliary turbine, the 4th class subsidiary engine includes steam condenser and steam trap.
CN201611166797.8A 2016-12-16 2016-12-16 Classification method and system for auxiliary devices of thermal power plant Pending CN106529839A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611166797.8A CN106529839A (en) 2016-12-16 2016-12-16 Classification method and system for auxiliary devices of thermal power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611166797.8A CN106529839A (en) 2016-12-16 2016-12-16 Classification method and system for auxiliary devices of thermal power plant

Publications (1)

Publication Number Publication Date
CN106529839A true CN106529839A (en) 2017-03-22

Family

ID=58340945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611166797.8A Pending CN106529839A (en) 2016-12-16 2016-12-16 Classification method and system for auxiliary devices of thermal power plant

Country Status (1)

Country Link
CN (1) CN106529839A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107766457A (en) * 2017-09-27 2018-03-06 华能国际电力股份有限公司上海石洞口第二电厂 A kind of thermal power plant's operation management system and its task executing method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101918903A (en) * 2008-01-18 2010-12-15 西门子公司 Planning device and method for planning a technical installation
CN105867339A (en) * 2016-05-26 2016-08-17 中国能源建设集团广东省电力设计研究院有限公司 Subunit-level sequence control logic module for nuclear power plant and application method of subunit-level sequence control logic module

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101918903A (en) * 2008-01-18 2010-12-15 西门子公司 Planning device and method for planning a technical installation
CN105867339A (en) * 2016-05-26 2016-08-17 中国能源建设集团广东省电力设计研究院有限公司 Subunit-level sequence control logic module for nuclear power plant and application method of subunit-level sequence control logic module

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
顾煜炯 等: "基于模糊评判和RCM分析的发电设备状态综合评价", 《中国电机工程学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107766457A (en) * 2017-09-27 2018-03-06 华能国际电力股份有限公司上海石洞口第二电厂 A kind of thermal power plant's operation management system and its task executing method

Similar Documents

Publication Publication Date Title
Viebahn et al. Comparison of carbon capture and storage with renewable energy technologies regarding structural, economic, and ecological aspects in Germany
CN105139078B (en) The method and device of load dispatch and pollution control optimization is provided
Abdulrazak et al. Towards energy sustainability: Bangladesh perspectives
Chang et al. Clean production pathways for regional power-generation system under emission constraints: A case study of Shanghai, China
Zhou et al. A comparative of life cycle assessment of post-combustion, pre-combustion and oxy-fuel CO2 capture
Li et al. Design for energy efficiency in early stages: A top-down method for new product development
Rolfe et al. Techno-economic and environmental analysis of calcium carbonate looping for CO2 capture from a pulverised coal-fired power plant
CN106529839A (en) Classification method and system for auxiliary devices of thermal power plant
Tugov Prospects for the use of municipal solid wastes as secondary energy resources in Russia
Boakes et al. The influence of energy output and substitution on the environmental impact of waste-to-energy operation: Quantification by means of a case study
Geng et al. Environmental economic dispatch towards multiple emissions control coordination considering a variety of clean generation technologies
Ferrey Presidential Executive Action: Unilaterally Changing the World's Critical Technology and Infrastructure
Gray Decrease in fly ash spurring innovation within construction materials industry
Chikkatur et al. Rethinking India's coal-power technology trajectory
Ye et al. A multi-period multi-region optimization model of china's power sector considering synergetic CO2 and air pollutants control
Gerbelová et al. A techno-economical study of the CO2 capture in the energy sector in Portugal
Stanchev et al. Review of Methodologies for Life Cycle Assessment of Power Electronic Devices
Minchener Non-greenhouse gas emissions from coal-fired power plants in China
Wang et al. Evaluation of clean coal technologies in China: Based on rough set theory
Li et al. Multifactor configurations of coal power technology in China substantially differ in life-cycle environmental impacts
CN106980940A (en) The method for evaluating reliability and system of a kind of subsidiary engine equipment of thermal power plant
Qiu Economic and Environmental Implications of Low-Carbon Transition in Energy System: Case Studies on Lighting Technologies, Electricity System, and Direct Air Capture
Kitto Jr et al. World-class technology for the newest waste-to-energy plant in the United States—Palm Beach renewable energy facility No. 2
Guo Pre-feasibility study of a waste-to-energy (WTE) plant for Baotou city, China
Cho Environmental impact assessment of Australian power stations using integrated LCA and GIS methods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322

RJ01 Rejection of invention patent application after publication