CN109492876A - A kind of assembled architecture production and construction management module information system - Google Patents
A kind of assembled architecture production and construction management module information system Download PDFInfo
- Publication number
- CN109492876A CN109492876A CN201811199097.8A CN201811199097A CN109492876A CN 109492876 A CN109492876 A CN 109492876A CN 201811199097 A CN201811199097 A CN 201811199097A CN 109492876 A CN109492876 A CN 109492876A
- Authority
- CN
- China
- Prior art keywords
- module
- information
- construction
- production
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention proposes a kind of assembled architecture productions and construction management module information system, including management information platform and production and construction management information module, the production and construction management information module includes project management module, informationization designing module, store keeping module, production management module, finished product and shipping management module and construction management module;The present invention passes through to the informationization designing module in assembled architecture process of producing product, store keeping module, production management module link is managed, and to the construction plan module in work progress, live material module, construction speed module, construction quality module link is managed, realize the information sharing of production and construction process, ensure production link product quality and construction link efficiency, improve the level of production and construction management module, establish production adaptable therewith, construction overall process management information platform, it realizes trans-departmental, information sharing across the stage, improve the utilization rate of information resources.
Description
Technical field
The present invention relates to technical field of buildings more particularly to a kind of assembled architecture productions and construction management module to believe
Breath system.
Background technique
In recent years, engineering construction field developed rapidly, and various regions engineering construction enterprise quickly grows, especially as some big
Enterprise, with largely increasing for branch company, the unrenewable traditional style of leadership of manager carries out centralization control, traditional pipe
Reason management mode cannot keep up with the step of development leap, and enterprise's entirety management level is in urgent need to be improved, all business datums point
Cloth cannot achieve unified data analysis in each branch company, and management level decision lacks comprehensive Informational support, in order to comply with collection
The internationalization strategy of group strengthens the decision support to overseas portion, group, increases affiliate and client to the engineering project of group
With the approval of managerial ability, inevitable requirement creates an efficient meta-synthetic management informatization platform, to deepen enterprises
Management space.However it can not achieve production process and work progress mostly in assembled architecture production and construction at present
Information sharing, thus it is impossible to ensure that the product quality of production link and the efficiency of construction link, and then assembled cannot be improved
The level of building products production and construction management module, in addition, the disconnection of engineering information is held for production management module person
It easily leads to engineering and loses tracking, the specific works completion situation of construction personnel can not understand, and construction quality is difficult to evaluate, and to rear
The maintenance management work of phase is made troubles, and therefore, solves the problems, such as this kind of be particularly important.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes a kind of assembled architecture production and construction management module information system,
The present invention passes through to the informationization designing module in assembled architecture process of producing product, store keeping module, production management mould
Block link is managed, and to construction plan module, the live material module, construction speed module, construction in work progress
Quality module link is managed, and realizes the information sharing of production process and work progress, it is ensured that the product quality of production link
With the efficiency of construction link, the level of assembled architecture production and construction management module is improved.
To solve the above-mentioned problems, the present invention proposes a kind of assembled architecture production and construction management module information system
System, including management information platform and production and construction management information module, the production and construction management information module include project pipe
Manage module, informationization designing module, store keeping module, production management module, finished product and shipping management module and construction management
Module, the project management module include project initiation, bid for a project, contract module, the project plan, the project implementation and control and
Project delivery and maintenance, the informationization designing module includes drawing module, construction part module, BOM module and changes module, described
Store keeping module includes jacking module, procurement module, quality of materials module and stock model, and the production management module includes
Production plan module, technical module, manufacturing schedule module and quality of production module, the finished product and shipping management module include into
Product stock model, final product quality module and finished product ship module, and the construction management module includes construction plan module, live object
Expect that module, construction speed module, construction quality module, be completed delivery and maintenance module;
The management information platform passes through to the informationization designing module in process of producing product, the store keeping
Module and the production management module carry out centralized management, and the relevant information in construction link using production link is to product
The quality of production is supervised, while the management information platform passes through to the finished product and shipping management module in work progress
It is supervised with the construction management module;
Material is carried out using internet of things barcode technology in the informationization designing module and the store keeping module
Unifying identifier, by material " sending and receiving, deposit, lead, with, move back " management of overall process, and according to raw materials inventory Information Statistics point
Materials situation, inventories, cost situation and all kinds of reports of establishment of analysis project, it is then right in the production management module
Personnel, process, equipment etc. encode, and establish automatic production line by product type, network management are carried out to equipment, by technique
Parameter executes manufacturing process, and feeds back production status, then utilizes internet of things barcode in the finished product and shipping management module
Technology realizes the overall process retrospect of product quality, checks that product is marched into the arena progress, and wrong sending, omission sending etc. are avoided by product batches in the middle,
Unifying identifier is carried out to product using internet of things barcode technology in the construction management module simultaneously, rationally utilizes live stockyard
Then space carries out preassembling simulation to product in the construction quality module, reduces and correct assembled error, finally in institute
It states completion delivery the information of collection is arranged and analyzed with maintenance module, and the information of completion is fed back into management information
Platform.
Further improvement lies in that: cost estimation, offer by tender are carried out in the bid for a project, are then established and are improved letter
Database is ceased, the signing of contract, implementation, control and evaluation overall process are managed in the contract module, according to project plan
It draws the information documents such as book and Project contract and works out the project plan, and arrange production and construct according to the project plan, institute
State the project implementation and control include Deepen Design implement with control, buying implement with control, production implement with control, shipping implement
Implement with control and construction and control, the project implementation and control management make full use of information technology, automatic identification technology, view
Frequency technology is collected and the information such as cost, progress, goods and materials, the environment in typing project each stage.
Further improvement lies in that: all drawings are managed in the drawing module, and drawing is encoded, and are saved simultaneously
Drawing record and modification information, then encode component in the construction part module, and establish component design information and original
Material information, connection component production and constructed between actual progress information, quality information etc., while BOM in the BOM module
Inventory fully demonstrates data sharing and information integration, and the change module is changed according to changing process, drawing after change,
BOM table issues after need to auditing qualification, and saves modification information in time.
Further improvement lies in that: the jacking module carries out the pre- jacking of material, and foundation and inventory information according to BOM table
Connection, according to balanced stock result work out procurement plan, in the procurement module according to the rules to procurement plan carry out
Then coding collects simultaneously typing raw material arrival, outbound, marches into the arena and consume information, and is compared with plan, the buying mould
Block includes procurement plan module, adoption process module and supplier module.
Further improvement lies in that: it carries out an acceptance inspection to the material of buying, when then being checked and accepted in the quality management of the material
Data can be examined with collection material correlation, verification material information, checks appearance, mark and the size of material, and will be collected
In information and the timely typing information system of record of acceptance, the stock model of the material should include material storage, outbound, make an inventory,
Clout etc..
Further improvement lies in that: work out a production plan in the production plan module, according to the rules to production plan into
Row coding, and establish production plan and component manufacturing schedule information, component process quality information, production scene monitoring information, original
Connection between material information, component machining information etc., then basketry and associated documents in the technical module, according to
Regulation encodes technique and related text, by the manufacturing schedule module and the quality of production module combination barcode technology,
Collection and each critical process progress msg of typing and quality information.
Further improvement lies in that: to carrying out an acceptance inspection before component storage in the final product quality module, when examination, collects structure
Part inspection of data, verification component information, appearance, mark and the size for checking component, and by collected information and record of acceptance
In timely typing information system, the finished goods inventory module includes component storage, outbound, makes an inventory, in the finished goods inventory mould
Inventory area is encoded according to the rules in block, and establishes inventory area information and constructs contacting between information, is then tied
Barcode technology is closed, collects and typing constructs information.
Further improvement lies in that: it collects with after typing building information, presses the project plan in finished product shipping module
It is required that working out delivery schedule in sequence with the scene that unit in charge of construction determines, delivery schedule is encoded according to the rules, in conjunction with
Barcode technology, real-time tracking component shipping status avoid leakage hair, mistake.
Further improvement lies in that: construction plan is worked out according to the general requirements of the project plan in the construction plan module,
Construction plan is encoded according to the rules, RFID and barcode technology is combined in the scene material module, collects and typing object
Material disengaging field and consumption information, and compared and analyzed with procurement plan, and adjust advance and retreat field in time according to progress control information
Time and amount of purchase.
Further improvement lies in that: in component site acceptance combination RFID and barcode technology in the construction quality module, receive
Collect component inspection of data, verification component information, detection means appearance, mark and size, and by collected information and checks and accepts note
It records in timely typing information system, while quality control in the construction process combines RFID and barcode technology, collects simultaneously typing
Quality information in component mounting process, and be analyzed and processed using these information, issuable quality problems are provided
The information corrected, prevented is formulated, is then delivered in the completion and the information of collection is arranged and analyzed with maintenance module,
And completion information is fed back into management information platform.
The invention has the benefit that assembled architecture production of the present invention passes through with construction management module information system
Informationization designing module, store keeping module, production management module link in assembled architecture process of producing product is carried out
Control, and to construction plan module, the live material module, construction speed module, construction quality module ring in work progress
Section is managed, and realizes the information sharing of production process and work progress, it is ensured that the product quality and construction link of production link
Efficiency, improve the level of assembled architecture production and construction management module, while being in assembled architecture production
Reduce error with being assembled in advance in work progress, reduces assembled cost, improve assembly efficiency, and also set up collaboration work
Make mechanism, specifies collaborative work process and achievement delivers content, and establish production adaptable therewith, construction overall process management letter
Platform is ceased, information sharing trans-departmental, across the stage is realized, also improves the utilization rate of information resources, reduce making for information resources
With cost, while management information platform can carry out the case where informationization designing module, store keeping module, production management module
Centralized management can supervise production quality using the relevant information of production link in construction link, and can pass through
Preassembling management of constructing improves construction assembly efficiency.
Detailed description of the invention
Fig. 1 is present system structural schematic diagram.
Specific embodiment
In order to deepen the understanding of the present invention, the present invention is further described below in conjunction with embodiment, the present embodiment
For explaining only the invention, it is not intended to limit the scope of the present invention..
According to Fig. 1, the present embodiment proposes a kind of assembled architecture production and construction management module information system
System, including management information platform and production and construction management information module, the production and construction management information module include project pipe
Manage module, informationization designing module, store keeping module, production management module, finished product and shipping management module and construction management
Module, the project management module include project initiation, bid for a project, contract module, the project plan, the project implementation and control and
Project delivery and maintenance, the informationization designing module includes drawing module, construction part module, BOM module and changes module, described
Store keeping module includes jacking module, procurement module, quality of materials module and stock model, and the production management module includes
Production plan module, technical module, manufacturing schedule module and quality of production module, the finished product and shipping management module include into
Product stock model, final product quality module and finished product ship module, and the construction management module includes construction plan module, live object
Material module, construction speed module, construction quality module, completion is delivered and maintenance module, the management information platform pass through to production
The informationization designing module, the store keeping module and the production management module in product production process carry out concentrate tube
Control, and production quality is supervised using the relevant information of production link in construction link, while the management is believed
Breath platform is by supervising the finished product in work progress with shipping management module and the construction management module, in institute
It states in informationization designing module and the store keeping module and unifying identifier is carried out to material using internet of things barcode technology, pass through
To material " sending and receiving, deposit, lead, with, move back " management of overall process, and materials according to raw materials inventory Information Statistics analysis project
Situation, inventories, cost situation and all kinds of reports of establishment, then in the production management module to personnel, process, set
It is standby etc. to be encoded, automatic production line is established by product type, network management is carried out to equipment, executes manufacture by technological parameter
Technique, and production status is fed back, then product is realized using internet of things barcode technology in the finished product and shipping management module
The overall process of quality traces, and checks that product is marched into the arena progress, avoids wrong sending, omission sending etc., while applying described by product batches in the middle
Unifying identifier is carried out to product using internet of things barcode technology in work management module, rationally using live stockyard space, is then existed
Preassembling simulation is carried out to product in the construction quality module, reduces and corrects assembled error, is finally delivered in the completion
The information of collection is arranged and analyzed with maintenance module, and the information of completion is fed back into management information platform;
Cost estimation, offer by tender are carried out in the bid for a project, then establish simultaneously perfect information database, the conjunction
The signing of contract, implementation, control and evaluation overall process are managed in module, according to project planning book and Project contract etc.
Information document works out the project plan, and arranges production and construct according to the project plan, the project implementation and control
Implement including Deepen Design implementation and control, buying and control, produce and implement and control, ship implementation and control and implementation of constructing
With control, the project implementation and control management make full use of information technology, automatic identification technology, video technique collection and typing
The information such as cost, progress, goods and materials, the environment in project each stage;
All drawings are managed in the drawing module, and drawing is encoded, while saving drawing record and change
Then information encodes component in the construction part module, and establish component design information and raw material information, component life
The connection for producing and constructing between actual progress information, quality information etc., while BOM inventory fully demonstrates number in the BOM module
According to shared and information integration, the change module is changed according to changing process, and the drawing, BOM table after change need to audit conjunction
It is issued after lattice, and saves modification information in time;
The jacking module carries out the pre- jacking of material according to BOM table, and establishes and contact with inventory information, according to balancing
The result of inventory works out procurement plan, encodes, then collects simultaneously to procurement plan according to the rules in the procurement module
Typing raw material arrival, outbound march into the arena and consume information, and be compared with plan, and the procurement module includes procurement plan
Module, adoption process module and supplier module;
It carries out an acceptance inspection to the material of buying, it can be with collection material correlation when then being checked and accepted in the quality management of the material
Examination data, verification material information, appearance, mark and the size for checking material, and by the information collected and record of acceptance and
When typing information system in, the stock model of the material should include material storage, outbound, make an inventory, clout etc.;
It works out a production plan, production plan is encoded according to the rules, and establish life in the production plan module
Production plan adds with component manufacturing schedule information, component process quality information, production scene monitoring information, raw material information, component
Connection between work information etc., then basketry and associated documents in the technical module, according to the rules to technique and phase
Guan Wen is encoded, and by the manufacturing schedule module and the quality of production module combination barcode technology, collects and typing is respectively closed
Key process progress msg and quality information;
To carrying out an acceptance inspection before component storage in the final product quality module, component inspection of data, verification are collected when examination
Component information, appearance, mark and the size for checking component, and by collected information and the timely typing information system of record of acceptance
In, the finished goods inventory module includes component storage, outbound, makes an inventory, according to the rules to library in the finished goods inventory module
Deposit region to be encoded, and establish inventory area information and construct contacting between information, then in conjunction with barcode technology, collect and
Typing constructs information;
It collects with after typing building information, is shipped in the finished product true by the requirement of the project plan and unit in charge of construction in module
Delivery schedule is worked out at fixed scene in sequence, is encoded according to the rules to delivery schedule, in conjunction with barcode technology, real-time tracking
Component shipping status avoids leakage hair, mistakes;
Construction plan is worked out according to the general requirements of the project plan in the construction plan module, construction is counted according to the rules
It draws and is encoded, in conjunction with RFID and barcode technology in the scene material module, collected and typing material disengaging field and consumption letter
Breath, and compared and analyzed with procurement plan, and adjust advance and retreat field time and amount of purchase in time according to progress control information;
In component site acceptance combination RFID and barcode technology in the construction quality module, collect component inspection of data,
Check component information, detection means appearance, mark and size, and by collected information and record of acceptance timely typing information system
Quality control in system, while in the construction process combines RFID and barcode technology, collects and in typing component mounting process
Quality information, and be analyzed and processed using these information, issuable quality problems are provided with the letter for formulating and correcting, preventing
Then breath is delivered in the completion and the information of collection is arranged and analyzed with maintenance module, and will completion information feedback
To management information platform.
The present invention passes through to informationization designing module, the store keeping module, life in assembled architecture process of producing product
It produces management module link to be managed, and to construction plan module, the live material module, construction speed mould in work progress
Block, construction quality module link are managed, and realize the information sharing of production process and work progress, it is ensured that the production of production link
The efficiency of quality and construction link improves the level of assembled architecture production and construction management module, while being to fill
Reduce error with being assembled in advance in the production of formula building products and work progress, reduce assembled cost, improve assembly efficiency,
And also set up cooperative mechanism, specify collaborative work process and achievement and deliver content, and establish production adaptable therewith,
Construction overall process management information platform realizes information sharing trans-departmental, across the stage, also improves the utilization rate of information resources,
The use cost of information resources is reduced, while management information platform can manage informationization designing module, store keeping module, production
Manage module the case where carry out centralized management, can in construction link using production link relevant information to production quality into
Row supervision, and construction assembly efficiency can be improved by construction preassembling management.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention
Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements
It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle
It is fixed.
Claims (10)
1. a kind of assembled architecture production and construction management module information system, it is characterised in that: flat including management information
Platform and production and construction management information module, the production and construction management information module include project management module, informationization designing
Module, store keeping module, production management module, finished product and shipping management module and construction management module, the project management
Module includes project initiation, bid for a project, contract module, the project plan, the project implementation and control and project delivery and maintenance, institute
Stating informationization designing module includes that drawing module, construction part module, BOM module and change module, the store keeping module include
Jacking module, procurement module, quality of materials module and stock model, the production management module include production plan module, work
Skill module, manufacturing schedule module and quality of production module, the finished product and shipping management module include finished goods inventory module, finished product
Quality module and finished product ship module, and the construction management module includes construction plan module, live material module, construction speed
Module, construction quality module, be completed delivery and maintenance module;
The management information platform passes through to the informationization designing module, the store keeping module in process of producing product
Centralized management is carried out with the production management module, and the relevant information in construction link using production link is to production
Quality is supervised, while the management information platform passes through to the finished product and shipping management module and institute in work progress
Construction management module is stated to be supervised;
Unification is carried out to material using internet of things barcode technology in the informationization designing module and the store keeping module
Mark, by material " sending and receiving, deposit, lead, with, move back " management of overall process, and according to raw materials inventory Information Statistics analysis item
Purpose materials situation, inventories, cost situation and all kinds of reports of establishment, then to people in the production management module
Member, process, equipment etc. are encoded, and establish automatic production line by product type, are carried out network management to equipment, are joined by technique
Number executes manufacturing process, and feeds back production status, then utilizes internet of things barcode skill in the finished product and shipping management module
Art realizes the overall process retrospect of product quality, checks that product is marched into the arena progress, avoids wrong sending, omission sending etc., together by product batches in the middle
When unifying identifier is carried out to product using internet of things barcode technology in the construction management module, it is rationally empty using live stockyard
Between, preassembling simulation then is carried out to product in the construction quality module, reduces and corrects assembled error, finally described
It is completed to deliver and the information of collection is arranged and analyzed with maintenance module, and the information of completion is fed back into management information and is put down
Platform.
2. a kind of assembled architecture production according to claim 1 and construction management module information system, feature
It is: carries out cost estimation, offer by tender in the bid for a project, then establishes simultaneously perfect information database, the contract
The signing of contract, implementation, control and evaluation overall process are managed in module, believed according to project planning book and Project contract etc.
The project plan described in documentation is ceased, and arranges production and constructs according to the project plan, the project implementation and control are wrapped
Include Deepen Design implement with control, buying implement with control, production implement with control, shipping implement with control and construction implement with
Control, the project implementation and control management make full use of information technology, automatic identification technology, video technique collection and entry item
The information such as cost, progress, goods and materials, the environment in mesh each stage.
3. a kind of assembled architecture production according to claim 1 and construction management module information system, feature
It is: manages all drawings in the drawing module, and drawing is encoded, while saves drawing record and believing with change
Breath, then encodes component in the construction part module, and establishes component design information and raw material information, component production
Connection between construction actual progress information, quality information etc., while BOM inventory fully demonstrates data in the BOM module
Shared and information integration, the change module are changed according to changing process, and the drawing, BOM table after change need to audit qualification
After issue, and save modification information in time.
4. a kind of assembled architecture production according to claim 1 and construction management module information system, feature
Be: the jacking module carries out the pre- jacking of material according to BOM table, and establishes and contact with inventory information, according to balancing library
The result establishment procurement plan deposited, according to the rules encodes procurement plan in the procurement module, then collects and record
Enter raw material arrival, outbound, march into the arena and consume information, and be compared with plan, the procurement module includes procurement plan mould
Block, adoption process module and supplier module.
5. a kind of assembled architecture production according to claim 4 and construction management module information system, feature
It is: carries out an acceptance inspection to the material of buying, can be examined when then being checked and accepted in the quality management of the material with collection material correlation
Appearance, mark and the size consult reference materials, check material information, checking material, and the information collected and record of acceptance is timely
In typing information system, the stock model of the material should include material storage, outbound, make an inventory, clout etc..
6. a kind of assembled architecture production according to claim 1 and construction management module information system, feature
It is: works out a production plan in the production plan module, production plan is encoded according to the rules, and establishes production meter
It draws and believes with component manufacturing schedule information, component process quality information, production scene monitoring information, raw material information, component processing
Connection between breath etc., then basketry and associated documents in the technical module, literary to technique and correlation according to the rules
It is encoded, by the manufacturing schedule module and the quality of production module combination barcode technology, is collected and each crucial work of typing
Sequence progress msg and quality information.
7. a kind of assembled architecture production according to claim 1 and construction management module information system, feature
It is: to carrying out an acceptance inspection before component storage in the final product quality module, component inspection of data, verification component is collected when examination
Information, appearance, mark and the size for checking component, and by collected information and the timely typing information system of record of acceptance,
The finished goods inventory module includes component storage, outbound, makes an inventory, according to the rules to inventory area in the finished goods inventory module
Domain is encoded, and is established inventory area information and constructed contacting between information, then in conjunction with barcode technology, collection and typing
Construct information.
8. a kind of assembled architecture production according to claim 7 and construction management module information system, feature
It is: collects with after typing building information, determined in finished product shipping module by the requirement of the project plan and unit in charge of construction
Scene work out delivery schedule in sequence, delivery schedule is encoded according to the rules, in conjunction with barcode technology, real-time tracking structure
Part shipping status avoids leakage hair, mistakes.
9. a kind of assembled architecture production according to claim 1 and construction management module information system, feature
It is: according to the general requirements establishment construction plan of the project plan in the construction plan module, according to the rules to construction plan
It is encoded, combines RFID and barcode technology in the scene material module, collected and typing material passes in and out field and consumes information,
And it is compared and analyzed with procurement plan, and adjust advance and retreat field time and amount of purchase in time according to progress control information.
10. a kind of assembled architecture production according to claim 1 and construction management module information system, feature
It is: in component site acceptance combination RFID and barcode technology in the construction quality module, collects component inspection of data, verification
Component information, detection means appearance, mark and size, and by collected information and the timely typing information system of record of acceptance
In, while quality control in the construction process combines RFID and barcode technology, collects the matter in simultaneously typing component mounting process
Information is measured, and is analyzed and processed using these information, issuable quality problems are provided with the letter for formulating and correcting, preventing
Then breath is delivered in the completion and the information of collection is arranged and analyzed with maintenance module, and will completion information feedback
To management information platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811199097.8A CN109492876A (en) | 2018-10-15 | 2018-10-15 | A kind of assembled architecture production and construction management module information system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811199097.8A CN109492876A (en) | 2018-10-15 | 2018-10-15 | A kind of assembled architecture production and construction management module information system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109492876A true CN109492876A (en) | 2019-03-19 |
Family
ID=65690332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811199097.8A Pending CN109492876A (en) | 2018-10-15 | 2018-10-15 | A kind of assembled architecture production and construction management module information system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109492876A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978375A (en) * | 2019-03-28 | 2019-07-05 | 江苏利柏特股份有限公司 | A kind of pipe prefabrication production line intelligent management system |
CN111421030A (en) * | 2020-03-27 | 2020-07-17 | 毅德建筑咨询(上海)有限公司 | Cold-bending assembly building prefabricated part production line and production process |
CN111861512A (en) * | 2020-07-28 | 2020-10-30 | 广州粤建三和软件股份有限公司 | System and method for tracking block chain of component information of assembled building parts |
CN111915151A (en) * | 2020-07-10 | 2020-11-10 | 中铁第四勘察设计院集团有限公司 | Information management platform and method applied to contact net pre-assembly workshop |
CN111985893A (en) * | 2020-08-15 | 2020-11-24 | 武汉华胜工程建设科技有限公司 | Building engineering project material entry auditing method, intelligent terminal and storage medium |
CN112059614A (en) * | 2020-09-15 | 2020-12-11 | 重庆顺泰铁塔制造有限公司 | Intelligent cutting device and system for node parts of power transmission tower |
CN112446668A (en) * | 2020-12-04 | 2021-03-05 | 上海浦兴路桥建设工程有限公司 | Construction material informatization management system, device and storage medium |
CN112731892A (en) * | 2021-01-27 | 2021-04-30 | 山东海龙建筑科技有限公司 | BIM-based construction method for assembly type building management and control and material tracing production line |
CN112837038A (en) * | 2021-02-07 | 2021-05-25 | 广东宏茂建设管理有限公司 | Overall process management system for concrete prefabricated part |
CN112862341A (en) * | 2021-02-25 | 2021-05-28 | 中铁一局集团有限公司 | Project cost management system |
CN113034027A (en) * | 2021-04-12 | 2021-06-25 | 湖南紫竹科技有限公司 | Intelligent manufacturing execution system for electronic components |
CN113807651A (en) * | 2021-08-09 | 2021-12-17 | 中建二局安装工程有限公司 | Big data based component whole process management system, terminal equipment and management method |
CN114003998A (en) * | 2021-11-05 | 2022-02-01 | 浙江东南网架股份有限公司 | Steel structure digital factory cooperation system and method based on digital twin technology |
CN114723315A (en) * | 2022-04-22 | 2022-07-08 | 中国电建集团成都勘测设计研究院有限公司 | Construction project planning overall process management and evaluation system based on informatization |
CN115167298A (en) * | 2022-06-23 | 2022-10-11 | 雷恩博(杭州)信息科技有限公司 | Manufacturing process management system |
CN117634736A (en) * | 2023-11-27 | 2024-03-01 | 成致项目管理有限公司 | Engineering supervision monitoring system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004008306A1 (en) * | 2002-07-10 | 2004-01-22 | Broughton W Curtis | System and method for tracking and managing construction projects |
CN103544556A (en) * | 2013-09-06 | 2014-01-29 | 上海大学 | Life-cycle management system and method for tunnels |
CN106485411A (en) * | 2016-10-08 | 2017-03-08 | 上海建工五建集团有限公司 | Prefabricated concrete structure based on BIM technology builds management method and system |
CN105023201B (en) * | 2015-07-24 | 2017-04-05 | 中建三局第一建设工程有限责任公司 | Assembled architecture Deepen Design and construction method based on BIM and big data |
CN107958328A (en) * | 2017-11-22 | 2018-04-24 | 北京善筑科技股份有限公司 | Green assembled architecture digitlization construct platform and its method of work |
-
2018
- 2018-10-15 CN CN201811199097.8A patent/CN109492876A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004008306A1 (en) * | 2002-07-10 | 2004-01-22 | Broughton W Curtis | System and method for tracking and managing construction projects |
CN103544556A (en) * | 2013-09-06 | 2014-01-29 | 上海大学 | Life-cycle management system and method for tunnels |
CN105023201B (en) * | 2015-07-24 | 2017-04-05 | 中建三局第一建设工程有限责任公司 | Assembled architecture Deepen Design and construction method based on BIM and big data |
CN106485411A (en) * | 2016-10-08 | 2017-03-08 | 上海建工五建集团有限公司 | Prefabricated concrete structure based on BIM technology builds management method and system |
CN107958328A (en) * | 2017-11-22 | 2018-04-24 | 北京善筑科技股份有限公司 | Green assembled architecture digitlization construct platform and its method of work |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978375A (en) * | 2019-03-28 | 2019-07-05 | 江苏利柏特股份有限公司 | A kind of pipe prefabrication production line intelligent management system |
CN111421030A (en) * | 2020-03-27 | 2020-07-17 | 毅德建筑咨询(上海)有限公司 | Cold-bending assembly building prefabricated part production line and production process |
CN111915151A (en) * | 2020-07-10 | 2020-11-10 | 中铁第四勘察设计院集团有限公司 | Information management platform and method applied to contact net pre-assembly workshop |
CN111861512A (en) * | 2020-07-28 | 2020-10-30 | 广州粤建三和软件股份有限公司 | System and method for tracking block chain of component information of assembled building parts |
CN111985893A (en) * | 2020-08-15 | 2020-11-24 | 武汉华胜工程建设科技有限公司 | Building engineering project material entry auditing method, intelligent terminal and storage medium |
CN112059614A (en) * | 2020-09-15 | 2020-12-11 | 重庆顺泰铁塔制造有限公司 | Intelligent cutting device and system for node parts of power transmission tower |
CN112446668A (en) * | 2020-12-04 | 2021-03-05 | 上海浦兴路桥建设工程有限公司 | Construction material informatization management system, device and storage medium |
CN112731892A (en) * | 2021-01-27 | 2021-04-30 | 山东海龙建筑科技有限公司 | BIM-based construction method for assembly type building management and control and material tracing production line |
CN112837038A (en) * | 2021-02-07 | 2021-05-25 | 广东宏茂建设管理有限公司 | Overall process management system for concrete prefabricated part |
CN112862341A (en) * | 2021-02-25 | 2021-05-28 | 中铁一局集团有限公司 | Project cost management system |
CN113034027A (en) * | 2021-04-12 | 2021-06-25 | 湖南紫竹科技有限公司 | Intelligent manufacturing execution system for electronic components |
CN113034027B (en) * | 2021-04-12 | 2023-12-15 | 湖南紫竹科技有限公司 | Intelligent manufacturing execution system of electronic component |
CN113807651A (en) * | 2021-08-09 | 2021-12-17 | 中建二局安装工程有限公司 | Big data based component whole process management system, terminal equipment and management method |
CN113807651B (en) * | 2021-08-09 | 2024-02-23 | 中建二局安装工程有限公司 | Component whole process management system based on big data, terminal equipment and management method |
CN114003998A (en) * | 2021-11-05 | 2022-02-01 | 浙江东南网架股份有限公司 | Steel structure digital factory cooperation system and method based on digital twin technology |
CN114723315A (en) * | 2022-04-22 | 2022-07-08 | 中国电建集团成都勘测设计研究院有限公司 | Construction project planning overall process management and evaluation system based on informatization |
CN115167298A (en) * | 2022-06-23 | 2022-10-11 | 雷恩博(杭州)信息科技有限公司 | Manufacturing process management system |
CN115167298B (en) * | 2022-06-23 | 2024-04-12 | 雷恩博(杭州)信息科技有限公司 | Manufacturing process management system |
CN117634736A (en) * | 2023-11-27 | 2024-03-01 | 成致项目管理有限公司 | Engineering supervision monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109492876A (en) | A kind of assembled architecture production and construction management module information system | |
CN107831750B (en) | IMES intelligent manufacturing execution system | |
CN111210199A (en) | Bridge prefab BIM information management system | |
Menezes et al. | Smart manufacturing execution systems for small and medium-sized enterprises | |
CN111523803A (en) | Factory transparent management method | |
CN100363952C (en) | Total life-period managing system of rubber sealing products | |
US20240289702A1 (en) | Method of interfacing discrete digital workshop information system | |
CN113519009A (en) | Industrial manufacturing resource sharing method, device and system based on block chain | |
CN111353787A (en) | Equipment comprehensive guarantee system based on cloud platform | |
CN111815265B (en) | Digital supply chain collaboration platform and construction method | |
CN112508381A (en) | Computing system for project cost of mechanical industry and implementation method thereof | |
CN111429284A (en) | New forms of energy fan spare part allies oneself with stores up transaction platform system | |
CN106325232A (en) | Mold manufacture automatic production control system and method | |
CN115860313B (en) | Industrial Internet of things system for automatically executing manufacturing based on order and control method thereof | |
CN107451739A (en) | A kind of cooperation processing management method and its system | |
Nuzulita et al. | Supply Chain Management Analysis Using the Business Process Model and Notation In the Midst of Covid-19 Pandemic:(A Case Study at MS Company–Indonesia) | |
CN116128419A (en) | Food production plan management method and system | |
CN115456380A (en) | Intelligent manufacturing digital integrated analysis system based on enterprise | |
Mrugalska et al. | Preventive Approach to Machinery and Equipment Maintenance in Manufacturing Companies | |
CN107169620A (en) | Model version circulation method between power network the superior and the subordinate scheduling system based on workflow | |
Brandl | Business to manufacturing (B2M) collaboration between business and manufacturing using ISA-95 | |
Maukar et al. | Application of Waterfall-System Development Life Cycle Methodology for Designing Purchase Order Material Control System | |
Hongjun et al. | Process improvement model and it’s application for manufacturing industry based on the BPM-ERP integrated framework | |
Qinglin et al. | The research on digital and intelligent management system for large castings based on Internet+ | |
Wang et al. | Research and Application of Material Data for Digital Manufacturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190926 Address after: 528300 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province Applicant after: Guangdong Bozhilin Robot Co., Ltd. Address before: Room 105-46536, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province Applicant before: Dingchen Construction Management Co., Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |
|
RJ01 | Rejection of invention patent application after publication |