CN107451739A - A kind of cooperation processing management method and its system - Google Patents

A kind of cooperation processing management method and its system Download PDF

Info

Publication number
CN107451739A
CN107451739A CN201710649878.1A CN201710649878A CN107451739A CN 107451739 A CN107451739 A CN 107451739A CN 201710649878 A CN201710649878 A CN 201710649878A CN 107451739 A CN107451739 A CN 107451739A
Authority
CN
China
Prior art keywords
processing
cooperation
quality
external coordination
producer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710649878.1A
Other languages
Chinese (zh)
Inventor
蒲兰芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Zhe Cheng Project Management Co Ltd
Original Assignee
Hefei Zhe Cheng Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Zhe Cheng Project Management Co Ltd filed Critical Hefei Zhe Cheng Project Management Co Ltd
Priority to CN201710649878.1A priority Critical patent/CN107451739A/en
Publication of CN107451739A publication Critical patent/CN107451739A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention discloses a kind of cooperation processing management method, this method utilizes cooperation processing server, carries out exchange of technology cooperation and quality management on line with external coordination producer, quick, efficiently, and the quality control management situation of real-time sharing production scene, grasp the real-time dynamic of quality;External coordination producer cooperative credit degree is established by the acceptable quality level of part processing on real-time information and man of outsourcing factory product, when credit rating is less than company standard, stops cooperation, when credit rating is good, strengthens cooperation;A kind of system of cooperation processing management method, including:Cooperation processing server, workshop declare module, the selected examination module of external coordination producer, quality management module, Product Acceptance Review module, part checks and accepts product control of the module to external coordination producer in the system of this method, timely if any unqualified part feedback, the adjustment of external coordination producer is rapid, reduces the loss of both sides.

Description

A kind of cooperation processing management method and its system
Technical field
The present invention relates to project management field, specifically a kind of cooperation processing management method and its system.
Background technology
Cooperation processing refers to our unit because equipment or technical deficiency, a certain overall manufacture processing tasks of complete independently Have any problem, or to reach expense needed for identical quality requirement higher, in order to ensure task is timely completed, and reduces cost, fully Using social storage resources, outwards or other unit orders or ordered and makees parts thereof or semi-finished product.
At present company by product external coordination to external coordination producer after, its production status is difficult to control, it may appear that product quality is poor Phenomenon, because plan is changed, external coordination producer can not promptly insert singly for company, and company and external coordination producer exchange of technology are few.
The content of the invention
It is an object of the invention to provide a kind of cooperation processing management method and its system, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the present invention provides following technical scheme:A kind of cooperation processing management method, is divided into following step Suddenly:
S1, by each workshop according to production need and company processing conditions, fill in《Cooperation processing request slip》Given birth in external coordination Production server enters on line to declare, and technical drawing or processing blueprint are sent at equipment control, is audited by equipment control, and Carry out request slip confirmation;
S2, the examination & verification of cooperation processing request slip, approval, including inventory uploads, vice president audits, approval is true at equipment control Recognize;
S3, external coordination producer is selected and examines, including examines on line, examines on the spot, and being examined on the line includes:Production stream Journey, the production technology ability of enterprise and deliverability, price, management and the service of processing, it is described to examine on the spot including outer The processing facility of producer of association, processing conditions, machining location, crudy;
S4, external coordination producer is determined, production contract is signed on line, and printed duplicate;
S5, cooperation processing technological document data management, including:A) producer that processing is manufactured to external coordination provides following provide Material:Workpiece blueprint, data criterion, detection mode, material requirements, b) technological document provides capping external coordination by company document control center Chapter, but external coordination producer, c are consigned to through purchasing department) external coordination producer can voluntarily copy the material, but must be with this public affairs as needed It is consistent to take charge of delivery data;
S6, yield plan arrangement and produce the linking of progress and include:
(q1) cooperation processing part and the production of company should be consistent in yield plan, it should be noted that outer Association's processing should will have a time in advance on the time is produced;
(q2) the company Annual production schedule can be used as guidance planning file, and man of outsourcing factory is transferred on line, so that they Production and supply to accessory have a long-term plan to prepare;
(q3) the production operation monthly plan of company should work out the foundation of the cooperation processing part production schedule, and therefore, company is every Month production schedules in kind, yield, the arrangement of time of producing progress all should notify cooperation processing producer in time;
(q4) according to " time in advance " principle, external coordination producer, can on the premise of company's year production schedule total output does not break through To arrange a certain amount of stock's finished product to store, supply during meeting emergencies;
S7, quality management, including:
(t1) quality management department of company, portion of outsourcing portion should be coordinated, carries out cooperation processing quality management and check work, managed The quality of external coordination supplier spare and accessory parts is managed, and assists to teach outsourcing factory, carries out quality management;
(t2) if outsourcing factory necessarily requires it first to manufacture experimently, fetch sample, pass through to manufacture the processing of this cooperation part for the first time Inspection is conformed to quality requirements completely, and it could be notified formally to manufacture tissue and refer to production;
(t3) in order to ensure the quality control management quality of production process, external coordination producer need to be divided in real time by external coordination server The quality control management situation of production scene is enjoyed, grasps the real-time dynamic of quality;
S8, the examination of cooperation processing part and storage, including:
(i1) the inspection of quality work of cooperation part, should implement by the examination mode of mutual agreement with sampling plan is taken out;
(i2) each Product Acceptance Review quality examination list should be achieved and upload cooperation part database by quality inspection personnel, if any not Qualified, feedback is given to man of outsourcing factory and achieved, as examination standard from now on;
(i3) it should handle and retract as contracted, while should also assist pair for the product off quality found in quality inspection Side ascertains the reason, and it is improved for defect.
As the further scheme of the present invention:Each workshop is according to production needs and the processing conditions bag of company in S1 steps Include:
(p1) working load of our company's production is too heavy, can not transfer personnel, equipment processing;
(p2) peculiar part can not buy stock, when can not also make by oneself;
(p3) there are the technical conditions of technicality in external coordination producer, using accessory quality preferably and price it is more honest and cleaner;
(p4) surface treatment of part.
As the further scheme of the present invention:When external coordination producer is determined in S4 steps, the outsourcing factory for ensureing to have 2-3 house is to same One cooperation part is supplied.
As the further scheme of the present invention:Workpiece blueprint form in the technological document data of cooperation processing in S5 steps Pdf document form is changed into, encryption circuit is used when being transmitted on technological document data line.
As the further scheme of the present invention:Company such as runs into client's emerency request in S6 steps, need to insert single production temporarily Or plan for adjustment situation when, answer on line and to notify outsourcing factory in time, same outsourcing factory such as maintenance of equipment or and other are various When reason can influence spare and accessory parts production, also answer and notify company in time on line.
As the further scheme of the present invention:Testing by part processing on real-time information and man of outsourcing factory product in S8 steps Receive qualification rate and establish external coordination producer cooperative credit degree, when credit rating is less than company standard, stop cooperation, when credit rating is good When, strengthen cooperation.
To reach above-mentioned technical purpose, present invention also offers a kind of system of cooperation processing management method, including:External coordination Processing server, workshop declare module, the selected examination module of external coordination producer, quality management module, Product Acceptance Review module, described outer Assist processing server include cooperation part database, documentation transmission unit, interactive unit, part processing live query unit, Cooperative credit unit, the cooperation part database are used to store the document related information of cooperation part, processing real time information, surveyed Storehouse data bank, documentation transmission unit are used for the transmission with external coordination maker's technical documents, and link encryption, the interactive unit Exchange of technology, production schedule adjustment for company and external coordination producer notify that the part processing live query unit is used for public affairs The situation of real-time query connecting elements processing is taken charge of, the cooperative credit unit is according to part processing on real-time information and outsourcing factory's family property The acceptable quality level of product, establishes cooperative credit degree, the workshop declare module include declaring preparatory unit, declare examination & verification unit, External coordination producer associative unit, workshop declare module and are used for declaring for external coordination producer, and the external coordination producer is selected to examine that module includes Unit is examined on line, examines unit on the spot, is examined on the line of external coordination producer with examining on the spot, the quality management module bag Quality production unit, part processing real time information unit are included, quality production unit provides producer of corporate external association product quality The machining state of part is fed back to company by the channel of management, part processing real time information unit in real time for external coordination producer, institute Stating Product Acceptance Review module includes check and accepting storing unit, unqualified part processing unit, and check and accepting storing unit is to external coordination producer product Check and accept and confirm to be put in storage and record, unqualified part processing unit is used for the processing of the unqualified part of product, and feeds back to external coordination producer.
Compared with prior art, the beneficial effects of the invention are as follows:
A kind of cooperation processing management method utilizes cooperation processing server, and exchange of technology cooperation is carried out with external coordination producer on line It is quick, efficient with quality management, and the quality control management situation of real-time sharing production scene, grasp the real-time dynamic of quality;It is logical Cross part processing on real-time information and the acceptable quality level of man of outsourcing factory product establishes external coordination producer cooperative credit degree, when credit rating is low When company standard, stop cooperation, when credit rating is good, strengthen cooperation;It is external to check and accept module for part in the system of this method The product control of producer is assisted, timely if any unqualified part feedback, the adjustment of external coordination producer is rapid, reduces the loss of both sides.
Brief description of the drawings
Fig. 1 is a kind of cooperation processing management method steps flow chart schematic diagram;
Fig. 2 is a kind of system composition schematic diagram of cooperation processing management method.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Referring to Fig. 1, a kind of cooperation processing management method, is divided into following steps:
S1, by each workshop according to production need and company processing conditions, fill in《Cooperation processing request slip》Given birth in external coordination Production server enters on line to declare, and technical drawing or processing blueprint are sent at equipment control, is audited by equipment control, and Carry out request slip confirmation;
S2, the examination & verification of cooperation processing request slip, approval, including inventory uploads, vice president audits, approval is true at equipment control Recognize;
S3, external coordination producer is selected and examines, including examines on line, examines on the spot, and being examined on the line includes:Production stream Journey, the production technology ability of enterprise and deliverability, price, management and the service of processing, it is described to examine on the spot including outer The processing facility of producer of association, processing conditions, machining location, crudy;
S4, external coordination producer is determined, production contract is signed on line, and printed duplicate;
S5, cooperation processing technological document data management, including:A) producer that processing is manufactured to external coordination provides following provide Material:Workpiece blueprint, data criterion, detection mode, material requirements, b) technological document provides capping external coordination by company document control center Chapter, but external coordination producer, c are consigned to through purchasing department) external coordination producer can voluntarily copy the material, but must be with this public affairs as needed It is consistent to take charge of delivery data;
S6, yield plan arrangement and produce the linking of progress and include:
(q1) cooperation processing part and the production of company should be consistent in yield plan, it should be noted that outer Association's processing should will have a time in advance on the time is produced;
(q2) the company Annual production schedule can be used as guidance planning file, and man of outsourcing factory is transferred on line, so that they Production and supply to accessory have a long-term plan to prepare;
(q3) the production operation monthly plan of company should work out the foundation of the cooperation processing part production schedule, and therefore, company is every Month production schedules in kind, yield, the arrangement of time of producing progress all should notify cooperation processing producer in time;
(q4) according to " time in advance " principle, external coordination producer, can on the premise of company's year production schedule total output does not break through To arrange a certain amount of stock's finished product to store, supply during meeting emergencies;
S7, quality management, including:
(t1) quality management department of company, portion of outsourcing portion should be coordinated, carries out cooperation processing quality management and check work, managed The quality of external coordination supplier spare and accessory parts is managed, and assists to teach outsourcing factory, carries out quality management;
(t2) if outsourcing factory necessarily requires it first to manufacture experimently, fetch sample, pass through to manufacture the processing of this cooperation part for the first time Inspection is conformed to quality requirements completely, and it could be notified formally to manufacture tissue and refer to production;
(t3) in order to ensure the quality control management quality of production process, external coordination producer need to be divided in real time by external coordination server The quality control management situation of production scene is enjoyed, grasps the real-time dynamic of quality;
S8, the examination of cooperation processing part and storage, including:
(i1) the inspection of quality work of cooperation part, should implement by the examination mode of mutual agreement with sampling plan is taken out;
(i2) each Product Acceptance Review quality examination list should be achieved and upload cooperation part database by quality inspection personnel, if any not Qualified, feedback is given to man of outsourcing factory and achieved, as examination standard from now on;
(i3) it should handle and retract as contracted, while should also assist pair for the product off quality found in quality inspection Side ascertains the reason, and it is improved for defect.
Each workshop needs according to production in S1 steps and the processing conditions of company includes:
(p1) working load of our company's production is too heavy, can not transfer personnel, equipment processing;
(p2) peculiar part can not buy stock, when can not also make by oneself;
(p3) there are the technical conditions of technicality in external coordination producer, using accessory quality preferably and price it is more honest and cleaner;
(p4) surface treatment of part.
When external coordination producer is determined in S4 steps, the outsourcing factory for ensureing to have 2-3 house is supplied same cooperation part, competing to strengthen its Production requirement can be met in time by striving ability and cooperation processing part.
Workpiece blueprint format conversion is into pdf document form, external coordination in the technological document data of cooperation processing in S5 steps Factory must assure that drawing does not leak, and encryption circuit is used when being transmitted on technological document data line.
Company such as runs into client's emerency request in S6 steps, when need to insert the singly situation of production or plan for adjustment temporarily, answers line It is upper notify outsourcing factory in time, such as maintenance of equipment of same outsourcing factory or and other a variety of causes when can influence spare and accessory parts and producing, Also answer and notify company in time on line.
External coordination producer is established in S8 steps by the acceptable quality level of part processing on real-time information and man of outsourcing factory product to close Make credit rating, when credit rating is less than company standard, stops cooperation, when credit rating is good, strengthen cooperation.
Referring to Fig. 2, a kind of system of cooperation processing management method, including:Mould is declared in cooperation processing server, workshop Block, the selected examination module of external coordination producer, quality management module, Product Acceptance Review module, the cooperation processing server include external coordination Part database, documentation transmission unit, interactive unit, part processing live query unit, cooperative credit unit, the external coordination Part database is used to store the document related information of cooperation part, processing real time information, check and accepting storing data bank, documentation transmission Unit is used for the transmission with external coordination maker's technical documents, and link encryption, and the interactive unit is used for company and external coordination producer Exchange of technology, production schedule adjustment notice, the part processing live query unit add for company's real-time query connecting elements The situation of work, the cooperative credit unit are established according to part processing on real-time information and the acceptable quality level of man of outsourcing factory product Cooperative credit degree, module is declared in the workshop to include declaring preparatory unit, declares examination & verification unit, external coordination producer associative unit, car Between declare module and be used for external coordination producer and declaring, operated on server line, rapidly and efficiently, the external coordination producer is selected to examine module Including examining unit on line, examining unit on the spot, examined on the line of external coordination producer with examining on the spot, the quality management mould Block includes quality production unit, part processing real time information unit, and quality production unit provides producer of corporate external association product The machining state of part is fed back to public affairs by the channel of quality management, part processing real time information unit in real time for external coordination producer Department, the Product Acceptance Review module include check and accepting storing unit, unqualified part processing unit, and check and accepting storing unit produces to external coordination producer The examination of product confirms to be put in storage and record, and unqualified part processing unit is used for the processing of the unqualified part of product, and feeds back to outsourcing factory Family.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (7)

1. a kind of cooperation processing management method, it is characterised in that be divided into following steps:
S1, by each workshop according to production need and company processing conditions, fill in《Cooperation processing request slip》Produce and take in external coordination Business device enters on line to declare, and technical drawing or processing blueprint are sent at equipment control, is audited by equipment control, and carry out Request slip confirms;
S2, the examination & verification of cooperation processing request slip, approval, including inventory uploads, vice president audits, ratifies to confirm at equipment control;
S3, external coordination producer is selected and examines, including examines on line, examines on the spot, and being examined on the line includes:Production procedure, enterprise The production technology ability and deliverability of industry, price, management and the service of processing, described examine on the spot include external coordination producer Processing facility, processing conditions, machining location, crudy;
S4, external coordination producer is determined, production contract is signed on line, and printed duplicate;
S5, cooperation processing technological document data management, including:A) producer that processing is manufactured to external coordination provides following information: Workpiece blueprint, data criterion, detection mode, material requirements, b) technological document provides capping external coordination chapter by company document control center, But external coordination producer, c are consigned to through purchasing department) external coordination producer can voluntarily copy the material, but must be with our company as needed Delivery data is consistent;
S6, yield plan arrangement and produce the linking of progress and include:
(q1) cooperation processing part and the production of company should be consistent in yield plan, it should be noted that external coordination adds Work should will have a time in advance on the time is produced;
(q2) manufacturing program of a year can be used as guidance planning file, man of outsourcing factory is transferred on line, so that they are to accessory Production and supply have a long-term plan to prepare;
(q3) production operation monthly plan should work out the foundation of the cooperation processing part production schedule, in production schedules monthly Kind, yield, the arrangement of time of producing progress all should notify cooperation processing producer in time;
(q4) according to " time in advance " principle, external coordination producer is not on the premise of company's year production schedule total output breaks through, Ke Yian The storage of a certain amount of stock's finished product is arranged, supply during meeting emergencies;
S7, quality management, including:
(t1) quality management department of company, portion of outsourcing portion should be coordinated, carries out cooperation processing quality management and check work, managed outer The quality of supplier's spare and accessory parts is assisted, and assists to teach outsourcing factory, carries out quality management;
(t2) if outsourcing factory necessarily requires it first to manufacture experimently, fetch sample, through examining to manufacture the processing of this cooperation part for the first time Quality requirement is complied fully with, it could be notified formally to manufacture tissue and refer to production;
(t3) in order to ensure the quality control management quality of production process, external coordination producer need to be given birth to by external coordination server real-time sharing The quality control management situation at scene is produced, grasps the real-time dynamic of quality;
S8, the examination of cooperation processing part and storage, including:
(i1) the inspection of quality work of cooperation part, should implement by the examination mode of mutual agreement with sampling plan is taken out;
(i2) each Product Acceptance Review quality examination list should be achieved and upload cooperation part database by quality inspection personnel, if any unqualified , feedback is given to man of outsourcing factory and achieved, as examination standard from now on;
(i3) it should be handled and retracted as contracted for the product off quality found in quality inspection, while should also assist other side to look into Bright reason, makes it be improved for defect.
2. a kind of cooperation processing management method according to claim 1, it is characterised in that each workshop is according to life in S1 steps Production needs and the processing conditions of company includes:
(p1) working load of our company's production is too heavy, can not transfer personnel, equipment processing;
(p2) peculiar part can not buy stock, when can not also make by oneself;
(p3) there are the technical conditions of technicality in external coordination producer, using accessory quality preferably and price it is more honest and cleaner;
(p4) surface treatment of part.
3. a kind of cooperation processing management method according to claim 1, it is characterised in that external coordination producer is determined in S4 steps When, the outsourcing factory for ensureing to have 2-3 house is supplied same cooperation part.
A kind of 4. cooperation processing management method according to claim 1, it is characterised in that the skill of cooperation processing in S5 steps Workpiece blueprint format conversion uses encryption line into pdf document form in art documentation when being transmitted on technological document data line Road.
5. a kind of cooperation processing management method according to claim 1, it is characterised in that company such as runs into visitor in S6 steps Family emerency request, when need to insert the singly situation of production or plan for adjustment temporarily, answer and notify outsourcing factory, same outsourcing factory in time on line In case of maintenance of equipment or and other a variety of causes can influence spare and accessory parts production when, also answer and notify company in time on line.
6. a kind of cooperation processing management method according to claim 1, it is characterised in that real-time by part in S8 steps The acceptable quality level of machining information and man of outsourcing factory product establishes external coordination producer cooperative credit degree, when credit rating is less than company standard When, stop cooperation, when credit rating is good, strengthen cooperation.
A kind of 7. system of cooperation processing management method, it is characterised in that including:Cooperation processing server, workshop declare module, External coordination producer is selected to examine module, quality management module, Product Acceptance Review module;
The cooperation processing server includes cooperation part database, documentation transmission unit, interactive unit, part processing fact Query unit, cooperative credit unit, the cooperation part database are used to store the document related information of cooperation part, processing letter in real time Breath, check and accepting storing data bank, documentation transmission unit are used for the transmission with external coordination maker's technical documents, and link encryption, institute State interactive unit and be used for the exchange of technology of company and external coordination producer, production schedule adjustment notice, the part processes live query Unit is used for the situation of company real-time query connecting elements processing, the cooperative credit unit according to part processing on real-time information with The acceptable quality level of man of outsourcing factory product, establishes cooperative credit degree;
Module is declared in the workshop to include declaring preparatory unit, declares examination & verification unit, external coordination producer associative unit, and mould is declared in workshop Block is used for declaring for external coordination producer, and the external coordination producer is selected to examine that module includes examining unit on line, examines unit on the spot, uses In being examined on the line of external coordination producer with examining on the spot, the quality management module includes quality production unit, part processing in real time Information unit, quality production unit provide the channel of producer of corporate external association product quality management, part processing real time information The machining state of part is fed back to company by unit in real time for external coordination producer;
The Product Acceptance Review module includes check and accepting storing unit, unqualified part processing unit, and check and accepting storing unit is to external coordination producer The examination of product confirms to be put in storage and record, and unqualified part processing unit is used for the processing of the unqualified part of product, and feeds back to external coordination Producer.
CN201710649878.1A 2017-08-02 2017-08-02 A kind of cooperation processing management method and its system Pending CN107451739A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710649878.1A CN107451739A (en) 2017-08-02 2017-08-02 A kind of cooperation processing management method and its system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710649878.1A CN107451739A (en) 2017-08-02 2017-08-02 A kind of cooperation processing management method and its system

Publications (1)

Publication Number Publication Date
CN107451739A true CN107451739A (en) 2017-12-08

Family

ID=60489348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710649878.1A Pending CN107451739A (en) 2017-08-02 2017-08-02 A kind of cooperation processing management method and its system

Country Status (1)

Country Link
CN (1) CN107451739A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108446832A (en) * 2018-02-26 2018-08-24 吴建 A kind of cooperation processing equipment matching process based on big data
CN108960735A (en) * 2018-07-10 2018-12-07 五冶集团上海有限公司 A kind of capacity coke oven refractory material management system and management method
CN111709711A (en) * 2020-06-15 2020-09-25 中国电子科技集团公司第二十九研究所 External cooperation management and control method in product development based on data driving

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103475702A (en) * 2013-09-04 2013-12-25 重庆大学 Networked outside processing progress real-time control method based on mobile terminal
CN205247437U (en) * 2015-11-25 2016-05-18 安徽四创电子股份有限公司 Machining spare information system of traceing back
CN105868924A (en) * 2016-04-25 2016-08-17 南京林业大学 Digital manufacturing-based furniture enterprise production quality control system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103475702A (en) * 2013-09-04 2013-12-25 重庆大学 Networked outside processing progress real-time control method based on mobile terminal
CN205247437U (en) * 2015-11-25 2016-05-18 安徽四创电子股份有限公司 Machining spare information system of traceing back
CN105868924A (en) * 2016-04-25 2016-08-17 南京林业大学 Digital manufacturing-based furniture enterprise production quality control system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吕海涛: "摩托车零部件制造企业网络化外协加工管理系统", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
姜晓章 等: "专机制造企业外协管理信息系统开发", 《电脑知识与技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108446832A (en) * 2018-02-26 2018-08-24 吴建 A kind of cooperation processing equipment matching process based on big data
CN108960735A (en) * 2018-07-10 2018-12-07 五冶集团上海有限公司 A kind of capacity coke oven refractory material management system and management method
CN111709711A (en) * 2020-06-15 2020-09-25 中国电子科技集团公司第二十九研究所 External cooperation management and control method in product development based on data driving

Similar Documents

Publication Publication Date Title
Singh et al. Application of lean manufacturing using value stream mapping in an auto‐parts manufacturing unit
Liu et al. Automatically updating maintenance information from a BIM database
CN107358340A (en) A kind of project management system based on list of engineering
CN107451739A (en) A kind of cooperation processing management method and its system
CN107358353A (en) A kind of industrial production wire management system and its method based on planar bar code technology
CN106408095A (en) System and method of ship equipment spare part management
CN107766493A (en) A kind of patch source power network resources Model analysis system and method
CN110189098A (en) A kind of online reviewing method
CN107844923A (en) A kind of ERP management systems and method
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
CN109325644A (en) Mechanical processing industry production capacity method of commerce, system, integrated system, terminal and storage medium
CN105159873B (en) Online patent drafting transaction processing system
CN103065213A (en) Converting station standardization inspection and acceptance auxiliary method based on workflow engine
Kusrini et al. Determining Performance Metrics of Supply Chain Management in Make-to-Order Small-Medium Enterprise Using Supply Chain Operation Reference Model (SCOR Version 12.0).
CN114926232B (en) Material purchasing system, method, controller and storage medium
CN109784836A (en) A kind of cloud design and craft cooperating management platform
CN109934738A (en) Intellectual Property Right of Enterprises management system that is a kind of convenient for management and concentrating
Selvi et al. Reverse logistics activities in enterprises and implementation reasons
CN109344453B (en) Automatic design production system of elevator
CN112561445A (en) Large goods storage management system and method
Thunberg et al. Identifying and positioning construction supply chain planning problems
Sahno et al. Knowledge management framework for Six Sigma performance level assessment
CN105096059A (en) Production and management system for enterprises
Frazier et al. HOW ADDITIVE MANUFACTURING EMPOWERS COMMERCE THROUGH EFFECTIVE DATA MANAGEMENT.
Mogos et al. Prerequisites for successful production transfers in the electronics industry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication