CN108960735A - A kind of capacity coke oven refractory material management system and management method - Google Patents

A kind of capacity coke oven refractory material management system and management method Download PDF

Info

Publication number
CN108960735A
CN108960735A CN201810752725.4A CN201810752725A CN108960735A CN 108960735 A CN108960735 A CN 108960735A CN 201810752725 A CN201810752725 A CN 201810752725A CN 108960735 A CN108960735 A CN 108960735A
Authority
CN
China
Prior art keywords
production
management
refractory material
plan
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810752725.4A
Other languages
Chinese (zh)
Inventor
吴鹏民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810752725.4A priority Critical patent/CN108960735A/en
Publication of CN108960735A publication Critical patent/CN108960735A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisions for transferring data to distant stations, e.g. from a sensing device
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of capacity coke oven refractory material management system, management system is based on internet, computer, mobile phone, quick response code printer are set, computer carries out back-stage management, cell phone application is connected by internet with computer, including system setup module, production management module and data management module, it is characterised in that: the system setup module includes administrator setting: increase and decrease administrator, administrator right setting;The production management module includes production list: production requirement plan, current production status;The data management module includes creation data: production total data is checked, is screened;Wherein the client of management system is equipped with user, producer and transporter.The advantages of there is the present invention management system scientific and reasonable, strong operability is arranged, and solve that the process times such as production, vanning, transport and the examination of refractory material are long, the big problem of cost, greatly improves refractory material management work efficiency and reduces job costs.

Description

A kind of capacity coke oven refractory material management system and management method
Technical field
The present invention relates to a kind of refractory materials to manage method, specifically, being a kind of capacity coke oven refractory material management system System and management method.
Background technique
The refractory material type of one capacity coke oven in the country is up to more than 10 kinds at present, and brick number is up to more than 1000 kinds, weight nearly 30,000 Ton.Refractory material manufacturer generally distance farther out, is up to hundreds of kilometer or even thousands of kilometers using project place.From production, It the overall processes such as transports, march into the arena and being related to multiple related sides such as refractory material producer, transporter, user, buying side, management is not Easily, ununified management platform often will cause the process management time such as production, vanning, transport and examination of refractory material Too long, cost of idleness easily influences the coke furnace building duration.
Refractory material user is in order to realize the management at each position, each specification refractory material, it is necessary to special messenger be sent to track production Production status, delivery state, travel position, the state of receiving, quality condition of square refractory material, producer must also send special messenger with Track travel position, inspection of incoming merchandise situation, transporter also needs situation on the way feeding back to producer, producer feeds back to use again Side, at the same user, producer and transporter to overcome production, transport, receive between can not by network information form and The obstacle of Shi Youxiao transmitting information.
In order to realize such demand, classical management approach is exactly that plan of needs is sent to life by fax or mailbox by user Then production side calls back and informs other side, user needs to arrange production, delivery, transportational process of multiple personnel to producer Situation carries out follow-up investigations, the producer that tells by telephone again of finding the problem, and producer is also required to tracking site acceptance situation, will check and accept Conclusion phone or written informing supervisor production leader, if intermediate link appearance lag will lead to user scene and a large amount of people occurs Member, the mechanical work holdup, cause heavy losses and the duration lags and faces owner's claim risk.With mentioning for capacity coke oven construction technology It rises, the speed of coke furnace building is getting faster, and the requirement to refractory material management is also higher and higher.Only manually tracking, phone connection System, surface mail and document transmitting information obviously do not catch up with the requirement at user scene.
Therefore known refractory material management mode there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of capacity coke oven refractory material management system in time, effectively transmitting information.
It is another object of the present invention to propose a kind of capacity coke oven refractory material management in time, effectively transmitting information The refractory material of system manages method.
To achieve the above object, the technical solution of the invention is as follows:
A kind of capacity coke oven refractory material management system, management system are based on internet, and setting computer, mobile phone, two dimensional code are beaten Print machine, computer carry out back-stage management, and cell phone application is connected by internet with computer, including system setup module, production Management module and data management module, it is characterised in that:
The system setup module includes administrator setting: increase and decrease administrator, administrator right setting;Message management: system disappears Breath setting, operation log are checked;User management: user's classification, user list management, increase and decrease user;
The production management module includes production list: production requirement plan, current production status;Production is checked: production, fortune Defeated, receipt control;
The data management module includes creation data: production total data is checked, is screened;Produce acceptable quality level;
Wherein the client of management system is equipped with user, producer and transporter, and user, producer and transporter make respectively Information Real-Time Sharing, exchange are carried out by internet with cell phone application;After user weaves the plan of needs of refractory material, It is uploaded to computer, producer checked by cell phone application, the plan of arranging production;After vanning is completed in refractory brick production, pass through two dimension Code technology, by the specification of every case brick, quantity, using position, march into the arena after the information such as storage position generate two dimensional code, and print and be attached to On packing case;When brick case entrucking is transported, by information of vehicles, information is loaded by planar bar code technology printing, is attached to car position;Fortune During defeated, cell phone application can lead to positioning, navigation feature, check refractory material transporting position can at any time, and driver can basis The navigation information that cell phone application provides selects reasonable transit route, user according to traffic condition reasonable arrangement Field Force and It is mechanical;When haulage vehicle enters use site unloading, user scans compartment two-dimensional barcode information and compares examination, sweeps when unpacking Packing case two dimensional code is retouched to carry out an acceptance inspection.The band of position that the information transport warehouse provided according to two dimensional code is specified;If checked and accepted not Qualification, by material uploads such as unqualified refractory brick model, quantity, evidences to computer, producer is checked by cell phone application, weight The new plan of arranging production.
A kind of management method of capacity coke oven refractory material management system, it is characterised in that the following steps are included:
A, the plan of needs of project demands side can in time, be accurately supplied to manufacturer, generate producer according to general plan, stage Plan reasonable arrangement production plan;
B, project demands can the production of dynamically track manufacturer, delivery state, and in time according to the production of producer, transport feelings Condition takes corresponding management measure;
C, project demands can produce according to manufacturer, transport real-time dynamic change adjusted iterm field operation plan, reach Personnel, mechanical optimization configuration;
D, the information between project demands side and manufacturer in time, can be transmitted effectively;
E, manufacturer can know the Qualification for refractory material of marching into the arena within first time, and adjust in time according to situation is checked and accepted Production plan.
After adopting the above technical scheme, capacity coke oven refractory material management system of the invention and management method are with following Advantage:
1, scientific and reasonable, strong operability is arranged in management system;
2, it is long that the process times such as production, vanning, transport and the examination of refractory material are solved, the big problem of cost;
3, refractory material management work efficiency is greatly improved, job costs are reduced.
Detailed description of the invention
Fig. 1 is that the capacity coke oven refractory material of the embodiment of the present invention manages system structure diagram;
Fig. 2 is the resistance to material demand flow chart of the embodiment of the present invention;
Fig. 3 is the resistance to material factory management flow chart of the embodiment of the present invention;
Fig. 4 is the management flow chart in transit of the embodiment of the present invention;
Fig. 5 is the site acceptance of the resistance to material flow chart of the embodiment of the present invention.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
System structure diagram is managed referring now to the capacity coke oven refractory material that Fig. 1, Fig. 1 are the embodiment of the present invention.
Capacity coke oven refractory material of the invention manages system, and management system is based on internet, setting computer, mobile phone, Quick response code printer, computer carry out back-stage management, and cell phone application is connected by internet with computer, including system setting Module, production management module and data management module, it is characterised in that:
The system setup module includes administrator setting: increase and decrease administrator, administrator right setting;Message management: system disappears Breath setting, operation log are checked;User management: user's classification, user list management, increase and decrease user;
The production management module includes production list: production requirement plan, current production status;Production is checked: production, fortune Defeated, receipt control;
The data management module includes creation data: production total data is checked, is screened;Produce acceptable quality level;
Wherein the client of management system is equipped with user, producer and transporter, and user, producer and transporter make respectively Information Real-Time Sharing, exchange are carried out by internet with cell phone application;After user weaves the plan of needs of refractory material, It is uploaded to computer, producer checked by cell phone application, the plan of arranging production;After vanning is completed in refractory brick production, pass through two dimension Code technology, by the specification of every case brick, quantity, using position, march into the arena after the information such as storage position generate two dimensional code, and print and be attached to On packing case;When brick case entrucking is transported, by information of vehicles, information is loaded by planar bar code technology printing, is attached to car position;Fortune During defeated, cell phone application can lead to positioning, navigation feature, check refractory material transporting position can at any time, and driver can basis The navigation information that cell phone application provides selects reasonable transit route, user according to traffic condition reasonable arrangement Field Force and It is mechanical;When haulage vehicle enters use site unloading, user scans compartment two-dimensional barcode information and compares examination, sweeps when unpacking Packing case two dimensional code is retouched to carry out an acceptance inspection.The band of position that the information transport warehouse provided according to two dimensional code is specified;If checked and accepted not Qualification, by material uploads such as unqualified refractory brick model, quantity, evidences to computer, producer is checked by cell phone application, weight The new plan of arranging production.
Embodiment 2
Fig. 2 is the resistance to material demand flow chart of the embodiment of the present invention, and Fig. 3 is the resistance to material factory management flow chart of the embodiment of the present invention, Fig. 4 is the management flow chart in transit of the embodiment of the present invention, and Fig. 5 is the site acceptance of the resistance to material flow chart of the embodiment of the present invention.
The management method of capacity coke oven refractory material management system of the invention, comprising the following steps:
A, the plan of needs of project demands side can in time, be accurately supplied to manufacturer, generate producer according to general plan, stage Plan reasonable arrangement production plan;
B, project demands can the production of dynamically track manufacturer, delivery state, and in time according to the production of producer, transport feelings Condition takes corresponding management measure;
C, project demands can produce according to manufacturer, transport real-time dynamic change adjusted iterm field operation plan, reach Personnel, mechanical optimization configuration;
D, the information between project demands side and manufacturer in time, can be transmitted effectively;
E, manufacturer can know the Qualification for refractory material of marching into the arena within first time, and adjust in time according to situation is checked and accepted Production plan.
The present invention has substantive distinguishing features and significant technological progress, and capacity coke oven refractory material of the invention manages system And management method, the process management overlong times such as the very good solution production of refractory material, vanning, transport and examination, cost Larger, refractory material management easily influences the problem of coke furnace masonry construction, and refractory material management work efficiency greatly improved, drop Low job costs.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (2)

1. a kind of capacity coke oven refractory material manages system, management system is based on internet, and computer, mobile phone, two dimensional code is arranged Printer, computer carry out back-stage management, and cell phone application is connected by internet with computer, including system setup module, life Produce management module and data management module, it is characterised in that:
The system setup module includes administrator setting: increase and decrease administrator, administrator right setting;Message management: system disappears Breath setting, operation log are checked;User management: user's classification, user list management, increase and decrease user;
The production management module includes production list: production requirement plan, current production status;Production is checked: production, fortune Defeated, receipt control;
The data management module includes creation data: production total data is checked, is screened;Produce acceptable quality level;
Wherein: the client of management system is equipped with user, producer and transporter, user, producer and transporter difference Information Real-Time Sharing, exchange are carried out by internet using cell phone application;User weaves the plan of needs of refractory material Afterwards, it is uploaded to computer, producer checked by cell phone application, the plan of arranging production;After vanning is completed in refractory brick production, pass through Planar bar code technology, by the specification of every case brick, quantity, using position, march into the arena after the information such as storage position generate two dimensional code, and print It is attached on packing case;When brick case entrucking is transported, by information of vehicles, information is loaded by planar bar code technology printing, is attached to compartment position It sets;In transportational process, cell phone application can lead to positioning, navigation feature, check refractory material transporting position can at any time, Si Jike Reasonable transit route is selected with the navigation information provided according to cell phone application, user is according to traffic condition reasonable arrangement scene Personnel and machinery;When haulage vehicle enters use site unloading, user scans compartment two-dimensional barcode information and compares examination, opens Packing case two dimensional code is scanned when case to carry out an acceptance inspection;
The band of position that the information transport warehouse provided according to two dimensional code is specified;If examination is unqualified, by unqualified refractory brick The material uploads such as model, quantity, evidence to computer, producer is checked by cell phone application, rearranges production plan.
2. a kind of management method of capacity coke oven refractory material management system as described in claim 1, it is characterised in that including Following steps:
A, the plan of needs of project demands side can in time, be accurately supplied to manufacturer, generate producer according to general plan, stage Plan reasonable arrangement production plan;
B, project demands can the production of dynamically track manufacturer, delivery state, and in time according to the production of producer, transport feelings Condition takes corresponding management measure;
C, project demands can produce according to manufacturer, transport real-time dynamic change adjusted iterm field operation plan, reach Personnel, mechanical optimization configuration;
D, the information between project demands side and manufacturer in time, can be transmitted effectively;
E, manufacturer can know the Qualification for refractory material of marching into the arena within first time, and adjust in time according to situation is checked and accepted Production plan.
CN201810752725.4A 2018-07-10 2018-07-10 A kind of capacity coke oven refractory material management system and management method Pending CN108960735A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810752725.4A CN108960735A (en) 2018-07-10 2018-07-10 A kind of capacity coke oven refractory material management system and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810752725.4A CN108960735A (en) 2018-07-10 2018-07-10 A kind of capacity coke oven refractory material management system and management method

Publications (1)

Publication Number Publication Date
CN108960735A true CN108960735A (en) 2018-12-07

Family

ID=64482849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810752725.4A Pending CN108960735A (en) 2018-07-10 2018-07-10 A kind of capacity coke oven refractory material management system and management method

Country Status (1)

Country Link
CN (1) CN108960735A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2434223B (en) * 2005-12-29 2010-06-16 Motorola Inc User interface for customising an electronic product
CN105225040A (en) * 2015-09-25 2016-01-06 中铁建电气化局集团南方工程有限公司 Based on the preparation of construction material overall process method for tracing of Internet of Things
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM
CN107451739A (en) * 2017-08-02 2017-12-08 合肥哲诚项目管理有限公司 A kind of cooperation processing management method and its system
CN107451777A (en) * 2017-07-27 2017-12-08 广州赛莱拉干细胞科技股份有限公司 The approaches to IM and platform that biological sample bank sample preserves temporarily
CN108198093A (en) * 2018-01-29 2018-06-22 墨点狗智能科技(东莞)有限公司 A kind of wisdom building system based on CPS

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2434223B (en) * 2005-12-29 2010-06-16 Motorola Inc User interface for customising an electronic product
CN105225040A (en) * 2015-09-25 2016-01-06 中铁建电气化局集团南方工程有限公司 Based on the preparation of construction material overall process method for tracing of Internet of Things
CN106600239A (en) * 2016-12-28 2017-04-26 中建科技有限公司 Assembly type building construction full process data cooperation management system based on BIM
CN107451777A (en) * 2017-07-27 2017-12-08 广州赛莱拉干细胞科技股份有限公司 The approaches to IM and platform that biological sample bank sample preserves temporarily
CN107451739A (en) * 2017-08-02 2017-12-08 合肥哲诚项目管理有限公司 A kind of cooperation processing management method and its system
CN108198093A (en) * 2018-01-29 2018-06-22 墨点狗智能科技(东莞)有限公司 A kind of wisdom building system based on CPS

Similar Documents

Publication Publication Date Title
CN109141398B (en) Unmanned aerial vehicle path planning method and device for logistics
US6401078B1 (en) Bill of lading transmission and processing system for less than a load carriers
US8275676B2 (en) Methods for processing shipping documentation sent from a vehicle
CN106203900A (en) Intelligent logistics management system and method
CN107194628B (en) Method and device for processing call request
US20210081516A1 (en) Automated authentication systems and methods including automated waste management system with automated weight ticket and authentication
CN103473665B (en) Container dispatching management information system and method
CN103985024A (en) System and method for managing cargo transfer operations at a cargo distribution terminal
CN210527526U (en) Vehicle-mounted storage and distribution integrated logistics distribution device
CN111882282B (en) Shipping cargo matching method, device, equipment and storage medium
CN110288281A (en) A kind of inlet and outlet kinds of goods management system
CN108062640A (en) A kind of logistics integrity management system
CN114399246A (en) Intelligent delivery scheduling system
CN109767162A (en) A kind of logistics information processing platform, system and its send addressee processing method
CN109118136A (en) A kind of relay station method and system for planning for logistics unmanned plane
US20220019960A1 (en) UniTOS Universal Transportation Operating System
CN108960735A (en) A kind of capacity coke oven refractory material management system and management method
CN108197879A (en) A kind of multi-mode passenger-cargo transportation method and system altogether
JP3516606B2 (en) Transportation planning method and system
CN112099452A (en) Automatic handing-over system of workshop material
CN108898343A (en) A kind of warehouse and its control method convenient for managing logistics transportation
CN107977814A (en) A kind of physical-distribution intelligent customer service system
KR101675070B1 (en) Method of Minimize Cargo Truck Unloading Wait Time for Delivery Metal Scrap Delivery
CN213182403U (en) Automatic handing-over system of workshop material
CN205405882U (en) Express delivery meets bicycle dispatching management system based on thing networking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207

RJ01 Rejection of invention patent application after publication