CN117355660A - 地下钻凿钻机行走控制 - Google Patents
地下钻凿钻机行走控制 Download PDFInfo
- Publication number
- CN117355660A CN117355660A CN202280036372.2A CN202280036372A CN117355660A CN 117355660 A CN117355660 A CN 117355660A CN 202280036372 A CN202280036372 A CN 202280036372A CN 117355660 A CN117355660 A CN 117355660A
- Authority
- CN
- China
- Prior art keywords
- drilling
- carrier
- orientation
- target
- drilling rig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/022—Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/025—Rock drills, i.e. jumbo drills
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Crystals, And After-Treatments Of Crystals (AREA)
- Forklifts And Lifting Vehicles (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP21176165.5 | 2021-05-27 | ||
| EP21176165.5A EP4095346B1 (en) | 2021-05-27 | 2021-05-27 | Undergroung drilling rig tramming control |
| PCT/EP2022/064446 WO2022248685A1 (en) | 2021-05-27 | 2022-05-27 | Undergroung drilling rig tramming control |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN117355660A true CN117355660A (zh) | 2024-01-05 |
Family
ID=76522747
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202280036372.2A Pending CN117355660A (zh) | 2021-05-27 | 2022-05-27 | 地下钻凿钻机行走控制 |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US20240240524A1 (enExample) |
| EP (1) | EP4095346B1 (enExample) |
| JP (1) | JP7855614B2 (enExample) |
| CN (1) | CN117355660A (enExample) |
| AU (1) | AU2022282583A1 (enExample) |
| CA (1) | CA3216565A1 (enExample) |
| CL (1) | CL2023003449A1 (enExample) |
| WO (1) | WO2022248685A1 (enExample) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2024248700A1 (en) * | 2023-05-31 | 2024-12-05 | Epiroc Rock Drills Aktiebolag | Method and arrangement for controlling execution of a drill plan |
| CN116950634A (zh) * | 2023-08-18 | 2023-10-27 | 清华大学 | 定向钻车控制方法及定向钻车 |
| CN119411942B (zh) * | 2024-11-18 | 2025-09-23 | 湖南创远智能发展有限责任公司 | 钻机移机的控制方法、装置、设备、介质及钻机 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103485756A (zh) * | 2012-06-07 | 2014-01-01 | 山特维克矿山工程机械有限公司 | 动态工作区域 |
| CN105164372A (zh) * | 2013-05-08 | 2015-12-16 | 山特维克矿山工程机械有限公司 | 分配并凿钻钻孔的设备 |
| CN109025815A (zh) * | 2018-09-14 | 2018-12-18 | 北京奥腾岩石科技有限公司 | 用于凿岩台车的控制系统和控制方法 |
| CN111655963A (zh) * | 2018-01-31 | 2020-09-11 | 山特维克矿山工程机械有限公司 | 用于岩石处理的设备、岩钻单元和方法 |
| JP2020183681A (ja) * | 2019-05-09 | 2020-11-12 | 鹿島建設株式会社 | 立坑構築装置及び立坑構築方法 |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5927289U (ja) * | 1982-08-11 | 1984-02-20 | 古河鉱業株式会社 | さく孔装置のさく孔位置の位置ずれ補正機構 |
| JPH07229385A (ja) * | 1994-02-16 | 1995-08-29 | Furukawa Co Ltd | 自動油圧クローラドリル |
| JPH07281749A (ja) * | 1994-04-07 | 1995-10-27 | Furukawa Co Ltd | 作業車両の運行方法 |
| FR2765912B1 (fr) * | 1997-07-11 | 1999-12-17 | Tamrock Secoma Sa | Engin de foration monte sur roues, a chassis articule |
| FI113796B (fi) * | 2000-10-24 | 2004-06-15 | Sandvik Tamrock Oy | Kallionporauslaite |
| JP6345991B2 (ja) * | 2014-06-03 | 2018-06-20 | 株式会社鴻池組 | 穿孔ナビゲーション装置 |
| JP6656810B2 (ja) * | 2015-02-23 | 2020-03-04 | ナブテスコ株式会社 | 駆動装置および建設機械 |
| EP3536864B1 (en) * | 2018-03-09 | 2020-12-30 | Sandvik Mining and Construction Oy | Hydraulic system and method of controlling hydraulic actuator |
-
2021
- 2021-05-27 EP EP21176165.5A patent/EP4095346B1/en active Active
-
2022
- 2022-05-27 CN CN202280036372.2A patent/CN117355660A/zh active Pending
- 2022-05-27 AU AU2022282583A patent/AU2022282583A1/en active Pending
- 2022-05-27 CA CA3216565A patent/CA3216565A1/en active Pending
- 2022-05-27 US US18/563,181 patent/US20240240524A1/en active Pending
- 2022-05-27 JP JP2023572148A patent/JP7855614B2/ja active Active
- 2022-05-27 WO PCT/EP2022/064446 patent/WO2022248685A1/en not_active Ceased
-
2023
- 2023-11-20 CL CL2023003449A patent/CL2023003449A1/es unknown
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103485756A (zh) * | 2012-06-07 | 2014-01-01 | 山特维克矿山工程机械有限公司 | 动态工作区域 |
| CN105164372A (zh) * | 2013-05-08 | 2015-12-16 | 山特维克矿山工程机械有限公司 | 分配并凿钻钻孔的设备 |
| CN111655963A (zh) * | 2018-01-31 | 2020-09-11 | 山特维克矿山工程机械有限公司 | 用于岩石处理的设备、岩钻单元和方法 |
| CN109025815A (zh) * | 2018-09-14 | 2018-12-18 | 北京奥腾岩石科技有限公司 | 用于凿岩台车的控制系统和控制方法 |
| JP2020183681A (ja) * | 2019-05-09 | 2020-11-12 | 鹿島建設株式会社 | 立坑構築装置及び立坑構築方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| EP4095346B1 (en) | 2024-07-31 |
| WO2022248685A1 (en) | 2022-12-01 |
| EP4095346C0 (en) | 2024-07-31 |
| JP2024519960A (ja) | 2024-05-21 |
| CL2023003449A1 (es) | 2024-08-30 |
| CA3216565A1 (en) | 2022-12-01 |
| US20240240524A1 (en) | 2024-07-18 |
| JP7855614B2 (ja) | 2026-05-08 |
| EP4095346A1 (en) | 2022-11-30 |
| AU2022282583A1 (en) | 2023-12-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12146407B2 (en) | Mine vehicle boom positioning control | |
| EP3005006B1 (en) | Method of controlling a mining vehicle and associated mining vehicle | |
| EP2446332B1 (en) | Determination of route for arranging automatic control of mobile mining machine | |
| EP2725183B1 (en) | Mining vehicle and method of moving boom | |
| JP7855614B2 (ja) | 地下掘削リグトラミング制御 | |
| US20230059996A1 (en) | Mine vehicle safety control | |
| WO2010149853A1 (en) | Determination of routes for arranging automatic control of mobile mining machine | |
| CN115885083A (zh) | 用于移动式钻凿钻机的地面支撑件 | |
| EP3754450B1 (en) | Autonomous vehicle monitoring | |
| CN118547741B (zh) | 采矿车辆校准装置和校准方法 | |
| EP4421249B1 (en) | Mining vehicle calibration | |
| AU2024281380A1 (en) | Method and arrangement for controlling execution of a drill plan | |
| EA042868B1 (ru) | Мониторинг автономных транспортных средств |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |