WO2022248685A1 - Undergroung drilling rig tramming control - Google Patents
Undergroung drilling rig tramming control Download PDFInfo
- Publication number
- WO2022248685A1 WO2022248685A1 PCT/EP2022/064446 EP2022064446W WO2022248685A1 WO 2022248685 A1 WO2022248685 A1 WO 2022248685A1 EP 2022064446 W EP2022064446 W EP 2022064446W WO 2022248685 A1 WO2022248685 A1 WO 2022248685A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- drilling
- carrier
- orientation
- tramming
- rig
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 286
- 238000000034 method Methods 0.000 claims abstract description 27
- 239000011435 rock Substances 0.000 claims description 20
- 238000004590 computer program Methods 0.000 claims description 9
- 238000012545 processing Methods 0.000 claims description 3
- 230000009471 action Effects 0.000 description 14
- 238000004891 communication Methods 0.000 description 7
- 239000000463 material Substances 0.000 description 5
- 238000013459 approach Methods 0.000 description 4
- 230000004044 response Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005422 blasting Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 230000010267 cellular communication Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 239000002828 fuel tank Substances 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000011282 treatment Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/022—Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
Definitions
- the present invention relates to controlling tramming of an underground drilling rig.
- Drilling rigs are used in underground construction and mining sites. In drilling blasting based methods rock is excavated in rounds. Several successive rounds produce a tunnel having a tunnel face. At first drill holes are drilled to the tunnel face, where after the drilled holes are charged and blasted. Rock material of the amount of one round is detached at one blasting time. The detached rock material is transported away from the tunnel for further treatments.
- an excavation plan which may comprise at least one drilling pattern, or drill hole pattern, is designed in advance and information on the rock type, for example, is determined.
- the drilling pattern is designed as office work for each round.
- the pattern is defining target holes and hence work tasks carried out by the drilling rig.
- the pattern is provided for the rock drilling rig to drill holes in the rock in such a way that a desired round and tunnel profile can be achieved.
- drilling rig is trammed in proximity of a tunnel face to be drilled in accordance with a target hole pattern defined in the drilling plan. Tramming may generally refer to driving the rig.
- a drilling unit of a drilling rig typically comprising a drill (machine) at a feed beam connected to a boom connected to a carrier, needs to be positioned at appropriate position and orientation before starting drilling.
- the rig has been stopped at the end of the tramming stage to a pose which does not allow correct positioning of the drilling unit, the rig needs to be driven back and forth to obtain appropriate pose to correctly position the drilling unit. This is a particular challenge in narrow underground tunnels, in which satellite-based positioning data is not available and re positioning of a large drilling rig is substantially more difficult than at surface work sites.
- a mobile underground drilling rig comprising a carrier, at least one boom attached at a first end to the carrier, and a drilling unit attached to a second end of the boom, and control means configured for: receiving target pose information indicative of at least target pose for the drilling unit in accordance with an input plan, detecting, during tramming of the drilling rig, carrier pose information indicative of orientation of the carrier, defining, during tramming of the drilling rig, orientation of the drilling unit on the basis of the detected carrier pose information, and generating tramming assistance information on the basis of the target pose information and the defined orientation of the drilling unit.
- a method for controlling an underground drilling rig comprising a carrier, at least one boom attached at a first end to the carrier, and a drilling unit attached to a second end of the boom, comprising: receiving target pose information indicative of at least target pose for the drilling unit in accordance with an input plan, detecting, during tramming of the drilling rig, carrier pose information indicative of orientation of the carrier, defining, during tramming of the drilling rig, orientation of the drilling unit on the basis of the detected carrier pose information, and generating tramming assistance information on the basis of the target pose information and the defined orientation of the drilling unit.
- a control apparatus for controlling an underground drilling rig comprising means for performing the method or an embodiment of the method.
- the means may comprise at least one processor, at least one memory including computer program code, the at least one memory and the computer program code being configured to, with the at least one processor, cause the apparatus at least to perform the method or an embodiment of the method.
- a computer program for, when executed in a data processing apparatus, to cause the apparatus to perform the method or an embodiment thereof.
- FIGURE 1 illustrates an example of a drilling rig
- FIGURE 2 illustrates a top view example of a drilling rig and tunnel excavation
- FIGURE 3 illustrates a method according to at least some embodiments
- FIGURE 4 illustrates an example display view
- FIGURE 5 illustrates an example apparatus capable of supporting at least some embodiments.
- Figure 1 illustrates a rock drilling rig 1 comprising a carrier 2, at least one (drilling) boom 3 rotatably attached to the carrier, and a drilling unit 4 rotatably attached to other end of the boom 3.
- the carrier comprises two portions, i.e. a first/front portion 2a and a second/rear portion 2b, connected by a joint 8.
- the boom 3 may comprise two or more parts or portions connected by a joint.
- the boom 3 is further connected to a drilling unit 4 by at least one joint.
- the drilling unit 4 comprises a feed beam 5 on which a rock drilling machine 6 can be moved by means of a feed device.
- a tool 7 is connectable to the drilling machine 5, by which tool the impact pulses given by the percussion device of the rock drilling machine are transmitted to the rock to be drilled.
- Figure 1 is simplified and represents one example of a drilling rig, in which the boom is relatively long. It is to be appreciated that the presently disclosed features may be applied for a wide variety of rock drilling rigs, some examples of which include tunnel development, long-hole, support, in-the-hole, and top-hammer drilling rig types.
- the boom may refer to (relatively short) support and connecting structure for the drilling unit.
- the rig 1 and the drilling unit 4 may comprise various further units and devices, such as a rod handling cassette, a support rack, cylinder(s), a dust removal unit, further drilling support elements, etc.
- the drilling rig 1 further comprises a motor 9, such as a combustion engine and/or an electric motor.
- the drilling rig 1 typically comprises a system of pumps for generating hydraulic pressure for operating various parts of the machine, such as actuating the boom 3 and the feed beam 5, etc.
- the drilling rig 1 may comprise one or more other sources of energy, such as an accumulator, a hydrogen container, a fuel tank, etc.
- the rock drilling rig 1 further comprises at least one control unit 10 arranged to control actuators of the rock drilling rig 1, for example.
- the control unit 10 may comprise one or more processors executing computer program code stored in a memory.
- the control unit may comprise or be connected to a user interface with a display device as well as operator input interface for receiving operator commands and information to the control unit 10 and generating display views and other output for an operator of the rig.
- the control unit 10 is configured to perform at least tramming control related operations, and there may be one or more other control units in the rig for controlling other operations.
- the rig 1 may tram towards direction TD to a drilling position at the worksite. It is to be noted that a specific tramming mode or boom and/or drilling unit position may be applied. For example, the drilling unit 4 may be pivoted partially on top of the boom 3.
- Figure 1 also illustrates examples of available movement of rig portions in relation to one another: arrow a indicates (horizontal/lateral plane or xy direction) movement/relation between rig portions 2a, 2b, b indicates (horizontal/lateral plane or xy direction) movement/relation between front carrier portion 2a and boom 3, c indicates (vertical plane or z direction) movement between front carrier portion 2a and boom 3, d and e movement/relation (in horizontal plane and vertical plane, respectively) between the boom 3 and the drilling unit 4. It is to be appreciated that there may be more or less joints and movement directions between rig portions, and the order of joints may be different than illustrated in the example of Figure 1.
- a bolter rig may comprise a further joint in the drilling unit, and a long-hole drilling rig may be arranged without a joint providing b direction movement.
- One or more sensors 11 may be arranged for determining current position and direction of the boom 3, or a portion thereof.
- One or more sensors may be arranged to determine current position and direction of the drilling unit 4.
- Figure 1 illustrates only single sensor 11, but it will be appreciated that there may be a plurality of sensors.
- Such sensors may be positioned in the carrier 2, the boom 3, and/or the drilling unit 4.
- the sensing data may be provided to the control unit 10 (or another control unit for positioning), which may execute appropriate computations.
- joints are equipped with joint position sensors.
- Joint position sensor data of a plurality of joints between the carrier 2 and the drilling unit 4, from such sensors is applied to define the position and orientation of the drilling unit 4 in relation to the carrier 2.
- the orientation of the drilling unit 4 may define also the orientation of the feed beam 5 and the drilling machine 6 (and the tool 7).
- the drilling rig 1 may comprise at least one scanner 12 for scanning tunnel profile.
- the scanner 12 is a 3D scanner, in which case 3D scanning data, e.g. point cloud data is produced.
- the rig may comprise a front scanner configured to scan environment towards normal forward driving direction TD (and naturally to sides within reach of the scanner).
- the rig may also comprise a rear scanner configured to scan the environment towards direction opposite to TD, i.e. backwards of the vehicle.
- the scanner 12 may be a laser scanner or another type of sensor device, such as 4D or another type of radar, appropriate for determining obstacles and distances to obstacles for the vehicle.
- the drilling rig 1 may comprise various further units, such as a wireless communications unit 13, configured for data transfer with a base station and/or a user device.
- the communication device may thus be connected to a communications system of the worksite, e.g. via a wireless access point or base station 14 of a wireless access system comprising a wireless local area network (WLAN) and/or a cellular communications network (e.g. a 4G, 5G or another generation cellular network).
- WLAN wireless local area network
- a cellular communications network e.g. a 4G, 5G or another generation cellular network.
- the drilling rig may be remotely monitored and controlled based on state data from the drilling rig and control data from a remote controller unit.
- Figure 1 provides only one example and many other configurations are applicable.
- Another type of work machine may be attached to the boom 3, such as a bolting unit, a concrete sprayer, a platform, a scaling unit, or an explosives charger unit, for example.
- the drilling rig may be unmanned.
- the user interface may be remote from the rig and the rig may be remotely controlled by an operator in the tunnel, or in control room at the worksite area or even long distance away from the worksite via communications network(s).
- a drilling plan (illustrated by broken line) may define positions and orientations of holes 200 to be drilled.
- the holes to be drilled may be arranged in multiple drill hole rows.
- the plan may define a plurality of target poses for the drilling unit 4, such as hole positions and orientations.
- the plan may be designed offline and off-site, for example in an office, or on-board the drilling rig. Such plan may be sent via a wired or wireless connection to, or otherwise loaded to a memory of the rock drilling rig 1 for access by the control unit 10.
- the drilling rig 1 may be trammed in proximity of a tunnel face to be drilled according to a target hole pattern defined in the drilling plan. After the tramming stage, a positioning stage may be carried out. Thus, the boom 3 and the drilling unit 4 are controlled to position the drilling unit 4, typically the feed beam 5, at the defined hole/target pose, at appropriate position and alignment based on hole position and orientation information defined in the plan. The drilling rig 1 is also stabilized for drilling, whereby typically a set of ground supports are pushed onto the ground. The drilling unit and/or feed beam may be positioned after the stabilization, or re-position after the stabilization to ensure correct pose to drill the first planned hole according to the drill plan.
- the drilling rig 1 may be configured to operate autonomously at least some operations, such as at least some of operations of a drilling work cycle.
- the drilling rig 1 may in its autonomous operating mode operate independently without requiring continuous user control but which may be taken under external control in response to an operator alert or automatic operation terminating, for example.
- the boom and/or feed beam positioning for achieving the target pose for the drilling unit 4, may be automatized.
- the control unit 10 may compute movement control actions (for the carrier 2, the boom 3, and/or the feed beam 5) required to arrive at the target pose, generate associated control signals, and send the control signals for associated actuators or control system elements.
- the parking position of the drilling rig 1 (and the carrier thereof), limited by the tunnel walls, does not allow the instrumentation to achieve the target pose for the drilling unit 4, autonomous positioning fails, requiring operator intervention and causing delay in production.
- the drilling rig 1 is configured to perform automatic drilling cycle.
- the drilling plan and pattern may be used as an input for automatic control of the drilling rig 1.
- the control unit 10 may generate steering instruction and associated control signal to operate the wheels to tram the drilling rig close to a target hole.
- Figure 3 illustrates a method according to some embodiments. The method may be performed by an apparatus for controlling a drilling rig, such as the control unit 10 of the drilling rig 1.
- the method comprises receiving 300 target pose information indicative of at least target pose for a drilling unit, such as the drilling unit 4, in accordance with an input plan, in some embodiments a drilling plan.
- the target pose information may be received from an internal or external memory, or from another apparatus, such as the remote controller unit or a worksite control system apparatus.
- the target pose information may be received as part of a received drilling plan or another type of tunnel system or mine plan or model, such as a tunnel plan file comprising data indicative at least a tunnel line and/or other tunnel parameters.
- Appropriate data of the plan may be (automatically) selectively obtained in block 300 for the target pose. In an example embodiment this is based on next drilling task to be performed by the rig, and the target pose information may comprise or be based on hole sequence data of a next round to be drilled. Reception/retrieval of the target pose information may be based on received positioning data indicative of current location of the rig 1.
- Carrier pose information indicative of orientation of a carrier of the drilling rig is detected 310 during tramming of the drilling rig. This information may be received from a carrier pose information source, such as a gyroscope or a magnetometer.
- a carrier pose information source such as a gyroscope or a magnetometer.
- Block 320 comprises defining, during tramming of the drilling rig, orientation of the drilling unit on the basis of the detected carrier pose information. This may comprise computing the orientation of the drilling unit on the basis of current orientation relation between the drilling unit and the carrier, in an embodiment computed based on current positions of a plurality of joints between the carrier and the drilling unit.
- Block 330 comprises generating tramming assistance information on the basis of the target pose information and the orientation of the drilling unit.
- Tramming assistance information refers generally to information applied during tramming of the drilling rig, for assisting the tramming of the rig.
- the tramming assistance information may be generated 330 to assist an operator to control the tramming and steering the rig, or for use by a control unit to autonomously steer the drilling rig.
- Block 320 may also comprise (or there may be a further block) of defining position of the drilling unit, and the tramming assistance information in block 330 may comprise or be based on position of the drilling unit in relation to the position of the target pose for the drilling unit (based on the drilling plan).
- the underground drilling rig 1 may be further steered to be positioned and oriented such as to allow appropriate pose of the drilling unit 4 for upcoming drilling task already during the tramming stage. That is, the tramming assistance information may be applied during driving when approaching a parking position for drilling, which may also be referred to as drilling position for the carrier, at the typically very narrow tunnel conditions, i.e. before stopping the rig and starting (fine- positioning of the boom and/or feed beam to a hole to be drilled. In case of manual operation, when tramming assistance information is displayed for the operator, the operator may be assisted already during the tramming stage, when steering the carrier 2 to the drilling position.
- a parking position for drilling which may also be referred to as drilling position for the carrier
- the operator may be provided with tramming assistance information indicating how the typically large drilling rig should be steered to approach the drilling position optimally for the upcoming drilling task at the narrow tunnel face area.
- the tramming assistance information or a GUI based on the assistance information, may indicate current pose of drilling unit relative to the target pose. The operator may thus instantly detect how the drilling unit currently positions in respect to the hole profile (or pattern).
- the present features enable to reduce or avoid movement or re-parking of the carrier after stopping at the drilling position, during the drilling unit positioning stage, or having to re-enter the tramming stage due positioning of the drilling unit failing.
- the tramming assistance information may indicate for the operator if, and in a further embodiment what, corrective steering and/or other rig actuator actions may need to be performed to have the drilling unit at the target pose or close to the target pose already at end of the tramming stage. Since orientation of the drilling unit is defined based on the orientation of the carrier, orientation sensors may be avoided at the drilling unit (or boom), where they would be much more vulnerable to be damaged.
- Deviations between position and/or orientation information in the input plan, in particular the target pose information, and current position and/or orientation of one or more drilling rig portions may be defined and applied for generating the tramming assistance information.
- tramming assistance information may be generated 330 on the basis of the defined deviation of the orientation of the drilling unit from the target pose in accordance with the drilling plan.
- the deviation may be defined based on angular difference between the current orientation of the drilling unit 4 and the target orientation for the drilling unit (in the same reference system).
- the deviation may further be based on positional deviation, and defined based on computed difference/distance between the current position of the drilling unit and target position for the drilling unit for initiating the upcoming drilling task and defined (in the target pose) based on the drilling plan.
- the method may comprise, during or after block 330, generating a GUI view indicative of at least the current orientation and/or position of the drilling unit 4 and the at least one target pose.
- the GUI view may thus indicate how the drilling unit is currently positioned in view of the approaching work task and hole to be drilled.
- a GUI view comprising at least elements illustrated in Figure 2 may be generated.
- the GUI view may be or comprise the tramming assistance information provided for the operator. When the operator perceives this relation already during the tramming stage, (s)he may take proactive corrective control actions already before stopping the rig and starting positioning of the drilling unit to the hole to be drilled.
- Position and orientation of other rig portions, in particular the carrier 2 and/or the boom 3, in relation to the target pose(s) may also be defined and displayed. This enables to further perceive how the rig 1 is posed in relation to the hole to be drilled and to assist in controlling the rig to approach the drilling position in optimal pose.
- One or more portions of the drilling plan in an embodiment a profile of at least one hole of a next round to be drilled, may be selectively displayed during the tramming stage.
- Various display effects may be utilized. For example, if drilling order is defined in the drilling plan, a first hole to be drilled is selected for display or highlighted e.g. with a particular color from other holes being displayed.
- GUI element(s) modelling or indicative of at least some portions of the drilling rig such as the carrier 2, the boom 3, and the drilling unit 4, may thus be positioned in the GUI view in accordance with the current position and orientation of the respective portion, and together with and in relation to at least some information of the drilling plan.
- the target pose(s) may be visualized in the display, e.g. by applying a form similar to that of drilling unit, positioned and oriented in the display in accordance with the position and orientation of a hole to be drilled.
- a GUI element may be generated, indicative of the deviation of the current orientation of the drilling unit 4 from the at least one target pose in accordance with the input plan.
- the (deviation) GUI element may serve as the tramming assistance information provided for the operator and may be included in the GUI view indicating position and orientation of at least some portions 2, 3, 4 of the drilling rig in relation to at least portion of the drilling plan.
- the deviation may be visualized in various ways. In a simple example, deviation is defined based on position and orientation of at least some portions of the drilling rig in relation to the target pose for the drilling unit (based on the drilling plan).
- the target pose (of the drilling unit) may be indicated or defined based on target tunnel line defined in the input plan.
- line 210 in Figure 2 may illustrate middle (target) tunnel line, in respect to which the target pose may be defined.
- the target tunnel line may be visualized in the GUI displayed during the tramming.
- Position and orientation of at least some portions of the rig 1, such as the carrier 2, and/or the drilling unit 4, may be displayed in relation to the tunnel line 210.
- GUI view of Figure 4 illustrating a top view of a front carrier portion 2a and a drilling unit 4, e.g. of a long-hole rig at a tramming position.
- the GUI view may comprise a (middle) tunnel line 210, which may represent current target pose for the drilling unit 4, according to the input plan.
- the GUI view may comprise tunnel walls 220a, 220b, which may be displayed e.g. based on a portion of a tunnel model relevant for the current position of the drilling rig 1.
- an assisting indicator 400 of the current orientation of the drilling unit is generated and displayed in the GUI view during the tramming. The operator may thus be prompted to perform a steering action to further align the lines 210, 400.
- the GUI view may also comprise further information assisting the operator in tramming the drilling rig 1 towards the drilling position. For example, distance of a rig portion to wall may be indicated, a warning indicator may be displayed, and/or a steering guidance indicator may be displayed.
- the associated drilling rig or remote control UI system may be configured to generate audible and/or haptic output based on block 330 to assist the operator.
- the GUI view and various tramming assistance elements/indicator thereof may be displayed and continuously updated during tramming of the drilling rig 1, for assisting (an on-board or remote) operator to control tramming and positioning of the drilling rig to the drilling position for carrying out a drilling operation according to the drilling plan.
- Block 330 may thus comprise generating assistance information for guiding the operator.
- the assistance information may indicate how the operator should control the rig 1, in particular the carrier 2, during the tramming to approach the position in optimal way (and pose).
- the view displayed for the operator and/or a UI element e.g.
- the tramming assistance information is generated and displayed during the tramming stage on the basis of input parameter data of (currently) available movement range or reach of a rig portion 3, 4, 5.
- the control unit 10 may compute, on the basis of available ranges of joints between the carrier 2 and the drilling unit 4, which is the current maximum reach of the drilling unit 4.
- information indicative of the available reach may be generated as the tramming assistance information.
- block 320 may comprise defining available orientation, e.g. as an available orientation range, based on the detected orientation of the carrier.
- the available reach information and the target pose may be processed to define if the target pose can be achieved with the current carrier orientation.
- the available reach information may be displayed in the GUI view and/or used for automatized tramming control. This assists the operator to instantly detect if it possible, with the current pose of the carrier, to position the drilling unit appropriately to the position and orientation of the hole to be drilled.
- the display view is continuously updated, and when the operator correctively steers the carrier, (s)he may instantly notice, based on updated reach indication, if the steering action was enough to reach the hole with the drilling unit 2.
- the GUI view indicates if the target pose cannot be reached with the current pose of the carrier.
- Such reach indication is particularly useful for last meters of tramming before the drilling position. Such reach indication may be activated based on rig position information, e.g. when the rig is less than 5 meters from the drilling position.
- the tramming assistance information may comprise an indication of upcoming path of the rig 1 in relation to at least a portion of the drilling plan.
- the indication may be defined on the basis of current status of a drilling rig portion, such as current position, orientation, and steering or articulation angle of the carrier 2. This enables to illustrate where, in relation to the drilling plan, the rig will move if the tramming is continued without further control actions.
- the GUI view may indicate future path for the carrier and drilling unit 4, e.g. by specific splines or other type of GUI element to visualize future occupancy area of the respective rig portion.
- Block 330 may comprise generating rig steering control instruction during the tramming for autonomously controlling at least some portions of the drilling rig 1 during the tramming. Additionally or alternatively, block 330 may comprise generating steering control assistance information for guiding an operator to control the drilling rig. Such control instmction(s) may be generated based on the difference between current position and orientation of the drilling unit 4 and that of the target pose. Such control instmction(s) may be steering operation control instructions for controlling steering system of the carrier 2.
- Block 330 may be performed by an autonomous tramming or driving control module, which generates steering control instructions to tram the rig to the drilling position. The control module may apply predefined route for the rig and steer the rig to route points of the route, for example.
- the rig control instruction may comprise defining required movement path, i.e. trajectory, of the carrier to (enable to) reach the target pose for the drilling unit 4, or at least to reduce the deviation defined in block 330.
- the autonomous tramming or driving control module may apply the target pose, carrier orientation and the available reach information to define steering action(s) control orientation of the carrier (or carrier portion) to facilitate aligning the drilling unit to the target pose.
- control signal(s) may be generated in or after block 330 for associated actuator(s), such as steering control system actuators.
- the control signals may then be sent for the associated actuators or control system elements. For example, a control signal is sent from the control unit 10 to actuator of the joint 8 to change articulation angle and driving direction of the rig to facilitate aligning the drilling unit to the target pose.
- the apparatus or control unit performing the method of Fig. 3 may be configured to inform and/or guide the operator during the autonomous tramming, in response to meeting a predefined trigger condition requiring operator attention being met. This may be based on the information based on block 320.
- the control unit 10 may cause an indication for the operator to manually control the drilling rig.
- the control unit 10 is configured to determine a corrective control action for one or more components of the drilling rig, after which a trajectory for positioning the drilling unit to the target pose can be generated.
- the target pose may be indicative of, or defined based on a target orientation for the feed beam 5 for drilling a hole in a set or pattern of holes defined in the drilling plan.
- the computation (in or for block 310, 320 and/or 330) may require conversion between (positioning) reference systems, such local drilling rig reference system and worksite or global reference system. Hence, one or more conversions between coordinate systems may be performed.
- the target pose may define the position and the orientation of the hole in a worksite/mine reference system, which may be a mine or tunnel coordinate system, which may be based on a global coordinate system.
- the target pose may need to be converted into a machine/drilling rig reference system, which may be a rig coordinate system, in relation to which position and orientation of rig portions, such as the carrier (portion), boom, and drilling unit 4 may be defined.
- a machine/drilling rig reference system which may be a rig coordinate system, in relation to which position and orientation of rig portions, such as the carrier (portion), boom, and drilling unit 4 may be defined.
- the orientation (and position) of the drilling unit in worksite/mine reference system is computed based on local drilling rig reference system, based on angular relations between associated rig portions and dimensional data of the rig portions.
- the carrier 2 may comprise a gyroscope.
- the orientation of the drilling unit 4 may be defined in block 320 on the basis of the received orientation of the carrier 2 as obtained from the gyroscope and joint position information of a plurality of joints between the carrier 2b and the drilling unit 4.
- the rear portion 2b may comprise a gyroscope 15.
- position of the carrier joint 8 is used as an input for defining the orientation of the drilling unit 4.
- the orientation may be defined as azimuth, and in the example of Figure 1, computed on the basis of current joint positions of movement ranges indicated by a-e. In case of drilling rigs with non-articulated carriers, the orientation may naturally be computed on the basis of positions of joints between the carrier and the drilling unit.
- An electronic device comprising electronic circuitries may be an apparatus for realizing at least some embodiments illustrated above, such as the method illustrated in connection with Figure 3.
- the apparatus may be comprised in at least one computing device connected to or integrated into a control system of the rock drilling rig.
- control system may be an intelligent on-board control system controlling operation of various sub-systems of the rock drilling rig, such as a hydraulic system, a motor, a rock drill, etc.
- control systems are often distributed and include many independent modules connected by a bus system of controller area network (CAN) nodes, for example.
- CAN controller area network
- Figure 5 illustrates a simplified example apparatus capable of supporting at least some embodiments of the present invention. Illustrated is a device 50, which may be configured to carry out at least some of the embodiments relating to the drilling rig tramming related operations illustrated above.
- the device 50 may comprise or implement the control unit 10.
- a processor 51 which may comprise, for example, a single- or multi-core processor.
- the processor 51 may comprise more than one processor.
- the processor may comprise at least one application-specific integrated circuit, ASIC.
- the processor may comprise at least one field -programmable gate array, FPGA.
- the processor may be configured, at least in part by computer instructions, to perform actions.
- the device 50 may comprise memory 52.
- the memory may comprise random- access memory and/or permanent memory.
- the memory may be at least in part accessible to the processor 51.
- the memory may be at least in part comprised in the processor 51.
- the memory may be at least in part external to the device 50 but accessible to the device.
- the memory 52 may be means for storing information, such as parameters 54 affecting operations of the device.
- the parameter information in particular may comprise parameter information affecting e.g. the operations in Figure 3, such as threshold values.
- the memory 52 may be a non-transitory computer readable medium comprising computer program code 53 including computer instructions that the processor 51 is configured to execute.
- computer program code 53 including computer instructions that the processor 51 is configured to execute.
- the processor and/or its at least one processing core may be considered to be configured to perform said certain actions.
- the processor may, together with the memory and computer program code, form means for performing at least some of the above-illustrated method steps in the device.
- the device 50 may comprise a communications unit 55 comprising a transmitter and/or a receiver.
- the transmitter and the receiver may be configured to transmit and receive, respectively, i.a. data and control commands within or outside the drilling rig 1.
- the transmitter and/or receiver may be configured to operate in accordance with global system for mobile communication, GSM, wideband code division multiple access, WCDMA, long term evolution, LTE, 3GPP new radio access technology (N-RAT), wireless local area network, WLAN, and/or Ethernet standards, for example.
- the device 50 may comprise a near- field communication, NFC, transceiver.
- the NFC transceiver may support at least one NFC technology, such as NFC, Bluetooth, or similar technologies.
- the device 50 may comprise or be connected to a UI component(s).
- the UI may comprise at least one of a display 56, a speaker, an input device 57 such as a keyboard, a joystick, a touchscreen, and/or a microphone.
- the UI may be configured to display views on the basis of above illustrated embodiments.
- a user may operate the device and control at least some of above illustrated features.
- the user may control the apparatus 30 or the rig 1 via the UI, for example to manually operate a boom, input steering control actions for the carrier 2, change operation mode of the drilling rig e.g. from tramming mode to automatic positioning at the drilling position, change display views, modify parameters 54, in response to user authentication and adequate rights associated with the user, etc.
- the device 50 may further comprise and/or be connected to further units, devices and systems, such as one or more sensor devices 58 sensing environment of the device 50 and/or joint position detection sensor device(s).
- the processor 51, the memory 52, the communications unit 55 and the UI may be interconnected by electrical leads internal to the device 50 in a multitude of different ways.
- each of the aforementioned devices may be separately connected to a master bus internal to the device, to allow for the devices to exchange information.
- this is only one example and depending on the embodiment various ways of interconnecting at least two of the aforementioned devices may be selected without departing from the scope of the present invention.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Forklifts And Lifting Vehicles (AREA)
- Crystals, And After-Treatments Of Crystals (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2023572148A JP2024519960A (en) | 2021-05-27 | 2022-05-27 | Underground drilling rig tramming control |
AU2022282583A AU2022282583A1 (en) | 2021-05-27 | 2022-05-27 | Undergroung drilling rig tramming control |
CN202280036372.2A CN117355660A (en) | 2021-05-27 | 2022-05-27 | Underground drilling rig travel control |
CA3216565A CA3216565A1 (en) | 2021-05-27 | 2022-05-27 | Undergroung drilling rig tramming control |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP21176165.5A EP4095346A1 (en) | 2021-05-27 | 2021-05-27 | Undergroung drilling rig tramming control |
EP21176165.5 | 2021-05-27 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022248685A1 true WO2022248685A1 (en) | 2022-12-01 |
Family
ID=76522747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2022/064446 WO2022248685A1 (en) | 2021-05-27 | 2022-05-27 | Undergroung drilling rig tramming control |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP4095346A1 (en) |
JP (1) | JP2024519960A (en) |
CN (1) | CN117355660A (en) |
AU (1) | AU2022282583A1 (en) |
CA (1) | CA3216565A1 (en) |
WO (1) | WO2022248685A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6152244A (en) * | 1997-07-11 | 2000-11-28 | Sandvik Tamrock Secoma Sa | Drilling apparatus mounted on wheels, with articulated chassis |
WO2002035052A1 (en) * | 2000-10-24 | 2002-05-02 | Sandvik Tamrock Oy | Rock drilling apparatus |
EP2672057A1 (en) * | 2012-06-07 | 2013-12-11 | Sandvik Mining and Construction Oy | Dynamic working area |
-
2021
- 2021-05-27 EP EP21176165.5A patent/EP4095346A1/en active Pending
-
2022
- 2022-05-27 JP JP2023572148A patent/JP2024519960A/en active Pending
- 2022-05-27 WO PCT/EP2022/064446 patent/WO2022248685A1/en active Application Filing
- 2022-05-27 CA CA3216565A patent/CA3216565A1/en active Pending
- 2022-05-27 CN CN202280036372.2A patent/CN117355660A/en active Pending
- 2022-05-27 AU AU2022282583A patent/AU2022282583A1/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6152244A (en) * | 1997-07-11 | 2000-11-28 | Sandvik Tamrock Secoma Sa | Drilling apparatus mounted on wheels, with articulated chassis |
WO2002035052A1 (en) * | 2000-10-24 | 2002-05-02 | Sandvik Tamrock Oy | Rock drilling apparatus |
EP2672057A1 (en) * | 2012-06-07 | 2013-12-11 | Sandvik Mining and Construction Oy | Dynamic working area |
Also Published As
Publication number | Publication date |
---|---|
AU2022282583A1 (en) | 2023-12-07 |
JP2024519960A (en) | 2024-05-21 |
CN117355660A (en) | 2024-01-05 |
EP4095346A1 (en) | 2022-11-30 |
CA3216565A1 (en) | 2022-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220162911A1 (en) | Mine vehicle boom positioning control | |
AU2018248800B2 (en) | Rock processing monitoring | |
US20230059996A1 (en) | Mine vehicle safety control | |
EP4217808A1 (en) | Mine vehicle safety control | |
WO2023036994A1 (en) | Mining worksite mapping | |
EP4095346A1 (en) | Undergroung drilling rig tramming control | |
US20230313613A1 (en) | Ground support for mobile drilling rig | |
US20230324925A1 (en) | Underground worksite vehicle positioning control | |
EP3754450B1 (en) | Autonomous vehicle monitoring | |
US20230315119A1 (en) | Underground worksite vehicle positioning control | |
EP4261646A1 (en) | Scanner emulation for mining vehicle | |
EP4148524A1 (en) | Mining vehicle task control | |
OA21177A (en) | Underground worksite vehicle positioning control. | |
OA21178A (en) | Underground worksite vehicle positioning control. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22730535 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 3216565 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 202280036372.2 Country of ref document: CN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2023572148 Country of ref document: JP Ref document number: 2022282583 Country of ref document: AU Ref document number: AU2022282583 Country of ref document: AU |
|
ENP | Entry into the national phase |
Ref document number: 2022282583 Country of ref document: AU Date of ref document: 20220527 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2023127743 Country of ref document: RU |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 22730535 Country of ref document: EP Kind code of ref document: A1 |