CN1159500A - 吊箱装置中的吊箱移动用轨道连接固定部件及采用该部件的轨道连接固定构造 - Google Patents
吊箱装置中的吊箱移动用轨道连接固定部件及采用该部件的轨道连接固定构造 Download PDFInfo
- Publication number
- CN1159500A CN1159500A CN 96121562 CN96121562A CN1159500A CN 1159500 A CN1159500 A CN 1159500A CN 96121562 CN96121562 CN 96121562 CN 96121562 A CN96121562 A CN 96121562A CN 1159500 A CN1159500 A CN 1159500A
- Authority
- CN
- China
- Prior art keywords
- track
- fixed
- mentioned
- building
- side plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP34728095A JPH09156870A (ja) | 1995-12-14 | 1995-12-14 | ゴンドラ装置におけるケージ吊り下げ装置移動レールの接続固定部材及びそれを用いたレール接続固定構造 |
JP347280/95 | 1995-12-14 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1159500A true CN1159500A (zh) | 1997-09-17 |
Family
ID=18389151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96121562 Pending CN1159500A (zh) | 1995-12-14 | 1996-12-16 | 吊箱装置中的吊箱移动用轨道连接固定部件及采用该部件的轨道连接固定构造 |
Country Status (2)
Country | Link |
---|---|
JP (1) | JPH09156870A (ja) |
CN (1) | CN1159500A (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7947356B2 (en) | 2006-03-22 | 2011-05-24 | Bridgestone Corporation | Molded foam and mold |
CN108071918A (zh) * | 2016-11-18 | 2018-05-25 | 宋旸 | 一种快装、适配的异形轨及搭接件 |
CN109025234A (zh) * | 2018-07-28 | 2018-12-18 | 北京建工集团有限责任公司 | 一种建筑高空悬空施工用可水平、垂直行走的轨道吊船 |
CN109778690A (zh) * | 2019-03-04 | 2019-05-21 | 中铁第一勘察设计院集团有限公司 | 长大坡道线路桥梁上无缝齿轨固定联结构件 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6719110B1 (ja) * | 2020-01-20 | 2020-07-08 | エスシー技建株式会社 | 開削工法における地中構造物搬送装置及び地中構造物搬送方法 |
-
1995
- 1995-12-14 JP JP34728095A patent/JPH09156870A/ja active Pending
-
1996
- 1996-12-16 CN CN 96121562 patent/CN1159500A/zh active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7947356B2 (en) | 2006-03-22 | 2011-05-24 | Bridgestone Corporation | Molded foam and mold |
CN101041412B (zh) * | 2006-03-22 | 2011-11-09 | 株式会社普利司通 | 模塑泡沫体和模具 |
CN108071918A (zh) * | 2016-11-18 | 2018-05-25 | 宋旸 | 一种快装、适配的异形轨及搭接件 |
CN108071918B (zh) * | 2016-11-18 | 2023-10-27 | 合肥发源地智能机器人有限公司 | 一种快装、适配的异形轨及搭接件 |
CN109025234A (zh) * | 2018-07-28 | 2018-12-18 | 北京建工集团有限责任公司 | 一种建筑高空悬空施工用可水平、垂直行走的轨道吊船 |
CN109778690A (zh) * | 2019-03-04 | 2019-05-21 | 中铁第一勘察设计院集团有限公司 | 长大坡道线路桥梁上无缝齿轨固定联结构件 |
CN109778690B (zh) * | 2019-03-04 | 2024-04-02 | 中铁第一勘察设计院集团有限公司 | 长大坡道线路桥梁上无缝齿轨固定联结构件 |
Also Published As
Publication number | Publication date |
---|---|
JPH09156870A (ja) | 1997-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7849639B2 (en) | Stressed membrane structure | |
CN113373812B (zh) | 一种可调节盖梁端头倒角模板标高的支撑装置及施工工艺 | |
JP5184311B2 (ja) | 鉄骨構造物の建方工法 | |
JP2019007206A (ja) | 橋梁点検用恒久足場の無足場設置工法 | |
CN1159500A (zh) | 吊箱装置中的吊箱移动用轨道连接固定部件及采用该部件的轨道连接固定构造 | |
CN112453798A (zh) | 一种钢结构焊接工艺 | |
CN113585828A (zh) | 一种大跨度倒三角管桁架坡屋面厂房的安装方法 | |
JPH06200625A (ja) | アーチトラス式構造物の架構方法 | |
CN110778094A (zh) | 高空大跨度拉索网操作平台及施工方法 | |
JP7019660B2 (ja) | 軽量覆工板の設置構造 | |
CN117071895A (zh) | 一种大坡度金属屋面的施工方法及应用的定位件 | |
CN217810491U (zh) | 一种桥梁伸缩缝 | |
CN114575251A (zh) | 大跨度钢桁拱桥施工体系及施工方法 | |
JP5476738B2 (ja) | スレート屋根用安全設備 | |
KR20020054259A (ko) | 교량 점검 장치 및 그 시공방법 | |
CN217629468U (zh) | 一种桥梁模板 | |
JP3462341B2 (ja) | 防風雪柵の支柱設置方法 | |
CN2440891Y (zh) | 一种建筑物平移工具式下轨道机构 | |
JP2612435B2 (ja) | 天井型クレーン | |
CN217732449U (zh) | 一种桥梁设计施工用吊运系统 | |
JP3155994B2 (ja) | 既設屋根勾配改修方法および既設屋根勾配改修金具 | |
JP7492472B2 (ja) | ジブクレーン装置 | |
KR200227919Y1 (ko) | 교량 점검 장치 | |
JPH05195633A (ja) | 仮設屋根およびその工法 | |
CN116950234A (zh) | 一种超长悬挑大弧度竖向外立面复杂膜结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C01 | Deemed withdrawal of patent application (patent law 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |