CN115075463A CN202210912463.XA CN202210912463A CN115075463A CN 115075463 A CN115075463 A CN 115075463A CN 202210912463 A CN202210912463 A CN 202210912463A CN 115075463 A CN115075463 A CN 115075463A
Authority
CN
China
Prior art keywords
pulley
ceiling
wood
wood veneer
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210912463.XA
Other languages
Chinese (zh)
Other versions
CN115075463B (en
Inventor
李占利
崔宗旭
贾海涛
周通
李永威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Guoji Construction Engineering Group Co ltd
Original Assignee
Henan Guoji Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Guoji Construction Engineering Group Co ltd filed Critical Henan Guoji Construction Engineering Group Co ltd
Priority to CN202210912463.XA priority Critical patent/CN115075463B/en
Priority claimed from CN202210912463.XA external-priority patent/CN115075463B/en
Publication of CN115075463A publication Critical patent/CN115075463A/en
Application granted granted Critical
Publication of CN115075463B publication Critical patent/CN115075463B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0407Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like being stiff and curved
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/16Connections between non-parallel members of the supporting construction the members lying in different planes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/24Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1805Ceiling panel lifting devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2103/00Material constitution of slabs, sheets or the like
    • E04B2103/04Material constitution of slabs, sheets or the like of plastics, fibrous material or wood

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a wood veneer molding suspended ceiling structure relates to wood veneer suspended ceiling structure's technical field, including lifting mechanism, fixed pulley and lifting rope, lifting mechanism and fixed pulley are used for dismantling the connection on the ceiling, lifting mechanism includes frame and pulley one, a pulley rotation is connected in the frame, the connection can be dismantled in the frame on the ceiling, the fixed pulley includes support body and pulley two, two rotations of pulley are connected on the support body, the connection can be dismantled on the ceiling to the support body, the lifting rope sets up on pulley one and pulley two, the last one end that is close to pulley one of lifting rope is used for being connected with the wood veneer. This application has the effect that promotes the construction speed of hoist and mount wood plaque.

Description

Wood veneer modeling suspended ceiling structure and installation method thereof
Technical Field
The application relates to the technical field of wood veneer suspended ceiling structures, in particular to a wood veneer modeling suspended ceiling structure and an installation method thereof.
Background
The wood veneer is also called as a wood veneer, has natural textures, can bring better decorative effect to the interior, and is widely applied to decoration engineering. The wood veneer is often used as suspended ceiling, and is horizontally hung on the ceiling, so that the effect of decorating indoor environment is achieved.
The related wood veneer suspended ceiling structure refers to the attached figure 1 of the specification, and comprises a ceiling 01, a screw 02, a main keel 03, a secondary keel 04, a connecting piece 05 and a wood veneer 06, wherein the screw 02 is vertically fixed on the ceiling 01, the screw 02 is arranged at equal intervals along the straight line direction, the main keel 03 is clamped with the connecting piece 05, and the connecting piece 05 is connected with the screw 02 through threads. The main joist 03 is parallel and parallel to each other, the cross runners 04 are perpendicular to the main joist 03, the cross runners 04 are fixed on the main joist, and the cross runners 04 are arranged at equal intervals along the length direction of the main joist 03. The wood decorative plate 06 is fixedly connected between two adjacent auxiliary keels 04, so that the wood decorative plate 06 can be hung on the ceiling 01.
The above related technical solutions have the following drawbacks: in the construction process, the process of hoisting the main keel, the auxiliary keel and the wood veneer and installing the main keel, the auxiliary keel and the wood veneer on the ceiling is time-consuming and labor-consuming, so that the construction is time-consuming.
Disclosure of Invention
In order to promote the construction speed of hoist and mount wood plaque, this application provides a wood veneer molding suspended ceiling structure and mounting method thereof.
The application provides a pair of wooden veneer molding suspended ceiling structure adopts following technical scheme:
the utility model provides a wood veneer molding suspended ceiling structure, includes and hangs lift mechanism, fixed pulley and lifting rope, hangs lift mechanism and fixed pulley and is used for dismantling the connection on the ceiling, hangs lift mechanism and includes frame and pulley one, and a pulley rotation is connected in the frame, and the connection can be dismantled in the frame on the ceiling, and the fixed pulley includes support body and pulley two, and pulley two rotates to be connected on the support body, and the connection can be dismantled on the ceiling to the support body, and the lifting rope setting is on pulley one and pulley two, and the last one end that is close to pulley one of lifting rope is used for being connected with the wood veneer.
Through adopting above-mentioned technical scheme, through set up on the ceiling and hang lift mechanism and fixed pulley, make the lifting rope can hang up the wood plaque through hanging lift mechanism and fixed pulley, constructor can set up the mechanism of hanging lift between a plurality of screw rods to make the wood plaque rise the back and the screw rod cooperation, constructor can be at high altitude connecting screw and connecting piece, thereby reduce constructor's the work load and the degree of difficulty of being under construction at the high altitude, have the effect that promotes the construction speed of hoist and mount wood plaque.
Optionally, the frame includes horizontal part and vertical portion, and horizontal part and vertical portion are connected and mutually perpendicular, and a pulley rotation is connected on vertical portion, has seted up the spout on the horizontal part, and the spout is logical groove, and the spout is used for supplying the bolt to pass through.
Through adopting above-mentioned technical scheme, through seting up the spout on the horizontal part, constructor can set up the bolt on the ceiling and make the bolt insert the spout in, through set up the nut on the bolt, makes the nut hold the horizontal part, and then reaches and will hang the effect that rises the mechanism and can dismantle the connection on the ceiling.
Optionally, the horizontal portion is provided with a yielding hole, the yielding hole is a through hole, the width of the yielding hole is larger than that of the sliding groove, and the yielding hole is communicated with the sliding groove.
Through adopting above-mentioned technical scheme, through seting up the hole of stepping down on the horizontal part, make the hole of stepping down and spout intercommunication, constructor can make the bolt and the nut on the ceiling be located the hole of stepping down through sliding the frame, and the frame can be disconnected with the ceiling this moment.
Optionally, a power part is arranged on the horizontal part, one end of the power part is fixed on the frame, the other end of the power part is fixedly connected with a jacking part, and the jacking part is used for clamping the bolt together with the frame.
Through adopting above-mentioned technical scheme, through setting up power spare on the horizontal part, make power spare can drive the kicking piece and remove, and then make the kicking piece can support on the bolt to make the horizontal part remain stable on the ceiling, reduce the probability that the horizontal part removed on the ceiling, promote the stability that lifts mechanism and ceiling are connected.
Optionally, both sides relative on the ejecting piece all are provided with the slider, have all seted up the cooperation groove on the relative lateral wall in the spout, and cooperation groove length direction is parallel with spout length direction, and a slider is used for sliding connection on a cooperation groove.
Through adopting above-mentioned technical scheme, through setting up the slider on the kicking piece, set up the cooperation groove on the spout inner wall, make slider can sliding connection in the cooperation groove, when the kicking piece supports on the bolt, mesh between slider and the horizontal part to make the slider bear the ascending stress of vertical side, can reduce the shear stress that receives on the power spare, promote the stability of power spare.
Optionally, one end is provided with many connecting ropes on the lifting rope, all is provided with the jack catch on every connecting rope, and the jack catch is used for the lateral wall of card at wood plaque.
Through adopting above-mentioned technical scheme, connect the rope through setting up on the lifting rope, set up the jack catch on connecting the rope, constructor can be with the jack catch card on wood plaque's lateral wall, and then makes a plurality of jack catch centre gripping wood plaque, makes things convenient for constructor to be connected the lifting rope with wood plaque.
Optionally, the jaw is used for being clamped at the joint of the frame and the pulley.
Through adopting above-mentioned technical scheme, can block between frame and pulley one through making the jack catch, after constructor installed the wood plaque on the ceiling, constructor can control the action of power spare, make the kicking piece slide to the direction of keeping away from the bolt, constructor pulling lifting rope makes the lifting rope can drive the frame and slides, and then makes the frame can slide to the position that bolt and nut are located the hole of stepping down, makes the mechanism of lifting can break away from with the ceiling and be connected, makes things convenient for constructor to retrieve the mechanism of lifting.
The application provides a wood veneer molding suspended ceiling structure's installation method adopts following technical scheme:
a method for installing a wood veneer modeling suspended ceiling structure comprises the following steps:
s1: installing a screw on a ceiling, installing a plurality of bolts on the ceiling, and installing the lifting mechanism and the fixed pulley on the ceiling through the bolts;
s2: assembling the main keel and the auxiliary keel on the ground, and installing the wood veneer on the auxiliary keel;
s3: clamping the clamping jaw with the wood decoration plate, and hoisting the wood decoration plate through the lifting rope;
s4: the connection between the wood decorative plate and the ceiling is finished at high altitude;
s5: the jack catch is disconnected with the wood veneer, and the lifting rope is pulled to move the jack catch upwards and clamp the jack catch at the connection position of the rack and the pulley;
s6: controlling the power part to act to enable the power part to be far away from the bolt;
s7: continuously pulling the lifting rope to enable the rack to slide, so that the bolt and the nut on the ceiling can be disconnected with the rack;
s8: and recovering the lifting mechanism, mounting the lifting mechanism on other bolts on the ceiling, and continuously mounting the wood decorative plate for working.
Through adopting above-mentioned technical scheme, at first will hang and rise mechanism and fixed pulley and install on the ceiling, the wooden plaque is hung to the rethread lifting rope, make the wooden plaque can stably rise, constructor can carry out wooden plaque and screw rod connection work in the high altitude, reduce the hard degree of constructor work, promote operating speed, through setting up the power spare in the frame, constructor can control the action of power spare, and then make frame and ceiling break away from and be connected, constructor can stimulate the lifting rope, thereby retrieve and hang and rise the mechanism, the convenient continuation of using.
To sum up, the beneficial technical effect of this application does:
1. the lifting mechanism and the fixed pulleys are arranged on the ceiling, so that the lifting rope can lift the wood decoration plate through the lifting mechanism and the fixed pulleys, a constructor can arrange the lifting mechanism among the plurality of screw rods, the wood decoration plate is matched with the screw rods after being lifted, the constructor can connect the screw rods and the connecting pieces at high altitude, the workload and the difficulty of the constructor in high altitude construction are reduced, and the effect of improving the construction speed of lifting the wood decoration plate is achieved;
2. through arranging the sliding groove on the horizontal part, a constructor can arrange a bolt on the ceiling and insert the bolt into the sliding groove, and through arranging the nut on the bolt, the nut supports the horizontal part, so that the effect of detachably connecting the hoisting mechanism to the ceiling is achieved;
3. through making the jack catch can block between frame and pulley one, after constructor installed the wood decorations board on the ceiling, constructor can control the action of power spare, makes the kicking part slide to the direction of keeping away from the bolt, and constructor pulling lifting rope makes the lifting rope can drive the frame and slide, and then makes the frame slide to the position that bolt and nut are located the hole of stepping down, makes to hang and rises the mechanism and can break away from the connection with the ceiling, makes things convenient for constructor to retrieve and hangs and rise the mechanism.
Drawings
Fig. 1 is a schematic view of a conventional connection structure between a ceiling and a wood veneer.
Fig. 2 is a schematic view of a connection relationship between the hoist mechanism and the fixed sheave according to the embodiment of the present application.
Fig. 3 is a schematic view of the connection relationship between the hoist mechanism, the fixed pulley, and the hoist rope according to the embodiment of the present application.
Fig. 4 is a schematic structural diagram of a lifting mechanism according to an embodiment of the present application.
Fig. 5 is an enlarged view of a portion a in fig. 4.
Fig. 6 is a schematic view of a connection structure of a hoist rope and a pawl according to an embodiment of the present application.
Reference numerals are as follows: 01. a ceiling; 02. a screw; 03. a main keel; 04. a false keel; 05. a connecting member; 06. a wood veneer; 1. a hoisting mechanism; 11. a frame; 111. a horizontal portion; 112. a vertical portion; 113. a chute; 114. a hole of abdication; 115. a power member; 116. a top piece; 117. a slider; 118. a mating groove; 12. a first pulley; 2. a fixed pulley; 21. a frame body; 22. a second pulley; 3. a lifting rope; 31. connecting ropes; 4. a claw; 41. a string loop.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses wood veneer molding suspended ceiling structure. Referring to fig. 1 and 2, including lifting mechanism 1, fixed pulley 2 and lifting rope 3, lifting mechanism 1 can dismantle the connection on screw rod 02, fixed pulley 2 can dismantle the connection on ceiling 01, lifting rope 3 loops through fixed pulley 2 and lifting mechanism 1, constructor splices main joist 03 and false keel 04 at first and installs wood plaque 06, install connecting piece 05 on main joist 03 again, install screw rod 02 on ceiling 01, make lifting rope 3 connect on wood plaque 06 at last, lift up wood plaque 06 through lifting rope 3, make wood plaque 06 horizontal lift, constructor can connect screw rod 02 and connecting piece 05 at the high altitude, reach the effect of installation wood plaque 06.
Referring to fig. 3 and 4, the hoist mechanism 1 includes a frame 11 and a first pulley 12, the frame 11 includes a horizontal portion 111 and a vertical portion 112, the horizontal portion 111 and the vertical portion 112 are connected by welding or integral molding, and the horizontal portion 111 and the vertical portion 112 are vertically connected. The horizontal part 111 is used for being connected with a bolt arranged on the ceiling 01, the first pulley 12 is rotatably connected to the vertical part 112, the rotating shaft of the first pulley 12 is in the horizontal direction, and a constructor can detachably connect the first pulley 12 to the ceiling 01 through the frame 11.
Referring to fig. 3, the fixed pulley 2 includes a frame body 21 and a second pulley 22, the second pulley 22 is rotatably connected to the frame body 21, a rotating shaft of the second pulley 22 is in a horizontal direction, the frame body 21 is connected to the ceiling 01 through a bolt, a constructor firstly sets a bolt on the ceiling 01 and then makes the bolt penetrate through the frame body 21, and a nut is set on the bolt to clamp the frame body 21, so that the effect of connecting the second pulley 22 to the ceiling 01 is achieved. The frame body 21 can rotate on the bolt, and a constructor can adjust the orientation of the second pulley 22 by rotating the frame body 21, so that the rotating shafts of the first pulley 12 and the second pulley 22 are parallel to each other, and when the lifting rope 3 is connected to the first pulley 12 and the second pulley 22, the length direction of the lifting rope 3 can be vertical to both the first pulley 12 and the second pulley 22. When the lifting rope 3 is arranged on the first pulley 12 and the second pulley 22, the part of the lifting rope 3 between the first pulley 12 and the second pulley 22 is in a horizontal state, and the wood decoration plate 06 with a large surface area can be horizontally lifted.
Referring to fig. 4 and 5, a sliding groove 113 is formed in the horizontal portion 111, the sliding groove 113 is a through groove, the sliding groove 113 is used for a bolt mounted on the ceiling 01 to pass through, a user can enable the bolt to pass through the sliding groove 113, a nut is arranged on the bolt, the nut is clamped on the lower side of the sliding groove 113, and then the nut supports the horizontal portion 111, so that the effect of fixing the frame 11 is achieved. The bolt can rotate in the sliding groove 113, and the constructor can rotate the frame 11, so that the orientation of the first pulley 12 on the ceiling 01 can be adjusted.
Referring to fig. 4 and 5, the horizontal portion 111 is provided with a relief hole 114, the width of the relief hole 114 is greater than that of the sliding groove 113, the relief hole 114 is communicated with one end of the sliding groove 113, a nut for supporting the horizontal portion 111 can be disengaged from the relief hole 114, a user can slide the bolt in the sliding groove 113 through the sliding frame 11, and further the bolt is disengaged from the frame 11, so that the effect of detaching the lifting mechanism 1 from the ceiling 01 is achieved.
Referring to fig. 4 and 5, the horizontal portion 111 is provided with a power member 115, the power member 115 may be an electric putter, and a longitudinal direction of the power member 115 is parallel to the horizontal portion 111 and parallel to a longitudinal direction of the chute 113. The power member 115 is fixed on the horizontal portion 111, the movable rod of the power member 115 is connected with the top member 116, and the top member 116 is used for sliding and abutting against the bolt, so that the top member 116 and the frame 11 clamp the bolt, and the effect of fixing the frame 11 is achieved. Be provided with slider 117 on two relative lateral walls on the ejecting 116, cooperation groove 118 has all been seted up on the 113 inner walls of spout, the length direction of cooperation groove 118 is parallel with the length direction of spout 113, slider 117 can sliding connection in a cooperation groove 118, when slider 117 slides to the hole 114 of stepping down, frame 11 can with install the screw bolt and the nut disconnection on ceiling 01, when slider 117 slides to spout 113 in, slider 117 card is in cooperation groove 118, bear the ascending stress of vertical side on the slider 117 this moment, can reduce the shear stress that receives on the power part 115, and then promote the structural security of power part 115.
Referring to fig. 3 and 6, the hoist rope 3 is formed by a plurality of strands of rope intertwined with one another, and in this embodiment four ropes are provided intertwined with one another to form the hoist rope 3. One end of the lifting rope 3 is provided with four connecting ropes 31, and the connecting ropes 31 are formed by mutually disconnecting and branching the ropes of the lifting rope 3. All be provided with jack catch 4 on every connection rope 31, jack catch 4 is used for connecting on one side lateral wall of wood plaque 06, and constructor connects four connection ropes 31 respectively around wood plaque 06 through jack catch 4 to play the effect that makes lifting rope 3 be connected with wood plaque 06, constructor keeps away from the one end of wood plaque 06 through pulling lifting rope 3, can make wood plaque 06 rise to ceiling 01 department, easy to assemble.
Referring to fig. 6, the clamping jaws 4 are provided with rope rings 41, the rope rings 41 are used for binding ropes, a constructor firstly clamps the clamping jaws 4 on the side walls of the wood decoration board 06, and then respectively binds and fixes the two ends of the ropes on the two rope rings 41, so that the clamping jaws 4 are kept connected, the probability that the clamping jaws 4 are disconnected from the wood decoration board 06 can be reduced, and the construction safety is improved.
Referring to fig. 6, the jaw 4 can be clamped at the joint of the frame 11 and the pulley one 12, when the frame 11 is connected to the bolt on the ceiling 01, the pulley one 12 and the power part 115 are respectively located at two sides of the bolt, after the hoisting is completed, a constructor can shrink the power part 115 to pull the lifting rope 3, so that the lifting rope 3 can drive the jaw 4 to move, the jaw 4 is clamped on the frame 11, the constructor can continue to pull the lifting rope 3 to enable the frame 11 to slide on the nut, and further the nut can move to the abdication hole 114, so that the frame 11 can be disconnected from the ceiling 01. When the wood veneer 06 having a large surface area is mounted on the ceiling 01, the operator hardly touches the frame 11, and can slide the frame 11 by the hanging rope 3 to be disconnected from the ceiling 01.
The implementation principle of the embodiment of the application is as follows: through set up on ceiling 01 and hang and rise mechanism 1 and fixed pulley 2, set up lifting rope 3 on lifting mechanism 1 and fixed pulley 2, make lifting rope 3's one end can be connected with wood plaque 06, thereby make wood plaque 06 can rise to being close to ceiling 01 department through lifting rope 3, constructor can carry out the concatenation of main joist 03 and false keel 04 and the installation work of wood plaque 06 subaerial, through with wood plaque 06, main joist 03 and false keel 04 are together hoisted, make things convenient for constructor to connect main joist 03 and screw rod 02 at the high altitude, can reduce high altitude construction's the degree of difficulty and work load, reach the effect that promotes construction speed.
The embodiment of the application discloses a method for installing a wood veneer modeling suspended ceiling structure, which comprises the following steps:
s1: a screw rod 02 is arranged on a ceiling 01, a plurality of bolts are arranged on the ceiling 01, and a hoisting mechanism 1 and a fixed pulley 2 are arranged on the ceiling 01 through the bolts;
s2: assembling a main keel 03 and a cross keel 04 on the ground, and installing a wood decoration plate 06 on the cross keel 04;
s3: clamping the clamping jaw 4 with the wood veneer 06, and hoisting the wood veneer 06 through the lifting rope 3;
s4: the connection between the wood decorative plate 06 and the ceiling 01 is finished at high altitude;
s5: the claw 4 is disconnected from the wood veneer 06, the lifting rope 3 is pulled, and the claw 4 moves upwards and is clamped at the connection position of the rack 11 and the pulley I12;
s6: the power element 115 is contracted, and the top element 116 moves into the abdicating hole 114;
s7: pulling the lifting rope 3 continuously to enable the rack 11 to slide, so that the bolt and the nut on the ceiling 01 can be positioned in the abdicating hole 114 and are disconnected from the rack 11;
s8: and (3) recovering the lifting mechanism 1, mounting the lifting mechanism 1 on other bolts on the ceiling 01, and continuously mounting the wood decoration plate 06 for work.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a wood veneer molding suspended ceiling structure which characterized in that: including lifting mechanism (1), fixed pulley (2) and lifting rope (3), lifting mechanism (1) and fixed pulley (2) are used for dismantling the connection on ceiling (01), lifting mechanism (1) includes frame (11) and pulley (12), pulley (12) rotate to be connected on frame (11), frame (11) can be dismantled to be connected on ceiling (01), fixed pulley (2) are including support body (21) and pulley (22), pulley (22) rotate to be connected on support body (21), support body (21) can be dismantled to be connected on ceiling (01), lifting rope (3) set up on pulley (12) and pulley (22), the one end that is close to pulley (12) on lifting rope (3) is used for being connected with wood decorations board (06).
2. The wood veneer modeling suspended ceiling structure of claim 1, wherein: the rack (11) comprises a horizontal part (111) and a vertical part (112), the horizontal part (111) and the vertical part (112) are connected and perpendicular to each other, the first pulley (12) is rotatably connected to the vertical part (112), a sliding groove (113) is formed in the horizontal part (111), the sliding groove (113) is a through groove, and the sliding groove (113) is used for allowing a bolt to pass through.
3. The wood veneer modeling suspended ceiling structure of claim 2, wherein: the horizontal part (111) is provided with a yielding hole (114), the yielding hole (114) is a through hole, the width of the yielding hole (114) is larger than that of the sliding groove (113), and the yielding hole (114) is communicated with the sliding groove (113).
4. The wood veneer modeling suspended ceiling structure of claim 3, wherein: the bolt clamping device is characterized in that a power piece (115) is arranged on the horizontal portion (111), one end of the power piece (115) is fixed on the frame (11), the other end of the power piece (115) is fixedly connected with a top piece (116), and the top piece (116) is used for clamping a bolt together with the frame (11).
5. The wood veneer modeling suspended ceiling structure of claim 4, wherein: both sides relative on the head piece (116) all are provided with slider (117), have all seted up cooperation groove (118) on the relative lateral wall in spout (113), and cooperation groove (118) length direction is parallel with spout (113) length direction, and a slider (117) are used for sliding connection on a cooperation groove (118).
6. The wood veneer modeling suspended ceiling structure of claim 4, wherein: one end is provided with many on lifting rope (3) and connects rope (31), all is provided with jack catch (4) on every connection rope (31), and jack catch (4) are used for the lateral wall of card at wood plaque (06).
7. The wood veneer modeling suspended ceiling structure of claim 6, wherein: the clamping jaw (4) is used for being clamped at the joint of the rack (11) and the first pulley (12).
8. A method of installing a wood veneer shaped suspended ceiling structure according to claim 7, wherein: the method comprises the following steps:
s1: a screw rod (02) is arranged on a ceiling (01), a plurality of bolts are arranged on the ceiling (01), and the hoisting mechanism (1) and the fixed pulley (2) are arranged on the ceiling (01) through the bolts;
s2: assembling the main keel (03) and the auxiliary keel (04) on the ground, and installing the wood decorative plate (06) on the auxiliary keel (04);
s3: clamping the clamping jaw (4) with the wood decoration plate (06), and hoisting the wood decoration plate (06) through the hoisting rope (3);
s4: the connection between the wood decorative plate (06) and the ceiling (01) is finished at high altitude;
s5: the claw (4) is disconnected from the wood decoration plate (06), the lifting rope (3) is pulled, and the claw (4) moves upwards and is clamped at the connection position of the rack (11) and the pulley I (12);
s6: controlling the power piece (115) to act to enable the power piece (115) to be far away from the bolt;
s7: continuously pulling the lifting rope (3) to enable the rack (11) to slide, so that the bolt and the nut on the ceiling (01) can be disconnected with the rack (11);
s8: and recovering the lifting mechanism (1), installing the lifting mechanism (1) on other bolts on the ceiling (01), and continuously installing the wood decorative plate (06) for working.
CN202210912463.XA 2022-07-30 Wood veneer modeling suspended ceiling structure and installation method thereof Active CN115075463B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210912463.XA CN115075463B (en) 2022-07-30 Wood veneer modeling suspended ceiling structure and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210912463.XA CN115075463B (en) 2022-07-30 Wood veneer modeling suspended ceiling structure and installation method thereof

Publications (2)

Publication Number Publication Date
CN115075463A true CN115075463A (en) 2022-09-20
CN115075463B CN115075463B (en) 2024-05-31

Family

ID=

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201065493Y (en) * 2007-06-01 2008-05-28 邱宝田 Pulley type clotheshorse fixing rack combined structure
EP2482130A1 (en) * 2011-01-27 2012-08-01 DDC Design & Development GmbH & Co. KG Flexible pulling system for projection screen systems and method for installing projection screen systems
CN103644192A (en) * 2013-11-17 2014-03-19 苏州蓝王机床工具科技有限公司 Quick connecting and fixing device
CN109462185A (en) * 2018-05-21 2019-03-12 国网浙江省电力有限公司嘉兴供电公司 A kind of insulator hanging method of ultra-high-tension power transmission line
CN214196930U (en) * 2021-01-08 2021-09-14 国网新疆电力有限公司伊犁供电公司 Insulating hook
CN114809426A (en) * 2022-04-18 2022-07-29 苏州斐石建筑装饰有限公司 Integral hoisting structure and hoisting method for ceiling framework

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201065493Y (en) * 2007-06-01 2008-05-28 邱宝田 Pulley type clotheshorse fixing rack combined structure
EP2482130A1 (en) * 2011-01-27 2012-08-01 DDC Design & Development GmbH & Co. KG Flexible pulling system for projection screen systems and method for installing projection screen systems
CN103644192A (en) * 2013-11-17 2014-03-19 苏州蓝王机床工具科技有限公司 Quick connecting and fixing device
CN109462185A (en) * 2018-05-21 2019-03-12 国网浙江省电力有限公司嘉兴供电公司 A kind of insulator hanging method of ultra-high-tension power transmission line
CN214196930U (en) * 2021-01-08 2021-09-14 国网新疆电力有限公司伊犁供电公司 Insulating hook
CN114809426A (en) * 2022-04-18 2022-07-29 苏州斐石建筑装饰有限公司 Integral hoisting structure and hoisting method for ceiling framework

Similar Documents

Publication Publication Date Title
CN106522832B (en) Vertical raising drilling machine
CN208869129U (en) Telescopic building hoist day beam is set in elevator traction
CN113291973B (en) Assembled building construction high accuracy hoist
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN109184064B (en) Ceiling mounting component and construction method applied to mounting of wavy aluminum square tube ceiling
CN217555581U (en) Automatic unhooking device for steel structure multi-section columns
CN115075463A (en) Wood veneer modeling suspended ceiling structure and installation method thereof
CN117536447A (en) Construction method for arc chamfer of building ALC external wall panel
CN218561044U (en) A operation platform for installing template
CN115075463B (en) Wood veneer modeling suspended ceiling structure and installation method thereof
CN108726358B (en) Batch hoisting device and method for main reinforcement of high-rise concrete structure
CN113529571B (en) Positioning device for rhombic wire-separating pipe cable saddle of short-tower cable-stayed bridge
CN115504364A (en) Split type frock of curtain unit hoist and mount
CN211285604U (en) Manual tube drawing machine
CN114182966A (en) Overhanging type unloading platform main beam
CN218371294U (en) Automatic tubular pile hoist
CN219341583U (en) Building material hoisting device for building construction
CN214573363U (en) Cable hanging system of single-column type steel cable tower cable-stayed bridge
CN212863872U (en) Double-rail device for installing curtain wall
CN217838322U (en) Lifting device
CN217264323U (en) High-efficient computer lab engineering construction equipment
CN219327298U (en) Sectional internal pulling type hanging basket construction device
CN113879987B (en) Hoisting equipment for turnout beam construction and hoisting method thereof
CN216918357U (en) Hoisting device utilizing building internal structure
CN2600536Y (en) Automation lift scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant