CN219327298U - Sectional internal pulling type hanging basket construction device - Google Patents
Sectional internal pulling type hanging basket construction device Download PDFInfo
- Publication number
- CN219327298U CN219327298U CN202320553067.2U CN202320553067U CN219327298U CN 219327298 U CN219327298 U CN 219327298U CN 202320553067 U CN202320553067 U CN 202320553067U CN 219327298 U CN219327298 U CN 219327298U
- Authority
- CN
- China
- Prior art keywords
- rod
- rod body
- hanging basket
- guide rod
- corresponding floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本申请涉及一种分段内拉式吊篮施工装置,属于建筑施工领域,其技术方案要点包括:设于相应楼层外侧的吊篮组件以及设于相应楼层外侧的用于吊装吊篮组件的吊装组件,所述吊装组件包括设于相应楼层外侧的导向杆以及设于导向杆端部的滑轮组,本申请在使用时,根据施工需求,在相应的楼层上安装导向杆与滑轮组来吊装吊篮组件,使吊篮组件始终与每层楼层均保持相同的水平间距,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。
This application relates to a segmented inner pull-type hanging basket construction device, which belongs to the field of building construction. The key points of its technical scheme include: hanging basket components located outside the corresponding floors and hoisting equipment for hoisting the hanging basket components located outside the corresponding floors Assemblies, the hoisting assembly includes guide rods located on the outside of the corresponding floor and pulley blocks located at the end of the guide rod. When the application is in use, the guide rod and the pulley block are installed on the corresponding floors to hoist the hanging basket assembly according to the construction requirements. , so that the hanging basket assembly always maintains the same horizontal distance from each floor, which can meet the installation of different heights and different inclination angles of the outwardly inclined curtain wall, with convenient operation, low cost and high safety.
Description
技术领域technical field
本申请涉及建筑施工领域,尤其是涉及一种分段内拉式吊篮施工装置。The present application relates to the field of building construction, in particular to a segmented inner pull-type hanging basket construction device.
背景技术Background technique
幕墙是建筑的外墙围护,不承重,像幕布一样挂上去,故又称为“帷幕墙”,是现代大型和高层建筑常用的带有装饰效果的轻质墙体,幕墙由面板和支承结构体系组成。随着建筑业的发展,造型美观的大角度外倾幕墙工程越来越多。The curtain wall is the outer wall enclosure of the building. It is not load-bearing and is hung like a curtain, so it is also called "curtain wall". It is a light wall with decorative effect commonly used in modern large and high-rise buildings. The curtain wall is composed of panels and supports. Structural system composition. With the development of the construction industry, there are more and more large-angle flared curtain wall projects with beautiful appearance.
施工时,先将龙骨等支承结构搭建好,然后再将面板吊装至龙骨上的预定位置进行安装即可,吊装工具通常有吊篮、脚手架以及登高车:常规的吊篮只能垂直上下移动,无法满足外倾幕墙的施工;搭建脚手架则需要搭建满堂脚手架,施工繁琐,费用高,且搭建的脚手架的质量受工作人员的个人技术影响较大,安全性无法保障,此外,脚手架拆除后还要考虑拆除位置幕墙的收口,增大了工作量;登高车作业点单一,无法同时满足多点同时施工的要求,导致工期延长,同时,登高车属于大型设备,租赁费用高,增加了施工成本。During construction, the keel and other supporting structures are built first, and then the panel is hoisted to the predetermined position on the keel for installation. The hoisting tools usually include hanging baskets, scaffolding and climbing vehicles: conventional hanging baskets can only move vertically up and down, It cannot satisfy the construction of the outwardly tilted curtain wall; building scaffolding requires building a full house of scaffolding, which is cumbersome and expensive, and the quality of the scaffolding is greatly affected by the personal skills of the staff, and the safety cannot be guaranteed. Considering the removal of the closure of the curtain wall at the location, the workload is increased; the climbing vehicle has a single operating point, which cannot meet the requirements of simultaneous construction at multiple points, resulting in an extension of the construction period. At the same time, the climbing vehicle is a large-scale equipment, and the rental fee is high, which increases the construction cost.
针对上述中的相关技术,发明人提出一种分段内拉式吊篮施工装置以解决现有技术中存在的不足。In view of the related technologies mentioned above, the inventor proposes a construction device of segmented inner pull-type hanging basket to solve the deficiencies in the prior art.
实用新型内容Utility model content
为了改善只能借助脚手架与登高车进行外倾幕墙施工中面板安装的问题,本申请提供一种分段内拉式吊篮施工装置。In order to improve the problem that the panels can only be installed with the help of scaffolding and climbing vehicles in the construction of the outward-tilted curtain wall, the application provides a segmented inner-drawn hanging basket construction device.
本申请提供的一种分段内拉式吊篮施工装置采用如下的技术方案:The construction device of a segmented inner pull-type hanging basket provided by the application adopts the following technical scheme:
一种分段内拉式吊篮施工装置,包括:设于相应楼层外侧的吊篮组件以及设于相应楼层外侧的用于吊装吊篮组件的吊装组件,所述吊装组件包括设于相应楼层外侧的导向杆以及设于导向杆端部的滑轮组。A segmented inner pull-type hanging basket construction device, comprising: a hanging basket assembly arranged on the outside of the corresponding floor and a hoisting assembly arranged on the outside of the corresponding floor for hoisting the hanging basket assembly. The guide rod and the pulley set at the end of the guide rod.
通过采用上述技术方案,根据施工需求,在相应的楼层上安装导向杆与滑轮组来吊装吊篮组件,使吊篮组件始终与每层楼层均保持相同的水平间距,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。By adopting the above technical scheme, according to the construction requirements, install guide rods and pulley blocks on the corresponding floors to hoist the hanging basket assembly, so that the hanging basket assembly always maintains the same horizontal distance from each floor, which can meet different heights and different inclination angles The installation of the outward-tilted curtain wall is easy to operate, low in cost and high in safety.
本申请进一步设置:所述滑轮组可拆连接于导向杆端部。The application further provides that: the pulley block is detachably connected to the end of the guide rod.
通过采用上述技术方案,可以根据施工需求将滑轮组安装至相应楼层的导向杆上,实现了滑轮组的周转使用,减少了成本投入,降低了施工成本。By adopting the above technical scheme, the pulley block can be installed on the guide rod of the corresponding floor according to the construction requirements, realizing the turnover use of the pulley block, reducing cost input and construction cost.
本申请进一步设置:所述滑轮组上设有定位块,所述导向杆端部设有用于容纳定位块的定位槽,所述导向杆上螺纹连接有螺栓,所述螺栓穿过定位块。The application further provides that: the pulley block is provided with a positioning block, the end of the guide rod is provided with a positioning groove for accommodating the positioning block, and the guide rod is threadedly connected with a bolt, and the bolt passes through the positioning block.
通过采用上述技术方案,安装滑轮组时,将滑轮组上的定位块与定位槽对齐并沿定位槽滑入,实现滑轮组的预定位,操作便捷,再通过螺栓将滑轮组固定住,固定稳固。By adopting the above technical scheme, when installing the pulley block, the positioning block on the pulley block is aligned with the positioning groove and slides in along the positioning groove to realize the pre-positioning of the pulley block, which is convenient to operate, and then the pulley block is fixed by bolts and is fixed firmly.
本申请进一步设置:所述螺栓的螺帽上套设有防松齿环,所述导向杆上设有与防松齿环相啮合的防松齿块。The present application further provides that: the nut of the bolt is covered with an anti-loosening tooth ring, and the guide rod is provided with an anti-loosening tooth block meshing with the anti-loosening tooth ring.
通过采用上述技术方案,吊篮组件升降时,导向杆与滑轮组会产生一定的晃动,在防松齿环与防松齿块的配合下,降低了螺栓松脱的可能性,固定更加稳固,安全性更高。By adopting the above-mentioned technical scheme, when the hanging basket assembly is raised and lowered, the guide rod and the pulley block will shake to a certain extent. With the cooperation of the anti-loosening gear ring and the anti-loosening gear block, the possibility of bolt loosening is reduced, and the fixation is more stable and safe. Sex is higher.
本申请进一步设置:所述导向杆包括设于相应楼层外侧的第一杆体以及沿第一杆体长度方向滑动连接于第一杆体端部的第二杆体,所述第一杆体上设有用于固定第二杆体的固定组件。The application further provides that: the guide rod includes a first rod body arranged on the outside of the corresponding floor and a second rod body slidingly connected to the end of the first rod body along the length direction of the first rod body; The fixed assembly of the two rods.
通过采用上述技术方案,将第一杆体固定于楼层外侧后,根据第一杆体的位置对第二杆体伸出楼层的长度进行调节,以便于吊装吊篮组件,不需要反复挑选合适长度的导向杆,操作便捷,省时省力。By adopting the above technical solution, after the first rod body is fixed on the outside of the floor, the length of the second rod body protruding from the floor is adjusted according to the position of the first rod body, so as to facilitate the hoisting of the hanging basket assembly, and it is not necessary to repeatedly select a guide rod of a suitable length , easy to operate, saving time and effort.
本申请进一步设置:所述固定组件包括设于第一杆体上的第一插孔,所述第一插孔内穿设有插杆,所述第二杆体上沿第二杆体的长度方向设有阵列排布的与第一插孔相对应的第二插孔。The application further provides that: the fixing assembly includes a first insertion hole provided on the first rod body, an insertion rod is pierced in the first insertion hole, and an insertion rod is arranged on the second rod body along the length direction of the second rod body. The second sockets corresponding to the first sockets are arranged in an array.
通过采用上述技术方案,将第二杆体滑动至预定位置后,其中一第二插孔与第一插孔对齐,将插杆同时穿过第一插孔与第二插孔,第二杆体被固定住,操作便捷,省时省力。By adopting the above technical solution, after sliding the second rod body to a predetermined position, one of the second insertion holes is aligned with the first insertion hole, and the insertion rod is passed through the first insertion hole and the second insertion hole at the same time, and the second rod body is fixed Live, easy to operate, save time and effort.
本申请进一步设置:所述插杆外套设有弹簧,所述弹簧一端连接于插杆上,所述弹簧另一端连接于第一杆体上,所述弹簧使插杆产生朝第二杆体方向滑动的趋势。The present application further provides that: the outer sleeve of the insertion rod is provided with a spring, one end of the spring is connected to the insertion rod, and the other end of the spring is connected to the first rod body, and the spring causes the insertion rod to slide toward the second rod body. trend.
通过采用上述技术方案,在弹簧回复力的作用下,插杆抵紧于第一插孔与第二插孔内,插杆不易松脱,固定更加稳固,安全性更高。By adopting the above technical solution, under the action of the spring restoring force, the insertion rod is tightly pressed against the first socket and the second socket, so that the insertion rod is not easy to loosen, the fixing is more stable, and the safety is higher.
本申请进一步设置:所述第一杆体上设有加强杆,所述加强杆另一端连接于相应楼层上。The present application further provides that: the first rod body is provided with a reinforcing rod, and the other end of the reinforcing rod is connected to a corresponding floor.
通过采用上述技术方案,加强了导向杆的整体强度,降低了吊装过程中导向杆断裂的可能性,安全性更高。By adopting the above technical solution, the overall strength of the guide rod is enhanced, the possibility of the guide rod breaking during the hoisting process is reduced, and the safety is higher.
综上所述,本申请具有以下有益效果:In summary, the application has the following beneficial effects:
根据施工需求,在相应的楼层上安装导向杆与滑轮组来吊装吊篮组件,使吊篮组件始终与每层楼层均保持相同的水平间距,操作便捷,成本低,安全性高。According to the construction requirements, guide rods and pulley blocks are installed on the corresponding floors to hoist the basket assembly, so that the basket assembly always maintains the same horizontal distance from each floor, which is convenient to operate, low in cost and high in safety.
附图说明Description of drawings
图1是本申请实施例的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the embodiment of the present application;
图2是本申请实施例的图1中A处的放大图。Fig. 2 is an enlarged view of A in Fig. 1 of the embodiment of the present application.
附图标记说明:Explanation of reference signs:
1、楼层;2、导向杆;21、第一杆体;22、第二杆体;23、第一插孔;24、插杆;25、第二插孔;26、弹簧;27、加强杆;3、滑轮组;31、定位块;32、定位槽;33、螺栓;34、防松齿环;35、防松齿块;41、主体结构钢梁;42、楼板;43、预埋钢梁;51、吊篮;52、钢丝绳;53、安全绳;61、支座;62、转轮;63、凹槽。1, floor; 2, guide rod; 21, first rod body; 22, second rod body; 23, first jack; 24, insertion rod; 25, second jack; 26, spring; 27, reinforcing rod; 3 , pulley block; 31, positioning block; 32, positioning groove; 33, bolt; 34, anti-loosening gear ring; 35, anti-loosening tooth block; 41, main structural steel beam; 42, floor slab; 43, embedded steel beam; , hanging basket; 52, steel wire rope; 53, safety rope; 61, support; 62, runner; 63, groove.
具体实施方式Detailed ways
以下结合附图对本申请作进一步详细说明。The application will be described in further detail below in conjunction with the accompanying drawings.
本实施例:一种分段内拉式吊篮施工装置,参照图1和图2,包括:设于相应楼层1外侧的吊篮组件以及设于相应楼层1外侧的用于吊装吊篮组件的吊装组件,楼层1包括主体结构钢梁41以及架设于主体结构钢梁41上的楼板42,楼板42的边缘处预埋有预埋钢梁43。This embodiment: a segmented inner pull-type hanging basket construction device, referring to Figure 1 and Figure 2, including: a hanging basket assembly arranged outside the
吊装组件包括水平焊接于相应楼层1预埋钢梁43上的导向杆2以及可拆连接于导向杆2端部的滑轮组3,导向杆2延伸至楼层1外部,导向杆2底部焊接有加强杆27,加强杆27与导向杆2之间呈四十五度,加强杆27另一端焊接于主体结构钢梁41上。吊篮组件包括吊篮51以及固定连接于吊篮51顶部的钢丝绳52与安全绳53,钢丝绳52与安全绳53从滑轮组3内穿过。The hoisting assembly includes a guide rod 2 horizontally welded on the embedded
施工时,将所有待安装的楼层1边缘处均焊接上导向杆2,然后从低至高或从高至低,将滑轮组3安装于其中一导向杆2上,将钢丝绳52与安全绳53穿过滑轮组3,通过吊篮51将面板吊装至相应的楼层1上,安装完成后再将滑轮组3安装于下一导向杆2上,以此类推,直至施工完成,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。During construction, all the edges of the
焊接导向杆2前,需要根据预埋钢梁43的位置选择合适长度的导向杆2,费时费力,因此,导向杆2包括焊接于相应楼层1外侧的第一杆体21以及沿第一杆体21长度方向滑动连接于第一杆体21端部的第二杆体22,第一杆体21上设有用于固定第二杆体22的固定组件。Before welding the guide rod 2, it is necessary to select a guide rod 2 with a suitable length according to the position of the embedded
固定组件包括开设于第一杆体21上的第一插孔23,第一插孔23内滑动穿设有插杆24,插杆24的延伸方向与第一杆体21的延伸方向相垂直,第二杆体22上沿第二杆体22的长度方向开设有阵列排布的与第一插孔23相对应的五个第二插孔25。此外,插杆24外套设有弹簧26,弹簧26一端连接于插杆24上,弹簧26另一端连接于第一杆体21上,弹簧26使插杆24产生朝第二杆体22方向滑动的趋势。The fixing assembly includes a
将第一杆体21焊接于预埋钢梁43上后,将插杆24拉起,此时,弹簧26处于拉伸状态,将第二杆体22滑动至预定位置后,其中一第二插孔25与第一插孔23对齐,松开插杆24,在弹簧26回复力的作用下,插杆24回弹至第一插孔23与第二插孔25内,第二杆体22被固定住,操作便捷,省时省力。After the
其中,滑轮组包括支座61以及转动连接于支座61上的转轮62,支座61上焊接有定位块31,导向杆2端部开设有用于容纳定位块31的定位槽32,导向杆2端部竖直螺纹连接有四个螺栓33,螺栓33穿过定位块31。螺栓33的螺帽上焊接有防松齿环34,导向杆2上开设有四个凹槽63,每个凹槽63内均卡接有与防松齿环34相啮合的防松齿块35。Wherein, the pulley block includes a
安装滑轮组3时,将支座61上的定位块31与导向杆2上的定位槽32对齐并沿定位槽32滑入,安装到位后将四个螺栓33旋入导向杆2与定位块31内,滑轮组3被固定住,拆装便捷,实现了滑轮组3的周转使用,减少了成本投入,降低了施工成本,最后再将防松齿块35卡入凹槽63内,防松齿块35与防松齿环34啮合,降低了螺栓33松脱的可能性,固定更加稳固,安全性更高。When installing the
本申请实施例一种分段内拉式吊篮施工装置的实施原理为:施工时,将导向杆2焊接于所有待施工的楼层1上,将第二杆体22滑动至预定位置,使用插杆24将第二杆体22固定住,从高至低或从低至高,将滑轮组3依次安装于每个导向杆2上,使用螺栓33将滑轮组3固定住,使用防松齿环34与防松齿块35限制螺栓33的转动,最后再将面板吊装至相应楼层1即可,实现了滑轮组3的周转使用,减少了成本投入,降低了施工成本,同时,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。The implementation principle of a segmented inner pull-type hanging basket construction device in the embodiment of the present application is as follows: during construction, the guide rod 2 is welded to all
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320553067.2U CN219327298U (en) | 2023-03-18 | 2023-03-18 | Sectional internal pulling type hanging basket construction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320553067.2U CN219327298U (en) | 2023-03-18 | 2023-03-18 | Sectional internal pulling type hanging basket construction device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219327298U true CN219327298U (en) | 2023-07-11 |
Family
ID=87063235
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320553067.2U Active CN219327298U (en) | 2023-03-18 | 2023-03-18 | Sectional internal pulling type hanging basket construction device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219327298U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117759039A (en) * | 2023-11-23 | 2024-03-26 | 中国建筑装饰集团有限公司 | A unit plate transfer track system and construction method |
| CN117758988A (en) * | 2024-01-02 | 2024-03-26 | 中建八局第一建设有限公司 | A construction method of slide and hanging basket based on layered structure |
-
2023
- 2023-03-18 CN CN202320553067.2U patent/CN219327298U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117759039A (en) * | 2023-11-23 | 2024-03-26 | 中国建筑装饰集团有限公司 | A unit plate transfer track system and construction method |
| CN117758988A (en) * | 2024-01-02 | 2024-03-26 | 中建八局第一建设有限公司 | A construction method of slide and hanging basket based on layered structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN117306732B (en) | Method for installing embedded prefabricated external wall panel component | |
| CN109555257B (en) | Combined supporting and hanging rod type suspended ceiling and construction method | |
| CN113503043A (en) | Assembly type building installation equipment | |
| CN107558746A (en) | A kind of out-hung panel bearing diagonal fixing means and instrument | |
| CN207660236U (en) | The quick connection hanging piece structure of wall | |
| CN207714775U (en) | A kind of large space ceiling support structure | |
| CN206844646U (en) | A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability | |
| CN205713166U (en) | The support connector of pre-formed members wallboard, pre-formed members wallboard and support system thereof | |
| CN212129961U (en) | Curtain wall keel hoisting device | |
| CN215563621U (en) | A dry-hanging connection structure for concrete curtain wall | |
| CN222835323U (en) | Spider man hanging point platform applied to inclined roof | |
| CN201730306U (en) | Light-weight scaffold | |
| CN217838208U (en) | A combined device for dismantling high-altitude climbing frames without tower crane | |
| CN217420656U (en) | Movable channel of attached lifting scaffold | |
| CN1800555A (en) | Large span suspended cable structure and its construction method | |
| CN221500417U (en) | Ring rail hoisting device for curtain wall installation | |
| CN219174032U (en) | A prefabricated concrete composite slab hoisting structure and system | |
| CN217581125U (en) | Scaffold for special-shaped curtain wall | |
| CN223446668U (en) | Wallboard mounting device | |
| CN222118708U (en) | Shallow buried pipe vertical installation auxiliary device | |
| CN220487147U (en) | Positioning device for curtain wall construction | |
| CN218205924U (en) | An engineering template support frame | |
| CN221856022U (en) | Stainless steel railing claw easy to fix | |
| CN220203447U (en) | Large-span inclined roof fly roof curtain wall mounting device | |
| CN218668433U (en) | Operating platform for building construction of anti-video wall of house |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20251016 Granted publication date: 20230711 |