CN219327298U - Sectional internal pulling type hanging basket construction device - Google Patents

Sectional internal pulling type hanging basket construction device Download PDF

Info

Publication number
CN219327298U
CN219327298U CN202320553067.2U CN202320553067U CN219327298U CN 219327298 U CN219327298 U CN 219327298U CN 202320553067 U CN202320553067 U CN 202320553067U CN 219327298 U CN219327298 U CN 219327298U
Authority
CN
China
Prior art keywords
rod
rod body
hanging basket
guide rod
corresponding floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320553067.2U
Other languages
Chinese (zh)
Inventor
田为永
李贤�
韩栋
周品
石志辉
陈宇轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Investment Building Industrialization Investment Construction Development Co ltd
Original Assignee
Beijing Investment Building Industrialization Investment Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Investment Building Industrialization Investment Construction Development Co ltd filed Critical Beijing Investment Building Industrialization Investment Construction Development Co ltd
Priority to CN202320553067.2U priority Critical patent/CN219327298U/en
Application granted granted Critical
Publication of CN219327298U publication Critical patent/CN219327298U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本申请涉及一种分段内拉式吊篮施工装置,属于建筑施工领域,其技术方案要点包括:设于相应楼层外侧的吊篮组件以及设于相应楼层外侧的用于吊装吊篮组件的吊装组件,所述吊装组件包括设于相应楼层外侧的导向杆以及设于导向杆端部的滑轮组,本申请在使用时,根据施工需求,在相应的楼层上安装导向杆与滑轮组来吊装吊篮组件,使吊篮组件始终与每层楼层均保持相同的水平间距,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。

Figure 202320553067

This application relates to a segmented inner pull-type hanging basket construction device, which belongs to the field of building construction. The key points of its technical scheme include: hanging basket components located outside the corresponding floors and hoisting equipment for hoisting the hanging basket components located outside the corresponding floors Assemblies, the hoisting assembly includes guide rods located on the outside of the corresponding floor and pulley blocks located at the end of the guide rod. When the application is in use, the guide rod and the pulley block are installed on the corresponding floors to hoist the hanging basket assembly according to the construction requirements. , so that the hanging basket assembly always maintains the same horizontal distance from each floor, which can meet the installation of different heights and different inclination angles of the outwardly inclined curtain wall, with convenient operation, low cost and high safety.

Figure 202320553067

Description

一种分段内拉式吊篮施工装置A segmented inner pull-type hanging basket construction device

技术领域technical field

本申请涉及建筑施工领域,尤其是涉及一种分段内拉式吊篮施工装置。The present application relates to the field of building construction, in particular to a segmented inner pull-type hanging basket construction device.

背景技术Background technique

幕墙是建筑的外墙围护,不承重,像幕布一样挂上去,故又称为“帷幕墙”,是现代大型和高层建筑常用的带有装饰效果的轻质墙体,幕墙由面板和支承结构体系组成。随着建筑业的发展,造型美观的大角度外倾幕墙工程越来越多。The curtain wall is the outer wall enclosure of the building. It is not load-bearing and is hung like a curtain, so it is also called "curtain wall". It is a light wall with decorative effect commonly used in modern large and high-rise buildings. The curtain wall is composed of panels and supports. Structural system composition. With the development of the construction industry, there are more and more large-angle flared curtain wall projects with beautiful appearance.

施工时,先将龙骨等支承结构搭建好,然后再将面板吊装至龙骨上的预定位置进行安装即可,吊装工具通常有吊篮、脚手架以及登高车:常规的吊篮只能垂直上下移动,无法满足外倾幕墙的施工;搭建脚手架则需要搭建满堂脚手架,施工繁琐,费用高,且搭建的脚手架的质量受工作人员的个人技术影响较大,安全性无法保障,此外,脚手架拆除后还要考虑拆除位置幕墙的收口,增大了工作量;登高车作业点单一,无法同时满足多点同时施工的要求,导致工期延长,同时,登高车属于大型设备,租赁费用高,增加了施工成本。During construction, the keel and other supporting structures are built first, and then the panel is hoisted to the predetermined position on the keel for installation. The hoisting tools usually include hanging baskets, scaffolding and climbing vehicles: conventional hanging baskets can only move vertically up and down, It cannot satisfy the construction of the outwardly tilted curtain wall; building scaffolding requires building a full house of scaffolding, which is cumbersome and expensive, and the quality of the scaffolding is greatly affected by the personal skills of the staff, and the safety cannot be guaranteed. Considering the removal of the closure of the curtain wall at the location, the workload is increased; the climbing vehicle has a single operating point, which cannot meet the requirements of simultaneous construction at multiple points, resulting in an extension of the construction period. At the same time, the climbing vehicle is a large-scale equipment, and the rental fee is high, which increases the construction cost.

针对上述中的相关技术,发明人提出一种分段内拉式吊篮施工装置以解决现有技术中存在的不足。In view of the related technologies mentioned above, the inventor proposes a construction device of segmented inner pull-type hanging basket to solve the deficiencies in the prior art.

实用新型内容Utility model content

为了改善只能借助脚手架与登高车进行外倾幕墙施工中面板安装的问题,本申请提供一种分段内拉式吊篮施工装置。In order to improve the problem that the panels can only be installed with the help of scaffolding and climbing vehicles in the construction of the outward-tilted curtain wall, the application provides a segmented inner-drawn hanging basket construction device.

本申请提供的一种分段内拉式吊篮施工装置采用如下的技术方案:The construction device of a segmented inner pull-type hanging basket provided by the application adopts the following technical scheme:

一种分段内拉式吊篮施工装置,包括:设于相应楼层外侧的吊篮组件以及设于相应楼层外侧的用于吊装吊篮组件的吊装组件,所述吊装组件包括设于相应楼层外侧的导向杆以及设于导向杆端部的滑轮组。A segmented inner pull-type hanging basket construction device, comprising: a hanging basket assembly arranged on the outside of the corresponding floor and a hoisting assembly arranged on the outside of the corresponding floor for hoisting the hanging basket assembly. The guide rod and the pulley set at the end of the guide rod.

通过采用上述技术方案,根据施工需求,在相应的楼层上安装导向杆与滑轮组来吊装吊篮组件,使吊篮组件始终与每层楼层均保持相同的水平间距,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。By adopting the above technical scheme, according to the construction requirements, install guide rods and pulley blocks on the corresponding floors to hoist the hanging basket assembly, so that the hanging basket assembly always maintains the same horizontal distance from each floor, which can meet different heights and different inclination angles The installation of the outward-tilted curtain wall is easy to operate, low in cost and high in safety.

本申请进一步设置:所述滑轮组可拆连接于导向杆端部。The application further provides that: the pulley block is detachably connected to the end of the guide rod.

通过采用上述技术方案,可以根据施工需求将滑轮组安装至相应楼层的导向杆上,实现了滑轮组的周转使用,减少了成本投入,降低了施工成本。By adopting the above technical scheme, the pulley block can be installed on the guide rod of the corresponding floor according to the construction requirements, realizing the turnover use of the pulley block, reducing cost input and construction cost.

本申请进一步设置:所述滑轮组上设有定位块,所述导向杆端部设有用于容纳定位块的定位槽,所述导向杆上螺纹连接有螺栓,所述螺栓穿过定位块。The application further provides that: the pulley block is provided with a positioning block, the end of the guide rod is provided with a positioning groove for accommodating the positioning block, and the guide rod is threadedly connected with a bolt, and the bolt passes through the positioning block.

通过采用上述技术方案,安装滑轮组时,将滑轮组上的定位块与定位槽对齐并沿定位槽滑入,实现滑轮组的预定位,操作便捷,再通过螺栓将滑轮组固定住,固定稳固。By adopting the above technical scheme, when installing the pulley block, the positioning block on the pulley block is aligned with the positioning groove and slides in along the positioning groove to realize the pre-positioning of the pulley block, which is convenient to operate, and then the pulley block is fixed by bolts and is fixed firmly.

本申请进一步设置:所述螺栓的螺帽上套设有防松齿环,所述导向杆上设有与防松齿环相啮合的防松齿块。The present application further provides that: the nut of the bolt is covered with an anti-loosening tooth ring, and the guide rod is provided with an anti-loosening tooth block meshing with the anti-loosening tooth ring.

通过采用上述技术方案,吊篮组件升降时,导向杆与滑轮组会产生一定的晃动,在防松齿环与防松齿块的配合下,降低了螺栓松脱的可能性,固定更加稳固,安全性更高。By adopting the above-mentioned technical scheme, when the hanging basket assembly is raised and lowered, the guide rod and the pulley block will shake to a certain extent. With the cooperation of the anti-loosening gear ring and the anti-loosening gear block, the possibility of bolt loosening is reduced, and the fixation is more stable and safe. Sex is higher.

本申请进一步设置:所述导向杆包括设于相应楼层外侧的第一杆体以及沿第一杆体长度方向滑动连接于第一杆体端部的第二杆体,所述第一杆体上设有用于固定第二杆体的固定组件。The application further provides that: the guide rod includes a first rod body arranged on the outside of the corresponding floor and a second rod body slidingly connected to the end of the first rod body along the length direction of the first rod body; The fixed assembly of the two rods.

通过采用上述技术方案,将第一杆体固定于楼层外侧后,根据第一杆体的位置对第二杆体伸出楼层的长度进行调节,以便于吊装吊篮组件,不需要反复挑选合适长度的导向杆,操作便捷,省时省力。By adopting the above technical solution, after the first rod body is fixed on the outside of the floor, the length of the second rod body protruding from the floor is adjusted according to the position of the first rod body, so as to facilitate the hoisting of the hanging basket assembly, and it is not necessary to repeatedly select a guide rod of a suitable length , easy to operate, saving time and effort.

本申请进一步设置:所述固定组件包括设于第一杆体上的第一插孔,所述第一插孔内穿设有插杆,所述第二杆体上沿第二杆体的长度方向设有阵列排布的与第一插孔相对应的第二插孔。The application further provides that: the fixing assembly includes a first insertion hole provided on the first rod body, an insertion rod is pierced in the first insertion hole, and an insertion rod is arranged on the second rod body along the length direction of the second rod body. The second sockets corresponding to the first sockets are arranged in an array.

通过采用上述技术方案,将第二杆体滑动至预定位置后,其中一第二插孔与第一插孔对齐,将插杆同时穿过第一插孔与第二插孔,第二杆体被固定住,操作便捷,省时省力。By adopting the above technical solution, after sliding the second rod body to a predetermined position, one of the second insertion holes is aligned with the first insertion hole, and the insertion rod is passed through the first insertion hole and the second insertion hole at the same time, and the second rod body is fixed Live, easy to operate, save time and effort.

本申请进一步设置:所述插杆外套设有弹簧,所述弹簧一端连接于插杆上,所述弹簧另一端连接于第一杆体上,所述弹簧使插杆产生朝第二杆体方向滑动的趋势。The present application further provides that: the outer sleeve of the insertion rod is provided with a spring, one end of the spring is connected to the insertion rod, and the other end of the spring is connected to the first rod body, and the spring causes the insertion rod to slide toward the second rod body. trend.

通过采用上述技术方案,在弹簧回复力的作用下,插杆抵紧于第一插孔与第二插孔内,插杆不易松脱,固定更加稳固,安全性更高。By adopting the above technical solution, under the action of the spring restoring force, the insertion rod is tightly pressed against the first socket and the second socket, so that the insertion rod is not easy to loosen, the fixing is more stable, and the safety is higher.

本申请进一步设置:所述第一杆体上设有加强杆,所述加强杆另一端连接于相应楼层上。The present application further provides that: the first rod body is provided with a reinforcing rod, and the other end of the reinforcing rod is connected to a corresponding floor.

通过采用上述技术方案,加强了导向杆的整体强度,降低了吊装过程中导向杆断裂的可能性,安全性更高。By adopting the above technical solution, the overall strength of the guide rod is enhanced, the possibility of the guide rod breaking during the hoisting process is reduced, and the safety is higher.

综上所述,本申请具有以下有益效果:In summary, the application has the following beneficial effects:

根据施工需求,在相应的楼层上安装导向杆与滑轮组来吊装吊篮组件,使吊篮组件始终与每层楼层均保持相同的水平间距,操作便捷,成本低,安全性高。According to the construction requirements, guide rods and pulley blocks are installed on the corresponding floors to hoist the basket assembly, so that the basket assembly always maintains the same horizontal distance from each floor, which is convenient to operate, low in cost and high in safety.

附图说明Description of drawings

图1是本申请实施例的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the embodiment of the present application;

图2是本申请实施例的图1中A处的放大图。Fig. 2 is an enlarged view of A in Fig. 1 of the embodiment of the present application.

附图标记说明:Explanation of reference signs:

1、楼层;2、导向杆;21、第一杆体;22、第二杆体;23、第一插孔;24、插杆;25、第二插孔;26、弹簧;27、加强杆;3、滑轮组;31、定位块;32、定位槽;33、螺栓;34、防松齿环;35、防松齿块;41、主体结构钢梁;42、楼板;43、预埋钢梁;51、吊篮;52、钢丝绳;53、安全绳;61、支座;62、转轮;63、凹槽。1, floor; 2, guide rod; 21, first rod body; 22, second rod body; 23, first jack; 24, insertion rod; 25, second jack; 26, spring; 27, reinforcing rod; 3 , pulley block; 31, positioning block; 32, positioning groove; 33, bolt; 34, anti-loosening gear ring; 35, anti-loosening tooth block; 41, main structural steel beam; 42, floor slab; 43, embedded steel beam; , hanging basket; 52, steel wire rope; 53, safety rope; 61, support; 62, runner; 63, groove.

具体实施方式Detailed ways

以下结合附图对本申请作进一步详细说明。The application will be described in further detail below in conjunction with the accompanying drawings.

本实施例:一种分段内拉式吊篮施工装置,参照图1和图2,包括:设于相应楼层1外侧的吊篮组件以及设于相应楼层1外侧的用于吊装吊篮组件的吊装组件,楼层1包括主体结构钢梁41以及架设于主体结构钢梁41上的楼板42,楼板42的边缘处预埋有预埋钢梁43。This embodiment: a segmented inner pull-type hanging basket construction device, referring to Figure 1 and Figure 2, including: a hanging basket assembly arranged outside the corresponding floor 1 and a hanging basket assembly arranged outside the corresponding floor 1 for hoisting the hanging basket assembly The hoisting assembly, the floor 1 includes a main structural steel beam 41 and a floor 42 erected on the main structural steel beam 41 , and a pre-embedded steel beam 43 is pre-embedded at the edge of the floor 42 .

吊装组件包括水平焊接于相应楼层1预埋钢梁43上的导向杆2以及可拆连接于导向杆2端部的滑轮组3,导向杆2延伸至楼层1外部,导向杆2底部焊接有加强杆27,加强杆27与导向杆2之间呈四十五度,加强杆27另一端焊接于主体结构钢梁41上。吊篮组件包括吊篮51以及固定连接于吊篮51顶部的钢丝绳52与安全绳53,钢丝绳52与安全绳53从滑轮组3内穿过。The hoisting assembly includes a guide rod 2 horizontally welded on the embedded steel beam 43 of the corresponding floor 1 and a pulley block 3 detachably connected to the end of the guide rod 2. The guide rod 2 extends to the outside of the floor 1, and the bottom of the guide rod 2 is welded with a reinforcing rod 27. The angle between the reinforcement rod 27 and the guide rod 2 is 45 degrees, and the other end of the reinforcement rod 27 is welded on the steel beam 41 of the main structure. The hanging basket assembly includes a hanging basket 51 and a steel wire rope 52 and a safety rope 53 fixedly connected to the top of the hanging basket 51 , and the steel wire rope 52 and the safety rope 53 pass through the pulley block 3 .

施工时,将所有待安装的楼层1边缘处均焊接上导向杆2,然后从低至高或从高至低,将滑轮组3安装于其中一导向杆2上,将钢丝绳52与安全绳53穿过滑轮组3,通过吊篮51将面板吊装至相应的楼层1上,安装完成后再将滑轮组3安装于下一导向杆2上,以此类推,直至施工完成,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。During construction, all the edges of the floors 1 to be installed are welded on the guide rods 2, and then from low to high or from high to low, the pulley block 3 is installed on one of the guide rods 2, and the steel wire rope 52 and the safety rope 53 are passed through The pulley block 3 is used to hoist the panel to the corresponding floor 1 through the hanging basket 51. After the installation is completed, the pulley block 3 is installed on the next guide rod 2, and so on until the construction is completed, which can meet different heights and different inclination angles. The installation of the outward-tilted curtain wall is easy to operate, low in cost and high in safety.

焊接导向杆2前,需要根据预埋钢梁43的位置选择合适长度的导向杆2,费时费力,因此,导向杆2包括焊接于相应楼层1外侧的第一杆体21以及沿第一杆体21长度方向滑动连接于第一杆体21端部的第二杆体22,第一杆体21上设有用于固定第二杆体22的固定组件。Before welding the guide rod 2, it is necessary to select a guide rod 2 with a suitable length according to the position of the embedded steel beam 43, which is time-consuming and laborious. Therefore, the guide rod 2 includes the first rod body 21 welded on the outside of the corresponding floor 1 and the first rod body 21 along the length of the first rod body 21. The second rod body 22 is slidably connected to the end of the first rod body 21 in one direction, and the first rod body 21 is provided with a fixing assembly for fixing the second rod body 22 .

固定组件包括开设于第一杆体21上的第一插孔23,第一插孔23内滑动穿设有插杆24,插杆24的延伸方向与第一杆体21的延伸方向相垂直,第二杆体22上沿第二杆体22的长度方向开设有阵列排布的与第一插孔23相对应的五个第二插孔25。此外,插杆24外套设有弹簧26,弹簧26一端连接于插杆24上,弹簧26另一端连接于第一杆体21上,弹簧26使插杆24产生朝第二杆体22方向滑动的趋势。The fixing assembly includes a first socket 23 opened on the first rod body 21, and an insertion rod 24 slides through the first socket 23. The extension direction of the insertion rod 24 is perpendicular to the extension direction of the first rod body 21, and the second Five second insertion holes 25 corresponding to the first insertion holes 23 arranged in an array are opened on the rod body 22 along the length direction of the second rod body 22 . In addition, the insertion rod 24 is covered with a spring 26 , one end of the spring 26 is connected to the insertion rod 24 , the other end of the spring 26 is connected to the first rod body 21 , and the spring 26 makes the insertion rod 24 slide toward the second rod body 22 .

将第一杆体21焊接于预埋钢梁43上后,将插杆24拉起,此时,弹簧26处于拉伸状态,将第二杆体22滑动至预定位置后,其中一第二插孔25与第一插孔23对齐,松开插杆24,在弹簧26回复力的作用下,插杆24回弹至第一插孔23与第二插孔25内,第二杆体22被固定住,操作便捷,省时省力。After the first rod body 21 is welded on the pre-embedded steel beam 43, the insertion rod 24 is pulled up. At this time, the spring 26 is in a stretched state. After the second rod body 22 is slid to a predetermined position, one of the second jacks 25 Align with the first insertion hole 23, release the insertion rod 24, under the action of the restoring force of the spring 26, the insertion rod 24 rebounds into the first insertion hole 23 and the second insertion hole 25, and the second rod body 22 is fixed, Easy to operate, saving time and effort.

其中,滑轮组包括支座61以及转动连接于支座61上的转轮62,支座61上焊接有定位块31,导向杆2端部开设有用于容纳定位块31的定位槽32,导向杆2端部竖直螺纹连接有四个螺栓33,螺栓33穿过定位块31。螺栓33的螺帽上焊接有防松齿环34,导向杆2上开设有四个凹槽63,每个凹槽63内均卡接有与防松齿环34相啮合的防松齿块35。Wherein, the pulley block includes a support 61 and a runner 62 that is rotatably connected to the support 61, the support 61 is welded with a positioning block 31, the end of the guide rod 2 is provided with a positioning groove 32 for accommodating the positioning block 31, and the guide rod 2 Four bolts 33 are vertically threaded at the end, and the bolts 33 pass through the positioning block 31 . An anti-loosening toothed ring 34 is welded on the nut of the bolt 33, and four grooves 63 are provided on the guide rod 2, and an anti-loosening tooth block 35 meshing with the anti-loosening toothed ring 34 is clamped in each groove 63. .

安装滑轮组3时,将支座61上的定位块31与导向杆2上的定位槽32对齐并沿定位槽32滑入,安装到位后将四个螺栓33旋入导向杆2与定位块31内,滑轮组3被固定住,拆装便捷,实现了滑轮组3的周转使用,减少了成本投入,降低了施工成本,最后再将防松齿块35卡入凹槽63内,防松齿块35与防松齿环34啮合,降低了螺栓33松脱的可能性,固定更加稳固,安全性更高。When installing the pulley block 3, align the positioning block 31 on the support 61 with the positioning groove 32 on the guide rod 2 and slide in along the positioning groove 32. After the installation is in place, screw the four bolts 33 into the guide rod 2 and the positioning block 31 , the pulley block 3 is fixed, easy to disassemble and assemble, realizes the turnaround use of the pulley block 3, reduces cost input, reduces construction costs, and finally snaps the anti-loosening tooth block 35 into the groove 63, and the anti-loosening tooth block 35 and The meshing of the anti-loosening gear ring 34 reduces the possibility of the bolt 33 getting loose, and the fixing is more stable and the safety is higher.

本申请实施例一种分段内拉式吊篮施工装置的实施原理为:施工时,将导向杆2焊接于所有待施工的楼层1上,将第二杆体22滑动至预定位置,使用插杆24将第二杆体22固定住,从高至低或从低至高,将滑轮组3依次安装于每个导向杆2上,使用螺栓33将滑轮组3固定住,使用防松齿环34与防松齿块35限制螺栓33的转动,最后再将面板吊装至相应楼层1即可,实现了滑轮组3的周转使用,减少了成本投入,降低了施工成本,同时,可以满足不同高度,不同倾斜角度的外倾幕墙的安装,操作便捷,成本低,安全性高。The implementation principle of a segmented inner pull-type hanging basket construction device in the embodiment of the present application is as follows: during construction, the guide rod 2 is welded to all floors 1 to be constructed, the second rod body 22 is slid to a predetermined position, and the insertion rod is used. 24 Fix the second rod body 22, from high to low or from low to high, install the pulley block 3 on each guide rod 2 in turn, use the bolt 33 to fix the pulley block 3, use the anti-loosening gear ring 34 and the anti-loosening tooth The block 35 restricts the rotation of the bolt 33, and finally the panel is hoisted to the corresponding floor 1, which realizes the turnover and use of the pulley block 3, reduces the cost input, and reduces the construction cost. At the same time, it can meet different heights and different inclination angles The installation of the tilting curtain wall is easy to operate, low in cost and high in safety.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.

Claims (5)

1. The utility model provides a segmentation internal pulling formula hanging flower basket construction equipment which characterized in that includes: the lifting device comprises a hanging basket assembly arranged on the outer side of a corresponding floor (1) and a lifting assembly arranged on the outer side of the corresponding floor (1) and used for lifting the hanging basket assembly, wherein the lifting assembly comprises a guide rod (2) arranged on the outer side of the corresponding floor (1) and a pulley block (3) arranged at the end part of the guide rod (2);
the pulley block (3) is detachably connected to the end part of the guide rod (2);
the pulley block (3) is provided with a positioning block (31), the end part of the guide rod (2) is provided with a positioning groove (32) for accommodating the positioning block (31), the guide rod (2) is connected with a bolt (33) in a threaded manner, and the bolt (33) penetrates through the positioning block (31);
the anti-loosening toothed ring (34) is sleeved on the nut of the bolt (33), and the anti-loosening toothed block (35) meshed with the anti-loosening toothed ring (34) is arranged on the guide rod (2).
2. The segmented pull-in basket construction device of claim 1, wherein: the guide rod (2) comprises a first rod body (21) arranged on the outer side of the corresponding floor (1) and a second rod body (22) which is connected to the end portion of the first rod body (21) in a sliding manner along the length direction of the first rod body (21), and a fixing assembly used for fixing the second rod body (22) is arranged on the first rod body (21).
3. A segmented pull-in basket construction apparatus according to claim 2, wherein: the fixing assembly comprises a first jack (23) arranged on a first rod body (21), a plug rod (24) is arranged in the first jack (23) in a penetrating mode, and second jacks (25) which are arranged in an array mode and correspond to the first jack (23) are arranged on a second rod body (22) in the length direction of the second rod body (22).
4. A segmented pull-in basket construction apparatus according to claim 3, wherein: the novel sliding rod is characterized in that a spring (26) is sleeved outside the inserted rod (24), one end of the spring (26) is connected to the inserted rod (24), the other end of the spring (26) is connected to the first rod body (21), and the spring (26) enables the inserted rod (24) to slide towards the second rod body (22).
5. A segmented pull-in basket construction apparatus according to claim 2, wherein: the first rod body (21) is provided with a reinforcing rod (27), and the other end of the reinforcing rod (27) is connected to the corresponding floor (1).
CN202320553067.2U 2023-03-18 2023-03-18 Sectional internal pulling type hanging basket construction device Active CN219327298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320553067.2U CN219327298U (en) 2023-03-18 2023-03-18 Sectional internal pulling type hanging basket construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320553067.2U CN219327298U (en) 2023-03-18 2023-03-18 Sectional internal pulling type hanging basket construction device

Publications (1)

Publication Number Publication Date
CN219327298U true CN219327298U (en) 2023-07-11

Family

ID=87063235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320553067.2U Active CN219327298U (en) 2023-03-18 2023-03-18 Sectional internal pulling type hanging basket construction device

Country Status (1)

Country Link
CN (1) CN219327298U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117759039A (en) * 2023-11-23 2024-03-26 中国建筑装饰集团有限公司 A unit plate transfer track system and construction method
CN117758988A (en) * 2024-01-02 2024-03-26 中建八局第一建设有限公司 A construction method of slide and hanging basket based on layered structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117759039A (en) * 2023-11-23 2024-03-26 中国建筑装饰集团有限公司 A unit plate transfer track system and construction method
CN117758988A (en) * 2024-01-02 2024-03-26 中建八局第一建设有限公司 A construction method of slide and hanging basket based on layered structure

Similar Documents

Publication Publication Date Title
CN117306732B (en) Method for installing embedded prefabricated external wall panel component
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN113503043A (en) Assembly type building installation equipment
CN107558746A (en) A kind of out-hung panel bearing diagonal fixing means and instrument
CN207660236U (en) The quick connection hanging piece structure of wall
CN207714775U (en) A kind of large space ceiling support structure
CN206844646U (en) A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability
CN205713166U (en) The support connector of pre-formed members wallboard, pre-formed members wallboard and support system thereof
CN212129961U (en) Curtain wall keel hoisting device
CN215563621U (en) A dry-hanging connection structure for concrete curtain wall
CN222835323U (en) Spider man hanging point platform applied to inclined roof
CN201730306U (en) Light-weight scaffold
CN217838208U (en) A combined device for dismantling high-altitude climbing frames without tower crane
CN217420656U (en) Movable channel of attached lifting scaffold
CN1800555A (en) Large span suspended cable structure and its construction method
CN221500417U (en) Ring rail hoisting device for curtain wall installation
CN219174032U (en) A prefabricated concrete composite slab hoisting structure and system
CN217581125U (en) Scaffold for special-shaped curtain wall
CN223446668U (en) Wallboard mounting device
CN222118708U (en) Shallow buried pipe vertical installation auxiliary device
CN220487147U (en) Positioning device for curtain wall construction
CN218205924U (en) An engineering template support frame
CN221856022U (en) Stainless steel railing claw easy to fix
CN220203447U (en) Large-span inclined roof fly roof curtain wall mounting device
CN218668433U (en) Operating platform for building construction of anti-video wall of house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20251016

Granted publication date: 20230711