CN108726358B - A batch hoisting device and method for main bars of a towering concrete structure - Google Patents

A batch hoisting device and method for main bars of a towering concrete structure Download PDF

Info

Publication number
CN108726358B
CN108726358B CN201810751490.7A CN201810751490A CN108726358B CN 108726358 B CN108726358 B CN 108726358B CN 201810751490 A CN201810751490 A CN 201810751490A CN 108726358 B CN108726358 B CN 108726358B
Authority
CN
China
Prior art keywords
hanging
steel bar
main
bracket
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810751490.7A
Other languages
Chinese (zh)
Other versions
CN108726358A (en
Inventor
王艳峰
冯广胜
黄旺明
田永强
张家伦
陈鹏飞
徐振山
王元利
宋海涛
程孝康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201810751490.7A priority Critical patent/CN108726358B/en
Publication of CN108726358A publication Critical patent/CN108726358A/en
Application granted granted Critical
Publication of CN108726358B publication Critical patent/CN108726358B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B66C1/28Duplicate, e.g. pivoted, members engaging the loads from two sides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/62Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a batch hoisting device and method for main bars of a high-rise concrete structure, wherein the batch hoisting device for the main bars of the high-rise concrete structure comprises a main framework, a lifting appliance and bar positioning frames, wherein the middle part of the main framework is provided with two hanging tables, the inner side edges of the two hanging tables are oppositely arranged, the hanging tables are provided with hanging table ear plates, the hanging table ear plates are hinged with the main framework, the lifting appliance comprises two groups of hanging arms, the two hanging arms are respectively used for driving the two hanging tables to rotate, so that the inner side edges of the two hanging tables are close to or far away from each other, the bar positioning frames are positioned at positions to be installed of bars and comprise limiting plates, the front side and the rear side of each limiting plate are respectively provided with a positioning plate and a positioning frame, and positioning grooves are formed between. According to the invention, the clamping and loosening of the steel bar group are realized through the self-weight of the main framework and the hanging table plate, the problems of difficult positioning and low efficiency in the steel bar hoisting process are solved, the hoisting method is simple, the use is flexible and effective, and the advantages of energy conservation and consumption reduction are also realized.

Description

一种高耸混凝土结构主筋批量吊装装置及方法A batch hoisting device and method for main bars of a towering concrete structure

技术领域technical field

本发明涉及桥梁施工领域,具体涉及一种高耸混凝土结构主筋批量吊装装置及方法。The invention relates to the field of bridge construction, in particular to a bulk hoisting device and method for main bars of a towering concrete structure.

背景技术Background technique

随着桥梁建设大力发展,桥梁跨越能力越来越大,承载能力越来越大,桥塔等高耸混凝土结构越来越广泛使用于桥梁工程中;而高空混凝土施工主筋一般采用大直径直螺纹套筒连接,随着施工高度增加以及高空爬模施工工艺以及现场控制技术日渐成熟,大直径钢筋长度6m、9m越来越常见。With the vigorous development of bridge construction, the spanning capacity and bearing capacity of bridges are getting larger and larger, and towering concrete structures such as bridge towers are more and more widely used in bridge engineering; while the main bars of high-altitude concrete construction generally use large-diameter straight thread sleeves With the increase of construction height and the maturity of high-altitude climbing formwork construction technology and on-site control technology, large-diameter steel bars with lengths of 6m and 9m are becoming more and more common.

大直径超长钢筋安装方法主要有:一是采用起重设备成捆吊装至施工平台上,再由双人甚至三人逐根安装由人工在施工平台逐根安装,该施工效率低下,且需大量劳动力;再一就是就地在地面将柱体整节混凝土钢筋拼装成整体,再由汽车吊或履带等大型起重机整体安装,该施工方法仅适宜高度较低的墩柱施工,而高空作业塔吊起重荷载一般在10吨左右,无法满足动辄上百吨的柱体标准节钢筋整体吊装。The main methods for installing large-diameter and super-long steel bars are as follows: First, use lifting equipment to hoist them to the construction platform in bundles, and then install them one by one by two people or even three people, and manually install them on the construction platform one by one. Labor force; another is to assemble the whole section of concrete and steel bars on the ground into a whole, and then install it as a whole by a large crane such as a truck crane or a crawler. This construction method is only suitable for the construction of piers with lower heights, and the high-altitude operation tower lift The heavy load is generally about 10 tons, which cannot meet the overall hoisting of the standard section steel bars of the column that can easily exceed hundreds of tons.

为提高钢筋吊装效率,充分发挥塔式起重机优点,特研究发明一种高耸混凝土结构用大直径钢筋批量吊装方法,工序简捷,施工快捷、安全等特点,是高耸混凝土结构大直径钢筋吊装高效、安全可行的施工方法之一。In order to improve the hoisting efficiency of steel bars and give full play to the advantages of tower cranes, a method for hoisting large-diameter steel bars in towering concrete structures in batches is specially researched and invented. One of the feasible construction methods.

本发明要解决的是提高高耸混凝土结构大直径钢筋的安装功效的技术问题,并提供了一种施工方法。The invention aims to solve the technical problem of improving the installation efficiency of large-diameter steel bars in tall concrete structures, and provides a construction method.

发明内容SUMMARY OF THE INVENTION

本发明所要解决的技术问题是针对高耸混凝土结构钢筋吊装功效的问题。The technical problem to be solved by the present invention is aimed at the problem of the hoisting effect of the steel bar of the towering concrete structure.

为了解决上述技术问题,本发明所采用的技术方案是提供一种高耸混凝土结构主筋批量吊装装置,包括:In order to solve the above-mentioned technical problems, the technical solution adopted in the present invention is to provide a bulk hoisting device for the main bars of a towering concrete structure, including:

主构架,其中部设有挂台板,所述挂台板设置为两个,并以内侧边缘相对设置,所述挂台板上设有挂台耳板,所述挂台耳板与所述主构架铰接;The main frame is provided with a hanging plate in the middle, the two hanging plates are arranged in two, and the inner edges are opposite to each other. The hanging plate is provided with a hanging lug, and the hanging lug The main frame is hinged;

吊具,包括吊臂,所述吊臂设置为两组,分别用于带动两个所述挂台板转动,使两个所述挂台板的内侧边缘相互靠近或相互远离;The hanger includes a hanger arm, and the hanger arm is arranged in two groups, which are respectively used to drive the two hanging platens to rotate, so that the inner edges of the two hanging platens are close to each other or away from each other;

钢筋定位架,位于钢筋的待安装位置,其包括限位板,所述限位板的前后两侧分别设有定位板和定位架,所述定位板的之间形成定位槽。The steel bar positioning frame is located at the position where the steel bar is to be installed, and includes a limit plate. The front and rear sides of the limit plate are respectively provided with a positioning plate and a positioning frame, and a positioning groove is formed between the positioning plates.

在上述方案中,所述主构架为中部中空的矩形框架,所述挂台耳板设置在所述挂台板的外侧边缘,所述挂台板与所述主构架之间形成间隙。In the above solution, the main frame is a rectangular frame with a hollow central part, the table-hanging lugs are arranged on the outer edge of the table-hanging plate, and a gap is formed between the table-hanging plate and the main frame.

在上述方案中,所述吊臂通过托架带动所述挂台板转动,所述托架与所述吊臂的下端铰接,所述主构架上设有托架座,所述托架的一端与所述托架座铰接,所述托架的另一端设有用于承接所述挂台板的承托。In the above solution, the suspension arm drives the hanging plate to rotate through a bracket, the bracket is hinged with the lower end of the suspension arm, the main frame is provided with a bracket seat, and one end of the bracket is The bracket is hinged with the bracket base, and the other end of the bracket is provided with a support for receiving the hanging plate.

在上述方案中,所述托架的中部设有凹槽,所述吊臂的下端位于所述凹槽内。In the above solution, a groove is provided in the middle of the bracket, and the lower end of the boom is located in the groove.

在上述方案中,所述托架座上设有托架止轨,所述托架上设有与所述托架止轨适配的承托止轨。In the above solution, the bracket base is provided with a bracket stop rail, and the bracket is provided with a support stop rail adapted to the bracket stop rail.

在上述方案中,所述挂台板的内侧边缘设有用于夹紧钢筋的凹口。In the above solution, the inner edge of the hanging plate is provided with a notch for clamping the steel bar.

在上述方案中,所述吊具还包括吊梁,所述吊梁与所述吊臂的上端铰接,所述吊梁的中部设有吊耳。In the above solution, the hoisting tool further includes a hoisting beam, the hoisting beam is hinged with the upper end of the hoisting arm, and the middle part of the hoisting beam is provided with a hoisting lug.

在上述方案中,所述限位板的左右两侧分别设有支撑座,所述支撑座上倾斜设有导向板。In the above solution, support seats are respectively provided on the left and right sides of the limiting plate, and guide plates are inclined on the support seats.

在上述方案中,所述定位板呈向上弯折的曲状,所述定位架的顶面高于所述限位板的上表面。In the above solution, the positioning plate is in a curved shape that is bent upward, and the top surface of the positioning frame is higher than the upper surface of the limiting plate.

本发明还提供了一种高耸混凝土结构主筋批量吊装方法,包括以下步骤:The present invention also provides a batch hoisting method for main bars of a towering concrete structure, comprising the following steps:

S1、通过吊具起吊主构架,使主构架位于放置钢筋组的钢筋支架上方,下放主构架,通过钢筋支架上的导向装置完成主构架的水平定位;S1. The main frame is lifted by the sling, so that the main frame is located above the steel support bracket on which the steel bar group is placed, the main frame is lowered, and the horizontal positioning of the main frame is completed through the guide device on the steel support bracket;

S2、在主构架下放过的程中,使钢筋支架上的钢筋组将两个挂台板顶开;并穿过两个挂台板之间的空隙,继续下放,使两个挂台板在自重的作用下闭合;S2. In the process of lowering the main frame, make the steel bar group on the steel support bracket push the two hanging plates; and pass through the gap between the two hanging plates, and continue to lower, so that the two hanging plates are in the closed under the action of its own weight;

S3、缓慢起升主构架,使两个挂台板卡紧钢筋组;S3. Slowly lift the main frame to make the two hanging plates clamp the steel bar group;

S4、将钢筋组移至钢筋定位架的上方,缓慢下放主构架,使钢筋组的每根钢筋分别穿过定位板上的定位槽,继续下放主构架,使托架带动两个挂台板打开,使挂台板放弃支承,将钢筋组置换至钢筋定位架上;S4. Move the steel bar group to the top of the steel bar positioning frame, and slowly lower the main frame, so that each steel bar of the steel bar group passes through the positioning grooves on the positioning plate respectively, and continue to lower the main frame, so that the bracket drives the two hanging platens to open , to make the hanging platform give up the support, and replace the steel bar group to the steel bar spacer;

S5、提升主构架,使主构架脱离钢筋组。S5. Lift the main frame so that the main frame is separated from the steel bar group.

与现有技术相比,本发明,通过主构架和挂台板的自重及实现对钢筋组的夹紧和松脱,可使带套筒大直径钢筋自动进槽、脱槽,可有效加快大直径超长钢筋的吊装速度,减少大直径钢筋的吊装工序,解决了钢筋吊装过程中难定位、功效低的问题,本发明,吊装方法简单,使用灵活、有效,还具有节能减耗的优点。Compared with the prior art, the present invention, through the self-weight of the main frame and the hanging plate, realizes the clamping and loosening of the steel bar group, so that the large-diameter steel bars with sleeves can be automatically slotted into and out of the slot, which can effectively speed up the large-diameter steel bar with sleeves. The hoisting speed of the super-long diameter steel bar reduces the hoisting process of the large-diameter steel bar, and solves the problems of difficult positioning and low efficiency during the hoisting process of the steel bar.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is the structural representation of the present invention;

图2为本发明中主构架的结构示意图;Fig. 2 is the structural representation of main frame in the present invention;

图3为本发明中挂台板的结构示意图;Fig. 3 is the structural representation of hanging platen in the present invention;

图4为本发明中吊臂与托架连接的示意图;4 is a schematic diagram of the connection between the boom and the bracket in the present invention;

图5为本发明中托架的结构示意图;5 is a schematic structural diagram of a bracket in the present invention;

图6为本发明中吊具的结构示意图;6 is a schematic structural diagram of a spreader in the present invention;

图7为本发明中钢筋定位架的结构示意图;Fig. 7 is the structural representation of reinforcing bar positioning frame in the present invention;

图8为本发明吊装钢筋组的示意图;Fig. 8 is the schematic diagram of the hoisting steel bar group of the present invention;

图9为本发明将钢筋组放置到钢筋定位架上的示意图。FIG. 9 is a schematic diagram of placing the reinforcing bar group on the reinforcing bar positioning frame according to the present invention.

具体实施方式Detailed ways

本发明针对目前吊装系统存在的问题,解决其在使用中需反复拆装,施工繁琐,功效较低,无法对大长度的钢筋实现批量、快速的吊装的缺陷。下面结合说明书附图和具体实施方式对本发明做出详细说明。The present invention aims at the problems existing in the current hoisting system, and solves the defects of repeated disassembly and assembly in use, complicated construction, low efficacy, and inability to achieve batch and rapid hoisting of large-length steel bars. The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments of the description.

如图1~7所示,本发明提供了一种高耸混凝土结构主筋批量吊装装置,包括主构架1、吊具4和钢筋定位架5。主构架1的中部设有挂台板2。本发明通过吊具4带动主构架1和挂台板2吊装钢筋组,并通过钢筋定位架5将钢筋组安放到指定位置,可实现对钢筋组高效、快速的吊装。As shown in FIGS. 1 to 7 , the present invention provides a bulk hoisting device for main reinforcing bars of a towering concrete structure, including a main frame 1 , a hanger 4 and a reinforcing bar positioning frame 5 . The middle part of the main frame 1 is provided with a hanging plate 2 . The present invention drives the main frame 1 and the hanging plate 2 to hoist the steel bar group through the hanger 4, and places the steel bar group at the designated position through the steel bar positioning frame 5, so that the high-efficiency and fast hoisting of the steel bar group can be realized.

主构架1包括主构架主体1-1,主构架主体1-1为矩形框架,包括边框,边框的内侧竖直设有竖板,竖板和边框之间设有加强肋1-5。The main frame 1 includes a main frame body 1-1, which is a rectangular frame and includes a frame. The inner side of the frame is vertically provided with a vertical plate, and a reinforcing rib 1-5 is arranged between the vertical plate and the frame.

挂台板2设置为两个,并以内侧边缘相对设置,挂台板2包括挂台板主体2-1,挂台板主体2-1呈矩形,挂台板主体2-1上设有挂台耳板2-2,挂台耳板2-2设置在挂台板主体2-1的外侧边缘。主构架1上设有耳板1-2,挂台耳板2-2与耳板1-2铰接,挂台板主体2-1的内侧边缘设有用于夹紧钢筋的凹口2-3。两个挂台板主体2-1通过绕铰接点转动改变两挂台板主体2-1上凹口2-3的正对距离,由此实现对钢筋的夹紧和松脱。There are two hanging platens 2, and the inner edges are opposite to each other. The hanging plate 2 includes a main body 2-1 of the hanging plate. The main body 2-1 of the hanging plate is rectangular, and the main body 2-1 of the hanging plate is provided with a hanging plate. The table lug plate 2-2 and the table hanging lug plate 2-2 are arranged on the outer edge of the table hanging plate main body 2-1. The main frame 1 is provided with an ear plate 1-2, the hanging table ear plate 2-2 is hinged with the ear plate 1-2, and the inner edge of the hanging table main body 2-1 is provided with a notch 2-3 for clamping steel bars. The two hanging plate bodies 2-1 are rotated around the hinge point to change the facing distance of the notches 2-3 on the two hanging plate bodies 2-1, thereby realizing the clamping and loosening of the steel bars.

吊具4包括吊臂4-1,吊臂4-1设置为两组,分别用于带动两个挂台板2转动,使两个挂台板2的内侧边缘相互靠近或相互远离,由此实现对钢筋的夹紧和松脱。主构架1为中部中空的矩形框架,挂台耳板2-2与主构架1之间形成间隙,该间隙用于穿过吊臂4-1,使吊臂4-1自由活动。吊臂4-1通过托架3带动挂台板主体2-1转动,托架3与吊臂4-1的下端铰接,主构架1上设有托架座1-3,托架3的一端与托架座1-3铰接,托架3的另一端设有用于承接挂台板主体2-1的承托3-1。优选的托架3上的一端和中部分别设有第一销孔3-4和第二销孔3-5,第一销孔3-4和第二销孔3-5分别配合销柱与托架座1-3和吊臂4-1的下端铰接。托架3的中部设有开口朝上的凹槽3-3,吊臂4-1的下端位于该凹槽3-3内。优选的,托架座1-3上设有托架止轨1-4,托架3上设有与托架止轨1-4适配的承托止轨3-2,起到限位的作用,防止托架3旋转过度,造成不必要的碰伤。The hanger 4 includes a hanger arm 4-1, and the hanger arm 4-1 is arranged in two groups, which are respectively used to drive the two hanging platens 2 to rotate, so that the inner edges of the two hanging platens 2 are close to each other or away from each other, thereby Realize the clamping and loosening of steel bars. The main frame 1 is a rectangular frame with a hollow center, and a gap is formed between the hanging table lugs 2-2 and the main frame 1, and the gap is used to pass through the boom 4-1, so that the boom 4-1 can move freely. The hanging arm 4-1 drives the main body 2-1 to rotate through the bracket 3, the bracket 3 is hinged with the lower end of the hanging arm 4-1, the main frame 1 is provided with a bracket seat 1-3, and one end of the bracket 3 Hinged with the bracket base 1-3, the other end of the bracket 3 is provided with a support 3-1 for receiving the main body 2-1 of the hanging platen. Preferably, one end and the middle of the bracket 3 are respectively provided with a first pin hole 3-4 and a second pin hole 3-5, and the first pin hole 3-4 and the second pin hole 3-5 are respectively matched with the pin post and the bracket The frame base 1-3 and the lower end of the boom 4-1 are hinged. The middle of the bracket 3 is provided with a groove 3-3 with an upward opening, and the lower end of the boom 4-1 is located in the groove 3-3. Preferably, the bracket base 1-3 is provided with a bracket stop rail 1-4, and the bracket 3 is provided with a support stop rail 3-2 adapted to the bracket stop rail 1-4 to limit the position. It can prevent the bracket 3 from rotating excessively and cause unnecessary bumps.

吊具4还包括吊梁4-2,吊梁4-2与吊臂4-1的上端铰接,吊梁4-2的中部设有吊耳4-3。优选的,吊梁4-2呈条状,吊臂4-1设置为4条,分别设置在吊梁4-2的四角边缘,并通过销柱与吊梁4-2铰接。The hanger 4 further includes a hanger beam 4-2, the hanger beam 4-2 is hinged with the upper end of the hanger arm 4-1, and the middle part of the hanger beam 4-2 is provided with a hanger 4-3. Preferably, the suspending beam 4-2 is in strip shape, and four suspending arms 4-1 are provided, which are respectively arranged on the four corner edges of the suspending beam 4-2, and are hinged to the suspending beam 4-2 through pins.

钢筋定位架5位于钢筋的待安装位置,用于配合主构架1、挂台板2、托架3和吊具4实现自动卸载钢筋,并将钢筋放置到指定位置,钢筋定位架5包括限位板,限位板的前后两侧分别设有定位板5-4和定位架5-1,定位板5-4的之间形成定位槽5-5,定位槽5-5用于定位单根钢筋。The reinforcing bar locating frame 5 is located at the position where the reinforcing bar is to be installed, and is used to cooperate with the main frame 1, the hanging plate 2, the bracket 3 and the spreader 4 to realize the automatic unloading of the reinforcing bar, and place the reinforcing bar in the designated position. The reinforcing bar locating frame 5 includes the limit The front and rear sides of the limit plate are respectively provided with a positioning plate 5-4 and a positioning frame 5-1, a positioning groove 5-5 is formed between the positioning plates 5-4, and the positioning groove 5-5 is used for positioning a single steel bar .

限位板的左右两侧分别设有支撑座5-3,支撑座5-3上倾斜设有导向板5-2,导向板5-2用于为主构架1的下放导向,实现快速到位。定位板5-4呈向上弯折的曲状,定位架5-1的顶面高于限位板的上表面。当主构架1置于钢筋定位架5上后,可支承托架3,使挂台板2在托架3、吊具4以及钢筋组的重力作用下向下翻折,使挂台板2打开,释放钢筋组。The left and right sides of the limit plate are respectively provided with support seats 5-3, and guide plates 5-2 are inclined on the support seats 5-3. The positioning plate 5-4 is curved upward, and the top surface of the positioning frame 5-1 is higher than the upper surface of the limiting plate. When the main frame 1 is placed on the reinforcement positioning frame 5, the bracket 3 can be supported, so that the hanging plate 2 is folded down under the gravity of the bracket 3, the hanger 4 and the reinforcement group, so that the hanging plate 2 is opened. Release the rebar group.

本发明的工作原理为:The working principle of the present invention is:

钢筋组起吊:当吊机将主构架1吊起,并位于钢筋支架正上方时,缓慢下放主构架1,同时,通过钢筋支架上的导向装置定位,使钢筋组将挂台板2顶开并穿入,待主构架1下放到一定位置,使钢筋顶部的套筒穿过挂台板2后,挂台板2在自重的作用下恢复原位,此时,钢筋已被挂台板2上的凹口2-3卡紧,提升吊架主构架1,将钢筋组吊离钢筋支架;Lifting the steel bar group: When the crane lifts the main frame 1 and is located directly above the steel support bracket, slowly lower the main frame 1, and at the same time, locate the guide device on the steel support bracket, so that the steel bar group lifts the hanging platform 2 to open and close. After the main frame 1 is lowered to a certain position, after the sleeve on the top of the steel bar passes through the hanging platen 2, the hanging platen 2 will return to its original position under the action of its own weight. The notches 2-3 are clamped, lift the main frame 1 of the hanger, and lift the steel bar group away from the steel support bracket;

钢筋组落架:通过吊具4将钢筋组置于钢筋定位架5的上方,缓慢下放主构架1,在导向板5-2和定位架5-1的作用下,将钢筋组的每根钢筋嵌入到定位槽5-5内,当主构架1下放到支撑座5-3上时,通过吊具4继续下放主构架1,直至无法下放,此时,托架3受到定位板5-4和定位架5-1的支承,使挂台板2悬空,在钢筋和挂台板2重力的作用下,挂台板2向下翻折,使挂台板2打开,释放钢筋,向上起吊主构架1即可将钢筋组整体置换至定位板5-4上,并使主构架1脱离钢筋组,以备下次起吊。Rebar group drop frame: place the steel bar group above the steel bar positioning frame 5 through the spreader 4, slowly lower the main frame 1, and embed each steel bar of the steel bar group under the action of the guide plate 5-2 and the positioning frame 5-1 In the positioning groove 5-5, when the main frame 1 is lowered onto the support base 5-3, the main frame 1 continues to be lowered through the hanger 4 until it cannot be lowered. At this time, the bracket 3 is supported by the positioning plate 5-4 and the positioning frame. The support of 5-1 makes the hanging plate 2 hang in the air. Under the action of the steel bar and the gravity of the hanging plate 2, the hanging plate 2 is folded downward, so that the hanging plate 2 is opened, the steel bars are released, and the main frame 1 is lifted upwards. The whole steel bar group can be replaced on the positioning plate 5-4, and the main frame 1 can be separated from the steel bar group for the next lifting.

如图8~9所示,本发明还一种高耸混凝土结构主筋批量吊装方法,用于实现钢筋的批量、吊装,包括以下步骤:As shown in Figures 8-9, the present invention also provides a method for hoisting the main bars of a towering concrete structure in batches, which is used to realize the batch and hoisting of the bars, and includes the following steps:

S1、通过吊具起吊主构架,使主构架位于放置钢筋组的钢筋支架上方,下放主构架,通过钢筋支架上的导向装置完成主构架的水平定位;S1. The main frame is lifted by the sling, so that the main frame is located above the steel support bracket on which the steel bar group is placed, the main frame is lowered, and the horizontal positioning of the main frame is completed through the guide device on the steel support bracket;

S2、在主构架下放过的程中,使钢筋支架上的钢筋组将两个挂台板顶开;并穿过两个挂台板之间的空隙,继续下放,使两个挂台板在自重的作用下闭合;S2. In the process of lowering the main frame, make the steel bar group on the steel support bracket push the two hanging plates; and pass through the gap between the two hanging plates, and continue to lower, so that the two hanging plates are in the closed under the action of its own weight;

S3、缓慢起升主构架,使两个挂台板卡紧钢筋组;S3. Slowly lift the main frame to make the two hanging plates clamp the steel bar group;

S4、将钢筋组移至钢筋定位架的上方,缓慢下放主构架,使钢筋组的每根钢筋分别穿过定位板上的定位槽,继续下放主构架,使托架带动两个挂台板打开,使挂台板放弃支承,将钢筋组置换至钢筋定位架上;S4. Move the steel bar group to the top of the steel bar positioning frame, and slowly lower the main frame, so that each steel bar of the steel bar group passes through the positioning grooves on the positioning plate respectively, and continue to lower the main frame, so that the bracket drives the two hanging platens to open , to make the hanging platform give up the support, and replace the steel bar group to the steel bar spacer;

S5、提升主构架,使主构架脱离钢筋组。S5. Lift the main frame so that the main frame is separated from the steel bar group.

与现有技术相比,本发明,通过主构架和挂台板的自重及实现对钢筋组的夹紧和松脱,可使带套筒大直径钢筋自动进槽、脱槽,可有效加快大直径超长钢筋的吊装速度,减少大直径钢筋的吊装工序,解决了钢筋吊装过程中难定位、功效低的问题,本发明,吊装方法简单,使用灵活、有效,还具有节能减耗的优点。Compared with the prior art, the present invention, through the self-weight of the main frame and the hanging plate, realizes the clamping and loosening of the steel bar group, so that the large-diameter steel bars with sleeves can be automatically slotted into and out of the slot, which can effectively speed up the large-diameter steel bar with sleeves. The hoisting speed of the super-long diameter steel bar reduces the hoisting process of the large-diameter steel bar, and solves the problems of difficult positioning and low efficiency during the hoisting process of the steel bar.

本发明并不局限于上述最佳实施方式,任何人应该得知在本发明的启示下做出的结构变化,凡是与本发明具有相同或相近的技术方案,均落入本发明的保护范围之内。The present invention is not limited to the above-mentioned best embodiment. Anyone should be aware of the structural changes made under the inspiration of the present invention, and any technical solutions that are the same or similar to those of the present invention shall fall within the protection scope of the present invention. Inside.

Claims (9)

1. The utility model provides a high concrete structure owner muscle is hoist device in batches which characterized in that includes:
the middle of the main framework is provided with two hanging table plates, the inner side edges of the two hanging table plates are oppositely arranged, and the hanging table plates are provided with hanging table ear plates which are hinged with the main framework;
the lifting appliance comprises two groups of lifting arms, wherein the two groups of lifting arms are respectively used for driving the two hanging table plates to rotate through brackets, so that the inner side edges of the two hanging table plates are close to or far away from each other, the brackets are hinged with the lower ends of the lifting arms, a bracket seat is arranged on the main framework, one end of each bracket is hinged with the corresponding bracket seat, and the other end of each bracket is provided with a bearing for bearing the corresponding hanging table plate;
the reinforcing bar locating rack is located the mounted position of treating of reinforcing bar, and it includes the limiting plate, both sides are equipped with locating plate and locating rack respectively around the limiting plate, form the constant head tank between the locating plate, the left and right sides of limiting plate is equipped with the supporting seat respectively, the slope is equipped with the deflector on the supporting seat.
2. The batch hoisting device for the main bars of the high-rise concrete structure as claimed in claim 1, wherein the main frame is a rectangular frame with a hollow middle part, the hanging platform ear plate is arranged at the outer edge of the hanging platform plate, and a gap is formed between the hanging platform plate and the main frame.
3. The batch hoisting device for the main reinforcement of the high-rise concrete structure as claimed in claim 1, wherein the bracket is provided with a groove at the middle part, and the lower end of the boom is positioned in the groove.
4. The device for batch hoisting of the main reinforcement of the high-rise concrete structure as claimed in claim 1, wherein the bracket seat is provided with a bracket stop rail, and the bracket is provided with a bearing stop rail adapted to the bracket stop rail.
5. The mass hoisting device of the main reinforcement of the high-rise concrete structure as claimed in claim 1, wherein the inside edge of the hanging plate is provided with a notch for clamping the reinforcement.
6. The batch hoisting device for the main reinforcement of the high-rise concrete structure as claimed in claim 1, wherein the lifting tool further comprises a lifting beam, the lifting beam is hinged with the upper end of the lifting arm, and a lifting lug is arranged in the middle of the lifting beam.
7. The batch hoisting device for the main reinforcement of the high-rise concrete structure as claimed in claim 1, wherein the left and right sides of the position-limiting plate are respectively provided with a support seat, and the support seats are provided with guide plates thereon.
8. The batch hoisting device for the main reinforcement of the high-rise concrete structure as claimed in claim 1, wherein the positioning plate is bent upwards, and the top surface of the positioning frame is higher than the upper surface of the limiting plate.
9. A method for batch hoisting of main reinforcement of a high-rise concrete structure, which is carried out by using the hoisting device as claimed in claim 1, and comprises the following steps:
s1, hoisting the main framework through the lifting appliance, enabling the main framework to be located above the steel bar positioning frame for placing the steel bar group, lowering the main framework, and completing horizontal positioning of the main framework through a guide device on the steel bar positioning frame;
s2, in the process of lowering the main framework, the steel bar group on the steel bar positioning frame jacks up the two hanging bedplate; the hanging plates pass through the gap between the two hanging plates and are continuously lowered, so that the two hanging plates are closed under the action of self weight;
s3, slowly lifting the main framework to enable the two hanging platform boards to clamp the steel bar group tightly;
s4, moving the steel bar group to the upper part of the steel bar positioning frame, slowly lowering the main framework to enable each steel bar of the steel bar group to penetrate through the positioning groove on the positioning plate, continuously lowering the main framework to enable the bracket to drive the two hanging table plates to be opened, enabling the hanging table plates to give up support, and replacing the steel bar group to the steel bar positioning frame;
and S5, lifting the main framework to separate the main framework from the steel bar group.
CN201810751490.7A 2018-07-10 2018-07-10 A batch hoisting device and method for main bars of a towering concrete structure Active CN108726358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810751490.7A CN108726358B (en) 2018-07-10 2018-07-10 A batch hoisting device and method for main bars of a towering concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810751490.7A CN108726358B (en) 2018-07-10 2018-07-10 A batch hoisting device and method for main bars of a towering concrete structure

Publications (2)

Publication Number Publication Date
CN108726358A CN108726358A (en) 2018-11-02
CN108726358B true CN108726358B (en) 2020-01-07

Family

ID=63926572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810751490.7A Active CN108726358B (en) 2018-07-10 2018-07-10 A batch hoisting device and method for main bars of a towering concrete structure

Country Status (1)

Country Link
CN (1) CN108726358B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110329896A (en) * 2019-08-14 2019-10-15 四川路桥华东建设有限责任公司 The curtain hoisting structure and lift-on/lift-off system that square concrete pier stud main reinforcement quickly positions, installs
CN113235826B (en) * 2021-05-19 2022-10-28 中建桥梁有限公司 Steel bar wire connection installation positioning method
CN117306412B (en) * 2023-11-07 2026-03-03 中铁十一局集团有限公司 Integral hoisting alignment adjustable construction method for high pier main reinforcement stirrup-free

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU925839A1 (en) * 1980-08-25 1982-05-07 Государственный Всесоюзный научно-исследовательский институт строительных материалов и конструкций им.П.П.Будникова Gripper for piece loads
CN2537692Y (en) * 2002-04-22 2003-02-26 张德生 Multifunctional hanging tongs
CN202643100U (en) * 2012-06-21 2013-01-02 中铁隧道装备制造有限公司 Mechanical self-locking pipe sheet clamp
CN203474231U (en) * 2013-08-08 2014-03-12 中交第二航务工程局有限公司 Steel bar tower safety hoisting device
CN203545431U (en) * 2013-11-27 2014-04-16 葛洲坝集团第五工程有限公司 Device for vertically hoisting whole large-diameter rebar in high pier construction
CN105152006B (en) * 2015-09-24 2017-05-03 太原高科锐志物流仓储设备有限公司 Gravity-controlled opening and closing lifting appliance
CN205973440U (en) * 2016-08-02 2017-02-22 威海银河风力发电有限公司 Special lifting device of permanent magnet wind power generator main shaft tapered roller bearing

Also Published As

Publication number Publication date
CN108726358A (en) 2018-11-02

Similar Documents

Publication Publication Date Title
CN206783109U (en) A kind of steel bar girder prefabricated board lifting device
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN108726358B (en) A batch hoisting device and method for main bars of a towering concrete structure
CN218619838U (en) Steel pipe truss hoist and mount auxiliary device
CN214326960U (en) Indoor equipment for existing high-rise building hoisting large-scale device
CN211034927U (en) Assembled building hoist and mount frame
CN216105701U (en) Hoisting device for engineering reinforcement construction
CN201334770Y (en) Wall-attached supporting seat
CN110723642A (en) A device and method for translating and hoisting equipment in a closed workshop
CN218027231U (en) A Simple Device for Lowering the Bottom Basket of a Hanging Basket
CN106744310A (en) A kind of large-scale steel structure column hanging method
CN201485204U (en) Gas tank hanging device
CN110306777A (en) A construction method applied to elevator shaft lifting platform in construction engineering
CN214935537U (en) Construction equipment for quickly installing roadbed side ditch cover plate
CN212127255U (en) A turnaround hoisting tool
CN219384478U (en) Precast beam template hoist
CN211367119U (en) A biological filler suspension device for sewage treatment
CN211496634U (en) Main tower integral hoisting system
CN209538714U (en) A kind of bracket device for overhanging unloading platform
CN205527505U (en) Jack overhead hoist
CN220539250U (en) Steel pipe removes scaffold
CN220550838U (en) Building construction external platform
CN222974728U (en) Millions of unit boiler steelframe crossbeam hoist device
CN221216786U (en) Stirrup lifting appliance
CN217518116U (en) Lifting operation platform for construction of steel structure factory building top layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant