CN212863872U - Double-rail device for installing curtain wall - Google Patents

Double-rail device for installing curtain wall Download PDF

Info

Publication number
CN212863872U
CN212863872U CN202021016889.XU CN202021016889U CN212863872U CN 212863872 U CN212863872 U CN 212863872U CN 202021016889 U CN202021016889 U CN 202021016889U CN 212863872 U CN212863872 U CN 212863872U
Authority
CN
China
Prior art keywords
track
fixedly connected
electric hoist
electric
rigid coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021016889.XU
Other languages
Chinese (zh)
Inventor
夏洋
李岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021016889.XU priority Critical patent/CN212863872U/en
Application granted granted Critical
Publication of CN212863872U publication Critical patent/CN212863872U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a construction technical field specifically discloses a double track way device for installing curtain, supporter including the rigid coupling in building structure one end, the side end face of supporter is from last down the rigid coupling in proper order has first track and second track, the lower extreme rigid coupling of supporter has the hoist engine, the inside equal sliding connection of first track and second track has the inside electric pulley that rotates the motor, first track and second track rigid coupling are passed respectively at the both ends of electric pulley has first dead lever and second dead lever, the rigid coupling has first electric hoist lift and second electric hoist lift respectively on the dead lever, the output rigid coupling of first electric hoist lift has operation platform, this device has solved traditional curtain installation and the construction process who dismantles many, the problem of the low problem of efficiency of construction.

Description

Double-rail device for installing curtain wall
Technical Field
The utility model relates to a construction technical field specifically discloses a double track way device for installing curtain.
Background
Curtain walls (Curtain walls) are outer Wall enclosures of buildings and hung like curtains, so the Curtain walls are also called as hanging walls and are light Wall bodies with decoration effects commonly used in modern large and high-rise buildings. The building envelope structure consists of a structural frame and an embedded plate, does not bear the load and the action of a main structure, is different from a building window, and can be called as a curtain wall only by an outer wall with the following four characteristics (1) hung in front of the structural frame (the upright post can be reversely supported under the condition of eccentric compression without instability); 2. does not bear the load of the building structure: a non-load-bearing outer wall comprising loads in horizontal and vertical directions; 3. the self weight and the wind load of the wall body are transmitted to the structural frame of the building through the anchor points; 4. seam design and connection process between the curtain component should be able to make the curtain erect into the continuous wall in limit of any pattern, and in the actual work progress, after hoisting the curtain to the height of the position of treating the installation, the curtain is difficult to carry out lateral shifting, and there is certain horizontal distance between curtain and the position of treating the installation, and the construction is inconvenient. Usually treat the relative both sides of mounted position at the curtain and vertically set up a pair of spacing slide rail, but in the work progress of installing polylith curtain on building structure, corresponding to the mounted position of different curtain, all need install spacing slide rail again or dismantle spacing slide rail at every turn, the efficiency of construction is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problem of the traditional curtain installation and the problem of the low problem of efficiency of construction many with the construction process of dismantlement.
In order to achieve the above object, the present invention provides the following basic scheme:
a double-track device for installing a curtain wall comprises a first track, a second track and a support body for supporting the first track and the second track, wherein one end of the support body is fixedly connected to a building structure, the first track and the second track are fixedly connected to the other end of the support body, a winch is fixedly connected to the lower end of the support body, sliding grooves are formed in the tops of the first track and the second track, electric pulleys with rotating motors arranged inside are slidably connected to the sliding grooves, sliding rods are fixedly connected to the two ends of each electric pulley, a first fixing rod is fixedly connected to the first track through the first end, away from the support body, of each sliding rod in the first track, a first electric hoist lifter is fixedly connected to the first fixing rod, a second electric hoist lifter is fixedly connected to the second fixing rod through the second track through the second end, away from the support body, of each sliding rod in the second track, the output end of the first electric hoist lifter is fixedly connected with an operating platform, a mounting plate is arranged below the second electric hoist lifter, the output end of the second electric hoist lifter is detachably connected with the top of the mounting plate, and one end, far away from the second electric hoist lifter, of the mounting plate is detachably connected with a curtain wall;
the top of mounting panel still the rigid coupling has the electromagnetism handle, the electromagnetism handle is connected with the output electromagnetism of hoist engine, the inside control panel that is based on the PLC controller that is equipped with of operation platform, first electric hoist lift, second electric hoist lift, hoist engine, electromagnetism handle and rotation motor are connected to the control panel electricity respectively.
The principle and the effect of the basic scheme are that,
1. compared with the prior art, this device has solved the mounted position corresponding to different curtain through the design of first track and second track, all need install spacing slide rail again or dismantle spacing slide rail at every turn, problem that the efficiency of construction is low utilizes the second electric hoist lift on operation platform on the first track and the second track to make operation platform and curtain be close to each other or keep away from each other to the mounted position of reasonable adjustment curtain.
2. Compared with the prior art, this device all adopts the electric control mode on first track and second track, because high altitude construction, the feared psychology that can't avoid operating personnel all is dragged or utilizes the haulage rope to drag to artificial pulling, but utilizes the feared psychology that operating personnel just avoided to article on the first track of removal and the second track of electric control mode to the progress of work efficiency and engineering has been improved.
Furthermore, the support body is a right triangle, and the hypotenuse of the right triangle is made of semi-austenite precipitation hardening stainless steel. The right triangle has stability, and the hypotenuse of the right triangle can bear high-strength load by adopting semi-austenite precipitation hardening type stainless steel materials, so that the stability is stronger.
Further, the output end of the first electric hoist lifter adopts a plurality of high-strength high-density cables which are fixedly connected with the operating platform. And a plurality of high-strength and high-density cables guarantee the safety of the operation platform.
Further, the plurality of high strength, high density cables is at least three. Three high-strength and high-density mooring ropes are uniformly and fixedly connected to the top end of the operation platform, so that the stability of the operation platform is improved.
Further, the winch adopts a JM series slow speed winch. The JM series is a slow speed series, and the slow speed winch has higher stability and is more suitable for aerial operation.
Drawings
Fig. 1 is a schematic structural diagram of a dual rail device for installing a curtain wall according to an embodiment of the present invention;
fig. 2 is a schematic installation diagram of a supporting body of a double-rail device for installing a curtain wall according to an embodiment of the present invention;
fig. 3 is a schematic view illustrating the sliding of the electric pulley in the dual-rail device for installing the curtain wall according to the embodiment of the present invention.
Detailed Description
The following is further detailed by the specific embodiments:
reference numerals in the drawings of the specification include: building structure 1, supporter 2, hang plate 3, hoist engine 4, first track 5, second track 6, first electric hoist lift 7, operation platform 9, second electric hoist lift 10, mounting panel 11, collar 12, electromagnetism handle 13, curtain 14, electric pulley 15.
Examples are shown in fig. 1, 2 and 3:
the utility model provides a double track way device for installing curtain, including the supporter 2 of rigid coupling in 1 one end of building structure, supporter 2 is right angled triangle, right angled triangle's hypotenuse adopts half austenite precipitation hardening type stainless steel, specifically be half austenite precipitation hardening type hang plate 3, right angled triangle possesses stability, and right angled triangle's hypotenuse adopts half austenite precipitation hardening type stainless steel can bear the load of high strength, stability is stronger, the right side terminal surface of supporter 2 has first track 5 and second track 6 from last rigid coupling down in proper order, the lower extreme rigid coupling of supporter 2 has hoist engine 4, hoist engine 4 adopts JM series slow speed hoist engine 4. JM series is a slow series, 4 stability of slow hoist engine is higher, be more suitable for aerial operation, first track 5 and the inside equal sliding connection of second track 6 have inside electric pulley 15 that is equipped with the rotation motor, the equal rigid coupling of first track 5 and second track 6 is passed respectively at the both ends of electric pulley 15, the left end of slide bar is worn out first track 5 and second track 6 rigid coupling respectively and is had first dead lever and second dead lever, on first dead lever and the second dead lever respectively the rigid coupling have first electric hoist lift 7 and second electric hoist lift 10, the output rigid coupling of first electric hoist lift 7 has operation platform 9, concrete connection mode is: many high strength high density hawsers are adopted to first electric hoist lift 7's output, many high strength high density hawsers all with operation platform 9 rigid coupling, many high strength high density hawsers give operation platform 9 safe guarantee, many high strength high density hawsers are three at least, the even rigid coupling of three high strength high density hawsers is on operation platform 9 top, improve operation platform 9's stability, the below of second electric hoist lift 10 is equipped with mounting panel 11, the rigid coupling has collar 12 on mounting panel 11, collar 12 is located mounting panel 11's top both ends, the output of second electric hoist lift 10 can be dismantled with the collar 12 at mounting panel 11's top and be connected, mounting panel 11 keeps away from the lower extreme releasable connection of second electric hoist lift 10 and has curtain 14.
The top of mounting panel 11 still the rigid coupling has electromagnetism handle 13, and electromagnetism handle 13 is connected with hoist engine 4's output electromagnetism, and operation platform 9 is inside to be equipped with the control panel based on the PLC controller, and first electric hoist 7, second electric hoist 10, hoist engine 4, electromagnetism handle 13 and rotation motor are connected to the control panel electricity respectively.
The specific implementation process comprises the following steps: firstly, an operator enters an operation platform 9, a worker at the bottom of a building structure 1 fixedly connects a curtain wall 14 with a mounting plate 11, the output end of a winch 4 is wound and connected on an electromagnetic handle 13, then the operator in the operation platform 9 is indicated, the operator supplies electricity to the electromagnetic handle 13 through a control panel, secondly and finally, the output end of a second electric hoist lifter 10 is detachably connected with a mounting ring 12, thirdly, the operator in the operation platform 9 starts the winch 4 through the control panel, the curtain wall 14 is lifted, fourthly, the curtain wall 14 is lifted to a proper height, the winch 4 is stopped and a command of power failure of the electromagnetic handle 13 is given, the electromagnetic handle 13 is powered off, the operator in the operation platform 9 moves the operation platform through a first electric hoist lifter 7, and a cable between the winch 4 and the electromagnetic handle 13 is manually taken off, the output and the mounting panel 11 separation of hoist engine 4 start the rotation motor that is arranged in the electric pulley 15 in second track 6, the rotation motor starts, electric pulley 15 can slide on second track 6 to horizontal migration about driving curtain 14, when removing suitable position, operating personnel gives the instruction of stall rotation motor pivoted in the operation platform 9 is inside, then remove operation platform 9 through control panel, curtain 14 is finally taken off, it can to realize the installation of curtain 14.
The device has simple structure, and solves the problems of more construction procedures and low construction efficiency of the traditional curtain wall 14 installation and disassembly.
The above description is only for the embodiments of the present invention, and the common general knowledge of the known specific structures and characteristics in the schemes is not described herein too much, and those skilled in the art will know all the common technical knowledge in the technical field of the present invention before the application date or the priority date, can know all the prior art in this field, and have the ability to apply the conventional experimental means before this date, and those skilled in the art can combine their own ability to perfect and implement the schemes, and some typical known structures or known methods should not become obstacles for those skilled in the art to implement the present application. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.

Claims (5)

1. The utility model provides a double rail way device for installing curtain which characterized in that: the lifting device comprises a first track, a second track and a supporting body for supporting the first track and the second track, wherein one end of the supporting body is fixedly connected to a building structure, the first track and the second track are fixedly connected to the other end of the supporting body, a winch is fixedly connected to the lower end of the supporting body, sliding grooves are formed in the tops of the first track and the second track, electric pulleys with rotating motors arranged inside are connected to the sliding grooves in a sliding mode, sliding rods are fixedly connected to the two ends of each electric pulley, one end, far away from the supporting body, of each sliding rod in the first track penetrates through the first track and is fixedly connected with a first fixing rod, a first electric hoist lifter is fixedly connected to the first fixing rod, one end, far away from the supporting body, of each sliding rod in the second track penetrates through the second track and is fixedly connected with a second fixing rod, a second electric hoist lifter is fixedly connected to the second fixing rod, and an operation platform is fixedly connected to the output end, a mounting plate is arranged below the second electric hoist lifter, the output end of the second electric hoist lifter is detachably connected with the top of the mounting plate, and one end of the mounting plate, far away from the second electric hoist lifter, is detachably connected with a curtain wall;
the top of mounting panel still the rigid coupling has the electromagnetism handle, the electromagnetism handle is connected with the output electromagnetism of hoist engine, the inside control panel that is based on the PLC controller that is equipped with of operation platform, first electric hoist lift, second electric hoist lift, hoist engine, electromagnetism handle and rotation motor are connected to the control panel electricity respectively.
2. A double track device for mounting curtain walls according to claim 1, wherein: the support body is in the shape of a right triangle, and the hypotenuse of the right triangle is made of semi-austenite precipitation hardening stainless steel.
3. A double track device for mounting curtain walls according to claim 1, wherein: the output end of the first electric hoist lifter adopts a plurality of high-strength high-density cables which are fixedly connected with the operating platform.
4. A double track device for mounting curtain walls according to claim 3, wherein: the plurality of high strength high density cables is at least three.
5. A double track device for mounting curtain walls according to claim 1, wherein: the winch adopts a JM series low-speed winch.
CN202021016889.XU 2020-06-05 2020-06-05 Double-rail device for installing curtain wall Expired - Fee Related CN212863872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021016889.XU CN212863872U (en) 2020-06-05 2020-06-05 Double-rail device for installing curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021016889.XU CN212863872U (en) 2020-06-05 2020-06-05 Double-rail device for installing curtain wall

Publications (1)

Publication Number Publication Date
CN212863872U true CN212863872U (en) 2021-04-02

Family

ID=75208617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021016889.XU Expired - Fee Related CN212863872U (en) 2020-06-05 2020-06-05 Double-rail device for installing curtain wall

Country Status (1)

Country Link
CN (1) CN212863872U (en)

Similar Documents

Publication Publication Date Title
CN102397039B (en) Folding window cleaning equipment
CN203855328U (en) Novel hoisting machine
CN106241618A (en) A kind of curtain wall profiles boom hoisting
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN109025234A (en) A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN112575691B (en) Single-column cable tower cable-stayed bridge cable hanging system and method
CN212863872U (en) Double-rail device for installing curtain wall
CN110056176A (en) A kind of elevator mobile platform and application method
CN105776092A (en) Stretching type basket device and construction method thereof
CN206014303U (en) A kind of hoisting mechanism and the jacking system of the large-sized structural parts based on the mechanism
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN203430008U (en) Integrally movable type construction platform for cast-in-situ of elevator shaft
CN214573363U (en) Cable hanging system of single-column type steel cable tower cable-stayed bridge
CN106968371B (en) A kind of construction method of the high wing articulated structure drifted by wind of curtain wall construction
CN115557404A (en) Luffing jib tower crane with self-balancing mechanism
CN208980193U (en) The curtain wall hanging apparatus of anticollision
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN210559078U (en) Small-size material lifting machine
CN203320415U (en) Novel large-scale pier coating operation hanging basket
CN105438958B (en) Rotating lifting steel-fastening structure component boom hoisting
CN219341583U (en) Building material hoisting device for building construction
CN2435463Y (en) Integral climbing and split lowering scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210402

CF01 Termination of patent right due to non-payment of annual fee