CN109025234A - A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk - Google Patents
A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk Download PDFInfo
- Publication number
- CN109025234A CN109025234A CN201810849959.0A CN201810849959A CN109025234A CN 109025234 A CN109025234 A CN 109025234A CN 201810849959 A CN201810849959 A CN 201810849959A CN 109025234 A CN109025234 A CN 109025234A
- Authority
- CN
- China
- Prior art keywords
- workbench
- horizontal
- vacantly
- crane ship
- track crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/283—Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of building high-altitudes vacantly to construct with the track crane ship that can horizontal, vertically walk, it is related to a kind of construction hanging basket, drip irrigation device includes the guide rail for being fixed on girder steel side, the horizontally moving device being slidably arranged on guide rail and be lifted on workbench below horizontally moving device by wirerope, is fixedly installed is wound the lifting device so that the workbench rise and fall to wirerope on the working platform.Except capable of being vertically moved up or down, additionally it is possible to be horizontally moved, in the construction process, improve construction efficiency.
Description
Technical field
The present invention relates to a kind of construction hanging baskets, more particularly to a kind of track crane ship.
Background technique
Architectural lighting roof is generally positioned at nave, height higher, the decorations of daylighting top/bottom part and power
When electric constructing operation, usual situation allows people to daylighting jacking using the method for setting up scaffold by overlapping scaffold
Row operation, still, scaffold, which is taken, tears larger workload open, and long construction period occupies ground larger space at the same time.
It is existing in the construction process, also usually using hanging basket carry out oscilaltion, still, existing hanging basket, it usually needs
Wirerope is fixed on the girder steel at the top of daylighting, and hanging basket is merely able to oscilaltion, when hanging basket rises to maximum height, still away from
Farther out from lighting roof, at the same time, it when needing to carry out constructing operation to other horizontal positions, needs to retighten wirerope,
It is transferred to other positions to construct again later, this construction efficiency is lower.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of building high-altitude vacantly to construct with can water
Track crane ship that is flat, vertically walking, except capable of being vertically moved up or down, additionally it is possible to be horizontally moved, in the construction process, improve
Construction efficiency.
To achieve the above object, the present invention provides the following technical scheme that
A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk, including be fixed on girder steel guide rail, cunning
The dynamic horizontally moving device being arranged on guide rail and by wirerope be lifted on workbench below horizontally moving device,
It is fixedly installed on the working platform and is wound the lifting device so that the workbench rise and fall to wirerope.
By using above-mentioned technical proposal, pass through the horizontally moving device and lifting dress under the guide rail and guide rail of setting
It sets, workbench can be driven to be gone up and down and moved horizontally, lighting roof can move horizontally in work progress,
Construction efficiency is higher.
Preferably, interval is fixedly installed several support plates on the girder steel, the support plate is " U "-shaped, and the court that is open
On, the guide rail is lifted on the downside of the support plate by bolt.
Guide rail can be reinforced by using above-mentioned technical proposal by the support plate of setting, so that guide rail makes
With more stable in the process.
Preferably, the guide rail includes the fixed part close to support plate side and the lifting portion far from support plate side;
The support plate and fixed part are bolted to connection.
By using above-mentioned technical proposal, pass through the fixed part of setting, for being fixedly connected with support plate, downside
Lifting portion slided for horizontally moving device.
Preferably, lifting portion vertical section is in " mouth " shape, sliding slot is offered in the side far from support plate, is being hung
Slideway is formed among dress portion;The horizontally moving device is provided with two groups on adjacent girder steel, and horizontally moving device includes hanging to connect
Rail climbing device and one end on the downside of the guide rail, which are connected to the other end on Rail climbing device and are connected in the slideway, sockets bar;
It is connected separately with wirerope in the Rail climbing device and the end for socketing bar, to lift to workbench.
By using above-mentioned technical proposal, it is used to slide on rail by the Rail climbing device of setting, realizes workbench
It moves horizontally, meanwhile, bar is socketed by setting, in Rail climbing device and sockets and is separately connected wirerope on bar, thus flat to work
Platform is fixed, and a Rail climbing device is respectively set on each rail, the horizontal drive to workbench can be realized.
Preferably, the Rail climbing device includes motor, the retarder connecting with motor and is connected to the defeated of retarder
Rotating roller on shaft is fixedly installed the driven voller parallel with rotating roller, and the driven voller and rotating roller on retarder
It is connected to the vertical two sides of slideway respectively.
By using above-mentioned technical proposal, rotating roller is driven to be rotated by the motor of setting, rotating roller and driven
Roller is connected to respectively on the vertical two sides inner wall of slideway, by the rotation of rotating roller, is realized and is slided in level, thus, band is started building
It is mobile to make plateau levels.
It sockets bar preferably, described one end of Rail climbing device is provided with T-shaped slider, T-shaped slider upper end is slipped in slideway
It is interior, lower end connecting steel wire ropes.
By using above-mentioned technical proposal, by the T-shaped slider of setting, upside can slip in slideway, and downside can be used for
Connecting steel wire ropes are driven moving horizontally for workbench to can be realized using a Rail climbing device, reduce this and hang applying for ship
Work cost.
Preferably, the workbench includes horizontal table and is arranged on the upside of horizontal table and increases platform,
The height for increasing platform is higher than the horizontal table.
By using above-mentioned technical proposal, increases platform by being arranged on horizontal table, can reduce lighting roof
Minimum range between workbench, so that more convenient operating personnel operates.
Preferably, the lifting device includes the first driving motor being fixed on workbench and is fixed on first
The first reel in driving motor output shaft is wound with wirerope on first reel.
By using above-mentioned technical proposal, by the first driving motor of setting, during it is rotated, drive
First reel is rotated, to drive wirerope-winding on the first reel or extend, realizes the lifting to workbench
Driving.
Preferably, the quadrangle of the workbench is fixedly installed lifting device respectively, and pass through wirerope and water respectively
Flat mobile device connection;Safety lifting device is additionally provided in the workbench corner location;The safety lifting device and
Safety rope is connected between horizontally moving device.
Preferably, the safety lifting device includes the second driving motor being fixed on workbench and is fixed on
The second reel in second driving motor output shaft is wound with safety rope on second reel.
By using above-mentioned technical proposal, pass through the safety lifting device of setting, when the work of the first driving motor, second
Driving motor works together with the first driving motor, the synchronous oscilaltion of safety rope is driven, to more effectively play pre-
Anti- effect, when wirerope, which occurs, can not surprisingly play the role of lifting, safety rope can be lifted workbench, so that
The workbench is safer in construction.
In conclusion the invention has the following advantages:
1, by the horizontally moving device and lifting device under the guide rail of setting and guide rail, workbench can be driven to carry out
It goes up and down and moves horizontally, lighting roof can move horizontally, construction efficiency is higher in work progress;
2, it is used to slide on rail by the Rail climbing device of setting, realizes moving horizontally for workbench, meanwhile, pass through setting
Bar is socketed, in Rail climbing device and sockets and is separately connected wirerope on bar, to workbench be fixed, on each rail
A Rail climbing device is respectively set, the horizontal drive to workbench can be realized;
3, increase platform by being arranged on horizontal table, can reduce the most narrow spacing between lighting roof and workbench
From so that more convenient operating personnel operates;
4, by the safety lifting device of setting, when the work of the first driving motor, the second driving motor is with the first driving electricity
Machine works together, drives the synchronous oscilaltion of safety rope, so that preventive effect is more effectively played, when wirerope occurs surprisingly
When can not play the role of lifting, safety rope can be lifted workbench so that the workbench construction when more
Safety.
Detailed description of the invention
Fig. 1 is the overall structure diagram of track crane ship;
Fig. 2 is the schematic diagram of prominent guide rail in track crane ship;
Fig. 3 is the schematic diagram of prominent horizontally moving device in track crane ship;
Fig. 4 is the schematic diagram of prominent lifting device in track crane ship;
Fig. 5 is the enlarged drawing of A structure in prominent Fig. 4 in track crane ship;
Fig. 6 is the schematic diagram of prominent safety lifting device in track crane ship;
Fig. 7 is the schematic diagram of workbench in track crane ship.
Appended drawing reference: 1, girder steel;2, guide rail;21, support plate;211, floor;22, fixed part;23, lifting portion;231, sliding
Access slot;232, slideway;3, horizontally moving device;31, Rail climbing device;311, motor;312, retarder;313, rotating roller;314,
Driven voller;32, bar is socketed;321, T-shaped slider;4, wirerope;41, safety rope;5, workbench;51, horizontal table;52,
Increase platform;53, connecting rod;6, lifting device;61, the first driving motor;62, the first reel;7, safety lifting device;71,
Second driving motor;72, the second reel.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail, wherein the identical appended drawing reference of identical components
It indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down", " bottom surface " and
" top surface " refers to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from geometric center of specific component
Direction.
A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk, as shown in Figure 1, including being fixed on
Guide rail 2 on girder steel 1 and the horizontally moving device 3 being slidably arranged on guide rail 2 and level is lifted on by wirerope 4
The workbench 5 of the lower section of mobile device 3 is fixedly installed lifting device 6 on workbench 5, passes through lifting device 6 and connect steel wire
Rope 4 realizes driving upside down to workbench 5.
Referring to figs. 1 and 2, several support plates 21 are fixed at intervals on girder steel 1, by support plate 21 to guide rail 2
Support is fixed, wherein the vertical section of support plate 21 is " U "-shaped, and support plate 21 is opening up, passes through on the downside of it
Bolt is fixedly connected with guide rail 2.Length direction one end of support plate 21 is fixed on girder steel 1, further, in order to support plate 21
Connection between girder steel 1 is reinforced, and is fixedly connected with floor 211 between the vertical two sides and girder steel 1 of support plate 21, is passed through
Floor 211 reinforces support plate 21, keeps its fixation more stable.
Guide rail 2 includes the fixed part 22 being fixedly connected with support plate 21 and the lifting for being located remotely from 21 side of support plate
Portion 23, wherein 22 section of fixed part is in " mouth " shape, is fixedly connected by using bolt with support plate 21.Its lifting portion 23 is erected
Straightforward face is in " mouth " shape, and offers sliding slot 231 in the side far from support plate 21, and the length direction for slipping slot 231 is parallel
With the length direction of guide rail 2, slideway 232 is formed among lifting portion 23, for connecting with horizontally moving device 3.
In conjunction with shown in Fig. 2 and Fig. 3, horizontally moving device 3 include be hanging connected in the downside of every guide rail 2 Rail climbing device 31 and
One end, which is connected to the other end on Rail climbing device 31 and is connected in the slideway 231, sockets bar 32.Wherein, Rail climbing device 31 and bar is socketed
32 end is connected separately with wirerope 4, connects one jiao of workbench 5 by wirerope 4, thus, so that workbench 5 exists
It is relatively stable when up and down.
Rail climbing device 31 includes motor 311, the retarder 312 connecting with motor 311 and is connected to retarder 312
Rotating roller 313 on upper output shaft drives rotating roller 313 to rotate by motor 311.At the same time, solid on retarder 312
Surely it is provided with the driven voller 314 parallel with rotating roller 313, wherein driven voller 314 is each provided with one in the two sides of rotating roller 313
It is a, and the roll surface of two driven vollers 314 protrudes from the roll surface of rotating roller 313 in side, thus after mounting, 313 He of rotating roller
Driven voller 314 is all located in slideway 232, and rotating roller 313 and driven voller 314 are connected to respectively on the two sidewalls in slideway 232,
It is creeped by the driving realization level of motor 311.
It sockets bar 32 and one end of Rail climbing device 31 is provided with T-shaped slider 321,321 upper end of T-shaped slider is slipped in slideway
In 232, lower end connecting steel wire ropes 4.To which a Rail climbing device 31 only be arranged under each sliding rail 2, can be realized flat to work
The horizontal drive of platform 5, meanwhile, workbench 5 is again more stable.
In conjunction with shown in Fig. 4 and Fig. 5, lifting device 6 is each provided with one group in the quadrangle of workbench 5, in lifting, simultaneously
Driving upside down to workbench 5 is realized in starting.
Lifting device 6 includes the first driving motor 61 being fixed on workbench 5 and is fixed on the first driving motor
The first reel 62 on 61 output shafts, the one ends wound of the separate Rail climbing device 31 of wirerope 4 pass through control on the first reel 62
The rotation direction of first driving motor 61 realizes the scaling of the first reel 62 control wirerope 4, thus, it realizes to workbench 5
Lifting.
In conjunction with shown in Fig. 5 and Fig. 6, in lifting process, in order to increase degree of safety when construction, the four of workbench 5
Angle Position is additionally provided with safety lifting device 7, at the same time, is connected between safety lifting device 7 and horizontally moving device 3
Safety rope 41, during lifting device 6 moves up and down, the synchronous driving of safety lifting device 7, to more effectively prevent safety
Accident occurs.
Safety lifting device 7 includes the second driving motor 71 being fixed on workbench 5 and is fixed on the second driving
The second reel 72 on 71 output shaft of motor, the lower end of safety rope 41 are wrapped on the second reel 72, when about 6 lifting device rises
When drop, the synchronous driving of the second driving motor 71 realizes the folding and unfolding to safety rope 41, plays the effect of safety precautions.
As shown in fig. 7, workbench 5 includes the horizontal table 51 of fixed lifting device 6 and safety lifting device 7, with
And it is arranged among horizontal table 51 and increases platform 52, wherein the downside for increasing platform 52 passes through the connecting rod 53 of setting
It is supported on horizontal table 51, so that the height for increasing platform 52 is higher than horizontal table 51.To when rising, when reaching
When to maximum height, i.e., the height of horizontal table 51 is lower than girder steel 1, at this point, can reduce lighting roof by increasing platform 52
With the minimum range between workbench 5, thus more convenient operating personnel operate.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (10)
1. a kind of building high-altitude is vacantly constructed with the track crane ship that can horizontal, vertically walk, it is characterised in that: including being fixed on steel
The guide rail (2) of beam (1) side, the horizontally moving device (3) being slidably arranged on guide rail (2) and by wirerope (4) lift
Workbench (5) below horizontally moving device (3), be fixedly installed on the workbench (5) to wirerope (4) into
Row winds the lifting device (6) so that the workbench (5) rise and fall.
2. building high-altitude according to claim 1 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: interval is fixedly installed several support plates (21) on the girder steel (1), and the support plate (21) is " U "-shaped, and the court that is open
On, the guide rail (2) is lifted on the downside of the support plate (21) by bolt.
3. building high-altitude according to claim 1 or 2 is vacantly constructed with the track crane ship that can horizontal, vertically walk, spy
Sign is: the guide rail (2) includes close to the fixed part (22) of support plate (21) side and hanging far from support plate (21) side
Dress portion (23);The support plate (21) and fixed part (22) are bolted to connection.
4. building high-altitude according to claim 3 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: lifting portion (23) vertical section is in " mouth " shape, offers sliding slot (231) in the side far from support plate (21),
Slideway (232) are formed among lifting portion (23);
The horizontally moving device (3) is provided with two groups on adjacent girder steel, and horizontally moving device (3) includes being hanging connected in described lead
Rail climbing device (31) and one end on the downside of rail (2) are connected to the other end on Rail climbing device (31) and are connected in the slideway (232)
Socket bar (32);Wirerope (4) are connected separately in the Rail climbing device (31) and the end for socketing bar (32), thus flat to work
Platform (5) is lifted.
5. building high-altitude according to claim 4 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: the Rail climbing device (31) includes that motor (311), the retarder (312) connecting with motor (311) and being connected to subtracts
Rotating roller (313) on the output shaft of fast device (312), is fixedly installed parallel with rotating roller (313) on retarder (312)
Driven voller (314), and the driven voller (314) and rotating roller (313) are connected to slideway (232) vertical two sides respectively.
6. building high-altitude according to claim 4 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: described to socket bar one end of Rail climbing device is provided with T-shaped slider, T-shaped slider upper end is slipped in slideway, and lower end connects steel
Cord.
7. building high-altitude according to claim 1 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: the workbench (5) includes that horizontal table (51) and setting increase platform on the upside of horizontal table (51)
(52), the height for increasing platform (52) is higher than the horizontal table (51).
8. building high-altitude according to claim 1 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: the lifting device (6) includes the first driving motor (61) being fixed on workbench (5) and is fixed on the first drive
The first reel (62) on motor (61) output shaft is moved, is wound with wirerope (4) on first reel (62).
9. building high-altitude according to claim 8 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: the quadrangle of the workbench (5) is fixedly installed lifting device (6) respectively, and passes through wirerope (4) and horizontal shifting respectively
Dynamic device (3) connection;
In the workbench (5), corner location is additionally provided with safety lifting device (7);The safety lifting device (7) and water
Safety rope (41) are connected between flat mobile device (3).
10. building high-altitude according to claim 9 is vacantly constructed with the track crane ship that can horizontal, vertically walk, feature
Be: safety lifting device (7) lifting device (6) include be fixed on workbench (5) the second driving motor (71), with
And it is fixed on the second reel (72) on the second driving motor (71) output shaft, safety rope is wound on second reel (72)
(41).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810849959.0A CN109025234A (en) | 2018-07-28 | 2018-07-28 | A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810849959.0A CN109025234A (en) | 2018-07-28 | 2018-07-28 | A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109025234A true CN109025234A (en) | 2018-12-18 |
Family
ID=64647631
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810849959.0A Pending CN109025234A (en) | 2018-07-28 | 2018-07-28 | A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109025234A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109468962A (en) * | 2019-01-08 | 2019-03-15 | 云南省建设投资控股集团有限公司 | High-altitude construction auxiliary device and method |
| CN111608378A (en) * | 2020-05-21 | 2020-09-01 | 江南大学 | A beam track connector |
| CN111893888A (en) * | 2020-07-15 | 2020-11-06 | 刘世松 | Movable hanging basket for bridge construction |
| CN112324121A (en) * | 2020-10-30 | 2021-02-05 | 中国一冶集团有限公司 | Sliding type silo cantilever tripod structure and installation method |
| CN112627491A (en) * | 2020-12-31 | 2021-04-09 | 中国建筑第七工程局有限公司 | Rail-traveling single-layer and double-layer hanging basket cantilever device |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0226169A2 (en) * | 1985-12-11 | 1987-06-24 | Przedsiebiorstwo Robot Izolacyjnych | Working platform |
| CN1159500A (en) * | 1995-12-14 | 1997-09-17 | 日本比索株式会社 | Connecting members for connecting rails for moving scaffold suspending unit for moving scaffold and rail connecting structure |
| CN101514586A (en) * | 2009-01-14 | 2009-08-26 | 北京江河幕墙股份有限公司 | Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof |
| CN102733589A (en) * | 2012-06-26 | 2012-10-17 | 中建钢构有限公司 | Mobile operating platform and construction method thereof |
| CN204676869U (en) * | 2015-04-23 | 2015-09-30 | 中国建筑第八工程局有限公司 | For the travelling cradle of curtain wall construction |
| CN105464358A (en) * | 2016-01-13 | 2016-04-06 | 中国葛洲坝集团第一工程有限公司 | Multi-layer construction basket |
| US20180016802A1 (en) * | 2016-07-15 | 2018-01-18 | Korea University Research And Business Foundation | Cage apparatus for construction |
-
2018
- 2018-07-28 CN CN201810849959.0A patent/CN109025234A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0226169A2 (en) * | 1985-12-11 | 1987-06-24 | Przedsiebiorstwo Robot Izolacyjnych | Working platform |
| CN1159500A (en) * | 1995-12-14 | 1997-09-17 | 日本比索株式会社 | Connecting members for connecting rails for moving scaffold suspending unit for moving scaffold and rail connecting structure |
| CN101514586A (en) * | 2009-01-14 | 2009-08-26 | 北京江河幕墙股份有限公司 | Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof |
| CN102733589A (en) * | 2012-06-26 | 2012-10-17 | 中建钢构有限公司 | Mobile operating platform and construction method thereof |
| CN204676869U (en) * | 2015-04-23 | 2015-09-30 | 中国建筑第八工程局有限公司 | For the travelling cradle of curtain wall construction |
| CN105464358A (en) * | 2016-01-13 | 2016-04-06 | 中国葛洲坝集团第一工程有限公司 | Multi-layer construction basket |
| US20180016802A1 (en) * | 2016-07-15 | 2018-01-18 | Korea University Research And Business Foundation | Cage apparatus for construction |
Non-Patent Citations (1)
| Title |
|---|
| 许 刚、刘超太: "北京远洋大厦采光顶擦窗机设备的安装", 《建筑机械化》 * |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109468962A (en) * | 2019-01-08 | 2019-03-15 | 云南省建设投资控股集团有限公司 | High-altitude construction auxiliary device and method |
| CN111608378A (en) * | 2020-05-21 | 2020-09-01 | 江南大学 | A beam track connector |
| CN111893888A (en) * | 2020-07-15 | 2020-11-06 | 刘世松 | Movable hanging basket for bridge construction |
| CN112324121A (en) * | 2020-10-30 | 2021-02-05 | 中国一冶集团有限公司 | Sliding type silo cantilever tripod structure and installation method |
| CN112627491A (en) * | 2020-12-31 | 2021-04-09 | 中国建筑第七工程局有限公司 | Rail-traveling single-layer and double-layer hanging basket cantilever device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109025234A (en) | A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk | |
| CN201411635Y (en) | Construction trolley of safety barrier template | |
| CN201610631U (en) | Traction and movable type lifting platform for construction | |
| CN205275110U (en) | Portable jacking device | |
| CN106430006B (en) | Distribution line mobile insulation ascending operation apparatus and method | |
| CN106437118A (en) | Movable lifter | |
| CN113089894A (en) | Method for installing prefabricated wall board of prefabricated building | |
| CN210127623U (en) | Pulling-up hanging basket for construction of constructional engineering | |
| CN108193603B (en) | A kind of bridge construction hanging device | |
| CN113955636A (en) | Hoisting equipment for assembly type building construction | |
| CN115402909A (en) | Super high-rise inclined double-layer special-shaped curtain wall construction device | |
| CN114033151B (en) | A high-altitude work hanging basket system suitable for various wall conditions | |
| CN221856149U (en) | Guide rope type hanging basket | |
| CN214575445U (en) | Mounting equipment for white hole stone wall panel | |
| CN213571997U (en) | Water conservancy cofferdam construction equipment | |
| CN217924788U (en) | High overhead position climbing frame climbing fixing auxiliary device | |
| CN217352166U (en) | Anticollision wall template platform truck | |
| CN215858940U (en) | Novel detachable combined type steel structure aerial work moving operation platform | |
| CN209799328U (en) | Construction safety construction platform | |
| KR101834355B1 (en) | Quadric crank mechanism using joint type lift | |
| CN213774378U (en) | A prefabricated building safety construction platform | |
| CN111255210A (en) | Lifting platform for low-rise building construction | |
| CN115676617A (en) | A truss type steel coil lifting device | |
| CN109231036B (en) | Building promotes panel with fixed steady equipment of hanging | |
| CN116988419B (en) | A method for moving the dam body near the water surface during construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |
|
| RJ01 | Rejection of invention patent application after publication |