CN218561044U - A operation platform for installing template - Google Patents
A operation platform for installing template Download PDFInfo
- Publication number
- CN218561044U CN218561044U CN202222348140.0U CN202222348140U CN218561044U CN 218561044 U CN218561044 U CN 218561044U CN 202222348140 U CN202222348140 U CN 202222348140U CN 218561044 U CN218561044 U CN 218561044U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- work platform
- screw rod
- platform
- recess
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The application discloses an operation platform for installing template relates to construction technical field, and it wastes time and energy to improve and set up the scaffold, the lower problem of work efficiency, including operation platform and support frame, the support frame includes base, support column and roof, the hoist engine is installed at the top of roof, the winding has the lifting rope on the hoist engine, the one end and the operation platform hoist and mount of lifting rope, the recess has all been seted up to the both sides of operation platform bottom, the inside sliding connection of recess has the extension board, two one side that the recess is close to each other all rotates installs the screw rod, the extension board screw thread cup joints at the screw rod, two the one end that the screw rod is close to each other is connected with the driving piece jointly. This application is through the setting of support frame, and the staff can stand and carry out the template construction on operation platform, need not to set up the scaffold frame, and labour saving and time saving can improve work efficiency.
Description
Technical Field
The application relates to the field of building construction, in particular to an operation platform for installing templates.
Background
The building template is an important tool for manufacturing special-shaped buildings, and in order to ensure the installation of the building template, an operation platform needs to be provided for workers for installing the building template.
At present, the traditional work platform generally adopts and sets up fastener steel pipe scaffold to lay the scaffold board and form construction platform, the staff can stand and carry out the template construction on the platform.
In the process of implementing the application, the inventor finds that at least the following problems exist in the technology, the time and the labor are wasted when the scaffold is erected, and the working efficiency is low, so that a working platform for installing the formwork is provided at present.
SUMMERY OF THE UTILITY MODEL
In order to improve and to set up the scaffold and waste time and energy, the lower problem of work efficiency, this application provides an operation platform for erection formwork.
The application provides an operation platform for installing template adopts following technical scheme:
an operation platform for installing a template comprises an operation platform and a support frame for supporting the operation platform, wherein the support frame comprises a base, a support column fixedly installed on the base and a top plate fixedly installed at the upper end of the support column;
the groove is formed in each of two sides of the bottom of the operation platform, an extension plate is connected to the inner portion of each groove in a sliding mode, a screw rod is installed on one side, close to each other, of each groove in a rotating mode, the extension plate is sleeved on the screw rod in a threaded mode, and one end, close to each other, of each screw rod is connected with a driving piece.
Through adopting the above technical scheme, can start the hoist engine and carry out the rolling to the lifting rope, thereby can make the lifting rope drive operation platform and rise, the staff can stand and carry out the template construction on operation platform, need not to set up the scaffold frame, time saving and labor saving, can improve work efficiency, furthermore, can start the driving piece and drive two screw rods and rotate, make two screw rods drive the extension board and slide in the recess, can be with the outside roll-off of extension board from the opening of recess gradually, the staff can stand and carry out the operation on the extension board, enlarge operation platform's usable floor area, can further improve operation platform's result of use.
Optionally, the top parts of the two sides of the operation platform are fixedly connected with lifting pieces for fixing lifting ropes.
By adopting the technical scheme, the lifting rope can drive the operation platform to rise.
Optionally, the two sides of the operation platform are fixedly connected with connecting pieces, and the connecting pieces are sleeved on the supporting columns in a sliding mode.
Through adopting above-mentioned technical scheme, through the cooperation of connecting piece with the support column, can play the slip supporting role to operation platform, improve operation platform's stability.
Optionally, the driving member includes a motor fixedly mounted on one side of the work platform, a master gear fixedly mounted on an output end of the motor, and a slave gear fixedly mounted on one end of the screw, and the master gear is engaged with the slave gear.
By adopting the technical scheme, the motor can be started to drive the main gear to rotate, so that the main gear drives the driven gear to rotate, and the driven gear drives the screw rod to rotate.
Optionally, a guide rod parallel to the screw rod is fixedly installed inside the groove, and the extension plate is slidably sleeved on the guide rod.
Through adopting above-mentioned technical scheme, the guide arm can play the spacing effect of direction to the extension board.
Optionally, two the equal fixedly connected with baffle of one end that the extension board was kept away from each other.
Through adopting above-mentioned technical scheme, the baffle can play the guard action to operation platform's both ends.
Optionally, the two ends of the baffle are fixedly connected with connecting plates, connecting grooves are formed in the two sides of the operation platform, and the connecting plates are inserted into the connecting grooves.
Through adopting above-mentioned technical scheme, through the cooperation of connecting plate and spread groove, at the extension board in-process that extends, the connecting plate can remain throughout between operation platform and baffle, plays the guard action to the personnel.
Optionally, brake wheels are mounted at four corners of the bottom of the base.
Through adopting above-mentioned technical scheme, be convenient for remove the support frame through the brake wheel.
In summary, the present application has the following beneficial effects:
1. according to the template construction method, the winch can be started to wind the lifting rope through the arrangement of the supporting frame, so that the lifting rope can drive the operation platform to rise, workers can stand on the operation platform to perform template construction, a scaffold does not need to be erected, time and labor are saved, and the working efficiency can be improved;
2. this application is through the setting of recess, extension board, driving piece and screw rod, can enlarge work platform's usable floor area, can further improve work platform's result of use.
Drawings
Fig. 1 is a schematic diagram of the whole structure of the present application.
Fig. 2 is a schematic structural diagram of the work platform of the present application.
Fig. 3 is a schematic cross-sectional view of the bottom of the work platform of the present application.
Description of reference numerals:
1. an operation platform; 2. a base; 3. a support pillar; 4. a top plate; 5. a winch; 6. a lifting rope; 7. a groove; 8. an extension plate; 9. a screw; 10. a drive member; 101. a motor; 102. a main gear; 103. a slave gear; 11. a hanger; 12. a connecting member; 13. a guide bar; 14. a baffle plate; 15. a connecting plate; 16. connecting grooves; 17. a brake wheel.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1-2, an operation platform for installing a template includes an operation platform 1 and a support frame for supporting the operation platform 1, the support frame includes a base 2, a support column 3 fixedly installed on the base 2 and a top plate 4 fixedly installed on the upper end of the support column 3, a hoist 5 is installed on the top of the top plate 4, a lifting rope 6 is wound on the hoist 5, one end of the lifting rope 6 is hoisted with the operation platform 1, two lifting pieces 11 for fixing the lifting rope 6 are fixedly connected to the tops of two sides of the operation platform 1, two lifting ropes 6 are installed, one end of each of the two lifting ropes 6 is connected with the two lifting pieces 11, and the lifting rope 6 can drive the operation platform 1 to be lifted.
When using, can start hoist engine 5 and carry out the rolling to lifting rope 6 to can make lifting rope 6 drive work platform 1 and rise, the staff can stand and carry out the template construction on work platform 1, need not to set up the scaffold frame, labour saving and time saving can improve work efficiency.
Wherein, the equal fixedly connected with connecting piece 12 in both sides of work platform 1, connecting piece 12 slide to cup joint on support column 3, through the cooperation of connecting piece 12 with support column 3, can play the slip supporting role to work platform 1, improve work platform 1's stability.
Referring to fig. 1, brake wheels 17 are mounted at four corners of the bottom of the base 2, and the support frame is convenient to move through the brake wheels 17.
Referring to fig. 2 and fig. 3, recess 7 has all been seted up to the both sides of operation platform 1 bottom, the inside sliding connection of recess 7 has extension board 8, one side that two recesses 7 are close to each other all rotates installs screw rod 9, screw rod 9 is the level and arranges, 8 screw threads of extension board cup joint at screw rod 9, the one end that two screw rods 9 are close to each other is connected with driving piece 10 jointly, can start driving piece 10 and drive two screw rods 9 and rotate, make two screw rods 9 drive extension board 8 slide in recess 7, can outwards roll-off from the opening of recess 7 gradually extension board 8, the staff can stand and carry out the operation on extension board 8, enlarge the usable floor area of operation platform 1, can further improve the result of use of operation platform 1.
The driving member 10 includes a motor 101 fixedly mounted on one side of the work platform 1, a master gear 102 fixedly mounted on an output end of the motor 101, and a slave gear 103 fixedly mounted on one end of the screw 9, wherein the master gear 102 is engaged with the slave gear 103, and the motor 101 can be started to drive the master gear 102 to rotate, so that the master gear 102 drives the slave gear 103 to rotate, and the slave gear 103 drives the screw 9 to rotate.
In addition, the inside fixed mounting of recess 7 has the guide arm 13 that parallels with screw rod 9, and extension board 8 slides and cup joints on guide arm 13, and guide arm 13 can play the spacing effect of direction to extension board 8.
Referring to fig. 2, two extension plates 8 keep away from each other's the equal fixedly connected with baffle 14 of one end, and baffle 14 can play the guard action to the both ends of work platform 1. The equal fixedly connected with connecting plate 15 in both ends of baffle 14, spread groove 16 has all been seted up to work platform 1's both sides, and connecting plate 15 is pegged graft in spread groove 16, through connecting plate 15 and spread groove 16's cooperation, at extension board 8 extension in-process, and connecting plate 15 can remain throughout between work platform 1 and baffle 14, plays the guard action to the personnel.
The implementation principle of the application is as follows: when using, the hoist engine 5 that can start carries out the rolling to lifting rope 6, thereby can make lifting rope 6 drive operation platform 1 and rise, the staff can stand and carry out the template construction on operation platform 1, need not to set up the scaffold frame, time saving and labor saving, can improve work efficiency, furthermore, the driving piece 10 that can start drives two screw rods 9 and rotates, make two screw rods 9 drive extension board 8 and slide in recess 7, can be with extension board 8 from the outside roll-off of opening of recess 7 gradually, the staff can stand and carry out the operation on extension board 8, enlarge the usable floor area of operation platform 1, can further improve the result of use of operation platform 1.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a work platform for installing template, includes work platform (1) and the support frame that is used for supporting work platform (1), its characterized in that: the supporting frame comprises a base (2), a supporting column (3) fixedly installed on the base (2) and a top plate (4) fixedly installed at the upper end of the supporting column (3), a winch (5) is installed at the top of the top plate (4), a lifting rope (6) is wound on the winch (5), and one end of the lifting rope (6) is hoisted with the operation platform (1);
recess (7) have all been seted up to the both sides of operation platform (1) bottom, the inside sliding connection of recess (7) has extension board (8), two one side that recess (7) are close to each other all rotates and installs screw rod (9), extension board (8) screw thread cup joints at screw rod (9), two the one end that screw rod (9) are close to each other is connected with driving piece (10) jointly.
2. A work platform for installing formwork according to claim 1, wherein: the top parts of the two sides of the operation platform (1) are fixedly connected with hanging pieces (11) used for fixing the hanging ropes (6).
3. A work platform for installing formwork according to claim 1, wherein: the two sides of the operation platform (1) are fixedly connected with connecting pieces (12), and the connecting pieces (12) are sleeved on the supporting columns (3) in a sliding mode.
4. A work platform for installing formwork according to claim 1, wherein: the driving piece (10) comprises a motor (101) fixedly mounted on one side of the operation platform (1), a main gear (102) fixedly mounted at the output end of the motor (101) and a driven gear (103) fixedly mounted at one end of the screw rod (9), and the main gear (102) is meshed with the driven gear (103).
5. A work platform for installing formwork according to claim 1, wherein: and a guide rod (13) parallel to the screw rod (9) is fixedly arranged in the groove (7), and the extension plate (8) is sleeved on the guide rod (13) in a sliding manner.
6. A work platform for installing formwork according to claim 1, wherein: two the equal fixedly connected with baffle (14) of one end that extension board (8) kept away from each other.
7. A work platform for installing formwork according to claim 6, wherein: the two ends of the baffle (14) are fixedly connected with connecting plates (15), connecting grooves (16) are formed in the two sides of the operation platform (1), and the connecting plates (15) are inserted into the connecting grooves (16).
8. A work platform for installing formwork according to claim 1, wherein: brake wheels (17) are installed at the four corners of the bottom of the base (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222348140.0U CN218561044U (en) | 2022-09-05 | 2022-09-05 | A operation platform for installing template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222348140.0U CN218561044U (en) | 2022-09-05 | 2022-09-05 | A operation platform for installing template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218561044U true CN218561044U (en) | 2023-03-03 |
Family
ID=85311804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222348140.0U Active CN218561044U (en) | 2022-09-05 | 2022-09-05 | A operation platform for installing template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218561044U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117702741A (en) * | 2024-02-05 | 2024-03-15 | 山西路桥第六工程有限公司 | Novel multifunctional pile foundation construction operation platform |
-
2022
- 2022-09-05 CN CN202222348140.0U patent/CN218561044U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117702741A (en) * | 2024-02-05 | 2024-03-15 | 山西路桥第六工程有限公司 | Novel multifunctional pile foundation construction operation platform |
CN117702741B (en) * | 2024-02-05 | 2024-04-23 | 山西路桥第六工程有限公司 | Novel multifunctional pile foundation construction operation platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218561044U (en) | A operation platform for installing template | |
CN102198914A (en) | Working platform for installing wind generating set | |
CN210828372U (en) | Lifting and mounting integrated ALC partition board mounting machine | |
CN212105028U (en) | Safe type scaffold frame for construction | |
CN218478434U (en) | Prefabricated shear wall lifting device for building convenient to dismantle installation | |
CN112144898A (en) | Supporting mechanism for prefabricated concrete slab | |
CN213923842U (en) | Wallboard lifting device in assembled | |
CN214360123U (en) | Small-size lift is used in engineering construction | |
CN213950475U (en) | Lifting machine for constructional engineering | |
CN210508326U (en) | Liftable well operation platform | |
CN1987020B (en) | Attached climbing type high mast structure mounting method and constructing device | |
CN202011709U (en) | Installation work platform for wind turbine generator set | |
CN100365236C (en) | Circulating mechanical arm type lifting scaffold | |
CN221682397U (en) | Assembled building construction platform | |
CN219341583U (en) | Building material hoisting device for building construction | |
CN214780391U (en) | Lifting device for constructional engineering | |
CN212897670U (en) | Automatic change wall body mounting platform | |
CN213865151U (en) | Small-size hoist device is used in building installation | |
CN218539002U (en) | Various steel sheet construction installation hoist and mount frame with prevent empting function | |
CN115075463B (en) | Wood veneer modeling suspended ceiling structure and installation method thereof | |
CN204531320U (en) | One facilitates furred ceiling ascending/decending gypsum plank fitting machine | |
CN214298986U (en) | Be used for supplementary hoisting device of building door and window construction | |
CN220487147U (en) | Positioning device for curtain wall construction | |
CN220412593U (en) | High security steel stand hoist device | |
CN220845218U (en) | Curtain wall mounting cross-wall suspension device |