CN114875912A - 一种液压式破桩头的钢筋保护方法 - Google Patents
一种液压式破桩头的钢筋保护方法 Download PDFInfo
- Publication number
- CN114875912A CN114875912A CN202210595028.9A CN202210595028A CN114875912A CN 114875912 A CN114875912 A CN 114875912A CN 202210595028 A CN202210595028 A CN 202210595028A CN 114875912 A CN114875912 A CN 114875912A
- Authority
- CN
- China
- Prior art keywords
- reinforcement
- reinforcement cage
- pile
- hollow foam
- head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 229910001294 Reinforcing steel Inorganic materials 0.000 title claims abstract description 16
- 230000002787 reinforcement Effects 0.000 claims abstract description 65
- 239000006260 foam Substances 0.000 claims abstract description 36
- 239000004567 concrete Substances 0.000 claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 20
- 239000010959 steel Substances 0.000 claims abstract description 20
- 238000010276 construction Methods 0.000 description 5
- 238000003973 irrigation Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
一种液压式破桩头的钢筋保护方法,其特征在于包括以下步骤:a、根据钢筋笼主筋的数量及直径,提供若干与钢筋笼主筋同数量且直径配合的空心泡沫棒;b、在钢筋笼顶端的钢筋笼主筋超灌混凝土部分的每根钢筋上套入泡空心沫棒;c、将钢筋笼主筋与空心泡沫棒下部连接部位用扎丝绑扎牢固;d、根据混凝土钢筋笼桩规范要求超灌混凝土部分的高度最少为500mm,为保证砼浇筑能直观看到桩头钢筋位置,空心泡沫棒长度要大于设计超灌要求,便于液压破桩机将桩头分离时保护钢筋。本发明的液压式破桩头的钢筋保护方法具有泡空心沫棒结构简单、使用方便,阻断了混凝土与桩头钢筋的直接接触,保证破除桩头时桩头钢筋不被损坏的优点。
Description
技术领域
本发明涉及钢筋混凝土桩施工技术领域,具体地说,是一种液压式破桩头的钢筋保护方法。
背景技术
建设工程中灌注桩施工完毕后需要进行对超灌量混凝土桩头破除,传统的施工工艺中由于砼浇筑后桩头钢筋位置得不到确定,且桩头钢筋与混凝土直接咬合接触,而在破桩过程当中,会出现两种破坏桩头钢筋现象,其一,在不确定桩钢筋位置情况下,液压破桩机在挤压时刚好挤压到钢筋,容易挤压破损钢筋;其二,桩的混凝土和钢筋在混凝土达到终凝后,钢筋和混凝土形成一定的咬合力,当液压破桩机将桩头分离时,易导致钢筋拉断。
因此已知的超灌量混凝土桩头破除方式存在着上述种种不便和问题。
发明内容
本发明的目的,在于提出一种安全可靠的液压式破桩头的钢筋保护方法。
为实现上述目的,本发明的技术解决方案是:
一种液压式破桩头的钢筋保护方法,其特征在于包括以下步骤:
a、根据钢筋笼主筋的数量及直径,提供若干与钢筋笼主筋同数量且直径配合的空心泡沫棒;
b、在钢筋笼顶端的钢筋笼主筋超灌混凝土部分的每根钢筋上套入泡空心沫棒;
c、将钢筋笼主筋与空心泡沫棒下部连接部位用扎丝绑扎牢固;
d、根据混凝土钢筋笼桩规范要求超灌混凝土部分的高度最少为500mm,为保证砼浇筑能直观看到桩头钢筋位置,空心泡沫棒长度要大于设计超灌要求,便于液压破桩机将桩头分离时保护钢筋。
本发明的液压式破桩头的钢筋保护方法还可以采用以下的技术措施来进一步实现。
前述的方法,其中所述空心泡沫棒为锥形空心泡沫棒。
前述的方法,其中所述空心泡沫棒的直径大于钢筋笼主筋直径5mm。
前述的方法,其中所述泡空心沫棒在每根钢筋笼主筋上的套入长度为大于100mm。
采用上述技术方案后,本发明的液压式破桩头的钢筋保护方法具有以下优点:
1、泡空心沫棒结构简单、使用方便;
2、阻断了混凝土与桩头钢筋的直接接触,保证破除桩头时桩头钢筋不被损坏。
附图说明
图1为本发明实施例的锥形空心泡沫棒与钢筋笼主筋结合的结构示意图。
图中:1钢筋笼主筋,2钢筋笼箍筋,3锥形空心泡沫棒。
具体实施方式
以下结合实施例及其附图对本发明作更进一步说明。
实施例1
现请参阅图1,图1为本发明实施例的锥形空心泡沫棒与钢筋笼主筋结合的结构示意图。本发明的液压式破桩头的钢筋保护方法,包括以下步骤:
1、根据钢筋笼主筋的数量及直径,选取与钢筋笼主筋同数量且直径大于钢筋笼主筋5mm的一组锥形空心泡沫棒。
2、在钢筋笼上依次将主筋超灌部分套入锥形泡空心沫棒,泡沫棒长度高出超灌100mm。
3、将钢筋笼主筋与锥形空心泡沫棒下部连接部位用扎丝绑扎牢固。
4、根据规范要求超灌最少为500mm,为保证砼浇筑能直观看到桩头钢筋位置,泡沫棒长度要大于设计超灌要求。
本发明具有实质性特点和显著的技术进步,本发明的液压式破桩头的钢筋保护方法,确定了桩头钢筋的位置,阻断了混凝土与桩头钢筋的直接接触,从而保证破除桩头时桩头钢筋不被损坏,为桩头破除提供便利条件。
本发明的液压式破桩头的钢筋保护方法在明城金澜湾工程项目中运用,方法简单,安全可靠,效果显著,得到了实施单位、监理单位和建设单位充分肯定。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本发明的范畴,应由各权利要求限定。
Claims (4)
1.一种液压式破桩头的钢筋保护方法,其特征在于包括以下步骤:
a、根据钢筋笼主筋的数量及直径,提供若干与钢筋笼主筋同数量且直径配合的空心泡沫棒;
b、在钢筋笼顶端的钢筋笼主筋超灌混凝土部分的每根钢筋上套入泡空心沫棒;
c、将钢筋笼主筋与空心泡沫棒下部连接部位用扎丝绑扎牢固;
d、根据混凝土钢筋笼桩规范要求超灌混凝土部分的高度最少为500mm,为保证砼浇筑能直观看到桩头钢筋位置,空心泡沫棒长度要大于设计超灌要求,便于液压破桩机将桩头分离时保护钢筋。
2.如权利要求1所述的液压式破桩头的钢筋保护方法,其特征在于,所述空心泡沫棒为锥形空心泡沫棒。
3.如权利要求1所述的液压式破桩头的钢筋保护方法,其特征在于,所述空心泡沫棒的直径大于钢筋笼主筋直径5mm。
4.如权利要求1所述的液压式破桩头的钢筋保护方法,其特征在于,所述泡空心沫棒在每根钢筋笼主筋上的套入长度为大于100mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210595028.9A CN114875912A (zh) | 2022-05-29 | 2022-05-29 | 一种液压式破桩头的钢筋保护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210595028.9A CN114875912A (zh) | 2022-05-29 | 2022-05-29 | 一种液压式破桩头的钢筋保护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114875912A true CN114875912A (zh) | 2022-08-09 |
Family
ID=82679533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210595028.9A Pending CN114875912A (zh) | 2022-05-29 | 2022-05-29 | 一种液压式破桩头的钢筋保护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114875912A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115467328A (zh) * | 2022-10-26 | 2022-12-13 | 中交第三公路工程局有限公司 | 一种基于无损钢筋的桩头安全破除装置及方法 |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1981002757A1 (en) * | 1980-03-17 | 1981-10-01 | K Asakura | Method of removing top part of cast-in-place concrete pile |
JP2005325607A (ja) * | 2004-05-14 | 2005-11-24 | Takenaka Komuten Co Ltd | 場所打ちコンクリート杭の杭頭処理工法 |
CN202247889U (zh) * | 2011-08-16 | 2012-05-30 | 中建三局建设工程股份有限公司 | 一种新型的桩头破除系统 |
CN105735317A (zh) * | 2016-03-09 | 2016-07-06 | 中天路桥有限公司 | 灌注桩破除桩头施工工艺 |
GB201617072D0 (en) * | 2016-02-19 | 2016-11-23 | Novaslice Ltd | Improvements in or relating to pile head removal |
CN206052712U (zh) * | 2016-08-24 | 2017-03-29 | 中交一公局厦门工程有限公司 | 一种新型钻孔桩桩头预埋免钻孔环切整体快速提吊装置 |
CN206667234U (zh) * | 2017-04-06 | 2017-11-24 | 重庆建工第四建设有限责任公司 | 混凝土桩头破除辅助结构 |
CN108086306A (zh) * | 2017-11-20 | 2018-05-29 | 浙江省地矿建设有限公司 | 一种桩头混凝土施工及凿除方法 |
CN208472728U (zh) * | 2018-07-03 | 2019-02-05 | 中国水利水电第十四工程局有限公司 | 一种用于钻孔桩桩头破除的钢筋保护装置 |
CN110485421A (zh) * | 2019-09-24 | 2019-11-22 | 中国五冶集团有限公司 | 一种桩头快速破除施工工艺 |
JP2020063660A (ja) * | 2019-12-16 | 2020-04-23 | 株式会社村上工業 | 地中杭破砕方法 |
CN112761154A (zh) * | 2020-12-31 | 2021-05-07 | 中交一公局第二工程有限公司 | 一种混凝土灌注桩桩头的破除方法 |
CN214061588U (zh) * | 2020-12-15 | 2021-08-27 | 福建省融创建设工程有限公司 | 一种用于钻孔桩桩头破除的钢筋保护装置 |
CN114541394A (zh) * | 2022-02-21 | 2022-05-27 | 陕西建工机械施工集团有限公司 | 一种便于灌注桩桩头破除的施工方法 |
-
2022
- 2022-05-29 CN CN202210595028.9A patent/CN114875912A/zh active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1981002757A1 (en) * | 1980-03-17 | 1981-10-01 | K Asakura | Method of removing top part of cast-in-place concrete pile |
JP2005325607A (ja) * | 2004-05-14 | 2005-11-24 | Takenaka Komuten Co Ltd | 場所打ちコンクリート杭の杭頭処理工法 |
CN202247889U (zh) * | 2011-08-16 | 2012-05-30 | 中建三局建设工程股份有限公司 | 一种新型的桩头破除系统 |
GB201617072D0 (en) * | 2016-02-19 | 2016-11-23 | Novaslice Ltd | Improvements in or relating to pile head removal |
CN105735317A (zh) * | 2016-03-09 | 2016-07-06 | 中天路桥有限公司 | 灌注桩破除桩头施工工艺 |
CN206052712U (zh) * | 2016-08-24 | 2017-03-29 | 中交一公局厦门工程有限公司 | 一种新型钻孔桩桩头预埋免钻孔环切整体快速提吊装置 |
CN206667234U (zh) * | 2017-04-06 | 2017-11-24 | 重庆建工第四建设有限责任公司 | 混凝土桩头破除辅助结构 |
CN108086306A (zh) * | 2017-11-20 | 2018-05-29 | 浙江省地矿建设有限公司 | 一种桩头混凝土施工及凿除方法 |
CN208472728U (zh) * | 2018-07-03 | 2019-02-05 | 中国水利水电第十四工程局有限公司 | 一种用于钻孔桩桩头破除的钢筋保护装置 |
CN110485421A (zh) * | 2019-09-24 | 2019-11-22 | 中国五冶集团有限公司 | 一种桩头快速破除施工工艺 |
JP2020063660A (ja) * | 2019-12-16 | 2020-04-23 | 株式会社村上工業 | 地中杭破砕方法 |
CN214061588U (zh) * | 2020-12-15 | 2021-08-27 | 福建省融创建设工程有限公司 | 一种用于钻孔桩桩头破除的钢筋保护装置 |
CN112761154A (zh) * | 2020-12-31 | 2021-05-07 | 中交一公局第二工程有限公司 | 一种混凝土灌注桩桩头的破除方法 |
CN114541394A (zh) * | 2022-02-21 | 2022-05-27 | 陕西建工机械施工集团有限公司 | 一种便于灌注桩桩头破除的施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115467328A (zh) * | 2022-10-26 | 2022-12-13 | 中交第三公路工程局有限公司 | 一种基于无损钢筋的桩头安全破除装置及方法 |
CN115467328B (zh) * | 2022-10-26 | 2024-04-05 | 中交第三公路工程局有限公司 | 一种基于无损钢筋的桩头安全破除装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101302758B (zh) | 预应力方桩的加工方法 | |
CN114875912A (zh) | 一种液压式破桩头的钢筋保护方法 | |
CN101525917A (zh) | 一种墙体的建造工艺 | |
CN206828967U (zh) | 铁路工程连续梁的纵向预应力张拉装置 | |
CN102828510A (zh) | H型支护桩及其制备方法 | |
CN102966101B (zh) | 一种预应力混凝土实心方桩及其制作方法 | |
CN101942832A (zh) | 钢桩尖全预应力混凝土整根实心方桩及其加工方法 | |
CN102979086A (zh) | 一种预应力混凝土方桩及其制作方法 | |
CN202989918U (zh) | 可回收预应力锚索的智能承载头 | |
CN102995635B (zh) | 预应力混凝土方桩及其制作方法 | |
CN107044295B (zh) | 一种新型注浆锚杆 | |
CN202954490U (zh) | 一种钢筋笼吊装滚动式垫块 | |
CN102852139B (zh) | 一种异形高承载力混凝土桩及其生产方法 | |
CN101892664B (zh) | 塑料蜂窝管护壁的灌注桩群施工方法及蜂窝形灌注桩 | |
CN204738454U (zh) | 一种墙柱纵向钢筋定位工具 | |
CN204875525U (zh) | 一种预应力钢绞线退锚装置 | |
CN210396152U (zh) | 现浇结构梁板与墙柱交界面不同标号混凝土节点浇筑控制工具 | |
CN205954641U (zh) | 可循环使用的拼装式集水坑支撑防护装置 | |
CN215669474U (zh) | 一种phc管桩结构 | |
CN205677664U (zh) | 一种柔性模板加固装置 | |
CN219930943U (zh) | 一种后插筋灌注桩钢筋笼端部构造 | |
CN209212262U (zh) | 一种隧道二衬钢筋结构 | |
CN202718394U (zh) | 支模用锥体螺杆 | |
CN216551898U (zh) | 一种免破灌注桩头一体成型装置 | |
CN214460342U (zh) | 一种灌注桩的快速试桩桩帽成型装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220809 |