CN114775954A - High-efficient rubbish clearance system of super high-rise building thing - Google Patents

High-efficient rubbish clearance system of super high-rise building thing Download PDF

Info

Publication number
CN114775954A
CN114775954A CN202210486149.XA CN202210486149A CN114775954A CN 114775954 A CN114775954 A CN 114775954A CN 202210486149 A CN202210486149 A CN 202210486149A CN 114775954 A CN114775954 A CN 114775954A
Authority
CN
China
Prior art keywords
communicating
floor
stabilizing
piece
communicating piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210486149.XA
Other languages
Chinese (zh)
Other versions
CN114775954B (en
Inventor
李应心
王忠俭
李文强
郭立
倪庆双
赵振超
曾繁博
付志鹏
李震东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202210486149.XA priority Critical patent/CN114775954B/en
Publication of CN114775954A publication Critical patent/CN114775954A/en
Application granted granted Critical
Publication of CN114775954B publication Critical patent/CN114775954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/10Arrangements in buildings for the disposal of refuse

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuse Collection And Transfer (AREA)

Abstract

The invention relates to a high-efficiency garbage clearing system for a super high-rise building, which relates to the technical field of building engineering and comprises a stabilizing mechanism arranged on a floor, wherein the stabilizing mechanism is provided with a garbage channel, the garbage channel comprises a plurality of groups of channel components, the stabilizing mechanism comprises a plurality of groups of stabilizing components arranged on the floor, connecting pieces matched with communicating pieces are arranged on the stabilizing components, and the connecting pieces are positioned at the connecting parts of two adjacent channel components. The invention can be stably hung on the floor through the unique structural design, simultaneously can effectively reduce the damage of high-rise building garbage to the whole communicating piece, can reduce the raised dust generated by the building garbage, and can treat the building garbage at the first floor of the building.

Description

High-efficient rubbish clearance system of super high-rise building thing
Technical Field
The invention relates to the technical field of constructional engineering, in particular to a high-efficiency garbage clearing system for a super high-rise building.
Background
In high-rise building or super high-rise building construction, can produce a large amount of building rubbish, especially the electromechanical, the fitment construction decoration stage in later stage, each floor all can have a large amount of building rubbish, and these building rubbish need in time be transported to ground and shift the processing, otherwise these building rubbish can occupy a large amount of construction space, hinder the volume of normal construction to go on, therefore the constructor is puzzled in the processing of these building rubbish.
At present, the traditional treatment method of floor building rubbish is that the manual trolley transports the building rubbish to the made rubbish dumping place through a construction elevator and the like, but the method can consume a large amount of manpower and material resources, and the transportation efficiency is achieved, and meanwhile in the whole transportation process, the raised dust is difficult to control, and adverse effects are caused on the construction environment of a construction site.
In addition, a closed channel is built on the side face of the stair by the masonry, a movable collecting opening is formed in each floor to collect garbage, the construction cost is high, the channel is of a fixed structure and cannot be recycled, the building aesthetic feeling is influenced, the transportation of the building garbage is generally not carried out by the mode, in addition, a device for transporting the building garbage by the channel is also arranged on the market at present, some channels are made of metal, the channels are irregular due to the fact that the building garbage is often massive and have sharp corners to damage the metal channels to a certain extent, if the channels are made of flexible materials, the channels are often damaged to a certain extent, and particularly the building garbage in higher floors often have larger impulse force and also can cause larger impact force.
How to solve the above technical problems is the subject of the present invention.
Disclosure of Invention
In order to solve the defects of the prior art, the invention provides the high-efficiency garbage clearing system for the super high-rise building, which is reasonable in design, safe and reliable.
The technical scheme adopted by the invention for solving the technical problem is as follows: a high-efficiency garbage clearing system for a super high-rise building comprises a stabilizing mechanism arranged on a floor, wherein the stabilizing mechanism is provided with a garbage channel, the garbage channel comprises a plurality of groups of channel pieces, the stabilizing mechanism comprises a plurality of groups of stabilizing components arranged on the floor, connecting pieces matched with the communicating pieces are arranged on the stabilizing components, and the connecting pieces are positioned at the connecting parts of two adjacent channel pieces; the stabilizing component at the bottommost end of the stabilizing mechanism is arranged on the second floor of the building, the communicating piece comprises a releasing communicating piece located in the middle of the floor, the releasing communicating piece is provided with a releasing port, the top end of the releasing communicating piece is provided with a buffering communicating piece, a buffering component is arranged in the buffering communicating piece, the bottom end of the releasing communicating piece is provided with a connection with a common communicating piece of the buffering communicating piece, the common communicating piece is located at the bottommost end of the second floor of the building and is provided with a crushing component, and a garbage collection bin communicated with the common communicating piece on the second floor of the building is arranged on the ground.
Further, be provided with the door of losing on losing the mouth, just the buffering subassembly is including setting up buffer board in the buffering communicating piece, the both sides of buffer board with the buffering communicating piece rotates to be connected, the buffer board with buffering communicating piece constitutes the contained angle, just buffering communicating piece be provided with buffer board complex buffer spring, and the buffer board difference side of the buffering communicating piece in two adjacent floors.
Furthermore, a crushing assembly is arranged on a common communicating piece at the bottommost end of each floor, and a stabilizing frame connected with the floors is arranged on the outer side of the common communicating piece with the crushing assembly.
Furthermore, the crushing unit package is embedded in the crushing frame in the common communicating piece, two crushing rollers which are parallel to each other and symmetrically arranged are arranged on the crushing frame, a driving piece matched with the crushing rollers is arranged on the crushing frame, and a garbage feeding funnel matched with the releasing communicating piece is arranged at the top end of the crushing frame.
Further, the subassembly that stabilizes includes the U type spare of two relative settings, the through hole has been seted up of U type spare, be equipped with firm bolt in the through hole, just firm bolt runs through the one end of U type spare be provided with the fixed foot that the floor contacted, just the top of U type spare is provided with firm telescopic link, the one end of firm telescopic link with U type spare is connected, the other end of firm telescopic link and the U type spare bottom of another adjacent group's firm subassembly or adjacent the bottom of floor contacts.
Furthermore, be provided with on the U-shaped spare with the connection protruding that the intercommunication piece is connected, with it complex, the intercommunication piece be provided with connect protruding complex intercommunication recess.
Furthermore, the connecting piece comprises two connecting half frames which are opposite and symmetrically arranged, the connecting half frames form a connecting frame, the connecting frame is sleeved on the stable telescopic rod, fixing parts are arranged at openings of the two connecting half frames, and fixing bolts are arranged on the fixing parts; one side of the opening part of the connecting half frame is provided with a semicircular groove, the two semicircular grooves form a circular groove, the circular groove is provided with threads, a fixing screw rod is matched with the threads in the circular groove, and one end of the fixing screw rod is provided with a pad foot which is contacted with the stable telescopic rod; the other side of the opening part of the connecting half frame is provided with a connecting part connected with the communicating part and matched with the connecting part, and the communicating part is provided with a matching part matched with the connecting part.
Furthermore, the bottom of the stabilizing telescopic rod is provided with a connecting groove in threaded fit with the stabilizing bolt.
Further, the garbage collection bin is located bottom department of refuse passage and with the refuse passage intercommunication, one side intercommunication in garbage collection bin has a garbage transfer section of thick bamboo, just a garbage transfer section of thick bamboo is located the first layer of building for collect the building rubbish of building the first layer.
The invention can be stably hung on floors through the unique structural design, can effectively reduce the damage of high-rise building garbage to the whole communicating piece, can reduce the raised dust generated by the building garbage, and can treat the building garbage at the first floor of the building.
According to the invention, through the arrangement of the unique stabilizing mechanism, the communicating piece can be stably hung on a floor, and the garbage channel is arranged in the stabilizing mechanism according to a series of structural designs, so that the connecting strength of the whole device is improved.
The invention can effectively insist on the raised dust generated when the high-rise building garbage is thrown through the arrangement of the unique garbage channel, and can effectively transfer the building garbage on each floor and reduce the damage to the whole communicating piece through the arrangement of the buffering component, the crushing component and the throwing port.
Drawings
FIG. 1 is a schematic three-dimensional structure of the present invention;
FIG. 2 is a rear view of the present invention;
FIG. 3 is a schematic cross-sectional view A-A of the present invention;
FIG. 4 is an enlarged schematic view of the invention at point A;
FIG. 5 is a schematic three-dimensional structure of the stabilizing mechanism of the present invention;
FIG. 6 is an enlarged schematic view of the invention at B;
wherein the figures are identified as: 1. a floor; 2. a stabilizing mechanism; 21. a stabilizing assembly; 211. a U-shaped member; 212. stabilizing the bolt; 213. a fixing leg; 214. the telescopic rod is stabilized; 3. a refuse chute; 31. a channel member; 311. a lost square communicating piece; 312. a buffer communication member; 313. a common communicating member; 4. a connecting member; 41. connecting the half frames; 42. a connecting frame; 43. a fixed part; 44. fixing the screw rod; 441. a foot pad; 5. building; 6. a buffer assembly; 61. a buffer plate; 7. a size reduction assembly; 71. a crushing roller; 8. a garbage collection bin; 9. a refuse transfer cylinder.
Detailed Description
Referring to fig. 1 to 6, the present embodiment is a high-efficiency garbage cleaning system for a super high-rise building, including a stabilizing mechanism 2 disposed on a floor 1, the stabilizing mechanism 2 is provided with a garbage passage 3, the garbage passage 3 includes several groups of passage members 31, the stabilizing mechanism 2 includes several groups of stabilizing assemblies 21 disposed on the floor 1, the stabilizing assemblies 21 are provided with connecting members 4 engaged with the communication members 31, and the connecting members 4 are located at the connection positions of two adjacent passage members 31; the stabilizing component 21 at the bottommost end of the stabilizing mechanism 2 is arranged on the second floor of the building 5, the communicating piece 31 comprises a releasing communicating piece 311 positioned in the middle of the floor, the releasing communicating piece 311 is provided with a releasing port, the top end of the releasing communicating piece 311 is provided with a buffering communicating piece 312, a buffering component 6 is arranged in the buffering communicating piece 312, the bottom end of the releasing communicating piece 311 is provided with a common communicating piece 313 connected with the buffering communicating piece 312, the common communicating piece 313 positioned at the bottommost end of the second floor of the building 5 is provided with a crushing component 7, and a garbage collection bin 8 communicated with the common communicating piece 313 on the second floor of the building 5 is arranged on the ground.
Specifically, two connected communicating members 31 are connected by bolts, and a buffer rubber pad is arranged between the two connected communicating members 31.
Further, it is provided with the door of putting to lose on the mouth, just buffering subassembly 6 is including setting up buffer board 61 in the buffering communicating piece 312, buffer board 61's both sides with buffering communicating piece 312 rotates to be connected, buffer board 61 with buffering communicating piece 312 constitutes the contained angle, just buffering communicating piece 312 be provided with buffer board 61 complex buffer spring, and the buffer board 61 difference side of buffering communicating piece 312 in two adjacent floors.
Furthermore, the common communicating piece 313 at the bottommost end of each floor is provided with the crushing assembly 7, and the outer side of the common communicating piece 313 with the crushing assembly 7 is provided with a stabilizing frame connected with the floor.
Further, the crushing assembly 7 is embedded in the crushing frame of the common communicating piece 313, the crushing frame is provided with two crushing rollers 71 which are parallel to each other and symmetrically arranged, the crushing frame is provided with a driving piece matched with the crushing rollers, and the top end of the crushing frame is provided with a garbage feeding funnel matched with the releasing communicating piece 311.
Further, the subassembly 21 that stabilizes includes the U type spare 211 of two relative settings, the through hole has been seted up of U type spare 211, be equipped with stabilizing bolt 212 in the through hole, just stabilizing bolt 212 runs through the one end of U type spare 211 be provided with the fixed foot 213 that the floor contacted, just the top of U type spare 211 is provided with firm telescopic link 214, the one end of firm telescopic link 214 with U type spare 211 is connected, the other end of firm telescopic link 214 and the U type spare 211 bottom of the subassembly 21 that stabilizes of another adjacent group or adjacent the bottom of floor contacts.
Furthermore, the U-shaped part 211 is provided with a connecting protrusion connected to the communicating member 31, and the communicating member 31 is provided with a communicating groove matched to the connecting protrusion.
Further, the connecting member 4 includes two connecting half frames 41 which are opposite and symmetrically arranged, the connecting half frames 41 form a connecting frame 42, the connecting frame 42 is sleeved on the stabilizing telescopic rod 214, fixing portions 43 are arranged at openings of the two connecting half frames 41, and fixing bolts are arranged on the fixing portions 43; a semicircular groove 411 is formed in one side of the opening of the connecting half frame 41, the two semicircular grooves 411 form a circular groove 421, a thread is formed on the circular groove 421, a fixing screw 44 is matched with the thread in the circular groove 421, and a foot pad 441 in contact with the stabilizing telescopic rod 214 is arranged at one end of the fixing screw 44; the other side of the opening of the connecting half frame 41 is provided with a connecting part connected with the communicating part 31, and the communicating part 31 is provided with a matching part matched with the connecting part.
Preferably, a stable nut is arranged on the bolt and is in contact with the connecting frame.
Preferably, the connecting portion is provided as a connecting claw, and the engaging portion is provided as a connecting portion engaged with the connecting claw.
Preferably, the connecting part of the connecting half frame is provided with a protrusion which is matched with the protrusion, and the matched part of the communicating piece is provided with a groove.
Preferably, the connecting portion of connecting half frame set up to the baffle, just be provided with on the baffle and hang and establish the recess, with it complex, the recess is provided with and hangs and establish recess complex couple.
Further, the bottom of the stabilizing telescopic rod 43 is provided with a connecting groove matched with the stabilizing bolt 212 in a threaded manner, so that the overall performance of the whole stabilizing assembly is improved, and the stabilizing mechanism has stronger stability.
Further, garbage collection bin 8 is located garbage channel 3's bottom department and with garbage channel 3 intercommunication, one side intercommunication in garbage collection bin 8 has a garbage transfer section of thick bamboo 9, just a garbage transfer section of thick bamboo 9 is located the first layer of building for collect the building rubbish of building the first layer.
During the use, according to the quantity of floor and the interval of floor, select the communicating piece of different quantity to carry out setting up of rubbish passageway, and at the beginning of setting up of rubbish passageway, set up whole firm mechanism earlier, concretely, earlier hang whole U type spare on the floor outside, and adjust the interval between two U type spares according to the size of communicating piece, and utilize firm bolt to fix, all floors all are provided with the device, install firm telescopic link afterwards, secondly, the communicating piece of piecemeal in each floor carries out the erection joint, and use the U type spare of the bottom of every floor as the benchmark, assemble and communicate and form whole rubbish passageway, afterwards, collect the storehouse with rubbish to anticipated position department, and be linked together the top in rubbish passageway and rubbish collection storehouse, afterwards, be linked together whole rubbish transport section of thick bamboo and rubbish collection storehouse. Finally, the crushing assemblies are installed on the common communicating pieces in the floors with different heights according to requirements, but the outer side of the common communicating piece with the crushing assemblies is provided with a stabilizing frame due to vibration generated by crushing.
The technical features of the present invention which are not described in the above embodiments may be implemented by or using the prior art, and are not described herein again, of course, the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and variations, modifications, additions or substitutions which may be made by those skilled in the art within the spirit and scope of the present invention should also fall within the protection scope of the present invention.

Claims (9)

1. The utility model provides a high-efficient rubbish clearance system of super high-rise building, is including setting up stabilizing mean (2) on floor (1), stabilizing mean (2) are provided with rubbish passageway (3), rubbish passageway (3) include a plurality of groups channel part (31), its characterized in that: the stabilizing mechanism (2) comprises a plurality of groups of stabilizing components (21) arranged on the floor (1), connecting pieces (4) matched with the communicating pieces (31) are arranged on the stabilizing components (21), and the connecting pieces (4) are positioned at the connecting positions of two adjacent channel pieces (31);
the stabilizing component (21) at the bottommost end of the stabilizing mechanism (2) is arranged on the second floor of the building (5), the communicating piece (31) comprises a releasing communicating piece (311) located in the middle of the floor, the releasing communicating piece (311) is provided with a releasing port, the top end of the releasing communicating piece (311) is provided with a buffering communicating piece (312), the buffering component (6) is arranged in the buffering communicating piece (312), the bottom end of the releasing communicating piece (311) is provided with a common communicating piece (313) connected with the buffering communicating piece (312), the common communicating piece (313) at the bottommost end of the second floor of the building (5) is provided with a crushing component (7), and the ground is provided with a garbage collecting bin (8) communicated with the common communicating piece (313) on the second floor of the building (5).
2. The high efficiency refuse clearing system of super high-rise building as claimed in claim 1, wherein: be provided with the door of losing on losing the mouth, just buffering subassembly (6) are including setting up buffer board (61) in buffering communicating member (312), the both sides of buffer board (61) with buffering communicating member (312) rotate to be connected, buffer board (61) with buffering communicating member (312) constitute the contained angle, just buffering communicating member (312) be provided with buffer board (61) complex buffer spring, and buffer board (61) different sides of buffering communicating member (312) in two adjacent floors.
3. The high efficiency refuse clearing system for super high-rise building according to claim 2, wherein: and a crushing assembly (7) is arranged on the common communicating piece (313) at the bottommost end of each floor, and a stabilizing frame connected with the floor is arranged on the outer side of the common communicating piece (313) with the crushing assembly (7).
4. The high efficiency refuse clearing system of super high-rise building as claimed in claim 3, wherein: the crushing assembly (7) is embedded in the crushing frame in the common communicating piece (313), two crushing rollers (71) which are parallel to each other and symmetrically arranged are arranged on the crushing frame, a driving piece matched with the crushing rollers is arranged on the crushing frame, and a garbage feeding funnel matched with the releasing communicating piece (311) is arranged at the top end of the crushing frame.
5. The high efficiency refuse clearing system for super high-rise building according to claim 4, wherein: firm subassembly (21) include two relative U type spare (211) that set up, the through hole has been seted up of U type spare (211), be equipped with firm bolt (212) in the through hole, just firm bolt (212) run through the one end of U type spare (211) be provided with fixed foot (213) that the floor contacted, just the top of U type spare (211) is provided with firm telescopic link (214), the one end of firm telescopic link (214) with U type spare (211) are connected, the other end of firm telescopic link (214) and the U type spare (211) bottom of the firm subassembly (21) of another adjacent group or adjacent the bottom of floor contacts.
6. The high efficiency refuse clearing system of super high-rise building as claimed in claim 5, wherein: the U-shaped piece (211) is provided with a connecting bulge connected with the communicating piece (31) and matched with the connecting bulge, and the communicating piece (31) is provided with a communicating groove matched with the connecting bulge.
7. The high efficiency refuse clearing system for super high-rise building according to claim 6, wherein: the connecting piece (4) comprises two opposite and symmetrically arranged connecting half frames (41), the connecting half frames (41) form a connecting frame (42), the connecting frame (42) is sleeved on the stabilizing telescopic rod (214), a fixing part (43) is arranged at an opening of the two connecting half frames (41), and a fixing bolt is arranged on the fixing part (43);
one side of the opening part of the connecting half frame (41) is provided with a semi-circular groove (411), the two semi-circular grooves (411) form a circular groove (421), a thread is arranged on the circular groove (421), a fixing screw rod (44) is matched with the thread in the circular groove (421), and one end of the fixing screw rod (44) is provided with a pad foot (441) which is in contact with the stabilizing telescopic rod (214);
the other side of the opening part of the connecting half frame (41) is provided with a connecting part connected with the communicating piece (31) and matched with the connecting part, and the communicating piece (31) is provided with a matching part matched with the connecting part.
8. The high efficiency refuse clearing system for super high-rise building according to claim 7, wherein: the bottom end of the stabilizing telescopic rod (43) is provided with a connecting groove which is in threaded fit with the stabilizing bolt (212).
9. The apparatus of claim 8, wherein: garbage collection storehouse (8) are located the bottom department of refuse channel (3) and with refuse channel (3) intercommunication, one side intercommunication in garbage collection storehouse (8) has a garbage transfer section of thick bamboo (9), just a garbage transfer section of thick bamboo (9) are located the first layer of building.
CN202210486149.XA 2022-05-06 2022-05-06 High-efficient rubbish clearance system of super high-rise building Active CN114775954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210486149.XA CN114775954B (en) 2022-05-06 2022-05-06 High-efficient rubbish clearance system of super high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210486149.XA CN114775954B (en) 2022-05-06 2022-05-06 High-efficient rubbish clearance system of super high-rise building

Publications (2)

Publication Number Publication Date
CN114775954A true CN114775954A (en) 2022-07-22
CN114775954B CN114775954B (en) 2023-08-11

Family

ID=82435475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210486149.XA Active CN114775954B (en) 2022-05-06 2022-05-06 High-efficient rubbish clearance system of super high-rise building

Country Status (1)

Country Link
CN (1) CN114775954B (en)

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0524603A (en) * 1991-07-22 1993-02-02 Kajima Corp Conveyor type dust chute device
JP2007182327A (en) * 2007-01-30 2007-07-19 Shin Meiwa Ind Co Ltd Method of assembling vertical transport pipe
KR20080040208A (en) * 2006-11-02 2008-05-08 주식회사 신성엔지니어링 Refuse collecting equipment for highrise building having a pressure-sensitive operating valve
CN203640227U (en) * 2013-11-30 2014-06-11 佛山市南海保达建筑机械设备有限公司 Mounting structure of floor construction waste collection passage
WO2015140403A1 (en) * 2014-03-17 2015-09-24 Maricap Oy Method and apparatus for feeding in and conveying material
CN208533965U (en) * 2018-06-15 2019-02-22 济宁职业技术学院 Building waste clears device in high-building construction floor
CN210316383U (en) * 2019-07-09 2020-04-14 张琳岗 Device is cleared to rubbish in high-rise building construction floor
CN210459879U (en) * 2019-06-12 2020-05-05 苏州建设交通高等职业技术学校 In-floor garbage transportation system
CN111530544A (en) * 2020-05-11 2020-08-14 通州建总集团有限公司 External auxiliary structure of high-rise building rubbish passageway
CN111749430A (en) * 2020-05-28 2020-10-09 湖北洲天建设集团有限公司 Automatic conveying system for construction waste of high-rise building
CN212249032U (en) * 2020-04-24 2020-12-29 广东华工大建筑工程有限公司 Mounting structure of floor building rubbish clearance passageway
CN213174631U (en) * 2020-07-22 2021-05-11 首建建设发展有限公司 Building rubbish discharging equipment in construction
CN112942735A (en) * 2021-02-03 2021-06-11 浙江省建筑设计研究院 Vertical garbage transporting device for high-rise building construction site and construction method thereof
CN213868763U (en) * 2020-11-12 2021-08-03 中建四局第五建筑工程有限公司 Closed floor building rubbish transport passage device
CN213927327U (en) * 2020-07-20 2021-08-10 广州建誉利业建设发展股份有限公司 Building rubbish discharging equipment in construction
CN214006411U (en) * 2020-09-23 2021-08-20 中国建筑第二工程局有限公司 Regularization refuse passage
CN214575586U (en) * 2021-04-12 2021-11-02 河南中安建设工程有限公司 Supporting device for building construction
CN215106963U (en) * 2021-02-14 2021-12-10 中建二局第二建筑工程有限公司 Mounting structure of floor building rubbish clearance passageway
CN114162737A (en) * 2021-12-09 2022-03-11 中建八局发展建设有限公司 Super high-rise assembled plastic building garbage transportation channel construction device and construction method
CN217500927U (en) * 2022-05-06 2022-09-27 中建八局第一建设有限公司 Construction waste transfer device

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0524603A (en) * 1991-07-22 1993-02-02 Kajima Corp Conveyor type dust chute device
KR20080040208A (en) * 2006-11-02 2008-05-08 주식회사 신성엔지니어링 Refuse collecting equipment for highrise building having a pressure-sensitive operating valve
JP2007182327A (en) * 2007-01-30 2007-07-19 Shin Meiwa Ind Co Ltd Method of assembling vertical transport pipe
CN203640227U (en) * 2013-11-30 2014-06-11 佛山市南海保达建筑机械设备有限公司 Mounting structure of floor construction waste collection passage
WO2015140403A1 (en) * 2014-03-17 2015-09-24 Maricap Oy Method and apparatus for feeding in and conveying material
CN208533965U (en) * 2018-06-15 2019-02-22 济宁职业技术学院 Building waste clears device in high-building construction floor
CN210459879U (en) * 2019-06-12 2020-05-05 苏州建设交通高等职业技术学校 In-floor garbage transportation system
CN210316383U (en) * 2019-07-09 2020-04-14 张琳岗 Device is cleared to rubbish in high-rise building construction floor
CN212249032U (en) * 2020-04-24 2020-12-29 广东华工大建筑工程有限公司 Mounting structure of floor building rubbish clearance passageway
CN111530544A (en) * 2020-05-11 2020-08-14 通州建总集团有限公司 External auxiliary structure of high-rise building rubbish passageway
CN111749430A (en) * 2020-05-28 2020-10-09 湖北洲天建设集团有限公司 Automatic conveying system for construction waste of high-rise building
CN213927327U (en) * 2020-07-20 2021-08-10 广州建誉利业建设发展股份有限公司 Building rubbish discharging equipment in construction
CN213174631U (en) * 2020-07-22 2021-05-11 首建建设发展有限公司 Building rubbish discharging equipment in construction
CN214006411U (en) * 2020-09-23 2021-08-20 中国建筑第二工程局有限公司 Regularization refuse passage
CN213868763U (en) * 2020-11-12 2021-08-03 中建四局第五建筑工程有限公司 Closed floor building rubbish transport passage device
CN112942735A (en) * 2021-02-03 2021-06-11 浙江省建筑设计研究院 Vertical garbage transporting device for high-rise building construction site and construction method thereof
CN215106963U (en) * 2021-02-14 2021-12-10 中建二局第二建筑工程有限公司 Mounting structure of floor building rubbish clearance passageway
CN214575586U (en) * 2021-04-12 2021-11-02 河南中安建设工程有限公司 Supporting device for building construction
CN114162737A (en) * 2021-12-09 2022-03-11 中建八局发展建设有限公司 Super high-rise assembled plastic building garbage transportation channel construction device and construction method
CN217500927U (en) * 2022-05-06 2022-09-27 中建八局第一建设有限公司 Construction waste transfer device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李文强, 刘文荣, 马小明: "城镇发展中的污染转移问题", 四川环境, no. 04, pages 103 - 106 *
赵伟;刘安柱;江帅;: "关于旧改项目防尘降噪钢桶垃圾溜槽的应用", 居舍, no. 15, pages 202 *

Also Published As

Publication number Publication date
CN114775954B (en) 2023-08-11

Similar Documents

Publication Publication Date Title
CN217500927U (en) Construction waste transfer device
CN105127092A (en) Standard rail seat type elastic rod sieve plate
CN112829666B (en) Transfer device for construction machinery
CN203903233U (en) Garbage truck feeding mechanism and garbage truck
CN114775954A (en) High-efficient rubbish clearance system of super high-rise building thing
CN208533965U (en) Building waste clears device in high-building construction floor
CN111350329B (en) Elevator shaft protection platform and garbage conveying integrated device
CN213293672U (en) Electromechanical transportation transmission in colliery
CN203514736U (en) Waste clearance channel used for high-rise building construction
CN208932155U (en) A kind of building waste channel
CN214987801U (en) Building rubbish clearing device in high-rise building construction floor
CN203740475U (en) Building garbage bag placement device
CN204125881U (en) Refuse sweeping and conveying are split type purging system
CN212893329U (en) Falling-proof rod for elevator maintenance
CN205169602U (en) Buffer feeder in belt feeder baffle box
CN209124376U (en) A kind of spiral winnowing machine
CN213316043U (en) Drum screen control device
CN219992986U (en) Can have enough to meet need assembled floor rubbish passageway and wash pump waste fitting discharging concurrently
CN210217037U (en) Vertical garbage transporting device for high-rise building
CN219186275U (en) Device for recycling waste powder separated by large cyclone post-filter
CN218758511U (en) Construction waste cleaning pipeline
CN213910086U (en) Workshop magnetic force deironing dolly
CN208294001U (en) Floor a kind of easy to disassemble and with shock-absorbing function
CN112012430A (en) Interlayer building construction building rubbish clearance system
CN220048305U (en) Special soil material treatment device for bottom construction engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant