CN214575586U - Supporting device for building construction - Google Patents

Supporting device for building construction Download PDF

Info

Publication number
CN214575586U
CN214575586U CN202120742339.4U CN202120742339U CN214575586U CN 214575586 U CN214575586 U CN 214575586U CN 202120742339 U CN202120742339 U CN 202120742339U CN 214575586 U CN214575586 U CN 214575586U
Authority
CN
China
Prior art keywords
waste
pipeline
scaffold
waste pipeline
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120742339.4U
Other languages
Chinese (zh)
Inventor
崔希望
张文强
李学利
李文奎
杨楠楠
李小亮
李正权
马仕强
胡文莉
张燕玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongan Construction Engineering Co ltd
Original Assignee
Henan Zhongan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongan Construction Engineering Co ltd filed Critical Henan Zhongan Construction Engineering Co ltd
Priority to CN202120742339.4U priority Critical patent/CN214575586U/en
Application granted granted Critical
Publication of CN214575586U publication Critical patent/CN214575586U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of building construction, and discloses a supporting device for building construction, which comprises a gate-type scaffold and a waste pipeline arranged on the left side of the gate-type scaffold; two mounting rods are fixedly mounted between the front and rear symmetrical crawling ladders; the waste pipeline is detachably arranged on the mounting rod on the left side of the door type scaffold; the waste material pipeline is the integral type structure, includes pipe shaft on upper portion and the link of lower part. The utility model has simple structure and convenient operation; the connecting component of the utility model is convenient to install and disassemble, and is convenient for installing and disassembling the waste material pipeline; the waste pipeline is used, so that small waste can be conveyed through the waste pipeline in the building construction process, the waste can be conveyed quickly, and the conveying time of the waste is saved; the waste material pipeline has low use cost, and the use cost is saved.

Description

Supporting device for building construction
Technical Field
The utility model relates to a building construction technical field especially relates to a building is built and is used strutting arrangement.
Background
In the building construction or construction process, in order to ensure the smooth construction or construction, the supporting device needs to be constructed as a working platform, so that the construction requirements of constructors are met. Common supporting devices in the prior art mostly use scaffolds, and are divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form. The scaffold can be used by stacking according to the use requirement. However, the process of building up inevitably can produce waste materials, and the automatic take-up and pay-off device is often used to lift and send the produced waste materials down from the high place of the scaffold in the prior art, so that the conveying amount is small, the conveying time is long, and when the lifting and sending process is not stable, the waste materials can fall from the high place, thereby causing potential safety hazards. Some waste material transportation books adopt the lift, but the lift erects with high costs, and handles the promptness of waste material poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming current technical problem, provide a building is built and is used strutting arrangement.
In order to achieve the purpose, the utility model is implemented according to the following technical scheme:
a supporting device for building construction comprises a door type scaffold and a waste pipeline arranged on the left side of the door type scaffold; the gate-type scaffold comprises two gate-type frames which are bilaterally symmetrical, the two gate-type frames are connected with the cross pull rod through a scaffold plate, and the scaffold plate is positioned above the cross pull rod; the door-shaped frame is internally provided with crawling ladders which are symmetrical front and back; two mounting rods are fixedly mounted between the front and rear symmetrical crawling ladders; the waste pipeline is detachably arranged on the mounting rod on the left side of the door type scaffold;
the waste pipeline is of an integrated structure and comprises an upper pipe body and a lower connecting end; the cross section of the tube body and the cross section of the connecting end are both arched, and the projection of the tube body falls in the projection of the connecting end; the left side surface of the pipe body is an arc surface, and the right side surface of the pipe body is a vertical plane;
the length of the waste pipeline body is the same as the height of the door-shaped frame; the upper end surface of the waste pipeline is higher than the upper end surface of the door-shaped frame; a rectangular window is arranged on the right side surface of the waste pipeline, and a baffle is hinged to the right side of the rectangular window; the lower end surface of the baffle is higher than the upper end surface of the scaffold board.
Preferably, two groups of limiting assemblies are symmetrically arranged on each mounting rod in a front-back manner, and each limiting assembly comprises two limiting discs;
the right side surface of the waste pipeline is fixedly provided with a connecting assembly, and the position of the connecting assembly is matched with the position limiting assembly; each connecting component is clamped between two corresponding limiting discs.
Preferably, the connecting assembly comprises a U-shaped clamp, a connecting block, a supporting block, a locking plate and a plugboard; the U-shaped clamp is provided with a downward opening and is fixedly arranged on the right side surface of the waste pipeline through a connecting block; the supporting block is fixedly arranged on the waste pipeline below the connecting block; the locking plate is fixedly arranged on the right side surface of the U-shaped clamp; the lower parts of the two vertical parts of the U-shaped card are provided with rectangular through holes;
the U-shaped clamp is positioned between the two limiting disks of the limiting component and hung on the mounting rod between the two limiting disks; the inserting plate penetrates through the rectangular through hole, the left end face of the inserting plate is contacted with the right side face of the waste pipeline, and the lower part of the left end of the inserting plate is contacted with the upper end face of the supporting block; the right side of the inserting plate is fixedly connected with the locking plate through a bolt.
Preferably, a U-shaped elastic pad is arranged between the U-shaped card and the mounting rod.
Utility model's principle of action:
the utility model discloses when using, earlier with gate-type scaffold frame according to the stacked installation layer upon layer of user demand, on every gate-type scaffold frame's right side afterwards, by lower supreme installation waste material pipeline, with every waste material pipeline's U type card on corresponding spacing subassembly, later, use the picture peg to insert in the rectangle through-hole of U type card, through the bolt with picture peg and locking plate fixed connection. An elastic cushion block is arranged between the inserting plate and the locking plate, and a screw rod of the bolt penetrates through the elastic cushion block. A plurality of waste material pipelines meet end to end, and the head of the waste material pipeline of cover below covers the waste material pipeline of top, prevents that the waste material from running out from the junction of two waste material pipelines. The rectangular window on the right side of the waste pipe can also be used for waste delivery. When the waste material is conveyed through the waste material pipeline, a waste material accommodating groove can be arranged at the outlet of the waste material pipeline at the lowest position, the accommodating groove can be correspondingly arranged according to the actually accommodated waste material, for example, an accommodating groove with a shock absorption function and the like can be used, and the selection and the use of the accommodating groove are well known by those skilled in the art and are not described in detail or further limited herein.
The utility model discloses waste material pipeline sets up to the arch, and its right-hand member face is convenient for being connected with the installation pole for vertical plane, and guarantees waste material pipeline's installation stability. The use of spacing dish makes things convenient for coupling assembling spacing around, has restricted the front and back position of waste pipe. And the upper and lower positions of the waste pipeline are limited by the inserting plate arranged on the U-shaped clamp. The use of U type cushion not only reduces the collision between U type card and the installation pole, still increases the friction, guarantees waste pipe's installation stability.
The utility model discloses a coupling assembling, the installation is dismantled conveniently, makes things convenient for waste pipe installation and dismantlement. The use of waste pipe for at the in-process that the building was built, miniature waste material can be carried through waste pipe, makes things convenient for the waste material to carry fast, practices thrift the transit time of waste material. And the use cost of the waste pipeline is low, so that the use cost is saved.
The undefined components of the present invention all adopt the conventional means in the field, for example, the door type scaffold, etc. all select the common means in the field, and the technicians in the field can select the model and the installation mode according to the actual use requirements, so as to clearly know how to install and control the undefined components, and the details are not described herein. The connection mode between the door-type scaffolds is selected from the conventional connection mode in the prior art, and is not described in detail herein.
The utility model has the advantages that:
the utility model has simple structure and convenient operation; the connecting component of the utility model is convenient to install and disassemble, and is convenient for installing and disassembling the waste material pipeline; the waste pipeline is used, so that small waste can be conveyed through the waste pipeline in the building construction process, the waste can be conveyed quickly, and the conveying time of the waste is saved; the waste material pipeline has low use cost, and the use cost is saved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a left side view of FIG. 1;
FIG. 3 is a cross-sectional view taken along line E-E of FIG. 2;
FIG. 4 is a schematic view of the connecting assembly of FIG. 1;
fig. 5 is a usage state diagram of the present invention.
In the figure: 1. a door type scaffold; 2. a gantry frame; 3. a scaffold board; 4. a cross pull rod; 5. climbing a ladder; 6. mounting a rod; 7. a waste conduit; 8. a connecting end; 9. a tube body; 10. a rectangular window; 11. a baffle plate; 12. a limiting disc; 13. a U-shaped card; 14. connecting blocks; 15. a support block; 16. a locking plate; 17. inserting plates; 18. a rectangular through hole; 19. a bolt; 20. a U-shaped elastic pad; 21. and the elastic cushion block.
Detailed Description
The invention will be further described with reference to the drawings and specific embodiments, illustrative embodiments and description of which are provided herein to explain the invention, but not as a limitation thereof.
Example 1
As shown in fig. 1 to 5, a support device for building construction includes a gate-type scaffold 1, a waste pipe 7 installed at a left side of the gate-type scaffold 1; the gate-type scaffold 1 comprises two gate-type frames 2 which are bilaterally symmetrical, the two gate-type frames 2 are connected with a cross pull rod 4 through a scaffold board 3, and the scaffold board 3 is positioned above the cross pull rod 4; the door-shaped frame 2 is internally provided with crawling ladders 5 which are symmetrical front and back; two mounting rods 6 are fixedly arranged between the front and back symmetrical two crawling ladders 5; the waste pipe 7 is detachably mounted on the mounting bar 6 on the left side of the door scaffold 1.
The waste pipeline 7 is of an integrated structure and comprises an upper pipe body 9 and a lower connecting end 8; the section of the tube body 9 and the section of the connecting end 8 are both arched, and the projection of the tube body 9 falls in the projection of the connecting end 8; the left side of pipe shaft 9 is the arcwall face, and the right flank of pipe shaft 9 is vertical plane.
The length of the waste pipeline pipe body 9 is the same as the height of the door-shaped frame; the upper end surface of the waste pipeline 7 is higher than the upper end surface of the door-shaped frame 2; a rectangular window 10 is arranged on the right side surface of the waste pipeline 7, and a baffle plate 11 is hinged to the right side of the rectangular window 10; the lower end surface of the baffle plate 11 is higher than the upper end surface of the scaffold board 3.
Each mounting rod 6 is provided with two groups of limiting components which are symmetrically arranged in front and back, and each limiting component comprises two limiting discs 12; the right side surface of the waste pipeline 7 is fixedly provided with a connecting assembly, and the position of the connecting assembly is matched with the position limiting assembly; each connecting component is clamped between two corresponding limiting discs.
The connecting component comprises a U-shaped clamp 13, a connecting block 14, a supporting block 15, a locking plate 16 and an inserting plate 17; the U-shaped clamp 13 is downward opened and is fixedly arranged on the right side surface of the waste pipeline 7 through a connecting block 14; the supporting block 15 is fixedly arranged on the waste pipeline below the connecting block 14; the locking plate 16 is fixedly arranged on the right side surface of the U-shaped card 13; the lower parts of the two vertical parts of the U-shaped card 13 are provided with rectangular through holes 18.
The U-shaped clamp 13 is positioned between the two limiting disks 12 of the limiting component and hung on the mounting rod between the two limiting disks 12; the inserting plate 17 penetrates through the rectangular through hole 18, the left end face of the inserting plate 17 is contacted with the right side face of the waste pipeline 7, and the lower part of the left end of the inserting plate 17 is contacted with the upper end face of the supporting block 15; the right side of the inserting plate 17 is fixedly connected with the locking plate 16 through a bolt 19.
A U-shaped elastic pad 20 is arranged between the U-shaped card 13 and the mounting rod 6, and the U-shaped elastic pad 20 is fixed in the U-shaped card 13; an elastic cushion block 21 is arranged between the inserting plate 17 and the locking plate 16, the elastic cushion block 21 is fixed on the lower end face of the locking plate 16, and a screw rod of the bolt penetrates through the elastic cushion block 21.
The technical scheme of the utility model is not limited to the restriction of above-mentioned specific embodiment, all according to the utility model discloses a technical scheme makes technical deformation, all falls into within the protection scope of the utility model.

Claims (4)

1. A supporting device for building construction comprises a door type scaffold and a waste pipeline arranged on the left side of the door type scaffold; the gate-type scaffold comprises two gate-type frames which are bilaterally symmetrical, the two gate-type frames are connected with the cross pull rod through a scaffold plate, and the scaffold plate is positioned above the cross pull rod; the door-shaped frame is internally provided with crawling ladders which are symmetrical front and back; the method is characterized in that: two mounting rods are fixedly mounted between the front and rear symmetrical crawling ladders; the waste pipeline is detachably arranged on the mounting rod on the left side of the door type scaffold;
the waste pipeline is of an integrated structure and comprises an upper pipe body and a lower connecting end; the cross section of the tube body and the cross section of the connecting end are both arched, and the projection of the tube body falls in the projection of the connecting end; the left side surface of the pipe body is an arc surface, and the right side surface of the pipe body is a vertical plane;
the length of the waste pipeline body is the same as the height of the door-shaped frame; the upper end surface of the waste pipeline is higher than the upper end surface of the door-shaped frame; a rectangular window is arranged on the right side surface of the waste pipeline, and a baffle is hinged to the right side of the rectangular window; the lower end surface of the baffle is higher than the upper end surface of the scaffold board.
2. A support device for building construction according to claim 1, characterized in that: two groups of limiting assemblies are symmetrically arranged on each mounting rod in a front-back manner, and each limiting assembly comprises two limiting discs;
the right side surface of the waste pipeline is fixedly provided with a connecting assembly, and the position of the connecting assembly is matched with the position limiting assembly; each connecting component is clamped between two corresponding limiting discs.
3. A support device for building construction according to claim 2, wherein: the connecting component comprises a U-shaped clamp, a connecting block, a supporting block, a locking plate and a plugboard; the U-shaped clamp is provided with a downward opening and is fixedly arranged on the right side surface of the waste pipeline through a connecting block; the supporting block is fixedly arranged on the waste pipeline below the connecting block; the locking plate is fixedly arranged on the right side surface of the U-shaped clamp; the lower parts of the two vertical parts of the U-shaped card are provided with rectangular through holes;
the U-shaped clamp is positioned between the two limiting disks of the limiting component and hung on the mounting rod between the two limiting disks; the inserting plate penetrates through the rectangular through hole, the left end face of the inserting plate is contacted with the right side face of the waste pipeline, and the lower part of the left end of the inserting plate is contacted with the upper end face of the supporting block; the right side of the inserting plate is fixedly connected with the locking plate through a bolt.
4. A support device for building construction according to claim 3, wherein: a U-shaped elastic pad is arranged between the U-shaped clamp and the mounting rod.
CN202120742339.4U 2021-04-12 2021-04-12 Supporting device for building construction Expired - Fee Related CN214575586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120742339.4U CN214575586U (en) 2021-04-12 2021-04-12 Supporting device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120742339.4U CN214575586U (en) 2021-04-12 2021-04-12 Supporting device for building construction

Publications (1)

Publication Number Publication Date
CN214575586U true CN214575586U (en) 2021-11-02

Family

ID=78325616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120742339.4U Expired - Fee Related CN214575586U (en) 2021-04-12 2021-04-12 Supporting device for building construction

Country Status (1)

Country Link
CN (1) CN214575586U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114775954A (en) * 2022-05-06 2022-07-22 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building thing
GB2619545A (en) * 2022-06-09 2023-12-13 Donald Clark James Debris chute module, modular chute assembly and methods of constructing and deconstructing a debris chute

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114775954A (en) * 2022-05-06 2022-07-22 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building thing
CN114775954B (en) * 2022-05-06 2023-08-11 中建八局第一建设有限公司 High-efficient rubbish clearance system of super high-rise building
GB2619545A (en) * 2022-06-09 2023-12-13 Donald Clark James Debris chute module, modular chute assembly and methods of constructing and deconstructing a debris chute

Similar Documents

Publication Publication Date Title
CN214575586U (en) Supporting device for building construction
KR100876287B1 (en) Installation method and safety structure of safety net integrally connected to construction gang form
CN221027087U (en) Suspension type construction elevator guard gate
CN218881516U (en) Modular channel up-down construction platform
CN211058271U (en) Working platform
CN217759295U (en) Repeatedly-used alternate board room structure
CN217581588U (en) Traffic engineering is with enclosing fender safely that can have enough to meet need
CN215443025U (en) Safety construction platform for machine-room-less elevator shaft
CN111962894B (en) Civil engineering construction safety frame
CN214615300U (en) Scaffold for construction
CN213539660U (en) Attached electric construction platform
CN210833045U (en) Anti-falling type sintering machine trolley grid section
CN115749231A (en) Climbing type operation platform for high-rise building construction
CN214883101U (en) A kind of noise prevention equipment for environmental protection engineering
CN214063404U (en) Shock-proof type fan support
CN213174743U (en) Attachable support for building
CN112081379B (en) Civil engineering construction safety frame for building
CN210032540U (en) Steel column installation operation platform
CN214145014U (en) Temporary enclosure structure for building construction site
CN210319708U (en) Suspension type detachable lamp holder for gantry crane girder
CN223135623U (en) A new type of multifunctional external operating platform for building construction machine
CN218149107U (en) Curtain board is with general fixed knot structure
CN111962895A (en) Production method of modular safety frame for civil engineering building construction
CN218771053U (en) Pin-connected panel cable testing bridge
CN219638359U (en) Hanging basket for construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102

CF01 Termination of patent right due to non-payment of annual fee