CN1136623A - Punched pressure-pipe type rammed rubble pile construction method - Google Patents

Punched pressure-pipe type rammed rubble pile construction method Download PDF

Info

Publication number
CN1136623A
CN1136623A CN 96101736 CN96101736A CN1136623A CN 1136623 A CN1136623 A CN 1136623A CN 96101736 CN96101736 CN 96101736 CN 96101736 A CN96101736 A CN 96101736A CN 1136623 A CN1136623 A CN 1136623A
Authority
CN
China
Prior art keywords
pile
pipe
monkey
construction method
ram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 96101736
Other languages
Chinese (zh)
Other versions
CN1053723C (en
Inventor
赵德连
肖炳成
高国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 96101736 priority Critical patent/CN1053723C/en
Publication of CN1136623A publication Critical patent/CN1136623A/en
Application granted granted Critical
Publication of CN1053723C publication Critical patent/CN1053723C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The ramming construction method of rubble pile is composed of the following steps: position-fixing and staking out; putting ram machine in place; ram impaction in the pile tube makes the ram bottom extend out from tube bottom excess 0.5-1 m; using ram impact pile tube to bottom of the hole punched by ram; repeatedly impacting pressure tube to required depth, finally repeatedly pulling tube, filling block material, compacting to complete pile-making. It has the advantages of low cost, high pile quality, low noise and less mechanical equipment.

Description

Punched pressure-pipe type rammed rubble pile construction method
Common broken stone pile used in engineering, the flange foundation pile all is with hammering or the punching of shaking pile pipe to be sunk behind 0.5~1.0m place, pile pipe bottom system one stone plug, and is rubble with material, by squeezed pile, these two kinds of methods will could be implemented with large equipment, and the construction costs height.
The objective of the invention is to design a kind of large equipment that do not need, cost is low, the punched pressure-pipe type rammed rubble pile construction method that quality is high.
Technical scheme of the present invention is: remove the sizing unwrapping wire, outside the pile-forming machine perching preparatory process, also be made up of following job practices:
A, soil compaction pore-forming: the pile monkey of slinging makes it come and go impact in pile pipe, exceeds pile pipe bottom certain depth to the pile monkey bottom.
B, pressure are bombarded and sink pipe: sink to the bottom, hole that pile monkey has rushed with the urgent just pile pipe of pile monkey, repeat A and B step until immersed tube arrives projected depth.
C, compaction in layers: lifting pile pipe certain altitude forms the space that feeds intake, and throws in bulk material in pipe, reaches design density while feeding intake with the pile monkey repeated stock, repeats then to carry to manage → feed intake → tamp the step several until the system stake is complete.
Certain depth described in the A step is 0.5~1.0m, and the certain altitude described in the C step is 0.3~0.8m, and bulk material is special hard stone or other material that is equal to special hard stone, and its piece directly is 0.20~0.30m.
Special-effect of the present invention is:
1, with pile monkey punching pressure pipe disposal pore-forming, need not drilling tool, without chock plug, thereby can make construction sequence simple, convenient, improve work efficiency.
2, pile pipe is open type, and pile monkey directly rushes soil, and penetration resistance is little, noise is little, the vibration is little, little to ambient influnence.The injection energy is big, can pass through boulder bed, and running into erratic boulder can directly brokenly squeeze it in hole perisporium place.
3, in ramming pore forming process, with tup soil is extruded into around the hole wall, make all soil of stake obtain ground extruding, thereby can prevent from effectively to collapse hole, shrinkage cavity, make the quality of stake mention assurance.
4, this use equipment is little, and mechanical quantity is few, can construct in narrow place (be better than Frank drive piles method stake machine and flange base piling method stake machine).
5, this cost is low.Pile shaft material adopts special hard rubble (cost is lower than rubble), can take full advantage of local resources, thereby has reduced construction costs.The good endurance of rubble, intensity height, thus the sanction power of holding of stake is improved greatly.
6, have displacement and compacted and function, form the rubble pile composite foundation.Obvious to the soft foundation treatment effect, and cost is low, economic benefit is very remarkable.
Embodiment: (with reference to Fig. 1--Fig. 5)
The location unwrapping wire: the construction site is smooth good, put fixed stake position by construction drawing.
Pile-forming machine perching: the facility of will driving piles assemble the stake position place that moves to regulation, with pile pipe centrally aligned stake position, stand on ground and depend on the mobile jib of piling machine.
Soil compaction pore-forming: put into pile pipe with hoist engine by the steel wire rope pile monkey of slinging, pile monkey is come and gone in pile pipe impact, until the pile monkey bottom exceeds 0.5~1 meter (Fig. 1) in pile pipe bottom.
Pressure is bombarded and sink pipe.Penetrate in the special hole, pile monkey top with the steel casting rod of a Gent system and to be pressed in the pile pipe top, (when meeting obstructions to sink in sinking such as pile pipe, hitting the piling pipe with pile monkey again) forces pile pipe to sink to the bottom, hole (Fig. 2) that pile monkey has rushed
Bombard and sink pipe until design supporting course place (Fig. 3) such as the above-mentioned impact that moves in circles, pressure.
Compaction in layers.Form the space that feeds intake with promoting about 0.5 meter (also available pile monkey add rush certain depth) to the pile pipe of supporting course.(bulk material is special hard stone or other material that is equal to special hard stone to throw in bulk material in the stake pipe, the piece footpath is at 200~300mm, can put into dry mortar simultaneously when groundwater run off is big), filler limit, limit is downwards with the hammer repeated stock, reaches (Fig. 4) till the design compactness always.And then pile pipe promoted about 0.5 meter (fixed depending on geological conditions), feed intake again impact → tamp → proposing the pipe layering that moves in circles carries out until make complete.Namely form " punched pressure-pipe type rammed rubble stake " (Fig. 5), telephone-moving is to lower foundation again.
The layering filling tamped is the key point of system stake, and a pile body compactness and a compacted effect of all soil are had decisive influence.Should pass through test pile, carry out every section of choose reasonable according to the size in the length of soil layer property and stake, stake footpath and put forward pipe height, filler quantity, impact the parameter such as inferior, height of the fall, to guarantee quality of pile processed.
For pile body and all soil of stake that guarantees bottom of foundation place has enough packings, stake top mark height should be exceeded 0.5~0.8 meter of the bottom of foundation, (also can be flat with the bottom of foundation, but must with the general rammer of little hammer ram one time), superelevation pile body partly digs flat when foundation construction.

Claims (2)

1. a punched pressure-pipe type rammed rubble pile construction method comprises the location unwrapping wire, and the pile-forming machine perching step is characterized in that being made up of following job practices:
A, soil compaction pore-forming: the pile monkey of slinging makes it come and go impact in pile pipe, exceeds pile pipe bottom certain depth to the pile monkey bottom,
B, pressure are bombarded and sink pipe: force pile pipe to sink to the bottom, hole that pile monkey has rushed with pile monkey, repeat A and B step until immersed tube arrives projected depth,
C, compaction in layers: lifting pile pipe certain altitude forms the space that feeds intake, and throws in bulk material in pipe, reaches design density while feeding intake with the pile monkey repeated stock, repeats then to carry to manage → feed intake → tamp the step several until the system stake is complete.
2, a kind of punched pressure-pipe type rammed rubble pile construction method according to claim 1, it is characterized in that: the certain depth described in the A step is 0.5~1.0m, certain altitude described in the C step is 0.3~0.8m, bulk material is special hard stone or other material that is equal to special hard stone, and its piece directly is 0 20~030m.
CN 96101736 1996-01-30 1996-01-30 Punched pressure-pipe type rammed rubble pile construction method Expired - Fee Related CN1053723C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96101736 CN1053723C (en) 1996-01-30 1996-01-30 Punched pressure-pipe type rammed rubble pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96101736 CN1053723C (en) 1996-01-30 1996-01-30 Punched pressure-pipe type rammed rubble pile construction method

Publications (2)

Publication Number Publication Date
CN1136623A true CN1136623A (en) 1996-11-27
CN1053723C CN1053723C (en) 2000-06-21

Family

ID=5117236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96101736 Expired - Fee Related CN1053723C (en) 1996-01-30 1996-01-30 Punched pressure-pipe type rammed rubble pile construction method

Country Status (1)

Country Link
CN (1) CN1053723C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103966995A (en) * 2013-01-28 2014-08-06 丁思华 Construction method for composite foundation on soft soil stratum
CN104929009A (en) * 2015-06-04 2015-09-23 苏州金螳螂园林绿化景观有限公司 Method for preventing ground of square from subsiding

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100347379C (en) * 2002-05-22 2007-11-07 王继忠 Construction method of reinforced ground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103966995A (en) * 2013-01-28 2014-08-06 丁思华 Construction method for composite foundation on soft soil stratum
CN104929009A (en) * 2015-06-04 2015-09-23 苏州金螳螂园林绿化景观有限公司 Method for preventing ground of square from subsiding
CN104929009B (en) * 2015-06-04 2017-05-10 苏州金螳螂园林绿化景观有限公司 Method for preventing ground of square from subsiding

Also Published As

Publication number Publication date
CN1053723C (en) 2000-06-21

Similar Documents

Publication Publication Date Title
CN108914912A (en) A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
CN103835292B (en) High frequency vibrating rushes the construction method of base-extending deposited pile tube
CN104264655A (en) Preformed hole deep-layer underwater tamping method
CN105714773A (en) Foundation treatment method
CN1052284C (en) Method for construction of concrete pile
CN110055948A (en) A kind of big Treatment Methods of Karst Foundation of depth and device
CN106522191A (en) Transformer substation foundation treatment method and application thereof
JP7139277B2 (en) Compaction soil improvement method
CN1053723C (en) Punched pressure-pipe type rammed rubble pile construction method
CN1182301C (en) Technology for boring and prefabricating cast piles for foundation of building
CN112240022A (en) Construction method and construction equipment for static pressure immersed tube pile
CN1030581C (en) Working method of building refuse pile with heavy-hammer ramming
CN1095517C (en) Method for reinforcement of foundation ground
CN1076064C (en) Method for handling foundation
CN210459189U (en) Novel BNT carrier pile and construction equipment thereof
CN205776209U (en) The construction equipment of concrete-pile
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN112012199A (en) Novel BNT carrier pile and construction equipment construction method thereof
CN1364961A (en) Foundation reinforcing mode
CN1047716A (en) Utilize the method and the facility of industrial residue comprehensive treatment soft foundation
CN210238473U (en) Backfill device
RU2097489C1 (en) Process of placing concrete into cast-in-place piles and installation for its implementation
CN109577312A (en) A kind of silt geology vibro-replacement stone compacting pile construction method
JP6876526B2 (en) Specification setting method for sandy ground compaction method
CN1100182C (en) Construction method of vibration punching slurry-bitstone pile and apparatus used thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee