CN1095517C - Method for reinforcement of foundation ground - Google Patents

Method for reinforcement of foundation ground Download PDF

Info

Publication number
CN1095517C
CN1095517C CN 98124827 CN98124827A CN1095517C CN 1095517 C CN1095517 C CN 1095517C CN 98124827 CN98124827 CN 98124827 CN 98124827 A CN98124827 A CN 98124827A CN 1095517 C CN1095517 C CN 1095517C
Authority
CN
China
Prior art keywords
mentioned
reinforced material
compactness
until
soil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 98124827
Other languages
Chinese (zh)
Other versions
CN1226624A (en
Inventor
王继忠
杨秋新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=5228839&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1095517(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 98124827 priority Critical patent/CN1095517C/en
Publication of CN1226624A publication Critical patent/CN1226624A/en
Application granted granted Critical
Publication of CN1095517C publication Critical patent/CN1095517C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a construction method for reinforcing foundations, which has the following steps: firstly, an outer casing tube is hammered into a foundation to specified depth; secondly, reinforcing materials are filled into the outer casing tube, the reinforcing materials are tamped by a rammer till the consistency of the tamped reinforcing materials satisfy the rammer retracting standard, and thus, the surface soil body of the foundation has maximum consistency, and the ground can not be bulged simultaneously; the outer sleeve pipe is lifted in identical height respectively to repeatedly carry out the second step, is filled with materials by layers and is tamped to the surface of the foundation, and thus, the consistency of materials of a compaction pile body and pile surrounding soil is kept to even.

Description

The job practices of consolidated subsoil
Technical field
The present invention relates to field of civil engineering, relate in particular to the consolidation process of ground.
Background technology
In the ground stabilization of building is handled, usually adopt dynamic compaction, but this method has the bigger shortcoming of vibration, so it is not suitable for constructing in the intensive city of building, notification number be disclose in the CN86200550U utility model patent document a kind of in ground by ramming the method that method forms ram-compaction gravel piles, in the method, pile monkey does not directly impact filler, but ram the rubble of being filled by the plug of core pipe and its bottom, the shortcoming of this method be to filler to ram energy less, particularly can not control every layer of compactness of ramming material, thereby the compactness that can not make pile shaft material and pile peripheral earth keeps evenly, it is stressed to give full play to the participation of pile shaft material and pile peripheral earth, and promptly the bearing capacity of formed composite foundation is less.
The content of invention
The object of the present invention is to provide a kind of job practices of consolidated subsoil, can form following composite foundation quickly and easily, in this composite foundation, keep evenly along the compactness of vertical compacted pile body and the compactness of all soil of stake by this method.
Above-mentioned purpose of the present invention is that the job practices by following consolidated subsoil realizes that this method comprises the steps:
A) outer tube is squeezed in the ground, until prescribed depth;
B) in this overcoat steel, fill reinforced material, adopt hammer ram that the reinforced material of being filled is rammed, compactness until the reinforced material of being tamped satisfies such ceasing driving standard, thereby the foundation surface soil body reaches maximum compactness, and the face of land does not produce protuberance simultaneously;
C) elevated height outer tube according to the rules carries out above-mentioned steps b);
D) with the elevated height outer tube of afore mentioned rules, carry out above-mentioned steps b repeatedly), carry out the layering filler and ram action, until the foundation surface place, thereby the compactness of compacted pile shaft material and the compactness of the soil body around this are kept evenly.
It is bigger that said method is adapted at water content, and be easy to generate in the foundation soil body of undergauge and construct.
Above-mentioned purpose of the present invention also can realize that by the job practices of following consolidated subsoil its step comprises:
A) adopt hammer ram that foundation surface is tamped, form the compaction pile hole;
B) to a certain amount of reinforced material of the inner filling in above-mentioned compaction pile hole, by above-mentioned hammer ram the reinforced material of being filled is rammed, compactness until the reinforced material of being tamped satisfies such ceasing driving standard, thereby the foundation surface soil body reaches maximum compactness, and the face of land does not produce protuberance simultaneously;
C) carry out step b) repeatedly, carry out the layering filler and ram action,, thereby the compactness of the material of compacted pile body own and the compactness of the soil body around this are kept evenly until the foundation surface place.
It is less that said method is adapted at water content, and can not produce in the foundation soil body of undergauge and construct.
In above-mentioned two kinds of methods, above-mentioned reinforced material adopts building waste.
In above-mentioned two kinds of methods, above-mentioned reinforced material adopts harsh concrete.
In above-mentioned two kinds of methods, above-mentioned reinforced material adopts the cement sand-lime.
In above-mentioned two kinds of methods, above-mentioned building waste is mashed watt an of brickbat, various discarded aggregates, cobble, slag, the compound of flyash or mentioned component.
The advantage of the job practices of consolidated subsoil of the present invention is that the vibration that produces is less, be particularly suitable for constructing in the intensive city of building, because it is stressed to give full play to the participation of pile shaft material and pile peripheral earth, can make composite foundation obtain higher capacity like this.
Job practices to consolidated subsoil of the present invention specifically describes with reference to the accompanying drawings.
Brief description of drawings
Fig. 1 is the concrete steps figure of the job practices of consolidated subsoil of the present invention.
The specific embodiment
The foundation soil body of constructing in the embodiment shown in fig. 1, is the soil body that is easy to generate undergauge.According to the job practices of consolidated subsoil of the present invention, as shown in Figure 1a, at first outer earthen-ware pipe 1 is sunk in the ground, until prescribed depth.The mode that sinks to outer tube 1 can be known variety of way, such as, hammering is with pipe method, vibratory drilling method or the like.Shown in Fig. 1 b, in above-mentioned outer tube 1, fill reinforced material 3, such as building waste, hammer ram 2 is moved along outer tube 1 reinforced material 3 of being filled is rammed, form the 1st compacted layer.Shown in Fig. 1 c, promote outer tube 1 specified altitude, according to the generation type of the 1st compacted layer, carry out filler, ram, thereby on the 1st compacted layer, form the 2nd compacted layer.Promote outer tube 1 according to above-mentioned specified altitude, fill reinforced material and the action of ramming by hammer ram 2 according to the generation type of the 1st compacted layer repeatedly, thereby form along stacked up and down a plurality of compacted layer, until the foundation surface place, thereby in ground, form and have erose compaction pile, shown in Fig. 1 d, why forming irregularly shapedly, is because each the compacted layer in the compaction pile is according to identical ceasing driving standard, controls such as pile penetration, consequently, around compaction pile, in the ground than the weak soil layer, clamp-oned more reinforced material, corresponding, the diameter of compaction pile herein is bigger, and in the ground than hardpan, clamp-on less reinforced material, corresponding, the diameter of compaction pile herein is less.That is to say, this compaction pile is along having identical compactness up and down, and pile peripheral earth also has identical compactness in addition, thereby the compacted pile shaft material and the stake soil body that can give full play in the formed composite foundation participate in stressed, promptly bear upper load, the bearing capacity of composite foundation is higher like this.

Claims (10)

1. the job practices of a consolidated subsoil, its step comprises:
A) outer tube is squeezed in the ground, until prescribed depth;
B) in this outer tube, fill reinforced material, adopt hammer ram that the reinforced material of being filled is rammed, compactness until the reinforced material of being tamped satisfies such ceasing driving standard, thereby the foundation surface soil body reaches maximum compactness, and the face of land does not produce protuberance simultaneously;
C) elevated height outer tube according to the rules carries out above-mentioned steps b);
D) with the elevated height outer tube of afore mentioned rules, carry out above-mentioned steps b repeatedly), carry out the layering filler and ram action, until the foundation surface place, thereby the compactness of compacted pile shaft material and the compactness of the soil body around this are kept evenly.
2. method according to claim 1 is characterized in that above-mentioned reinforced material adopts building waste.
3. method according to claim 1 is characterized in that above-mentioned reinforced material adopts harsh concrete.
4. method according to claim 1 is characterized in that above-mentioned reinforced material adopts the cement sand-lime.
5. method according to claim 1 is characterized in that above-mentioned building waste is mashed watt an of brickbat, various discarded aggregates, cobble, slag, the compound of flyash or mentioned component.
6. the job practices of a consolidated subsoil, its step comprises:
A) adopt hammer ram that foundation surface is rammed, form the compaction pile hole;
B) to a certain amount of reinforced material of the inner filling in above-mentioned compaction pile hole, by above-mentioned hammer ram the reinforced material of being filled is rammed, compactness until the reinforced material of being tamped satisfies such ceasing driving standard, thereby the foundation surface soil body reaches maximum compactness, and the face of land does not produce protuberance simultaneously;
C) carry out step b) repeatedly, carry out the layering filler and ram action,, thereby the compactness of the material of compacted pile body own and the compactness of the soil body around this are kept evenly until the foundation surface place.
7. method according to claim 1 is characterized in that above-mentioned reinforced material adopts building waste.
8. method according to claim 1 is characterized in that above-mentioned reinforced material adopts harsh concrete.
9. method according to claim 1 is characterized in that above-mentioned reinforced material adopts the cement sand-lime.
10. method according to claim 1 is characterized in that above-mentioned building waste is mashed watt an of brickbat, various discarded aggregates, cobble, slag, the compound of flyash or mentioned component.
CN 98124827 1998-11-17 1998-11-17 Method for reinforcement of foundation ground Expired - Lifetime CN1095517C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98124827 CN1095517C (en) 1998-11-17 1998-11-17 Method for reinforcement of foundation ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98124827 CN1095517C (en) 1998-11-17 1998-11-17 Method for reinforcement of foundation ground

Publications (2)

Publication Number Publication Date
CN1226624A CN1226624A (en) 1999-08-25
CN1095517C true CN1095517C (en) 2002-12-04

Family

ID=5228839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98124827 Expired - Lifetime CN1095517C (en) 1998-11-17 1998-11-17 Method for reinforcement of foundation ground

Country Status (1)

Country Link
CN (1) CN1095517C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100347379C (en) * 2002-05-22 2007-11-07 王继忠 Construction method of reinforced ground
CN101586341B (en) * 2009-06-16 2010-12-01 陆观宏 Water sealing method for civil engineering groundwork
CN102200016A (en) * 2010-03-26 2011-09-28 上海申通轨道交通研究咨询有限公司 Method for injecting solid particles for long-term subsidence of shield tunnel in soft soil area
CN106836205B (en) * 2017-03-20 2019-10-01 大成科创基础建设股份有限公司 The Macadam Pile Construction method suitable for saturated soft soil
CN107338781A (en) * 2017-08-10 2017-11-10 中国电建集团华东勘测设计研究院有限公司 A kind of compacting pile construction device and its construction method
CN115012289A (en) * 2022-05-09 2022-09-06 新疆北新路桥集团股份有限公司 Minimally invasive treatment method for road deep disease

Also Published As

Publication number Publication date
CN1226624A (en) 1999-08-25

Similar Documents

Publication Publication Date Title
US5249892A (en) Short aggregate piers and method and apparatus for producing same
KR100634261B1 (en) Short aggregate pier techniques
CN105625294A (en) Composite foundation and construction method thereof
CN104074186A (en) Pile casing device for hole formation in building foundation and construction method of building foundation
CN1052284C (en) Method for construction of concrete pile
CN111794216A (en) Construction method of uplift carrier pile
CN1743561A (en) Column-hammer forced tamping substitution method
CN100347379C (en) Construction method of reinforced ground
CN102251514A (en) Multi-section type variable cross-section dynamic compaction method
CN1095517C (en) Method for reinforcement of foundation ground
CN101748720B (en) Construction method of composite foundation
CN1137314C (en) Construction method of concrete pile
CN1030581C (en) Working method of building refuse pile with heavy-hammer ramming
CN108487228A (en) A kind of method of collapsibility that capableing of Compaction variables loess
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN111549767A (en) Construction method for improving bearing capacity of concrete cast-in-place pile
CN1740457A (en) Vibration process of eliminating wet foundation falling for CFG pile
CN100396854C (en) Column-hammer strong-tamper displacing base kit supporting construction method
CN1076064C (en) Method for handling foundation
CN103966995A (en) Construction method for composite foundation on soft soil stratum
CN1621623A (en) Construction method of composite ground foundation
CN1364961A (en) Foundation reinforcing mode
CN1053723C (en) Punched pressure-pipe type rammed rubble pile construction method
CN219450301U (en) Virtual filling large-thickness collapsible loess road foundation treatment structure
CN219364557U (en) Composite artificial foundation device for waterproof type lime soil compaction pile

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1069434

Country of ref document: HK

EE01 Entry into force of recordation of patent licensing contract

Assignee: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD.

Assignor: Wang Jizhong

Contract record no.: 2011110000108

Denomination of invention: Method for reinforcement of foundation ground

Granted publication date: 20021204

License type: Exclusive License

Open date: 19990825

Record date: 20110718

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 102218 Beijing city Changping District East Town Taiping home building No. 31 Beijing possente Geotechnical Engineering Co. Ltd.

Patentee after: Wang Jizhong

Address before: 102209, Beijing, Changping District East small town Tiantongyuan Small District three, building 103, room 9

Patentee before: Wang Jizhong

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20021204