CN1743561A CN 200510030322 CN200510030322A CN1743561A CN 1743561 A CN1743561 A CN 1743561A CN 200510030322 CN200510030322 CN 200510030322 CN 200510030322 A CN200510030322 A CN 200510030322A CN 1743561 A CN1743561 A CN 1743561A
Authority
CN
China
Prior art keywords
hammer
tamping
ram
time
rammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510030322
Other languages
Chinese (zh)
Inventor
刘献刚
徐升才
邵忠心
胡保根
刘细则
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jiye Science & Technology Co Ltd
Original Assignee
Jiangxi Jiye Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Jiye Science & Technology Co Ltd filed Critical Jiangxi Jiye Science & Technology Co Ltd
Priority to CN 200510030322 priority Critical patent/CN1743561A/en
Publication of CN1743561A publication Critical patent/CN1743561A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

This invention discloses a new post hammer ramming replacement method, which first of all levels the ground, then sets out and distributes the places to decide the ram points, then a new post hammer, an ordinary ram hammer and a flat hammer are used to operate in steps. The effect of the new post hammer ramming replacement method is: every ram point forms a replacement pillar to be grouped to a thick earth block or an earth and stone mixed valve plate. In the stress sphere of the base, the replaced pillar and the compacted earth between pillars bear the top loaded compound ground base, which can be used in large stone filling, high saturated sand, clays with less than 40% water, thick plain fill, thin silt, ordinary cohesive soil or construction waste bone materials.

Description

Novel column-hammer forced tamping substitution method
Technical field
The present invention relates to the building lot reinforcing and processing method, especially relate to a kind of novel column-hammer forced tamping substitution method that is used for deep backfill or deep soft soil horizon ground stabilization.
Background technology
In construction work, generally want earlier ground to be reinforced, to improve intensity, bearing capacity and the stability of foundation soil, just can carry out next step construction.Dynamic compaction foundation treatment technology commonly used, be to adopt weight to tamp natural ground soil layer or soft soil horizon repeatedly, when soft soil horizon is thicker, tradition dynamic compaction and the effect of dynamic replacement rule are little, treatment effect is not obvious, particularly reinforcement depth does not reach designing requirement, the compactness and the intensity of deep soil are low, bearing capacity is poor, bigger compressive strain appears in foundation soil easily when bearing upper pressure, cause fabric structure to produce crack and differential settlement, simultaneously, if there is mud in ground than the depths, the earthquake liquefaction phenomenon can appear in the dynamic compaction construction, domestic present strong rammer equipment great majority (are 10T for the common crawler crane of being furnished with the auxiliary frame door, 15T, 20T, the middle-size and small-size crane of 30T), handling deep layer soft soil horizon poor effect, can't carry out the consolidation process of deep foundation soil, and large-scale rammer machine (more than the 50T) not only costs an arm and a leg, and construction One-Shift Costs height, Foundation Treatment is uneconomical, and large-scale rammer machine is from great, and place soft soil horizon intensity is low, make large-scale rammer machine be difficult to walking, can't construct.
Summary of the invention
The object of the present invention is to provide a kind of novel column-hammer forced tamping substitution method that is used for deep backfill or deep soft soil horizon ground stabilization, silt matter that this dynamic compaction can be used for handling that boulder bankets, high saturated sand, the clay of water content≤40%, plain fill, thickness that thickness is bigger are little or mucky soil, the soft grounds such as plastic general cohesive soil, architectural waste aggregate earth fill of moulding more can be used for all types of industries of multilayer even little high level and the foundation engineering of civilian construction and control is had relatively high expectations to settlement difference various buildings, water conservancy and highway facilities etc.
The object of the present invention is achieved like this:
(1), levelling of the land: by design elevation, dig, fill out and the earthwork of smooth place;
(2), unwrapping wire is layouted: by designing requirement, the location unwrapping wire is doubly layouted by the 1.5-2.0 that hammers end diameter into shape in the substrate field of load, determines tamping point; Between substrate, ground reinforces and expands in the rammer scope cloth and press formation condition and Structural Design Requirement control, and the 3--4 that is generally diameter at the bottom of the post doubly;
(3) gradation construction:
A, the first time are carried out the deep layer ground extruding: adopt novel post hammer, continuous injection of all tamping points or skips gradation injection (determining) according to soil body performance, hammer end static pressure value is about 80-150kPa, tamping pit is controlled in 5 meters, in the tamping pit after strong rammer is compacted, backfill original soil or aggregate continue to ram ceasing driving standard and the smooth place of determining to examination rammer district;
B, the second time are carried out the middle level ground extruding: adopt common hammer ram, continuous injection of all tamping points or gradation injection, principle according to protuberance amount≤20cm is selected, hammer end static pressure value is about 35-40kPa, tamping pit is controlled in 2.0 meters, in the tamping pit after strong rammer is compacted, and backfill aggregate or original soil, continue to ram the ceasing driving standard of determining to examination rammer district, and smooth place;
C, carry out the shallow-layer ground extruding for the third time: adopting common hammer ram is enlarging hammer, and hammer end static pressure value is hit full rammer for continuous 2-4 for the first time about 20-30kPa, is for the second time 1 to hit, and hammering overlaps 1/2-1/3;
D, each tamping point form the displacement pier of a first font after construction is finished.
Novel column-hammer forced tamping substitution method effect of the present invention is: each tamping point forms the displacement pier of a first font after construction is finished, forms the bigger soil body of a thickness or aggregate (sand, gravel or rubble, the useless aggregate of building etc.) mixes valve plate by each displacement pier combination back, in the substrate field of load by replacing pier body and pier subsoil body and being born a kind of composite foundation of superstructure load by the soil body between the pier after compacted jointly.
Because common dynamic compaction and dynamic replacement method are difficult to handle deep backfill or deep soft soil horizon ground stabilization, and novel column-hammer forced tamping substitution method Foundation Treatment technology of the present invention is to innovate to improve a kind of novel foundation treatment construction method that forms on the basis of common dynamic compaction and dynamic replacement method.The present invention is according to different engineering soil conditions, select different tamping energies for use, give full play to the potentiality of " novel post hammer ", merged the consolidation process principle of multiple foundation treatment technology, ram pore-forming to planning to build building lot, adopt tearing the useless aggregate backfill tamping pit of room building open and ramming of the useless aggregate of industry, local cheap native stone compound or urban waste, adopt enlarging hammer to carry out general rammer at last, up to reaching the purpose of deep soil and shallow soil being carried out simultaneously consolidation process.Employing the present invention not only can solve the technical barrier (as soil mass property, intensity and Deformation control etc.) in the dynamic compaction construction, and has saved construction costs greatly.After novel column-hammer forced tamping substitution method ground of the present invention is handled, effective reinforcement depth can be improved 1-2 doubly, bearing capacity can improve 40-150%, replacement the end degree of depth can reach 5-10m, reinforcing groundwork intensity and stability improves greatly, building settlement obviously reduces, and can reach the regulation requirement of design and standard.Silt matter that the present invention can be used for handling that boulder bankets, high saturated sand, the clay of water content≤40%, plain fill, thickness that thickness is bigger are little or mucky soil, the soft grounds such as plastic general cohesive soil, architectural waste aggregate earth fill of moulding.The present invention not only can be used for works limit and low layer industry and civilian construction, warehouse, oil tank, bunker, airport runways, railway and highway subgrade and the stone stockyard etc. of common dynamic compaction and the processing of dynamic replacement method, can also be used for all types of industries of multilayer even little high level and the foundation engineering of civilian construction and control is had relatively high expectations to settlement difference various buildings, water conservancy and highway facilities etc.
Description of drawings
Fig. 1 is the structural representation of novel post hammer;
Fig. 2 is the vertical view of Fig. 1.
The specific embodiment
Below in conjunction with embodiment and contrast accompanying drawing the present invention is described in further detail.
The construction sequence of novel column-hammer forced tamping substitution method is:
(1), levelling of the land: by design elevation, dig, fill out and the earthwork of smooth place;
(2), unwrapping wire is layouted: by designing requirement, the location unwrapping wire is doubly layouted by the 1.5-2.0 that hammers end diameter into shape in the substrate field of load, determines tamping point; Between substrate, ground reinforces and expands in the rammer scope cloth and press formation condition and Structural Design Requirement control, and the 3--4 that is generally diameter at the bottom of the post doubly;
(3) gradation construction:
A, the first time are carried out the deep layer ground extruding: adopt novel post hammer, continuous injection of all tamping points or skips gradation injection (determining) according to soil body performance, hammer end static pressure value is about 80-150kPa, tamping pit is controlled in 5 meters, in the tamping pit after strong rammer is compacted, backfill original soil or aggregate continue to ram ceasing driving standard and the smooth place of determining to examination rammer district;
B, the second time are carried out the middle level ground extruding: adopt common hammer ram, continuous injection of all tamping points or gradation injection, principle according to protuberance amount≤20cm is selected, hammer end static pressure value is about 35-40kPa, tamping pit is controlled in 2.0 meters, in the tamping pit after strong rammer is compacted, and backfill aggregate or original soil, continue to ram the ceasing driving standard of determining to examination rammer district, and smooth place;
C, carry out the shallow-layer ground extruding for the third time: adopting common hammer ram is enlarging hammer, and hammer end static pressure value is hit full rammer for continuous 2-4 for the first time about 20-30kPa, is for the second time 1 to hit, and hammering overlaps 1/2-1/3.

Claims (1)

1, a kind of novel column-hammer forced tamping substitution method is characterized in that:
(1), levelling of the land: by design elevation, dig, fill out and the earthwork of smooth place;
(2), unwrapping wire is layouted: by designing requirement, the location unwrapping wire is doubly layouted by the 1.5-2.0 that hammers end diameter into shape in the substrate field of load, determines tamping point; Between substrate, ground reinforces and expands in the rammer scope cloth and press formation condition and Structural Design Requirement control, and the 3-4 that is generally diameter at the bottom of the post doubly;
(3) gradation construction:
A, the first time are carried out the deep layer ground extruding: adopt novel post hammer, and continuous injection of all tamping points or skips gradation injection, the protuberance amount≤15cm after beating is rammed in control, hammer end static pressure value is about 120kPa, and tamping pit is controlled in 3 meters, in the tamping pit after strong rammer is compacted, the backfill aggregate continues to ram;
B, the second time are carried out the middle level ground extruding: adopt novel post hammer in conjunction with common hammer ram, continuous injection of all tamping points or gradation injection, protuberance amount≤15cm, hammer end static pressure value is about 120kPa, tamping pit is controlled in the 1.0-2.0 rice, in the tamping pit after strong rammer is compacted, and the backfill aggregate, continue to ram, and smooth place;
C, carry out the shallow-layer ground extruding for the third time: adopting common strong hammer ram is enlarging hammer, and hammer end static pressure value be continuous 2 times about 25kPa for the first time, and hammering is continuous, is for the second time 1 to hit, and hammering overlaps 1/3.
D, each tamping point form the displacement pier of a first font after construction is finished.
CN 200510030322 2005-09-30 2005-09-30 Column-hammer forced tamping substitution method Pending CN1743561A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510030322 CN1743561A (en) 2005-09-30 2005-09-30 Column-hammer forced tamping substitution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510030322 CN1743561A (en) 2005-09-30 2005-09-30 Column-hammer forced tamping substitution method

Publications (1)

Publication Number Publication Date
CN1743561A true CN1743561A (en) 2006-03-08

Family

ID=36139070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510030322 Pending CN1743561A (en) 2005-09-30 2005-09-30 Column-hammer forced tamping substitution method

Country Status (1)

Country Link
CN (1) CN1743561A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251514A (en) * 2011-06-15 2011-11-23 谢开生 Multi-section type variable cross-section dynamic compaction method
CN102535291A (en) * 2012-02-02 2012-07-04 石家庄铁道大学 Soft-soil foundation treatment method for expressway engineering
CN102535429A (en) * 2012-01-20 2012-07-04 刘献刚 Combined-rammer construction technology for foundation treatment
CN104594330A (en) * 2015-01-16 2015-05-06 刘献刚 Method for treating high-strength replacement pier composite ground foundation and high-strength replacement pier
CN106087946A (en) * 2016-06-13 2016-11-09 贵州正业工程技术投资有限公司 A kind of carbonate rock boulder strong rammer is combined to change to fill changes foundation reinforcement method
CN108914912A (en) * 2018-07-16 2018-11-30 中国能源建设集团安徽省电力设计院有限公司 A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
CN109914382A (en) * 2019-03-12 2019-06-21 北京综建科技有限公司 A kind of method of bulk rubble foundation strong rammer ground extruding
CN111733789A (en) * 2020-03-24 2020-10-02 山西机械化建设集团有限公司 Deep replacement process for fluid-plastic-soft-plastic clay by adopting medium-low energy level dynamic compaction

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251514A (en) * 2011-06-15 2011-11-23 谢开生 Multi-section type variable cross-section dynamic compaction method
CN102535429A (en) * 2012-01-20 2012-07-04 刘献刚 Combined-rammer construction technology for foundation treatment
CN102535291A (en) * 2012-02-02 2012-07-04 石家庄铁道大学 Soft-soil foundation treatment method for expressway engineering
CN104594330A (en) * 2015-01-16 2015-05-06 刘献刚 Method for treating high-strength replacement pier composite ground foundation and high-strength replacement pier
CN106087946A (en) * 2016-06-13 2016-11-09 贵州正业工程技术投资有限公司 A kind of carbonate rock boulder strong rammer is combined to change to fill changes foundation reinforcement method
CN108914912A (en) * 2018-07-16 2018-11-30 中国能源建设集团安徽省电力设计院有限公司 A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
CN109914382A (en) * 2019-03-12 2019-06-21 北京综建科技有限公司 A kind of method of bulk rubble foundation strong rammer ground extruding
CN111733789A (en) * 2020-03-24 2020-10-02 山西机械化建设集团有限公司 Deep replacement process for fluid-plastic-soft-plastic clay by adopting medium-low energy level dynamic compaction
CN111733789B (en) * 2020-03-24 2022-03-29 山西机械化建设集团有限公司 Deep replacement process for fluid-plastic-soft-plastic clay by adopting medium-low energy level dynamic compaction

Similar Documents

Publication Publication Date Title
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN1743561A (en) Column-hammer forced tamping substitution method
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
KR20010102022A (en) Short aggregate pier techniques
CN105625294A (en) Composite foundation and construction method thereof
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN1888331A (en) Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile
CN206070508U (en) Device for reinforcing foundation
CN106592608A (en) Differential settlement control method for new foundation and old roadbed of utility tunnel
CN102251514A (en) Multi-section type variable cross-section dynamic compaction method
CN104695419A (en) Soft soil roadbed construction method
Raju et al. Ground improvement: principles and applications in Asia
CN106958176A (en) Quick prefabricated pin-connected panel soft base processing method
CN2753797Y (en) Long-spiral pressure-poured concrete core-inserting combined pile
CN108570979A (en) A kind of construction method for building antiseepage composite foundation on dolomite stratigraph
CN1095517C (en) Method for reinforcement of foundation ground
CN1078282A (en) Pile shoe pouring process and special reinforcing steel cage thereof
CN1076064C (en) Method for handling foundation
CN1676763A (en) Boring-tamping cement-soil compacting pile construction method
CN1364961A (en) Foundation reinforcing mode
CN1621623A (en) Construction method of composite ground foundation
CN212801050U (en) Municipal administration road bad soil foundation stabilization structure
CN110080266A (en) Method for improving bearing capacity of pile foundation under construction by replacing and filling soil between piles
CN1167854C (en) Method for building compound pile
CN108411886A (en) A kind of storage terrace settlement Control system and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)