CN113457403B - 一种石灰石—石膏法烟气脱硫塔液气比的计算方法 - Google Patents
一种石灰石—石膏法烟气脱硫塔液气比的计算方法 Download PDFInfo
- Publication number
- CN113457403B CN113457403B CN202110772935.1A CN202110772935A CN113457403B CN 113457403 B CN113457403 B CN 113457403B CN 202110772935 A CN202110772935 A CN 202110772935A CN 113457403 B CN113457403 B CN 113457403B
- Authority
- CN
- China
- Prior art keywords
- exp
- parameters
- desulfurization
- liquid
- gas ratio
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D53/00—Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
- B01D53/34—Chemical or biological purification of waste gases
- B01D53/46—Removing components of defined structure
- B01D53/48—Sulfur compounds
- B01D53/50—Sulfur oxides
- B01D53/501—Sulfur oxides by treating the gases with a solution or a suspension of an alkali or earth-alkali or ammonium compound
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/15—Correlation function computation including computation of convolution operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2251/00—Reactants
- B01D2251/40—Alkaline earth metal or magnesium compounds
- B01D2251/404—Alkaline earth metal or magnesium compounds of calcium
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2251/00—Reactants
- B01D2251/60—Inorganic bases or salts
- B01D2251/606—Carbonates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D2258/00—Sources of waste gases
- B01D2258/02—Other waste gases
- B01D2258/0283—Flue gases
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Mathematical Analysis (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Optimization (AREA)
- Chemical & Material Sciences (AREA)
- Computational Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Biomedical Technology (AREA)
- Computing Systems (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Algebra (AREA)
- General Chemical & Material Sciences (AREA)
- Health & Medical Sciences (AREA)
- Databases & Information Systems (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Analytical Chemistry (AREA)
- Treating Waste Gases (AREA)
Abstract
本发明涉及湿法脱硫塔液气比的计算方法的技术领域,具体涉及一种石灰石—石膏法烟气脱硫塔液气比的计算方法,经过对湿法脱硫塔的各项参数进行分析,影响脱硫效率(SO2%)的因素主要有6个参数:L/G、pH、V、(SO2)in、Mg2+、Cl‑;通过量纲分析法,得出脱硫效率与各参数之间存在的计算公式,通过采集分析实际运行参数,得出系数,最终得到湿法脱硫塔液气比的计算的计算公式。本发明的计算方法可以快速获取脱硫工艺设计所需的关键参数—液气比,以便能在脱硫效率和能耗之间找到一个最优的平衡点,即达到设定的脱硫效率、又能使得能耗相对较低。
Description
技术领域
本发明涉及湿法脱硫塔液气比的计算方法的技术领域,具体涉及一种石灰石—石膏法烟气脱硫塔液气比的计算方法。
背景技术
湿法脱硫塔的液气比选择直接影响脱硫浆液循环泵的选型、影响脱硫塔的全塔烟气阻力进而关系到增压风机的选型——即湿法烟气脱硫的能耗高低主要由液气比来决定。
在烟气湿法脱硫领域,由于影响液气比的因素太多,如烟气流速、喷淋浆液的液滴大小、喷淋覆盖率、脱硫浆液的温度、脱硫浆液的PH、脱硫浆液Cl-的浓度、脱硫浆液Mg2+的浓度、氧化风机的供氧量等诸多因素均对液气比的确定造成了较大影响,故液气比是一个非常关键、但是准确获取又较困难的一个参数。故一直以来仍未有一个确切的公式可以直接计算液气比,实际工程应用往往是放大余量——增加循环泵的循环量来保证脱硫效率,但是这种做法往往会造成脱硫能耗较高,也违背了国家节能降耗的政策。
发明内容
本发明的目的在于提供一种石灰石—石膏法烟气脱硫塔液气比的计算方法,以便能在脱硫效率和能耗之间找到一个最优的平衡点,即达到设定的脱硫效率、又能使得能耗相对较低。
本发明实现目的所采用的方案是:一种石灰石—石膏法烟气脱硫塔液气比的计算方法,包括以下步骤:
(1)经过对湿法脱硫塔的各项参数进行分析,影响脱硫效率(SO2%)的因素主要有6个参数:①L/G—液气比、②pH—脱硫塔浆液酸碱值、③V—脱硫塔烟气流速、④(SO2)in—脱硫塔SO2入口浓度、⑤Mg2+—脱硫塔浆液Mg离子浓度、⑥Cl-—脱硫塔浆液Cl离子;
(2)通过量纲分析法,得出脱硫效率与各参数之间存在如下的计算公式:
SO2%=1-exp{a×(L/G)0.92V0.19exp[b×PH+c×Mg2++d×(SO2)in+e×Cl-]},其中a、b、c、d、e均为待定系数;
(3)通过采集分析实际运行参数,得出a、b、c、d、e系数为:a=-9.8×10-5,b=1.0,c=1.35×10-4,d=-1.7×10-4,e=1.45×10-5;
(4)将步骤(3)的各参数代入步骤(2)的公式中,得出如下湿法脱硫塔脱硫效率的计算公式:
SO2%=1-exp{-9.8×10-5(L/G)0.92V0.19exp[PH+1.35×10-4Mg2+-1.7×10-4(SO2)in+1.45×10-5Cl-]}。
优选地,所述步骤(2)中,公式的具体推导过程为:通过量纲分析法可得出脱硫效率和各参数之间存在如下关系:
S1、将参数①变量,参数②-⑥为定量,得出SO2%=1-exp{a1×(L/G)0.92},其中a1为常数;
S2、将参数②变量,参数①、③-⑥为定量,得出SO2%=1-exp{a2×exp[b1+c1×PH]},其中a2、b1、c1为常数;
S3、将参数③变量,参数①、②、④-⑥为定量,得出SO2%=1-exp{a3×V0.19},其中a3为常数;
S4、将参数④变量,参数①-③、⑤、⑥为定量,得出SO2%=1-exp{a4×exp[b2+c2×(SO2)in]},其中a4、b2、c2为常数;
S5、将参数⑤变量,参数①-④、⑥为定量,得出SO2%=1-exp{a5×exp[b3+c3×Mg2 +]},其中a5、b3、c3为常数;
S6、将参数⑥变量,参数①-⑤为定量,得出SO2%=1-exp{a6×exp[b4+c4×Cl-]},其中a6、b4、c4为常数;
S7、综上,可得出脱硫效率与各参数之间存在如下的计算公式:
SO2%=1-exp{a×(L/G)0.92V0.19exp[b×PH+c×Mg2++d×(SO2)in+e×Cl-]},其中a、b、c、d、e均为待定系数,通过采集实际运行项目的数据,最终得出系数值。
优选地,所述步骤(4)中,式中L/G取值70~180gal/Mcf;pH取值5.2~5.9;V取值5.3~9.3ft/s;(SO2)in取值1500-4500ppm;Mg2+取值0-10000ppm;Cl-取值4000-16000ppm;其中1gal/Mcf=0.134L/m3、1ft/s=0.305m/s、1ppm=2.86mg/Nm3。
本发明具有以下优点和有益效果:本发明的计算方法可以快速获取脱硫工艺设计所需的关键参数—液气比,以便能在脱硫效率和能耗之间找到一个最优的平衡点,即达到设定的脱硫效率、又能使得能耗相对较低。
具体实施方式
为更好的理解本发明,下面的实施例是对本发明的进一步说明,但本发明的内容不仅仅局限于下面的实施例。
实施例1
(1)、经过对湿法脱硫塔的各项参数进行分析,影响脱硫效率(SO2%)的因素主要有6个参数:①L/G—液气比、②PH—脱硫塔浆液酸碱值、③V—脱硫塔烟气流速、④(SO2)in—脱硫塔SO2入口浓度、⑤Mg2+—脱硫塔浆液Mg离子浓度、⑥Cl-—脱硫塔浆液Cl离子。通过实际运行参数进行分析,通过量纲分析法可得出脱硫效率和各参数之间存在如下关系:
S1、将参数①变量,参数②-⑥为定量,得出SO2%=1-exp{a1×(L/G)0.92},其中a1为常数;
S2、将参数②变量,参数①、③-⑥为定量,得出SO2%=1-exp{a2×exp[b1+c1×PH]},其中a2、b1、c1为常数;
S3、将参数③变量,参数①、②、④-⑥为定量,得出SO2%=1-exp{a3×V0.19},其中a3为常数;
S4、将参数④变量,参数①-③、⑤、⑥为定量,得出SO2%=1-exp{a4×exp[b2+c2×(SO2)in]},其中a4、b2、c2为常数;
S5、将参数⑤变量,参数①-④、⑥为定量,得出SO2%=1-exp{a5×exp[b3+c3×Mg2 +]},其中a5、b3、c3为常数;
S6、将参数⑥变量,参数①-⑤为定量,得出SO2%=1-exp{a6×exp[b4+c4×Cl-]},其中a6、b4、c4为常数;
S7、综上,可得出脱硫效率与各参数之间存在如下的计算公式:
SO2%=1-exp{a×(L/G)0.92V0.19exp[b×PH+c×Mg2++d×(SO2)in+e×Cl-]},其中a、b、c、d、e均为待定系数,通过采集分析实际运行参数,得出a、b、c、d、e系数为:a=-9.8×10-5,b=1.0,c=1.35×10-4,d=-1.7×10-4,e=1.45×10-5;
(4)将步骤(3)的各参数代入步骤(2)的公式中,得出如下湿法脱硫塔脱硫效率的计算公式:
SO2%=1-exp{-9.8×10-5(L/G)0.92V0.19exp[PH+1.35×10-4Mg2+-1.7×10-4(SO2)in+1.45×10-5Cl-]}。
(2)、根据实际运行项目,采集了如下数据:
V=7.3;Mg2+=0;(SO2)in=500-3000;Cl-=12000-16000
L/G=30 | L/G=40 | L/G=50 | L/G=60 | L/G=70 | |
PH=5.2 | SO2%=38% | SO2%=45% | SO2%=53% | SO2%=58% | SO2%=64% |
PH=5.5 | SO2%=46% | SO2%=56% | SO2%=64% | SO2%=69% | SO2%=73% |
PH=5.8 | SO2%=56% | SO2%=67% | SO2%=74% | SO2%=79% | SO2%=83% |
V=7.3;PH=5.4-5.6;(SO2)in=2500-3000;Cl-=8000-16000
L/G=30 | L/G=40 | L/G=50 | L/G=60 | L/G=70 | |
Mg2+=1000 | SO2%=52% | SO2%=61% | SO2%=66% | SO2%=73% | SO2%=76% |
Mg2+=4000 | SO2%=66% | SO2%=75% | SO2%=83% | SO2%=85% | SO2%=88% |
Mg2+=9000 | SO2%=88% | SO2%=92% | SO2%=94% | SO2%=96% | SO2%=97% |
V=7.3;L/G=51;(SO2)in=2500-3000;Cl-=12000-16000
PH=5.2 | PH=5.4 | PH=5.6 | PH=5.8 | |
Mg2+=1000 | SO2%=56% | SO2%=64% | SO2%=68% | SO2%=74% |
Mg2+=4000 | SO2%=73% | SO2%=77% | SO2%=84% | SO2%=88% |
Mg2+=9000 | SO2%=92% | SO2%=93% | SO2%=93% | SO2%=94% |
PH=5.7-5.9;Mg2+=0;(SO2)in=2000-3000;Cl-=3500-16000
V=5.0 | V=6.0 | V=7.0 | V=8.0 | V=9.0 | |
(L/G)×V×1000/60=15 | SO2%=72% | SO2%=67% | SO2%=64% | SO2%=60% | SO2%=58% |
(L/G)×V×1000/60=22.5 | SO2%=84% | SO2%=81% | SO2%=78% | SO2%=75% | SO2%=72% |
(L/G)×V×1000/60=30 | SO2%=91% | SO2%=88% | SO2%=87% | SO2%=85% | SO2%=83% |
通多对以上采集数据的分析,得出a、b、c、d、e系数为:
a=-9.8×10-5;b=1.0;c=1.35×10-4;d=-1.7×10-4;e=1.45×10-5,与本公式相符。
其中,以上公式中所含参数需要在一定范围内计算结果较准确:
L/G—液气比(70~180gal/Mcf),1gal/Mcf=0.134L/m3
PH—5.2~5.9
V—脱硫塔烟气流速(5.3~9.3ft/s),1ft/s=0.305m/s
(SO2)in—脱硫塔SO2入口浓度(1500-4500ppm),1ppm=2.86mg/Nm3
Mg2+—脱硫塔浆液Mg离子(0-10000),ppm
Cl-—脱硫塔浆液Cl离子(4000-16000),ppm。
实施例2
以某厂2×150t/h燃煤锅炉烟气湿法脱硫项目为例,测算该液气比计算公式的准确性。
该项目为1炉1塔,单炉烟气量为:193965Nm3/h(标态,湿基,实际含氧量),SO2:3000mg/Nm3(标态,干基,6%O2),脱硫系统入口烟气温度110~150℃时,脱硫效率不低于98.3%。脱硫剂采用成品石灰石粉,石灰石的粒度≤0.044mm,厂内制浆方式脱硫副产物石膏(CaSO4·2H2O)纯度>90%。装置可利用率>96%。即初始输入参数:SO2%=98.3%;pH=5.7;V=9.84ft/s;(SO2)in=1048ppm;Mg2+=1000ppm;Cl-=10000ppm
将以上数据输入公式:
SO2%=1-exp{-9.8×10-5(L/G)0.92V0.19exp[PH+1.35×10-4Mg2+-1.7×10-4(SO2)in+1.45×10-5Cl-]}
L/G=119.37gal/Mcf(即16.00L/m3),现场实际运行数据16.24L/m3,偏差1.48%,在允许范围内。
以上所述是本发明的优选实施方式而已,当然不能以此来限定本发明之权利范围,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和变动,这些改进和变动也视为本发明的保护范围。
Claims (2)
1.一种石灰石—石膏法烟气脱硫塔液气比的计算方法,其特征在于,包括以下步骤:
(1)经过对湿法脱硫塔的各项参数进行分析,影响脱硫效率SO2%的因素主要有6个参数:①L/G—液气比、②pH—脱硫塔浆液酸碱值、③V—脱硫塔烟气流速、④(SO2)in—脱硫塔SO2入口浓度、⑤Mg2+—脱硫塔浆液Mg离子浓度、⑥Cl-—脱硫塔浆液Cl离子;
(2)通过量纲分析法,得出脱硫效率与各参数之间存在如下的计算公式:
SO2%=1-exp{a×(L/G)0.92V0.19exp[b×pH+c×Mg2++d×(SO2)in+e×Cl-]},其中a、b、c、d、e均为待定系数;
(3)通过采集分析实际运行参数,得出a、b、c、d、e系数为:a=-9.8×10-5,b=1.0,c=1.35×10-4,d=-1.7×10-4,e=1.45×10-5;
(4)将步骤(3)的各参数代入步骤(2)的公式中,得出如下湿法脱硫塔脱硫效率的计算公式:
SO2%=1-exp{-9.8×10-5(L/G)0.92V0.19exp[pH+1.35×10-4Mg2+-1.7×10-4(SO2)in +1.45×10-5Cl-]};
将初始参数SO2%、pH、V、(SO2)in、Mg2+、Cl-输入以上公式,计算得出L/G;
所述步骤(2)中,公式的具体推导过程为:通过量纲分析法可得出脱硫效率和各参数之间存在如下关系:
S1、将参数①变量,参数②-⑥为定量,得出SO2%=1-exp{a1×(L/G)0.92},其中a1为常数;
S2、将参数②变量,参数①、③-⑥为定量,得出SO2%=1-exp{a2×exp[b1+c1×pH]},其中a2、b1、c1为常数;
S3、将参数③变量,参数①、②、④-⑥为定量,得出SO2%=1-exp{a3×V0.19},其中a3为常数;
S4、将参数④变量,参数①-③、⑤、⑥为定量,得出SO2%=1-exp{a4×exp[b2+c2×(SO2)in]},其中a4、b2、c2为常数;
S5、将参数⑤变量,参数①-④、⑥为定量,得出SO2%=1-exp{a5×exp[b3+c3×Mg2+]},其中a5、b3、c3为常数;
S6、将参数⑥变量,参数①-⑤为定量,得出SO2%=1-exp{a6×exp[b4+c4×Cl-]},其中a6、b4、c4为常数;
S7、综上,可得出脱硫效率与各参数之间存在如下的计算公式:
SO2%=1-exp{a×(L/G)0.92V0.19exp[b×pH+c×Mg2++d×(SO2)in+e×Cl-]},其中a、b、c、d、e均为待定系数,通过采集实际运行项目的数据,最终得出系数值。
2.根据权利要求1所述的石灰石—石膏法烟气脱硫塔液气比的计算方法,其特征在于:所述步骤(4)中,式中pH取值5.2~5.9;V取值5.3~9.3ft/s;(SO2)in取值1500-4500ppm;Mg2+取值0-10000ppm;Cl-取值4000-16000ppm;其中1gal/Mcf=0.134L/m3、1ft/s=0.305m/s、1ppm=2.86mg/Nm3。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110772935.1A CN113457403B (zh) | 2021-07-08 | 2021-07-08 | 一种石灰石—石膏法烟气脱硫塔液气比的计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110772935.1A CN113457403B (zh) | 2021-07-08 | 2021-07-08 | 一种石灰石—石膏法烟气脱硫塔液气比的计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113457403A CN113457403A (zh) | 2021-10-01 |
CN113457403B true CN113457403B (zh) | 2023-09-08 |
Family
ID=77879197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110772935.1A Active CN113457403B (zh) | 2021-07-08 | 2021-07-08 | 一种石灰石—石膏法烟气脱硫塔液气比的计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113457403B (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109647173A (zh) * | 2018-12-28 | 2019-04-19 | 浙江天蓝环保技术股份有限公司 | 一种半干法-湿法串联的so2烟气脱硫工艺及装置 |
CN111564184A (zh) * | 2020-04-15 | 2020-08-21 | 华电电力科学研究院有限公司 | 燃煤电厂石灰石-石膏湿法脱硫so3协同脱除效率预测方法 |
CN211645310U (zh) * | 2019-12-30 | 2020-10-09 | 营口东邦环保科技股份有限公司 | 动态自由铁水预处理脱硫喷枪 |
-
2021
- 2021-07-08 CN CN202110772935.1A patent/CN113457403B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109647173A (zh) * | 2018-12-28 | 2019-04-19 | 浙江天蓝环保技术股份有限公司 | 一种半干法-湿法串联的so2烟气脱硫工艺及装置 |
CN211645310U (zh) * | 2019-12-30 | 2020-10-09 | 营口东邦环保科技股份有限公司 | 动态自由铁水预处理脱硫喷枪 |
CN111564184A (zh) * | 2020-04-15 | 2020-08-21 | 华电电力科学研究院有限公司 | 燃煤电厂石灰石-石膏湿法脱硫so3协同脱除效率预测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN113457403A (zh) | 2021-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2626189C (en) | Method of mercury removal in a wet flue gas desulfurization system | |
US10099170B1 (en) | Ammonia-adding system for ammonia-based desulfurization device | |
EP3333130A1 (en) | Water treatment system, power generation plant, and method for controlling water treatment system | |
CN103831011B (zh) | 酸性气体稳定处理方法及燃烧排气处理设备 | |
JP5953342B2 (ja) | 水銀の再排出を低下させるための亜硫酸塩制御 | |
CN111340199A (zh) | 一种基于物料衡算和深度学习的脱硫系统节能方法 | |
CN102743972A (zh) | 一种脱硫系统石灰石浆液pH值控制器 | |
CN113457403B (zh) | 一种石灰石—石膏法烟气脱硫塔液气比的计算方法 | |
CN111028895B (zh) | 一种水处理过程中药剂软化加药量的计算方法 | |
CN111507016A (zh) | 一种运动条件动态下并联窄通道流动失稳边界的确定方法 | |
CN111564184A (zh) | 燃煤电厂石灰石-石膏湿法脱硫so3协同脱除效率预测方法 | |
JP5081000B2 (ja) | 湿式排煙脱硫装置の酸化用空気供給量制御方法 | |
CN102553424B (zh) | 一种吸收塔pH值调节方法 | |
US20170014759A1 (en) | Device and method for extracting a chemical compound in acid gases | |
JPS60110321A (ja) | 排煙脱硫プラントの制御方法 | |
Shahrestani et al. | Evaluation of electrical energy consumption in UV/H 2 O 2 advanced oxidation process for simultaneous removal of NO and SO 2 | |
JP4433268B2 (ja) | 湿式排煙脱硫方法と装置 | |
JP3651918B2 (ja) | 湿式排煙脱硫装置の制御方法 | |
CN112649553A (zh) | 一种石灰石湿法脱硫吸收塔浆液自然氧化率的测试方法 | |
CN105653766A (zh) | 一种非平衡分子动力学模拟计算分子扩散系数的方法 | |
JP2555873B2 (ja) | 排ガス中の水銀除去方法 | |
US10449487B2 (en) | Mercury control in a seawater flue gas desulfurization system | |
JP2971512B2 (ja) | 湿式排煙脱硫装置の制御方法 | |
CN111855604B (zh) | 一种烟气湿法脱硫石灰石浆料转化率的测定方法 | |
JPH1066825A (ja) | 脱硫制御装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |