CN113428769B - 海上大型预制墩台一体化吊装调位系统及工艺 - Google Patents
海上大型预制墩台一体化吊装调位系统及工艺 Download PDFInfo
- Publication number
- CN113428769B CN113428769B CN202110524153.6A CN202110524153A CN113428769B CN 113428769 B CN113428769 B CN 113428769B CN 202110524153 A CN202110524153 A CN 202110524153A CN 113428769 B CN113428769 B CN 113428769B
- Authority
- CN
- China
- Prior art keywords
- positioning
- steel
- lifting appliance
- prefabricated
- main beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 230000008569 process Effects 0.000 title claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 108
- 239000010959 steel Substances 0.000 claims abstract description 108
- 210000001503 joint Anatomy 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 15
- 238000010276 construction Methods 0.000 abstract description 12
- 230000000694 effects Effects 0.000 description 6
- 238000006243 chemical reaction Methods 0.000 description 4
- 230000001360 synchronised effect Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000017105 transposition Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
- B66C13/085—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions electrical
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110524153.6A CN113428769B (zh) | 2021-05-13 | 2021-05-13 | 海上大型预制墩台一体化吊装调位系统及工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110524153.6A CN113428769B (zh) | 2021-05-13 | 2021-05-13 | 海上大型预制墩台一体化吊装调位系统及工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113428769A CN113428769A (zh) | 2021-09-24 |
CN113428769B true CN113428769B (zh) | 2024-01-09 |
Family
ID=77802402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110524153.6A Active CN113428769B (zh) | 2021-05-13 | 2021-05-13 | 海上大型预制墩台一体化吊装调位系统及工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113428769B (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020074130A (ko) * | 2002-09-03 | 2002-09-28 | 최병렬 | 푸쉬-풀 및 리프팅 시스템을 이용한프리패브리캐션(Prefabrication) 교량상부구조의 일체화설치공법 |
CN201186864Y (zh) * | 2007-12-04 | 2009-01-28 | 上海宝冶建设有限公司 | 大型设备安装用自爬式液压顶升装置 |
CN101476291A (zh) * | 2009-01-21 | 2009-07-08 | 中铁一局集团有限公司 | 一种节段拼装简支箱梁移动膺架施工方法 |
CN102535469A (zh) * | 2012-02-17 | 2012-07-04 | 中交武汉港湾工程设计研究院有限公司 | 工具式导向沉桩装置 |
CN102852095A (zh) * | 2012-09-07 | 2013-01-02 | 中交第二航务工程局有限公司 | 一种桥梁预制墩台多功能吊装系统及施工步骤 |
CN102926397A (zh) * | 2012-09-07 | 2013-02-13 | 中交第二航务工程局有限公司 | 桥梁预制基础施工用多功能液压吊具及施工步骤 |
CN103362068A (zh) * | 2013-07-22 | 2013-10-23 | 中铁大桥局股份有限公司 | 预制承台的安装方法 |
CN105002919A (zh) * | 2015-07-29 | 2015-10-28 | 厦门理工学院 | 一种使预制承台与多根固定钢管桩相互定位的系统及其定位工艺 |
CN208856776U (zh) * | 2018-08-30 | 2019-05-14 | 中交二航局第二工程有限公司 | 便于大型钢筋笼下放及固定的装置 |
-
2021
- 2021-05-13 CN CN202110524153.6A patent/CN113428769B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020074130A (ko) * | 2002-09-03 | 2002-09-28 | 최병렬 | 푸쉬-풀 및 리프팅 시스템을 이용한프리패브리캐션(Prefabrication) 교량상부구조의 일체화설치공법 |
CN201186864Y (zh) * | 2007-12-04 | 2009-01-28 | 上海宝冶建设有限公司 | 大型设备安装用自爬式液压顶升装置 |
CN101476291A (zh) * | 2009-01-21 | 2009-07-08 | 中铁一局集团有限公司 | 一种节段拼装简支箱梁移动膺架施工方法 |
CN102535469A (zh) * | 2012-02-17 | 2012-07-04 | 中交武汉港湾工程设计研究院有限公司 | 工具式导向沉桩装置 |
CN102852095A (zh) * | 2012-09-07 | 2013-01-02 | 中交第二航务工程局有限公司 | 一种桥梁预制墩台多功能吊装系统及施工步骤 |
CN102926397A (zh) * | 2012-09-07 | 2013-02-13 | 中交第二航务工程局有限公司 | 桥梁预制基础施工用多功能液压吊具及施工步骤 |
CN103362068A (zh) * | 2013-07-22 | 2013-10-23 | 中铁大桥局股份有限公司 | 预制承台的安装方法 |
CN105002919A (zh) * | 2015-07-29 | 2015-10-28 | 厦门理工学院 | 一种使预制承台与多根固定钢管桩相互定位的系统及其定位工艺 |
CN208856776U (zh) * | 2018-08-30 | 2019-05-14 | 中交二航局第二工程有限公司 | 便于大型钢筋笼下放及固定的装置 |
Also Published As
Publication number | Publication date |
---|---|
CN113428769A (zh) | 2021-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108571425B (zh) | 一种海上风力发电机组桩基承台基础及其施工方法 | |
CN201376848Y (zh) | 双塔桅巨型自升降起重设备 | |
CN109680616B (zh) | 利用缆载吊机协同倒提升设备吊装主梁的施工方法 | |
CN113428769B (zh) | 海上大型预制墩台一体化吊装调位系统及工艺 | |
CN109607399B (zh) | 一种安装屋顶网架的吊装工艺 | |
CN111395395A (zh) | 一种地铁深基坑盖挖下支撑系统安装工艺 | |
LU501962B1 (en) | Long Platform Guy-Wire Hanging Basket and Construction Method For Main Girder Section | |
CN114370041A (zh) | 一种海上换流站基础平台 | |
CN208415258U (zh) | 一种海上风力发电机组基础的沉桩定位模架 | |
CN111456009A (zh) | 一种打桩施工中的工程桩导向装置及其使用方法 | |
CN111501756A (zh) | 一种抱桩导管架及其施工方法 | |
CN109440942B (zh) | 一种厂房屋面网架安装结构及施工工艺 | |
CN211647379U (zh) | 一种异形构件安装临时装置 | |
CN210195303U (zh) | 一种预制墙辅助安装架 | |
CN208980165U (zh) | 一种大直径桩基钢筋笼悬挂吊具 | |
CN208416809U (zh) | 一种海上风力发电机组桩基承台基础 | |
CN103072004B (zh) | 一种电动葫芦吊架的安装方法 | |
CN106340328B (zh) | 核电站压力容器筒体和蒸汽发生器的找正、调平方法 | |
CN113445423B (zh) | 预制件与结构件通用抱紧装置及抱紧方法 | |
CN216340793U (zh) | 一种新型外脚手架三角支撑装置 | |
CN219527360U (zh) | 一种用于高墩施工的稳定升降结构 | |
CN216948382U (zh) | 一种置于双壁钢围堰内壁的单吊点吊放结构 | |
CN111173300A (zh) | 一种预制装配式结构 | |
CN103711299A (zh) | 建筑外墙可升降脚手架 | |
CN214423955U (zh) | 一种建筑脚手架施工用升降层架定位化加固机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wen Dingxu Inventor after: Li Haifang Inventor after: Xu Qi Inventor after: Yu Xiaolong Inventor after: Chen Qiuzhu Inventor after: Yu Junye Inventor after: Wang Wei Inventor after: Zhang Junbo Inventor after: Wang Qi Inventor after: Su Yan Inventor after: Mei Long Inventor after: Lin Tieliang Inventor after: Chang Chenxi Inventor after: Wang Haiyang Inventor after: Wen Feng Inventor after: Xu Jian Inventor after: Yang Junxi Inventor after: Li Yang Inventor after: Lin Zhiping Inventor after: Guo Qiang Inventor after: Chai Haifeng Inventor after: Zhang Xiaoguang Inventor after: Tang Zujie Inventor after: Luo Hong Inventor after: Deng Yuxin Inventor after: Xue Zhiwu Inventor before: Wen Dingxu Inventor before: Xu Qi Inventor before: Yu Xiaolong Inventor before: Chen Qiuzhu Inventor before: Yu Junye Inventor before: Wang Wei Inventor before: Zhang Junbo Inventor before: Wang Qi Inventor before: Su Yan Inventor before: Mei Long Inventor before: Chang Chenxi Inventor before: Lin Tieliang Inventor before: Wang Haiyang Inventor before: Wen Feng Inventor before: Xu Jian Inventor before: Yang Junxi Inventor before: Li Yang Inventor before: Lin Zhiping Inventor before: Guo Qiang Inventor before: Chai Haifeng Inventor before: Zhang Xiaoguang Inventor before: Luo Hong Inventor before: Deng Yuxin Inventor before: Xue Zhiwu Inventor before: Li Haifang |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |