CN113235913A - 建筑竖向模板悬挂整拼整提的施工设备及方法 - Google Patents
建筑竖向模板悬挂整拼整提的施工设备及方法 Download PDFInfo
- Publication number
- CN113235913A CN113235913A CN202110523970.XA CN202110523970A CN113235913A CN 113235913 A CN113235913 A CN 113235913A CN 202110523970 A CN202110523970 A CN 202110523970A CN 113235913 A CN113235913 A CN 113235913A
- Authority
- CN
- China
- Prior art keywords
- steel
- hanging
- vertical
- template
- construction equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 title abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 74
- 239000010959 steel Substances 0.000 claims abstract description 74
- 238000009415 formwork Methods 0.000 abstract description 13
- 230000000694 effects Effects 0.000 abstract description 3
- 238000004904 shortening Methods 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 23
- 238000009435 building construction Methods 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/02—Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
- B66C11/04—Underhung trolleys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (7)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110523970.XA CN113235913B (zh) | 2021-05-13 | 2021-05-13 | 建筑竖向模板悬挂整拼整提的施工设备及方法 |
PCT/CN2022/088062 WO2022237482A1 (zh) | 2021-05-13 | 2022-04-21 | 建筑竖向模板悬挂整拼整提的施工设备及方法 |
ZA2022/06664A ZA202206664B (en) | 2021-05-13 | 2022-06-15 | Construction equipment for hanging, assembling and lifting vertical formworks of buildings and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110523970.XA CN113235913B (zh) | 2021-05-13 | 2021-05-13 | 建筑竖向模板悬挂整拼整提的施工设备及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113235913A true CN113235913A (zh) | 2021-08-10 |
CN113235913B CN113235913B (zh) | 2024-07-12 |
Family
ID=77134094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110523970.XA Active CN113235913B (zh) | 2021-05-13 | 2021-05-13 | 建筑竖向模板悬挂整拼整提的施工设备及方法 |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN113235913B (zh) |
WO (1) | WO2022237482A1 (zh) |
ZA (1) | ZA202206664B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022237482A1 (zh) * | 2021-05-13 | 2022-11-17 | 中建三局第三建设工程有限责任公司 | 建筑竖向模板悬挂整拼整提的施工设备及方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116025153A (zh) * | 2023-02-17 | 2023-04-28 | 中国十七冶集团有限公司 | 一种柱模板留置清槽口的处理方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203669346U (zh) * | 2013-12-13 | 2014-06-25 | 中建三局第一建设工程有限责任公司 | 一种贝雷架下弦下挂工字钢旋入式夹具 |
RU2604098C1 (ru) * | 2015-11-02 | 2016-12-10 | федеральное государственное автономное образовательное учреждение высшего образования "Южно-Уральский государственный университет" (национальный исследовательский университет)" (ФГАОУ ВО "ЮУрГУ" (НИУ) | Способ строительства подземного многоэтажного сооружения |
CN107489214A (zh) * | 2017-06-29 | 2017-12-19 | 深圳前海特辰科技有限公司 | 核心筒竖向与水平结构的平层施工方法 |
CN110863648A (zh) * | 2019-12-09 | 2020-03-06 | 中建七局第四建筑有限公司 | 一种超高层施工平台钢框木模板悬挂系统 |
WO2020118563A1 (zh) * | 2018-12-12 | 2020-06-18 | 大连理工大学 | 一种预制钢梁与楼板平齐装配的设计及快速施工方法 |
DE202020107429U1 (de) * | 2020-05-14 | 2021-01-13 | China Tiesiju Civil Engineering Group Co. LTD | Schnellverbindungs-Konstruktionswagen der Rohrgalerie-Membranplatte |
CN215717173U (zh) * | 2021-05-13 | 2022-02-01 | 中建三局第三建设工程有限责任公司 | 建筑竖向模板悬挂整拼整提的施工设备 |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB453924A (en) * | 1935-04-01 | 1936-09-21 | Harold George Dyke | Improvements relating to formwork for concrete construction |
GB800301A (en) * | 1954-11-20 | 1958-08-27 | Chester Irving Williams | Improvements in or relating to a method of building a concrete structure by the pouring of successive lifts af concrete |
DE29911524U1 (de) * | 1999-07-06 | 2001-01-04 | Heinzle Otto | Arbeitsgerüst zum Bau runder Türme aus Stahlbeton |
JP2004011110A (ja) * | 2002-06-03 | 2004-01-15 | Shiba Kensetsu Kk | コンクリート構造物における型枠の施工方法及び型枠・支柱の吊上げ方法 |
KR20080099685A (ko) * | 2007-05-10 | 2008-11-13 | 김지욱 | 건축 장치 및 방법 |
CN101575911B (zh) * | 2009-05-27 | 2010-12-29 | 上海市第一建筑有限公司 | 逆作降模模板系统及施工方法 |
CN103654610A (zh) * | 2012-09-02 | 2014-03-26 | 江苏雄宇重工科技股份有限公司 | 轨道式悬挂吊篮 |
CN104141383B (zh) * | 2014-07-16 | 2016-06-01 | 北京万兴建筑集团有限公司 | 一种贝雷梁悬吊模板支撑体系及其施工工法 |
CN206233542U (zh) * | 2016-10-10 | 2017-06-09 | 中国建筑第八工程局有限公司 | 一种用于顶升施工平台的吊模装置 |
CN210737607U (zh) * | 2019-07-22 | 2020-06-12 | 中建三局集团有限公司 | 一种用于逆作法梁板施工的悬挂支撑体系 |
CN212176541U (zh) * | 2019-12-29 | 2020-12-18 | 中建三局第三建设工程有限责任公司 | 轻型可周转高效施工造楼设备 |
CN111219055A (zh) * | 2019-12-29 | 2020-06-02 | 中建三局第三建设工程有限责任公司 | 轻型可周转高效施工造楼设备及其施工方法 |
CN212957618U (zh) * | 2020-06-28 | 2021-04-13 | 浙江铠甲建筑科技有限公司 | 爬升模板悬挂滑动装置 |
CN112681724B (zh) * | 2020-12-21 | 2022-09-13 | 中交第四公路工程局有限公司 | 一种高大空间型钢-混凝土结构屋盖施工模板体系及方法 |
CN113235913B (zh) * | 2021-05-13 | 2024-07-12 | 中建三局第三建设工程有限责任公司 | 建筑竖向模板悬挂整拼整提的施工设备及方法 |
-
2021
- 2021-05-13 CN CN202110523970.XA patent/CN113235913B/zh active Active
-
2022
- 2022-04-21 WO PCT/CN2022/088062 patent/WO2022237482A1/zh active Application Filing
- 2022-06-15 ZA ZA2022/06664A patent/ZA202206664B/en unknown
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203669346U (zh) * | 2013-12-13 | 2014-06-25 | 中建三局第一建设工程有限责任公司 | 一种贝雷架下弦下挂工字钢旋入式夹具 |
RU2604098C1 (ru) * | 2015-11-02 | 2016-12-10 | федеральное государственное автономное образовательное учреждение высшего образования "Южно-Уральский государственный университет" (национальный исследовательский университет)" (ФГАОУ ВО "ЮУрГУ" (НИУ) | Способ строительства подземного многоэтажного сооружения |
CN107489214A (zh) * | 2017-06-29 | 2017-12-19 | 深圳前海特辰科技有限公司 | 核心筒竖向与水平结构的平层施工方法 |
WO2020118563A1 (zh) * | 2018-12-12 | 2020-06-18 | 大连理工大学 | 一种预制钢梁与楼板平齐装配的设计及快速施工方法 |
CN110863648A (zh) * | 2019-12-09 | 2020-03-06 | 中建七局第四建筑有限公司 | 一种超高层施工平台钢框木模板悬挂系统 |
DE202020107429U1 (de) * | 2020-05-14 | 2021-01-13 | China Tiesiju Civil Engineering Group Co. LTD | Schnellverbindungs-Konstruktionswagen der Rohrgalerie-Membranplatte |
CN215717173U (zh) * | 2021-05-13 | 2022-02-01 | 中建三局第三建设工程有限责任公司 | 建筑竖向模板悬挂整拼整提的施工设备 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022237482A1 (zh) * | 2021-05-13 | 2022-11-17 | 中建三局第三建设工程有限责任公司 | 建筑竖向模板悬挂整拼整提的施工设备及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN113235913B (zh) | 2024-07-12 |
ZA202206664B (en) | 2023-02-22 |
WO2022237482A1 (zh) | 2022-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113235913A (zh) | 建筑竖向模板悬挂整拼整提的施工设备及方法 | |
CN108979131B (zh) | 一种高层建筑施工钢模板及操作架整体提升平台装置 | |
CN102230313A (zh) | 桥梁薄壁空心墩手拉葫芦提升作业平台及其施工方法 | |
CN214575640U (zh) | 一种u型浇筑混凝土竖向及水平结构同步施工模架体系 | |
CN102733608B (zh) | 一种造粒塔喷头层施工方法 | |
CN215717173U (zh) | 建筑竖向模板悬挂整拼整提的施工设备 | |
CN106042173A (zh) | 桥梁生产系统 | |
CN214996139U (zh) | 一种高空大跨度型钢混凝土梁悬吊模施工的安全操作平台 | |
CN111926998B (zh) | 一种超高层结构外框钢管柱施工方法 | |
CN113927729A (zh) | 一种预制空心墩的自动化生产系统 | |
CN213836318U (zh) | 一种桥面湿接缝吊模结构 | |
CN109869153A (zh) | 快速施工竖井衬砌的整体提升悬臂模板装置及施工方法 | |
CN116607426A (zh) | 一种拱桥外包混凝土施工平台系统及施工方法 | |
CN107381376B (zh) | 利用幕墙埋件实施吊装的装置及其方法 | |
CN216664766U (zh) | 一种装配式挑檐女儿墙 | |
CN216634842U (zh) | 一种预制空心墩的自动化生产系统 | |
CN216515141U (zh) | 一种新悬挑施工爬模装置 | |
CN102720360B (zh) | 高楼托吊浇灌水泥模架建材吊运外墙吊箱的组合装置 | |
CN115110765A (zh) | 一种变形缝处剪力墙施工方法及装置 | |
CN218563020U (zh) | 一种用于核心筒倒浇施工的滑爬模架体系 | |
CN214329836U (zh) | 一种滑模系统施工吊架 | |
CN110230265A (zh) | 一种用于高墩的施工方法 | |
JP2712121B2 (ja) | 鉄筋の建込み方法及び、該建込み方法において使用される吊下げ治具及び、案内器具 | |
CN216766824U (zh) | 一种预制板吊拉杆 | |
CN210341680U (zh) | 一种门式波形钢腹板安装及悬挑式吊架结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ding Weixiang Inventor after: Xu Guowei Inventor after: Zhang Buyue Inventor after: Zhou Pengcheng Inventor after: Gong Wentao Inventor after: Zhang Peng Inventor after: Wang Jifeng Inventor after: Liu Minkang Inventor after: Zou Jindun Inventor after: Qi Pei Inventor after: Feng Wei Inventor after: Qi Congyue Inventor after: Wei Xiaoming Inventor after: Lv Wenzhi Inventor after: Li Tong Inventor after: Wan Dehai Inventor after: Pan Dawei Inventor after: Zhang Shengneng Inventor after: Qian Shiqing Inventor after: Liu Hanwen Inventor after: Liu Heng Inventor after: Wang Wei Inventor after: Zhang Zhihua Inventor after: Zhou Hongwei Inventor after: Wang Yihan Inventor before: Ding Weixiang Inventor before: Zhou Hongwei Inventor before: Zhou Pengcheng Inventor before: Gong Wentao Inventor before: Zhang Peng Inventor before: Wang Jifeng Inventor before: Liu Minkang Inventor before: Zou Jindun Inventor before: Qi Pei Inventor before: Feng Wei Inventor before: Wei Xiaoming Inventor before: Qian Shiqing Inventor before: Lv Wenzhi Inventor before: Li Tong Inventor before: Wan Dehai Inventor before: Pan Dawei Inventor before: Zhang Shengneng Inventor before: Wang Wei Inventor before: Zhang Zhihua Inventor before: Liu Hanwen Inventor before: Liu Heng Inventor before: Xu Guowei Inventor before: Zhang Buyue Inventor before: Wang Yihan |
|
GR01 | Patent grant |