CN113108711A - 一种高温管道补偿段变形测量方法 - Google Patents
一种高温管道补偿段变形测量方法 Download PDFInfo
- Publication number
- CN113108711A CN113108711A CN202110409041.6A CN202110409041A CN113108711A CN 113108711 A CN113108711 A CN 113108711A CN 202110409041 A CN202110409041 A CN 202110409041A CN 113108711 A CN113108711 A CN 113108711A
- Authority
- CN
- China
- Prior art keywords
- compensation section
- thermal imaging
- temperature pipeline
- thermal
- pipeline compensation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000691 measurement method Methods 0.000 title abstract description 7
- 238000000034 method Methods 0.000 claims abstract description 36
- 238000001931 thermography Methods 0.000 claims description 64
- 238000009434 installation Methods 0.000 claims description 5
- 238000013480 data collection Methods 0.000 claims description 4
- 125000004122 cyclic group Chemical group 0.000 claims 1
- 238000005259 measurement Methods 0.000 abstract description 24
- 230000008602 contraction Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B11/00—Measuring arrangements characterised by the use of optical techniques
- G01B11/16—Measuring arrangements characterised by the use of optical techniques for measuring the deformation in a solid, e.g. optical strain gauge
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Length Measuring Devices By Optical Means (AREA)
Abstract
本发明公开了一种高温管道补偿段变形测量方法,涉及管道变形测量技术领域,包括以下步骤:S1、安装承载架1;S2、安装热成像仪5;S3、运动热成像仪5;S4、热成像收集和S5、热成像对比。本发明通过该采用外部测量方法,在高温管道补偿段输送过程中即可对其进行变形的测量工作,不需要等待高温管道补偿段停止工作进行测量,传统的内部影像测量数据容易出现误差,且仪器在测量过程中往往表面附着污垢,难以进行清理,为测量工作带来不便的问题,当高温管道补偿段不工作时,由于热胀冷缩的原理,对其进行测量的数据并非准确数据,因此次测量方法更加的准确,此测量方法简单,便于使用,不需要进行复杂的安装工作,从而提升测量的效率。
Description
技术领域
本发明涉及高温管道变形测量技术领域,具体为一种高温管道补偿段变形测量方法。
背景技术
高温管道指的是输送高温高压的金属耐高温热力工程管道材料,管道热补偿(Pipethermalcompesation)是防止管道因温度升高引起热伸长产生的应力而遭到破坏所采取的措施,在高温管道使用过程中需要对管道热补偿段进行变形的测量,以保证高温管道输送的安全性。
市场上的高温管道补偿段变形测量方法多数采用管内测量的形式,传统的内部影像测量数据容易出现误差,且仪器在测量过程中往往表面附着污垢,难以进行清理,为测量工作带来不便的问题,当高温管道补偿段不工作时,由于热胀冷缩的原理,对其进行测量的数据并非准确数据的问题,为此,我们提出这样一种高温管道补偿段变形测量方法。
发明内容
针对现有技术的不足,本发明提供了一种高温管道补偿段变形测量方法,解决了上述背景技术中提出的高温管道补偿段变形测量方法多数采用管内测量的形式,传统的内部影像测量数据容易出现误差,且仪器在测量过程中往往表面附着污垢,难以进行清理,为测量工作带来不便的问题,当高温管道补偿段不工作时,由于热胀冷缩的原理,对其进行测量的数据并非准确数据的问题。
为实现上述目的,本发明提供如下技术方案:一种高温管道补偿段变形测量方法,包括以下步骤:
S1、安装承载架;
S2、安装热成像仪;
S3、运动热成像仪;
S4、热成像收集;
S5、热成像对比。
优选的,所述一种高温管道补偿段变形测量方法包括以下具体步骤:
S1、安装承载架
首先根据实际测量的高温管道补偿段的长度进行选择安装对应长度的承载架,然后通过固定柱将承载架平行安装于高温管道补偿段的一侧,确保热成像仪与高温管道补偿段之间位置的准确性,从而保证热成像仪热成像数据收集的准确性;
S2、安装热成像仪
通过紧固螺栓将热成像仪固定于滑块上端,安装完成后推动热成像仪,确保热成像仪通过推动滑块可以在滑轨上端水平位置上的直线移动;
S3、运动热成像仪
开启热成像仪,确保热成像仪可以正常工作后,将热成像仪从高温管道补偿段的一端移动至另一端,抵达另一端后,再次推动热成像仪进行循环往复运动;
S4、热成像收集
热成像仪在保持与高温管道补偿段平行状态运动过程中,对高温管道补偿段的热成像进行收集记录,且热成像仪从高温管道补偿段的一端运动至高温管道补偿段的另一端记录一次;
S5、热成像对比
将收集到的热成像依次与初始标准热成像进行对比,通过对比热成像的范围,从而知晓高温管道补偿段是否发生变形,通过多组的热成像对比,保证测量结构的准确性。
优选的,所述S2安装热成像仪过程中采用的热成像仪具体型号为FLIR-A310型。
优选的,所述S3运动热成像仪过程中热成像仪循环往复运动次数具体为次,且热成像仪为滑动运动方式。
本发明提供了一种高温管道补偿段变形测量方法,具备以下有益效果:该采用外部测量方法,在高温管道补偿段输送过程中即可对其进行变形的测量工作,不需要等待高温管道补偿段停止工作进行测量,传统的内部影像测量数据容易出现误差,且仪器在测量过程中往往表面附着污垢,难以进行清理,为测量工作带来不便的问题,当高温管道补偿段不工作时,由于热胀冷缩的原理,对其进行测量的数据并非准确数据,因此次测量方法更加的准确,此测量方法简单,便于使用,不需要进行复杂的安装工作,从而提升测量的效率,通过水平滑动运动热成像仪,保证热成像仪与高温管道补偿段之间位置的准确性,从而保证热成像仪测量数据的有效性,通过三次循环往复运动收数据收集,保证最终测量数据的准确性。
附图说明
图1为本发明一种高温管道补偿段变形测量方法的俯视结构示意图;
图2为本发明一种高温管道补偿段变形测量方法的滑轨立体结构示意图;
图中;1、承载架;2、固定柱;3、滑轨;4、滑块;5、热成像仪;6、紧固螺栓。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上;术语“上”、“下”、“左”、“右”、“内”、“外”、“前端”、“后端”、“头部”、“尾部”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”等仅用于描述目的,而不能理解为指示或暗示相对重要性。
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。
请参阅图1-2,本发明提供一种技术方案:一种高温管道补偿段变形测量方法,包括以下步骤:
S1、安装承载架1;
S2、安装热成像仪5;
S3、运动热成像仪5;
S4、热成像收集;
S5、热成像对比。
一种高温管道补偿段变形测量方法包括以下具体步骤:
S1、安装承载架1
首先根据实际测量的高温管道补偿段的长度进行选择安装对应长度的承载架1,然后通过固定柱2将承载架1平行安装于高温管道补偿段的一侧,确保热成像仪5与高温管道补偿段之间位置的准确性,从而保证热成像仪5热成像数据收集的准确性;
S2、安装热成像仪5
通过紧固螺栓6将热成像仪5固定于滑块4上端,安装完成后推动热成像仪5,确保热成像仪5通过推动滑块4可以在滑轨3上端水平位置上的直线移动;
S2安装热成像仪5过程中采用的热成像仪5具体型号为FLIR-A310型;
S3、运动热成像仪5
开启热成像仪5,确保热成像仪5可以正常工作后,将热成像仪5从高温管道补偿段的一端移动至另一端,抵达另一端后,再次推动热成像仪5进行循环往复运动;
S3运动热成像仪5过程中热成像仪5循环往复运动次数具体为3次,且热成像仪5为滑动运动方式;
S4、热成像收集
热成像仪5在保持与高温管道补偿段平行状态运动过程中,对高温管道补偿段的热成像进行收集记录,且热成像仪5从高温管道补偿段的一端运动至高温管道补偿段的另一端记录一次;
S5、热成像对比
将收集到的热成像依次与初始标准热成像进行对比,通过对比热成像的范围,从而知晓高温管道补偿段是否发生变形,通过多组的热成像对比,保证测量结构的准确性;
综上,该高温管道补偿段变形测量方法,使用时高温管道补偿段变形测量方法包括以下具体步骤:
S1、安装承载架1
首先根据实际测量的高温管道补偿段的长度进行选择安装对应长度的承载架1,然后通过固定柱2将承载架1平行安装于高温管道补偿段的一侧,确保热成像仪5与高温管道补偿段之间位置的准确性,从而保证热成像仪5热成像数据收集的准确性;
S2、安装热成像仪5
通过紧固螺栓6将热成像仪5固定于滑块4上端,安装完成后推动热成像仪5,确保热成像仪5通过推动滑块4可以在滑轨3上端水平位置上的直线移动;
S3、运动热成像仪5
开启热成像仪5,确保热成像仪5可以正常工作后,将热成像仪5从高温管道补偿段的一端移动至另一端,抵达另一端后,再次推动热成像仪5进行循环往复运动;
S4、热成像收集
热成像仪5在保持与高温管道补偿段平行状态运动过程中,对高温管道补偿段的热成像进行收集记录,且热成像仪5从高温管道补偿段的一端运动至高温管道补偿段的另一端记录一次;
S5、热成像对比
将收集到的热成像依次与初始标准热成像进行对比,通过对比热成像的范围,从而知晓高温管道补偿段是否发生变形,通过多组的热成像对比,保证测量结构的准确性。
以上,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。
Claims (4)
1.根据权利要求1所述的一种高温管道补偿段变形测量方法,其特征在于,包括以下步骤:
S1、安装承载架(1);
S2、安装热成像仪(5);
S3、运动热成像仪(5);
S4、热成像收集;
S5、热成像对比。
2.根据权利要求1所述的一种高温管道补偿段变形测量方法,其特征在于:所述一种高温管道补偿段变形测量方法包括以下具体步骤:
S1、安装承载架(1)
首先根据实际测量的高温管道补偿段的长度进行选择安装对应长度的承载架(1),然后通过固定柱(2)将承载架(1)平行安装于高温管道补偿段的一侧,确保热成像仪(5)与高温管道补偿段之间位置的准确性,从而保证热成像仪(5)热成像数据收集的准确性;
S2、安装热成像仪(5)
通过紧固螺栓(6)将热成像仪(5)固定于滑块(4)上端,安装完成后推动热成像仪(5),确保热成像仪(5)通过推动滑块(4)可以在滑轨(3)上端水平位置上的直线移动;
S3、运动热成像仪(5)
开启热成像仪(5),确保热成像仪(5)可以正常工作后,将热成像仪(5)从高温管道补偿段的一端移动至另一端,抵达另一端后,再次推动热成像仪(5)进行循环往复运动;
S4、热成像收集
热成像仪(5)在保持与高温管道补偿段平行状态运动过程中,对高温管道补偿段的热成像进行收集记录,且热成像仪(5)从高温管道补偿段的一端运动至高温管道补偿段的另一端记录一次;
S5、热成像对比
将收集到的热成像依次与初始标准热成像进行对比,通过对比热成像的范围,从而知晓高温管道补偿段是否发生变形,通过多组的热成像对比,保证测量结构的准确性。
3.根据权利要求2所述的一种高温管道补偿段变形测量方法,其特征在于:所述S2安装热成像仪(5)过程中采用的热成像仪(5)具体型号为FLIR-A310型。
4.根据权利要求2所述的一种高温管道补偿段变形测量方法,其特征在于:所述S3运动热成像仪(5)过程中热成像仪(5)循环往复运动次数具体为3次,且热成像仪(5)为滑动运动方式。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110409041.6A CN113108711A (zh) | 2021-04-16 | 2021-04-16 | 一种高温管道补偿段变形测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110409041.6A CN113108711A (zh) | 2021-04-16 | 2021-04-16 | 一种高温管道补偿段变形测量方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113108711A true CN113108711A (zh) | 2021-07-13 |
Family
ID=76717968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110409041.6A Pending CN113108711A (zh) | 2021-04-16 | 2021-04-16 | 一种高温管道补偿段变形测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113108711A (zh) |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4983836A (en) * | 1988-06-30 | 1991-01-08 | Nkk Corporation | Method for detecting thinned out portion on inner surface or outer surface of pipe |
WO2006089514A1 (de) * | 2005-02-23 | 2006-08-31 | V & M Deutschland Gmbh | Verfahren und vorrichtung zur überwachung des fertigungsprozesses zur herstellung von warmgefertigten rohren aus stahl |
JP2010002234A (ja) * | 2008-06-18 | 2010-01-07 | Toyota Motor Corp | 内部欠陥検出装置 |
CN203892882U (zh) * | 2014-05-28 | 2014-10-22 | 北京二商集团有限责任公司西郊食品冷冻厂 | 制冷工质管路的监测装置及应用该装置的冷库监测系统 |
JP2015514587A (ja) * | 2012-04-18 | 2015-05-21 | エスエムエス メーア ゲゼルシャフト ミット ベシュレンクテル ハフツングSMS Meer GmbH | 管溶接装置において異形管を縦シーム溶接する方法及び装置 |
US20150330866A1 (en) * | 2012-12-20 | 2015-11-19 | General Electric Company | Method and system for monitoring operating conditions in a steam generator |
CN105716655A (zh) * | 2016-02-03 | 2016-06-29 | 西北工业大学 | 高能束增材制造中温度与变形实时同步测量装置及方法 |
CN107433959A (zh) * | 2017-05-12 | 2017-12-05 | 北京瑞途科技有限公司 | 一种智能巡检机器人 |
CN107941855A (zh) * | 2017-11-22 | 2018-04-20 | 四川大学 | 一种基于永磁体旋转加热的钢管管端热成像检测装置 |
WO2018105142A1 (ja) * | 2016-12-09 | 2018-06-14 | 富士通株式会社 | 配管診断方法、装置およびシステム |
US20180250072A1 (en) * | 2015-04-02 | 2018-09-06 | Mark John McDonald Rogers | Method and apparatus for treating soft tissue injury |
JP2020034429A (ja) * | 2018-08-30 | 2020-03-05 | 日本アビオニクス株式会社 | 配管検査装置及び配管検査方法 |
CN211087326U (zh) * | 2020-02-18 | 2020-07-24 | 西安金源电气股份有限公司 | 一种电力地下综合管廊巡检机器人系统 |
CN211401434U (zh) * | 2020-03-19 | 2020-09-01 | 天津市德力达电子科技有限公司 | 高温炉窑热成像测温装置 |
CN212298598U (zh) * | 2020-04-30 | 2021-01-05 | 大连民族大学 | 管道巡行机器人及管道巡行系统 |
-
2021
- 2021-04-16 CN CN202110409041.6A patent/CN113108711A/zh active Pending
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4983836A (en) * | 1988-06-30 | 1991-01-08 | Nkk Corporation | Method for detecting thinned out portion on inner surface or outer surface of pipe |
WO2006089514A1 (de) * | 2005-02-23 | 2006-08-31 | V & M Deutschland Gmbh | Verfahren und vorrichtung zur überwachung des fertigungsprozesses zur herstellung von warmgefertigten rohren aus stahl |
JP2010002234A (ja) * | 2008-06-18 | 2010-01-07 | Toyota Motor Corp | 内部欠陥検出装置 |
JP2015514587A (ja) * | 2012-04-18 | 2015-05-21 | エスエムエス メーア ゲゼルシャフト ミット ベシュレンクテル ハフツングSMS Meer GmbH | 管溶接装置において異形管を縦シーム溶接する方法及び装置 |
US20150330866A1 (en) * | 2012-12-20 | 2015-11-19 | General Electric Company | Method and system for monitoring operating conditions in a steam generator |
CN203892882U (zh) * | 2014-05-28 | 2014-10-22 | 北京二商集团有限责任公司西郊食品冷冻厂 | 制冷工质管路的监测装置及应用该装置的冷库监测系统 |
US20180250072A1 (en) * | 2015-04-02 | 2018-09-06 | Mark John McDonald Rogers | Method and apparatus for treating soft tissue injury |
CN105716655A (zh) * | 2016-02-03 | 2016-06-29 | 西北工业大学 | 高能束增材制造中温度与变形实时同步测量装置及方法 |
WO2018105142A1 (ja) * | 2016-12-09 | 2018-06-14 | 富士通株式会社 | 配管診断方法、装置およびシステム |
CN107433959A (zh) * | 2017-05-12 | 2017-12-05 | 北京瑞途科技有限公司 | 一种智能巡检机器人 |
CN107941855A (zh) * | 2017-11-22 | 2018-04-20 | 四川大学 | 一种基于永磁体旋转加热的钢管管端热成像检测装置 |
JP2020034429A (ja) * | 2018-08-30 | 2020-03-05 | 日本アビオニクス株式会社 | 配管検査装置及び配管検査方法 |
CN211087326U (zh) * | 2020-02-18 | 2020-07-24 | 西安金源电气股份有限公司 | 一种电力地下综合管廊巡检机器人系统 |
CN211401434U (zh) * | 2020-03-19 | 2020-09-01 | 天津市德力达电子科技有限公司 | 高温炉窑热成像测温装置 |
CN212298598U (zh) * | 2020-04-30 | 2021-01-05 | 大连民族大学 | 管道巡行机器人及管道巡行系统 |
Non-Patent Citations (1)
Title |
---|
岳海鹏: "油气管道聚乙烯层粘接缺陷的红外热成像检测技术研究", 《电子测量技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210199430A1 (en) | Method and device for measuring flatness of a flexible photovoltaic module | |
CN102768224B (zh) | 正反双向热流法测固-固接触热阻的测试方法 | |
CN113108711A (zh) | 一种高温管道补偿段变形测量方法 | |
CN111735393A (zh) | 一种同步在位测量导轨线位移与直线度的装置及方法 | |
CN102830134A (zh) | 上下恒温参数辨识法测热界面材料性能 | |
CN102815319B (zh) | 非接触式轨枕识别测量装置的测量方法 | |
CN113074854B (zh) | 陶瓷涂层高温内应力的评价方法 | |
CN111189552A (zh) | 一种甲烷水合物火焰温度测试装置及测温修正方法 | |
CN106323505B (zh) | 一种反射式光学成像设备焦面参考温度采集方法 | |
CN104538384A (zh) | 密排拼接的双波段长线列红外焦平面探测器结构 | |
CN112014043A (zh) | 一种数字式大板梁挠度测量装置及方法 | |
CN213748286U (zh) | 一种采用线激光的测量装置 | |
CN215447862U (zh) | 药用玻璃管直线度测量装置 | |
CN213842104U (zh) | 水管轮廓度检验工装 | |
CN210775294U (zh) | 一种建筑外窗保温性能检测装置 | |
CN114739310A (zh) | 一种基于机器视觉的最大拉压应变检测传感器 | |
CN219348491U (zh) | 一种光伏组件载荷测试装置 | |
CN208488394U (zh) | 电路板检测装置 | |
CN208888168U (zh) | 一种用于折棚风挡隔热性实验的装置 | |
CN113176003B (zh) | 一种高温陶瓷生产温度检测设备 | |
CN112816120A (zh) | 一种索力测量方法 | |
CN218673511U (zh) | 一种槽式集热器的面型动态检测系统 | |
CN111537551A (zh) | 一种耐高温材料热膨胀系数检测装置 | |
CN219935254U (zh) | 一种ccd视觉测试系统 | |
CN112730243B (zh) | 承载鞍检测方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210713 |