CN112726983A - Dividing joint slotting process - Google Patents

Dividing joint slotting process Download PDF

Info

Publication number
CN112726983A
CN112726983A CN202011549073.8A CN202011549073A CN112726983A CN 112726983 A CN112726983 A CN 112726983A CN 202011549073 A CN202011549073 A CN 202011549073A CN 112726983 A CN112726983 A CN 112726983A
Authority
CN
China
Prior art keywords
scraping
adhesive tape
hour
texture
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011549073.8A
Other languages
Chinese (zh)
Inventor
王孝永
汪城
周云
孙四新
陈化春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yonglianda Coating Engineering Co ltd
Original Assignee
Chongqing Yonglianda Coating Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yonglianda Coating Engineering Co ltd filed Critical Chongqing Yonglianda Coating Engineering Co ltd
Priority to CN202011549073.8A priority Critical patent/CN112726983A/en
Publication of CN112726983A publication Critical patent/CN112726983A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/165Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

A dividing joint grooving process comprises the following steps: s1: cramping; s2: leveling by applying decorative mortar; s3: scraping fine particles for repairing and leveling; s4: scraping texture for the first time; s5: dividing the elastic lines; s6: slitting by a slitting machine; s7: scraping texture and seams for the second time; s8: polishing and grinding texture; s9: printing; s10: spraying points; s11: polishing the surface layer; s12: brushing finish paint; s13: pasting a paper adhesive tape; s14: seam tracing; s15: paper-tearing adhesive tape. The process greatly shortens the working hours, improves the working efficiency, effectively improves the quality, ensures the flatness of the finished surface and the smoothness, the uniform size and the consistent depth of the seam, and saves the cost of the thick paper adhesive tape.

Description

Dividing joint slotting process
Technical Field
The invention relates to the field of wall construction, in particular to a dividing joint slotting process.
Background
In the conventional dividing and slotting process, the process flow as shown in the attached figure 1 is adopted for most of the processes, and the process flow specifically adopted comprises the steps of base layer treatment, line snapping and dividing, thick paper adhesive tape pasting, thick paper adhesive tape fixing, decoration mortar smearing, repairing and leveling, thick paper adhesive tape tearing, fine sub-seam scraping, texture and seam scraping for the first time, polishing for the first time, texture and seam scraping for the second time, polishing for the second time, printing, point spraying, surface layer polishing, finish paint brushing, surface adhesive tape pasting, seam tracing and paper adhesive tape tearing. The working hours are measured and calculated by 20 square meters of 2 persons, wherein the time required for base layer treatment is 0.5 hour, the time required for elastic line division is 0.5 hour, the time required for thick paper adhesive tape pasting is 1 hour, the time required for thick paper adhesive tape fixing is 0.5 hour, the time required for fine and smooth son seam scraping is 0.5 hour, the time required for first texture scraping and seam scraping is 0.75 hour, the time required for first polishing is 1 hour, the time required for second texture scraping and seam scraping is 0.75 hour, the time required for second polishing is 1 hour, the time required for printing is 0.5 hour, the time required for spraying points is 0.5 hour, the time required for surface layer polishing is 0.5 hour, the time required for finishing paint brushing is 0.5 hour, the time required for adhesive tape pasting is 0.5 hour, and the time required for seam tracing is 5 hours.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a dividing joint slotting process, which has the following specific technical scheme:
a dividing joint grooving process is characterized in that: the method comprises the following steps:
s1: the rib is arranged, and the thickness of the decorative layer and the flatness of the wall surface are ensured through the rib;
s2: leveling by applying decorative mortar;
s3: scraping fine particles for repairing and leveling;
s4: scraping texture for the first time;
s5: dividing the elastic lines;
s6: slitting by a slitting machine;
s7: scraping texture and seams for the second time;
s8: polishing and grinding texture;
s9: printing;
s10: spraying points;
s11: polishing the surface layer;
s12: brushing finish paint;
s13: pasting a paper adhesive tape;
s14: seam tracing;
s15: paper-tearing adhesive tape.
The invention has the beneficial effects that: compared with the traditional process flow, the invention greatly shortens the working time, improves the working efficiency, effectively improves the quality, ensures the flatness of the finished surface and the smoothness, the uniformity and the consistent depth of the seam, and saves the cost of the thick paper adhesive tape.
Drawings
FIG. 1 is a flow chart of a conventional process;
fig. 2 is a flow chart of the operation of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, "first," "second," "third," and "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Measuring and calculating the working hours by using 20 square meters of 2 persons, as shown in a traditional process flow chart shown in figure 1, wherein the time required for leveling a base layer is 0.5 hour, the time required for dividing elastic lines is 0.5 hour, the time required for pasting a thick paper adhesive tape is 1 hour, the time required for fixing the thick paper adhesive tape is 0.5 hour, the time required for scraping fine particles is 0.5 hour, the time required for scraping texture and digging seams for the first time is 0.75 hour, the time required for polishing the first time is 1 hour, the time required for scraping texture and digging seams for the second time is 0.75 hour, the time required for polishing the second time is 1 hour, the time required for printing is 0.5 hour, the time required for spraying points is 0.5 hour, the time required for polishing a surface layer is 0.5 hour, the time required for brushing finish paint is 0.5 hour, the time required for pasting adhesive tape is 0.5 hour, the time required for tracing seams is 0.5 hour, the total working time required to complete is 13.
Fig. 2 is a specific schematic diagram of the embodiment: a dividing joint grooving process comprises the following steps:
s1: the thickness of the decorative layer and the flatness of the wall surface meet the set requirements through the rib, the decorative mortar is convenient to be coated in the next step, and the step takes 0.2 hour;
s2: scraping the decorative mortar on the cleaned wall surface in batches, wherein the time spent in the step is 1 hour;
s3: scraping fine particles on the wall surface for leveling, wherein the time spent in the step is 0.2 hour;
s4: scraping texture for the first time, specifically selecting a specified limestone material, and smearing limestone paint on a wall to increase the flatness and smoothness of the wall, wherein the step takes 0.2 hour;
s5: dividing the elastic lines into grids, namely uniformly dividing the whole wall surface into rectangular grids by the elastic lines, wherein the step takes 0.5 hour;
s6: cutting gaps with the width and the depth required by the design at the elastic lines of the wall surface by using a slotting machine, so that the facing layer wall surface is divided into stone effects required by the design, and the step takes 1.5 hours;
s7: scraping texture on the wall surface for the second time, and cleaning the cut gap, wherein the time spent in the step is 0.75 hour;
s8: polishing and grinding the wall surface in a texture manner, wherein the step takes 0.5 hour;
s9: printing on the veneer layer to imitate the selected marble impression, which takes 0.5 hour;
s10: the method comprises the following steps of (1) carrying out dot spraying on a decorative layer according to a selected marble impression effect to enable a rectangular block to be closer to the selected marble impression effect, wherein the step takes 0.5 hour, and S9 and S10 are used for ensuring that a real stone decorative pattern effect is made;
s11: polishing the surface layer of the wall surface, wherein the step takes 0.5 hour;
s12: brushing the finish, which takes 0.5 hours;
s13: the sticker tape protection, which takes 0.5 hours;
s14: painting the gap with pointing paint, which takes 0.5 hour;
s15: the tape was torn, and this step took 0.5 hours.
As can be seen from the above embodiments, the total time spent in steps S1 to S15 is 8.15 hours, and compared with the conventional process, the work time is shortened by 4.85 hours and the work efficiency is improved when two persons are compared with the same conventional construction with a base number of 20 square meters. Meanwhile, the quality is controlled due to the simplified process, the flatness of the finished surface and the smoothness, the uniform size and the consistent depth of the seam are ensured, and the cost of the thick paper adhesive tape is saved.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (1)

1. A dividing joint grooving process is characterized in that: the method comprises the following steps:
s1: cramping;
s2: leveling by applying decorative mortar;
s3: scraping fine particles for repairing and leveling;
s4: scraping texture for the first time;
s5: dividing the elastic lines;
s6: slitting by a slitting machine;
s7: scraping texture and seams for the second time;
s8: polishing and grinding texture;
s9: printing;
s10: spraying points;
s11: polishing the surface layer;
s12: brushing finish paint;
s13: pasting a paper adhesive tape;
s14: seam tracing;
s15: paper-tearing adhesive tape.
CN202011549073.8A 2020-12-24 2020-12-24 Dividing joint slotting process Pending CN112726983A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011549073.8A CN112726983A (en) 2020-12-24 2020-12-24 Dividing joint slotting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011549073.8A CN112726983A (en) 2020-12-24 2020-12-24 Dividing joint slotting process

Publications (1)

Publication Number Publication Date
CN112726983A true CN112726983A (en) 2021-04-30

Family

ID=75605318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011549073.8A Pending CN112726983A (en) 2020-12-24 2020-12-24 Dividing joint slotting process

Country Status (1)

Country Link
CN (1) CN112726983A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000047836A1 (en) * 1999-02-12 2000-08-17 Morris Nankin Wall construction system
CN101638929A (en) * 2008-07-30 2010-02-03 上海富臣化工有限公司 Construction process of water-based elastic metallic luster coating on building surface
CN101832015A (en) * 2010-03-29 2010-09-15 陕西建工集团第二建筑工程有限公司 Construction process for outer wall metal fluorocarbon coating
CN102518271A (en) * 2011-11-30 2012-06-27 宁波华宝石节能建材有限公司 Coating construction method of faux stones
CN103233574A (en) * 2013-05-08 2013-08-07 内蒙古兴泰建筑有限责任公司 Construction method for simulation stone paint surface layer of external wall
CN111719788A (en) * 2020-06-23 2020-09-29 广东蕉岭建筑工程集团有限公司 Partition seam pre-construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000047836A1 (en) * 1999-02-12 2000-08-17 Morris Nankin Wall construction system
CN101638929A (en) * 2008-07-30 2010-02-03 上海富臣化工有限公司 Construction process of water-based elastic metallic luster coating on building surface
CN101832015A (en) * 2010-03-29 2010-09-15 陕西建工集团第二建筑工程有限公司 Construction process for outer wall metal fluorocarbon coating
CN102518271A (en) * 2011-11-30 2012-06-27 宁波华宝石节能建材有限公司 Coating construction method of faux stones
CN103233574A (en) * 2013-05-08 2013-08-07 内蒙古兴泰建筑有限责任公司 Construction method for simulation stone paint surface layer of external wall
CN111719788A (en) * 2020-06-23 2020-09-29 广东蕉岭建筑工程集团有限公司 Partition seam pre-construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
百度文库: "<<石灰石建筑施工工艺设计质感打底擦色(批刮型)>>", 13 May 2020 *

Similar Documents

Publication Publication Date Title
CN101832015B (en) Construction process for outer wall metal fluorocarbon coating
CN102518271B (en) Coating construction method of faux stones
JPH09123065A (en) Polishing sheet and its manufacture
CN101638929A (en) Construction process of water-based elastic metallic luster coating on building surface
CN103206066A (en) Construction method of laminated suspension gypsum plaster board combinational suspended ceiling
CN109424135A (en) The technique that the putty of metope in building is coated
CN106592899A (en) Construction method of inner wall
CN103321447B (en) Method for repairing metal fluorocarbon paint outer wall coating defects
CN106760285A (en) The technique coated to indoor wall using putty in furniture factory building
CN109025136A (en) Glue for tile pastes tapestry brick construction method between more boiled water rooms
CN112726983A (en) Dividing joint slotting process
CN110616861B (en) Thermal power plant concrete structure modification construction method
CN100582417C (en) Construction process for synthetic resin curtain wall series paste on wall surface
CN107620434A (en) The technique coated in furniture factory building using putty to indoor wall
CN109017109A (en) A kind of water knife parquets board manufacturing method and water knife parquets pavement construction method
CN113062557A (en) Mirror terrazzo construction process with metallic luster and color
CN203729556U (en) Polishing device for top wall surface
CN112727005A (en) Production method of whole-body colorful concrete product imitating natural cracks
CN203684607U (en) Device for polishing surface of side wall
CN104647610B (en) A kind of stone panel channeling method
TW201710584A (en) Construction method of post-fabricating old building wall surface into exposed concrete without needs of templates and grouting, thereby reducing cost and increasing construction efficiency
CN108544886A (en) A kind of ceramic mural decoration technology applied in Environment Design
CN113530003A (en) Embossed paint outer wall construction method for externally-hung strip-shaped perforated aluminum plate
JP2003064839A (en) Wall face finishing construction method, pebble dash wall face material used for it, and construction apparatus used for it
CN106522500A (en) Method capable of improving construction quality of soft covering wall face decoration in furniture workshop construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210430