CN112158669A - Power cable construction guide frame - Google Patents

Power cable construction guide frame Download PDF

Info

Publication number
CN112158669A
CN112158669A CN202011041728.0A CN202011041728A CN112158669A CN 112158669 A CN112158669 A CN 112158669A CN 202011041728 A CN202011041728 A CN 202011041728A CN 112158669 A CN112158669 A CN 112158669A
Authority
CN
China
Prior art keywords
cable
wire
plate
power cable
guide frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011041728.0A
Other languages
Chinese (zh)
Other versions
CN112158669B (en
Inventor
刘义强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Gongyi Power Generation Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011041728.0A priority Critical patent/CN112158669B/en
Publication of CN112158669A publication Critical patent/CN112158669A/en
Application granted granted Critical
Publication of CN112158669B publication Critical patent/CN112158669B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/06Annular guiding surfaces; Eyes, e.g. pigtails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/14Pulleys, rollers, or rotary bars
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/16Guides for filamentary materials; Supports therefor formed to maintain a plurality of filaments in spaced relation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Abstract

The invention discloses a power cable construction guide frame, and mainly relates to the field of power construction. The wire distributing device comprises a supporting plate, wherein a wire distributing device is arranged on one side of the supporting plate, a through hole is formed in the supporting plate and one side of the wire distributing device, a supporting frame is arranged on the supporting plate and located above the center of the through hole, an adjusting device is arranged at the bottom of the supporting frame, the bottom of the adjusting device penetrates through the through hole and is connected with a wire guiding device, and the height and the angle of the wire guiding device are adjusted through the adjusting device, so that the wire distributing device has the beneficial effects that: the cable that can carry out simultaneous unwrapping wire and wire angularly adjustable to two kinds of opposite directions, make the cable can not take place intertwine when many cables unwrapping wire simultaneously, can carry out the direction of certain angle to the cable conductor, reduce the friction on cable and cable shaft ground.

Description

Power cable construction guide frame
Technical Field
The invention relates to the field of power construction, in particular to a power cable construction guide frame.
Background
The wire and cable is a wire product used for transmitting electric (magnetic) energy, information and realizing electromagnetic energy conversion. Wire and cable in a broad sense is also referred to simply as cable. The cable in the narrow sense means an insulated cable. The wire and cable industry is the second industry in China next to the automobile industry, and both the product variety satisfaction rate and the domestic market share rate exceed 90%.
At present, a large number of cables are subjected to cable arrangement and transmission through underground cable wells, and with the increasing of the underground cable wells, the workload of cable paying-off is larger and larger, and particularly the use amount of the large-scale electric power dredging engineering to the cables is especially large.
At present, the cable paying-off is generally carried out by manually placing a pulley or a simple paying-off rack outside a cable well, and the specific problems of the paying-off mode during paying-off are as follows: the two cables in opposite directions cannot be paid off simultaneously; when a plurality of cables are paid off simultaneously, the cables are mutually wound, knotted cables need to be separated manually, and time is consumed; the cable can not be guided to a cable line at a certain angle when being guided into the cable well, and the cable can rub against the ground of the cable well, so that the cable is damaged.
Disclosure of Invention
The invention aims to provide a power cable construction guide frame which can be used for simultaneously paying off two cables in opposite directions and is adjustable in lead angle, a plurality of cables cannot be wound when being paid off simultaneously, the cables can be guided at a certain angle, and friction between the cables and the ground of a cable well is reduced.
In order to achieve the purpose, the invention is realized by the following technical scheme:
a power cable construction guide frame comprises a support plate, wherein a wire distributing device is arranged on one side of the support plate, a through hole is formed in the support plate and one side of the wire distributing device, a support frame is arranged on the support plate and positioned above the center of the through hole, an adjusting device is arranged at the bottom of the support frame, the bottom of the adjusting device penetrates through the through hole to be connected with a wire guiding device, the height and the angle of the wire guiding device are adjusted through the adjusting device,
the branching device comprises a plurality of bases, a fixed shaft is arranged on each base, two arc plates are rotatably arranged on the fixed shaft through torsional springs, the arc plates are symmetrically arranged on two sides of the central axis of the fixed shaft, the two arc plates can be spliced into a ring, the circle center of the arc plate spliced by the two arc plates faces the support frame,
the wire device includes the mount, one side that the separated time device was kept away from to the mount is equipped with the mounting panel, it has the wire hole to open on the mounting panel, one side that the separated time device was kept away from to the mounting panel articulates there are a plurality of baffles, the baffle sets up around the wire hole, one side that the baffle is close to the wire hole is connected with the extension spring with the mounting panel side, makes a plurality of the baffle becomes the tilt state and keeps off in wire hole one side, one side that the mounting panel was kept away from to the mount is rotated and is equipped with a pair of roller, the mount bottom still is.
Furthermore, adjusting device includes electric push rod and rotating electrical machines, electric push rod sets up in the support frame bottom, the rotating electrical machines sets up in electric push rod bottom, the fixed bolster top is connected with the rotating electrical machines bottom.
Further, the positions, close to the bottom, of the inner sides of the arc-shaped plates are provided with supporting plates, and the supporting plates are arranged on opposite sides.
Furthermore, the top ends of the arc-shaped plates are all rotatably provided with rolling shafts.
Furthermore, the inner side surface of the arc-shaped plate and the surface of the supporting plate are both provided with balls.
Further, stop device is including setting up the connecting plate in the mount bottom, the connecting plate both ends are articulated to have an extension board, two the extension board extends to the direction of wire hole and roller respectively, the extension board is kept away from the one end surface of articulated department and is equipped with the spring expansion plate, the spring expansion plate symmetry sets up in extension board surface both sides, all rotate between the movable part of spring expansion plate and the fixed part and be equipped with spacing roller.
Further, the spring expansion plate is including setting up the fixed plate on the extension board surface, be equipped with the cavity in the fixed plate, it is equipped with the slide to slide in the cavity, be equipped with the slide bar on the slide, the slide bar other end run through the fixed plate top and with fixed plate sliding connection, the one end that the slide bar runs through the fixed plate is equipped with the fly leaf, the outside cover that the slide bar is located the partial cavity has the spring, the spring is located between slide surface and the roof in the cavity.
Furthermore, the distance between the rollers is smaller than the outer diameter of the cable, and an elastic sponge sleeve is sleeved outside the rollers.
Further, the hinge shaft of the connecting plate and the extension plate is a damping shaft.
Compared with the prior art, the invention has the beneficial effects that:
1. when many cables unwrapping wire construction simultaneously, go into the arc of different positions with cable conductor card respectively in to separately place many cables, prevent that the cable conductor twines each other in the unwrapping wire process together, save the time of manual work arrangement, improve unwrapping wire efficiency;
2. the cable penetrates out of the branching device, one cable penetrates through the wire outlet hole and pushes the baffles open, then enters the cable well on one side under the limitation of the side limiting device, the end parts of the baffles are in close contact with the cable sheath under the action of the tension spring, the cable is prevented from being recovered due to external factors in the paying-off process, the normal paying-off progress is ensured, the other cable penetrates through the through hole and bypasses the upper part of the topmost roller and then penetrates out of the cable well on one side far away from the wire outlet hole from between the two rollers, and then enters the cable well on the roller side under the limitation of the roller side limiting device, two cables in opposite directions can be paid off simultaneously, the use and erection of paying-off equipment are reduced, and the working efficiency is improved;
3. the height and the angle of the wire guiding device are adjusted through the adjusting device, so that the wire guiding angle is adjusted, the cable can be more accurately and directly sent into a cable well, and the cable is prevented from being inclined and dragged to be abraded;
4. can carry out the direction of certain angle to the cable conductor through stop device, make the cable get into the cable shaft with an appropriate angle, reduce the friction on cable and cable shaft ground, prolong the life of cable.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural diagram of the present invention.
FIG. 3 is a schematic structural diagram of the wire distributing device of the present invention.
FIG. 4 is a side view of the thread separating device of the present invention.
Fig. 5 is a structural sectional view of an adjusting device and a wire guide device of the present invention.
Fig. 6 is a structural sectional view of the spring expansion plate of the present invention.
Fig. 7 is an enlarged view of the portion a of fig. 5 of the present invention.
Reference numerals shown in the drawings:
1. a support plate; 2. a wire branching device; 3. a through hole; 4. a support frame; 5. an adjustment device; 6. a wire guide device; 7. a base; 8. a fixed shaft; 9. a torsion spring; 10. an arc-shaped plate; 11. a fixed mount; 12. mounting a plate; 13. a wire outlet hole; 14. a baffle plate; 15. a tension spring; 16. a roller; 17. an electric push rod; 18. a rotating electric machine; 19. a support plate; 20. a roller; 21. a ball bearing; 22. a connecting plate; 23. an extension plate; 24. a spring expansion plate; 25. a limiting roller; 26. a fixing plate; 27. a chamber; 28. a slide plate; 29. a slide bar; 30. a movable plate; 31. a spring.
Detailed Description
The invention will be further illustrated with reference to the following specific examples. It should be understood that these examples are for illustrative purposes only and are not intended to limit the scope of the present invention. Further, it should be understood that various changes or modifications of the present invention may be made by those skilled in the art after reading the teaching of the present invention, and these equivalents also fall within the scope of the present application.
The invention relates to a power cable construction guide frame, which comprises a main body structure, wherein the main body structure comprises a support plate 1, the bottom of the outer side of the support plate 1 is provided with a support leg, one side of the support plate 1 is provided with a wire branching device 2, one side of the support plate 1 and one side of the wire branching device 2 are provided with through holes 3, a cable passes through the through holes 3 and is guided to two directions by a wire guiding device 6, the support plate 1 is provided with an n-shaped support frame 4, the support frame 4 is positioned above the central position of the through holes 3, two support legs of the support frame 4 are respectively positioned at two sides of the through holes 3, the bottom of the support frame 4 is provided,
the branching device 2 comprises 2 bases 7, a fixed shaft 8 is horizontally arranged on the bases 7, two arc plates 10 are rotatably arranged on the fixed shaft 8 through a torsion spring 9, a sleeve is arranged at the bottom of each arc plate 10, the length of the sleeve is smaller than half of the length of each arc plate 10, the positions of the sleeves at the bottoms of the two arc plates 10 are opposite, the two arc plates 10 are rotatably arranged on the fixed shaft 8 through the sleeves, two end parts of the torsion spring 9 are respectively inserted into the bottoms of the two arc plates 10, after the top ends of the two arc plates 10 are separated towards two sides, the two arc plates 10 can automatically return and approach together under the action of the torsion spring 9, the arc plates 10 are symmetrically arranged at two sides of the central axis of the fixed shaft 8, the two arc plates 10 can be spliced into a ring shape, the circle center of the two arc plates 10 after being spliced into an arc shape faces towards the supporting frame 4, the top ends of the arc plates, the cable external insulation part is prevented from being damaged, the cable is clamped from the top ends of the two arc-shaped plates 10, in the clamping process, the cable extrudes and pushes the top ends of the arc-shaped plates 10 to two sides and then is clamped into the arc-shaped plates 10, then the top ends of the arc-shaped plates 10 are closed under the action of the torsion spring 9, the structure can enclose the cable between the arc-shaped plates 10 without passing the end part of the cable between the arc-shaped plates 10, the two cables are more conveniently placed separately, the cables are prevented from being wound and knotted mutually in the paying-off process, the time of manual wire arrangement is saved, and the paying-off efficiency is improved,
the wire device 6 comprises a fixing frame 11, one side of the fixing frame 11 far away from the wire distributing device 2 is provided with a mounting plate 12, a wire outlet 13 is formed in the mounting plate 12, one side of the mounting plate 12 far away from the wire distributing device 2 is hinged with 4 trapezoidal baffles 14, the long sides of the baffles 14 are hinged with the mounting plate 12, the baffles 14 are enclosed around the wire outlet 13, one side of each baffle 14 close to the wire outlet 13 is connected with a tension spring 15 along the side surface of the mounting plate 12, 4 baffles 14 are in an inclined state to be blocked on one side of the wire outlet 13 under the action of the tension springs 15, 4 ends of the baffles 14 far away from the hinged parts are mutually abutted, the size of a hole formed by the end of each baffle 14 is smaller than that of the wire outlet 13, one end of each baffle 14 far away from the hinged parts is also rotated to be provided with a rolling shaft, one of cables passing through the wire distributing device 2, under the action of the tension spring 15, the end part of the baffle 14 is tightly attached to the outside of the cable, and due to the inclined arrangement of the baffle 14, a certain guiding and clamping effect is exerted on the cable, the cable is prevented from being recycled under external factors, the roller at the end part of the baffle 14 plays a role in reducing friction, the outside of the cable is protected, one side of the fixing frame 11, which is far away from the mounting plate 12, is rotatably provided with a pair of rollers 16, the distance between the outer surfaces of the rollers 16 is smaller than the outer diameter of the cable, an elastic sponge sleeve is sleeved outside the rollers 16, after another cable which passes through the branching device passes through the top roller 16, the other cable passes through the two rollers 16 and penetrates out in the direction far away from the mounting plate 12, the cable is extruded and coated between the rollers 16 through the elastic sponge sleeves outside the two rollers 16, so that the function of assisting in fixing the cable is achieved, and the material of the elastic, the simultaneous paying-off of two cables in opposite directions is realized, the use and erection of paying-off equipment are reduced, the working efficiency is improved, the bottom of the fixed frame 11 is also provided with a limiting device,
adjusting device 5 includes electric push rod 17 and rotating electrical machines 18, and electric push rod 17 and rotating electrical machines 18 are connected with the power through the power cord respectively, electric push rod 17 sets up in 4 bottoms of support frame, rotating electrical machines 18 sets up in electric push rod 17 bottoms, 11 tops of mount are connected with rotating electrical machines 18 bottoms, adjust wire device 6's height and angle through electric push rod 17 and rotating electrical machines 18 to adjust the wire angle, so that more accurate directly send into the cable shaft with the cable in, avoid the cable to be drawn askew and appear wearing and tearing.
Preferably, the inboard position that is close to the bottom of arc 10 all is equipped with layer board 19, layer board 19 offside sets up, and two layer board 19 outsides also just contact behind the contact of two arc 10 tops, make the activity plane of cable in arc 10 more level and smooth, prevent that the cable is outside by the articulated position fish tail of arc 10 bottom, arc 10 medial surface and layer board 19 surface all are equipped with ball 21, make the removal of cable in arc 10 more smooth and easy.
Preferably, the limiting device comprises a connecting plate 22 arranged at the bottom of the fixing frame 11, two ends of the connecting plate 22 are hinged with extension plates 23 through damping shafts, so that the positions of the extension plates 23 after rotating around the hinged part can be fixed, the two extension plates 23 respectively extend towards the direction of the wire outlet hole 13 and the roller 16 and along the direction of a wire of a cable, a spring expansion plate 24 is arranged on the surface of one end of the extension plate 23 far away from the hinged part, the spring expansion plates 24 are symmetrically arranged on two sides of the surface of the extension plate 23 to form a mounting frame, limiting rollers 25 are respectively and rotatably arranged between the movable part and the fixed part of the spring expansion plate 24, the spring expansion plate 24 enables the two limiting rollers 25 to move towards the opposite direction, the distance between the outer surfaces of the limiting rollers 25 is smaller than the outer dimension of the cable, the cable passes through the limiting rollers 25, and the cable pushes the two limiting rollers 25 to push, make the extension of spring expansion plate 24, under the pressure effect of spring expansion plate 24, make the cable extrusion fix between spacing roller 25, prevent that the cable from rocking at the unwrapping wire in-process and dropping, the cooperation extends board 23 and carries out the direction of certain angle to the cable conductor together before the cable gets into the cable shaft, makes the cable get into the cable shaft with a suitable angle, reduces the friction on cable and cable shaft ground, the life of extension cable.
Preferably, the spring expansion plate 24 includes a fixed plate 26 disposed on the surface of the extension plate 23, a cavity 27 is disposed in the fixed plate 26, a sliding plate 28 is slidably disposed in the cavity 27, a sliding rod 29 is disposed on the sliding plate 28, the other end of the sliding rod 29 penetrates through the top of the fixed plate 26 and is slidably connected to the fixed plate 26, a movable plate 30 is disposed at one end of the sliding rod 29 penetrating through the fixed plate 26, a spring 31 is sleeved outside the portion of the sliding rod 29 located in the cavity 27, the spring 31 is located between the surface of the sliding plate 28 and the inner top wall of the cavity 27, and under the action of the spring 31, the movable plate 30 is close to the fixed plate 26, so that the two limit rollers.
According to the invention, a plurality of cables are separately placed, so that cables are prevented from being wound together in the paying-off process, the time of manual arrangement is saved, the paying-off efficiency is improved, two cables in opposite directions can be paid off simultaneously, the use and erection of paying-off equipment are reduced, the working efficiency is improved, the angle of a lead can be adjusted, the cable can be more accurately and directly fed into a cable well, the cable is prevented from being inclined and dragged to be abraded, the cable is guided at a certain angle before entering the cable well, the cable enters the cable well at a proper angle, the friction between the cable and the ground of the cable well is reduced, and the service life of the cable is prolonged.

Claims (9)

1. The utility model provides a power cable construction leading truck which characterized in that: comprises a supporting plate (1), one side of the supporting plate (1) is provided with a wire distributing device (2), one side of the wire distributing device (2) on the supporting plate (1) is provided with a through hole (3), the supporting plate (1) is provided with a supporting frame (4), the supporting frame (4) is positioned above the central position of the through hole (3), the bottom of the supporting frame (4) is provided with an adjusting device (5), the bottom of the adjusting device (5) penetrates through the through hole (3) to be connected with a wire guiding device (6), and the height and the angle of the wire guiding device (6) are adjusted through the adjusting device (5),
the branching device (2) comprises a plurality of bases (7), a fixed shaft (8) is arranged on each base (7), two arc plates (10) are rotatably arranged on the fixed shaft (8) through torsion springs (9), the arc plates (10) are symmetrically arranged on two sides of the central axis of the fixed shaft (8), the two arc plates (10) can be spliced into a ring shape, the circle center of the arc plates (10) faces the support frame (4),
wire device (6) are including mount (11), one side that separated time device (2) was kept away from in mount (11) is equipped with mounting panel (12), it has wire hole (13) to open on mounting panel (12), one side that separated time device (2) was kept away from in mounting panel (12) articulates there are a plurality of baffles (14), baffle (14) set up around wire hole (13), one side that baffle (14) are close to wire hole (13) is connected with extension spring (15) with mounting panel (12) side, makes a plurality of baffle (14) become the tilt state and keep off in wire hole (13) one side, one side rotation that mounting panel (12) were kept away from in mount (11) is equipped with a pair of roller (16), mount (11) bottom still is equipped with stop device.
2. A power cable construction guide frame according to claim 1, characterized in that: adjusting device (5) include electric push rod (17) and rotating electrical machines (18), electric push rod (17) set up in support frame (4) bottom, rotating electrical machines (18) set up in electric push rod (17) bottom, mount (11) top is connected with rotating electrical machines (18) bottom.
3. A power cable construction guide frame according to claim 1, characterized in that: the inner sides of the arc-shaped plates (10) are provided with supporting plates (19) at positions close to the bottoms, and the supporting plates (19) are arranged on opposite sides.
4. A power cable construction guide frame according to claim 1 or 3, wherein: the top ends of the arc-shaped plates (10) are respectively provided with a rolling shaft (20) in a rotating way.
5. A power cable construction guide frame according to claim 3, wherein: and balls (21) are arranged on the inner side surface of the arc-shaped plate (10) and the surface of the supporting plate (19).
6. A power cable construction guide frame according to claim 1, characterized in that: stop device is including setting up connecting plate (22) in mount (11) bottom, connecting plate (22) both ends are articulated to have extension board (23), two extension board (23) extend to the direction of wire hole (13) and roller (16) respectively, the one end surface that articulated department was kept away from in extension board (23) is equipped with spring expansion plate (24), spring expansion plate (24) symmetry sets up in extension board (23) surface both sides, all rotate between the movable part of spring expansion plate (24) and the fixed part and be equipped with spacing roller (25).
7. The power cable construction guide frame of claim 6, wherein: spring expansion plate (24) is including setting up fixed plate (26) on extension board (23) surface, be equipped with cavity (27) in fixed plate (26), it is equipped with slide (28) to slide in cavity (27), be equipped with slide bar (29) on slide (28), slide bar (29) other end run through fixed plate (26) top and with fixed plate (26) sliding connection, the one end that slide bar (29) run through fixed plate (26) is equipped with fly leaf (30), the outside cover that slide bar (29) are located cavity (27) inside portion has spring (31), spring (31) are located between slide (28) surface and the roof in cavity (27).
8. A power cable construction guide frame according to claim 1, characterized in that: the distance between the rollers (16) is smaller than the outer diameter of the cable, and an elastic sponge sleeve is sleeved outside the rollers (16).
9. The power cable construction guide frame of claim 6, wherein: and the articulated shaft of the connecting plate (22) and the extension plate (23) is a damping shaft.
CN202011041728.0A 2020-09-28 2020-09-28 Power cable construction guide frame Active CN112158669B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011041728.0A CN112158669B (en) 2020-09-28 2020-09-28 Power cable construction guide frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011041728.0A CN112158669B (en) 2020-09-28 2020-09-28 Power cable construction guide frame

Publications (2)

Publication Number Publication Date
CN112158669A true CN112158669A (en) 2021-01-01
CN112158669B CN112158669B (en) 2022-11-25

Family

ID=73861605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011041728.0A Active CN112158669B (en) 2020-09-28 2020-09-28 Power cable construction guide frame

Country Status (1)

Country Link
CN (1) CN112158669B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113291918A (en) * 2021-05-21 2021-08-24 福州大学 Multi-motion-mode self-adaptive catheter conveying device and working method thereof
CN116730108A (en) * 2023-08-14 2023-09-12 安徽博诺思信息科技有限公司 Paying-off pulley structure for electric power construction overhead line
CN117200080A (en) * 2023-09-13 2023-12-08 国网安徽省电力有限公司潜山市供电公司 Cable tensioning equipment for high-altitude power construction

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2733219A1 (en) * 1995-04-21 1996-10-25 Alcatel Cable DEVICE FOR RELEASING REEL COIL CABLES
EP0776780A1 (en) * 1995-12-01 1997-06-04 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Machine for installing a track overhead line
US20150217967A1 (en) * 2014-02-05 2015-08-06 Polypipe Handling Specialists, Inc. Apparatus for deploying and retrieving hose
CN105692338A (en) * 2013-11-28 2016-06-22 刘伟华 Power line erecting device capable of being freely assembled
CN105858344A (en) * 2016-05-04 2016-08-17 国网山东省电力公司成武县供电公司 Grounding wire winding device
CN108599020A (en) * 2018-06-02 2018-09-28 马婧 A kind of buried cable well unwrapping wire power construction equipment
CN108711787A (en) * 2018-06-02 2018-10-26 郑文豪 A kind of cable multi-angle lay scaffold
CN108736380A (en) * 2018-06-02 2018-11-02 徐盼盼 A kind of power cable automatic placement equipment
CN108726253A (en) * 2018-06-02 2018-11-02 马婧 A kind of automatic payingoff construction vehicle of power cable well
CN108736379A (en) * 2018-06-02 2018-11-02 徐盼盼 A kind of Electrical construction guidance frame
CN108821016A (en) * 2018-09-03 2018-11-16 安徽双马机械设备有限公司 A kind of wire installation for paying out machine
CN110011238A (en) * 2019-04-10 2019-07-12 国家电网有限公司 A kind of cable bearer facilitating construction operation
CN209150632U (en) * 2019-01-14 2019-07-23 赵梓煜 A kind of disengaging cable fastening device of electrical equipment
CN111285174A (en) * 2020-03-02 2020-06-16 胡增永 Optical fiber releasing equipment of underground coal mine mobile equipment
CN211338325U (en) * 2019-12-05 2020-08-25 河北新启诚通信技术有限公司 Support arrangement is used in communication cable installation
CN211393322U (en) * 2019-12-31 2020-09-01 河北凯强建筑安装工程有限公司 Cable pay-off device

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2733219A1 (en) * 1995-04-21 1996-10-25 Alcatel Cable DEVICE FOR RELEASING REEL COIL CABLES
EP0776780A1 (en) * 1995-12-01 1997-06-04 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Machine for installing a track overhead line
CN105692338A (en) * 2013-11-28 2016-06-22 刘伟华 Power line erecting device capable of being freely assembled
US20150217967A1 (en) * 2014-02-05 2015-08-06 Polypipe Handling Specialists, Inc. Apparatus for deploying and retrieving hose
CN105858344A (en) * 2016-05-04 2016-08-17 国网山东省电力公司成武县供电公司 Grounding wire winding device
CN108726253A (en) * 2018-06-02 2018-11-02 马婧 A kind of automatic payingoff construction vehicle of power cable well
CN108711787A (en) * 2018-06-02 2018-10-26 郑文豪 A kind of cable multi-angle lay scaffold
CN108736380A (en) * 2018-06-02 2018-11-02 徐盼盼 A kind of power cable automatic placement equipment
CN108599020A (en) * 2018-06-02 2018-09-28 马婧 A kind of buried cable well unwrapping wire power construction equipment
CN108736379A (en) * 2018-06-02 2018-11-02 徐盼盼 A kind of Electrical construction guidance frame
CN108821016A (en) * 2018-09-03 2018-11-16 安徽双马机械设备有限公司 A kind of wire installation for paying out machine
CN209150632U (en) * 2019-01-14 2019-07-23 赵梓煜 A kind of disengaging cable fastening device of electrical equipment
CN110011238A (en) * 2019-04-10 2019-07-12 国家电网有限公司 A kind of cable bearer facilitating construction operation
CN211338325U (en) * 2019-12-05 2020-08-25 河北新启诚通信技术有限公司 Support arrangement is used in communication cable installation
CN211393322U (en) * 2019-12-31 2020-09-01 河北凯强建筑安装工程有限公司 Cable pay-off device
CN111285174A (en) * 2020-03-02 2020-06-16 胡增永 Optical fiber releasing equipment of underground coal mine mobile equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈彬: "浅析沟井电缆升降装置实施", 《中国设备工程》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113291918A (en) * 2021-05-21 2021-08-24 福州大学 Multi-motion-mode self-adaptive catheter conveying device and working method thereof
CN113291918B (en) * 2021-05-21 2022-03-15 福州大学 Multi-motion-mode self-adaptive catheter conveying device and working method thereof
CN116730108A (en) * 2023-08-14 2023-09-12 安徽博诺思信息科技有限公司 Paying-off pulley structure for electric power construction overhead line
CN116730108B (en) * 2023-08-14 2023-10-24 安徽博诺思信息科技有限公司 Paying-off pulley structure for electric power construction overhead line
CN117200080A (en) * 2023-09-13 2023-12-08 国网安徽省电力有限公司潜山市供电公司 Cable tensioning equipment for high-altitude power construction
CN117200080B (en) * 2023-09-13 2024-03-26 国网安徽省电力有限公司潜山市供电公司 Cable tensioning equipment for high-altitude power construction

Also Published As

Publication number Publication date
CN112158669B (en) 2022-11-25

Similar Documents

Publication Publication Date Title
CN112158669B (en) Power cable construction guide frame
CN107399646B (en) Self-adaptive follow-up winding displacement device
CN113602906B (en) A wire abrasionproof decreases device for transmission line non-tension unwrapping wire
CN216311447U (en) Cable production stranded conductor device
CN212668797U (en) Cable pay-off of speed automatically regulated
CN111792459A (en) Automatic well cable winding and unwinding device for power engineering construction
CN220106122U (en) Cable core stranding machine
CN111446046B (en) Stranding machine convenient for adjusting core wire quantity
CN215797643U (en) Information engineering optical fiber cable conveyer
CN207434714U (en) A kind of payingoff mechanism of full-automatic 12 axis coil winding machine
CN210443344U (en) Cable production stranding machine with regulating power
CN216918063U (en) Pay-off for electric power construction
CN211971339U (en) Winding machine for copper foil wire
CN112186610B (en) Distribution lines lays device
CN114843940A (en) Laying device for communication line of subway station
CN109023214B (en) Intelligent robot for arc spraying of large steel pipes
CN220316776U (en) Web guide for textile machinery
CN218664736U (en) Adjustable wire releasing device for wire and cable production
CN206427813U (en) Wrap-up with adaptive tensile force
CN211545474U (en) Cable paying-off mechanism
CN211655578U (en) Cable laying device for electric power automation equipment
CN214692591U (en) Circuit winding and unwinding device for electric power engineering
CN212101405U (en) Quick coiling and collecting device for cables
CN209957124U (en) High-temperature wire pay-off device
CN214428400U (en) Low-loss pair twister

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221109

Address after: 451200 Yulian Industrial Park, Gongyi City, Zhengzhou City, Henan Province

Applicant after: DATANG GONGYI POWER GENERATION Co.,Ltd.

Address before: No.18, xiluohe Road, Tianqiao District, Jinan City, Shandong Province, 250022

Applicant before: Liu Yiqiang

GR01 Patent grant
GR01 Patent grant