CN112096072B CN202010848140.XA CN202010848140A CN112096072B CN 112096072 B CN112096072 B CN 112096072B CN 202010848140 A CN202010848140 A CN 202010848140A CN 112096072 B CN112096072 B CN 112096072B
Authority
CN
China
Prior art keywords
wall
layer
floor
column
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010848140.XA
Other languages
English (en)
Other versions
CN112096072A (zh
Inventor
陈前广
张明杨
王邦平
李志�
陈平霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd.
Nest Technology Shanghai Co ltd
Original Assignee
Jiangsu Henggui Chuangke Construction Engineering Technology Co ltd
Shanghai Ouyue Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Henggui Chuangke Construction Engineering Technology Co ltd, Shanghai Ouyue Construction And Installation Engineering Co ltd filed Critical Jiangsu Henggui Chuangke Construction Engineering Technology Co ltd
Priority to CN202010848140.XA priority Critical patent/CN112096072B/zh
Priority to CN202210447781.3A priority patent/CN114908969A/zh
Publication of CN112096072A publication Critical patent/CN112096072A/zh
Application granted granted Critical
Publication of CN112096072B publication Critical patent/CN112096072B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing

Abstract

本发明提供一种用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,包括,第一步:扎第N层的墙、柱钢筋;第二步:安装隔离板,隔离板的高度与楼板层的高度一致;第三步:在楼板处的隔离板上,根据楼板层的配筋要求进行预埋植筋,植筋一端弯曲设置形成弯曲段且该弯曲段位于隔离板上的凹槽或内腔内;第四步:大模板进行合模,浇筑墙、柱混凝土;第五步:搭支楼板模板系统,扳直第N‑1层的第二钢筋段上的植筋,扎第N楼板层钢筋,浇筑楼板层。通过同层楼板滞后墙板的连续浇筑结合整块模板的内大模板、外大模板的设计。克服传统施工方式中需将墙体的内、外模板拆开、重组、搬运。同时也大量减少现有施工方法中墙体与楼板结合处模板连接材料和工序。

Description

用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法
技术领域
本发明涉及建筑混凝土浇筑方法,具体涉及一种用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法。
背景技术
目前住宅房建楼房施工方法如下:第一步、先扎第N层墙体钢筋。第二步、待墙体钢筋扎好后先支第N层墙体模板再支第N层屋面楼板模板。第三步、待第N层屋面楼板模板支好后再扎第N层屋面楼板钢筋。第四步、上述工作检查完成后,先浇筑第N层墙体然后浇筑第N层楼板。第五步、第N层混凝土整体固化后将第N-3层墙体及其楼板的模板拆成小模板,包括支撑和背愣搬运至第N+1层进行重组。
在上述多次重组这一过程中,模板、背愣和支撑要重复进行组装、拆分、搬运、重组,造成大量人力耗费在这一工作上,造成人力浪费,成本高,且在多次重复的拆分、重组过程中,模板、背愣和支撑易发生损坏、丢失、自然损耗等问题,同时人工多次折装材料磨损导致混凝土浇注成型越来越差。
发明内容
本发明针对现有技术的不足,提供一种住宅房建楼板同层滞后同步施工的混凝土浇筑施工方法,通过同层楼板滞后墙板的连续浇筑结合整块模板的内大模板、外大模板的设计,浇筑时,可直接将位于第N层的内大模板、外大模板吊装至第N+1层,再进行第N+1层墙体和第N层楼屋面板的浇筑,这一施工过程中,无需将墙体的内大模板、外大模板拆开、重组,仅需直接吊装即可,且吊装时,仅需结合少量人工即可实现,降低了工作量,节约人工。克服传统施工方式中需将墙体的内、外模板拆开、重组、搬运的问题。同时也大量减少现有施工方法中墙体与楼板结合处模板连接材料和工序。
为实现上述目的,本发明提供如下技术方案:一种用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,包括,
第一步:扎第N层的墙、柱钢筋,墙、柱钢筋至少包括连续设置的第一钢筋段、高度与楼板层厚度一致的第二钢筋段以及位于楼板层上方的第三钢筋段,墙、柱钢筋具有相对设置的第一内端面、第一外端面;
第二步:在第二钢筋段固定安装隔离板,隔离板的高度与楼板层的高度一致,隔离板具有相对设置的第二内端面、第二外端面,第二外端面位于第一内端面和第一外端面之间,第二内端面与第一内端面在同一竖直面;
第三步:在楼板处的隔离板上,根据楼板层的配筋要求进行预埋植筋,植筋一端位于第二外端面和第一外端面之间,另一端弯曲设置形成弯曲段且该弯曲段位于隔离板上的凹槽或内腔内,凹槽设置在隔离板的第二内端面;
第四步:大模板进行合模,搭支楼板模板系统,扳直第N-1层的第二钢筋段上的植筋,扎第N-1楼板层钢筋;
第五步:浇筑第N层墙、柱混凝土,墙、柱混凝土浇筑至第三钢筋段的两端之间形成供大模板在第N+1层墙、柱钢筋两侧固定用的夹持部,浇筑第N-1层楼板层混凝土。
在上述方案的基础上,作为优选,还包括第六步:浇筑墙、柱混凝土后,扎好第N+1层墙、柱钢筋;
第七步:退模,整体上移一层大模板;
第八步:重复第一步至第七步;
其中,第六步、第七步可在第四步之后立即执行。
在上述方案的基础上,作为优选,大模板夹在夹持部上后,大模板的下端面与楼板层上端面之间具有间隔。
在上述方案的基础上,作为优选,间隔的高度为20mm。
在上述方案的基础上,作为优选,第三钢筋段高出楼板层100mm。
在上述方案的基础上,作为优选,隔离板为泡沫板,扳直植筋时,先掏除楼板上的泡沫 板。
与现有技术相比,本发明的有益效果是:
1、本方法可实现N层墙体、柱与N-1楼板同步施工。这样有利于墙、柱的模板可以整体上移操作,大大减少建筑流结构浇铸支模的工程量。
具体实施方式
下面对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
一种用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,包括,
第一步:扎第N层的墙、柱钢筋,墙、柱钢筋至少包括连续设置的第一钢筋段、高度与楼板层厚度一致的第二钢筋段以及位于楼板层上方的第三钢筋段,墙、柱钢筋具有相对设置的第一内端面、第一外端面;第一内端面、第一外端面是指内、外大模板合模时墙、柱钢筋与内、外大模板的接触面。
第二步:在第二钢筋段固定安装隔离板,隔离板的高度与楼板层高度一致,隔离板具有相对设置的第二内端面、第二外端面,第二外端面位于第一内端面和第一外端面之间,第二内端面与第一内端面在同一竖直面;同一竖直面实现大模板合模时,隔离板的第二内端面与大模板之间能接触形成密封效果,避免其浇筑墙体时混凝土由其之间的间隙灌入,将后续步骤中的弯曲段浇筑在墙体内。
第三步:在楼板处的隔离板上,根据楼板层的配筋要求进行预埋植筋,植筋一端位于第二外端面和第一外端面之间,另一端弯曲设置形成弯曲段且该弯曲段位于隔离板上的凹槽或内腔内,凹槽设置在隔离板的第二内端面;
第四步:大模板进行合模,搭支楼板模板系统,扳直第N-1层的第二钢筋段上的植筋,扎第N-1楼板层钢筋;
第五步:浇筑第N层墙、柱混凝土,墙、柱混凝土浇筑至第三钢筋段的两端之间形成供大模板在第N+1层墙、柱钢筋两侧固定用的夹持部,浇筑第N-1层楼板层混凝土。
还包括第六步:浇筑墙、柱混凝土后,扎好第N+1层墙、柱钢筋;
第七步:退模,整体上移一层大模板;
第八步:重复第一步至第七步;
其中,第六步、第七步可在第四步之后立即执行。
其中,N为大于1的整数。
大模板夹在夹持部上后,大模板的下端面与楼板层上端面之间具有间隔,通过该间隔的设置,保证大模板在退模时不受阻挡,便于退模。
间隔的高度为20mm。
第三钢筋段高出楼板层100mm。
隔离板为泡沫板,扳直植筋时,先掏除楼板上的泡沫 板,采用泡沫板的材质,便于取出浇筑楼板层。
其中,间隔、钢筋段的具体高度依据具体场地需求而定。
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。

Claims (6)

1.一种用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,其特征在于,包括,
第一步:扎第N层的墙、柱钢筋,墙、柱钢筋至少包括连续设置的第一钢筋段、高度与楼板层厚度一致的第二钢筋段以及位于楼板层上方的第三钢筋段,墙、柱钢筋具有相对设置的第一内端面、第一外端面;
第二步:在第二钢筋段固定安装隔离板,隔离板的高度与楼板层高度一致,隔离板具有相对设置的第二内端面、第二外端面,第二外端面位于第一内端面和第一外端面之间,第二内端面与第一内端面在同一竖直面;
第三步:在楼板处的隔离板上,根据楼板层的配筋要求进行预埋植筋,植筋一端位于第二外端面和第一外端面之间,另一端弯曲设置形成弯曲段且该弯曲段位于隔离板上的凹槽或内腔内,凹槽设置在隔离板的第二内端面;
第四步:大模板进行合模,搭支楼板模板系统,扳直第N-1层的第二钢筋段上的植筋,扎第N-1楼板层钢筋;
第五步:浇筑第N层墙、柱混凝土,墙、柱混凝土浇筑至第三钢筋段的两端之间形成供大模板在第N+1层墙、柱钢筋两侧固定用的夹持部,浇筑第N-1层楼板层混凝土。
2.如权利要求1所述的用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,其特征在于,还包括第六步:浇筑墙、柱混凝土后,扎好第N+1层墙、柱钢筋;
第七步:退模,整体上移一层大模板;
第八步:重复第一步至第七步。
3.如权利要求1所述的用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,其特征在于,大模板夹在夹持部上后,大模板的下端面与楼板层上端面之间具有间隔。
4.如权利要求3所述的用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,其特征在于,间隔的高度为20mm。
5.如权利要求1所述的用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,其特征在于,第三钢筋段高出楼板层100mm。
6.如权利要求1所述的用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法,其特征在于,隔离板为泡沫板,扳直植筋时,先掏除楼板上的泡沫 板。
CN202010848140.XA 2020-08-21 2020-08-21 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法 Active CN112096072B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202010848140.XA CN112096072B (zh) 2020-08-21 2020-08-21 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法
CN202210447781.3A CN114908969A (zh) 2020-08-21 2020-08-21 一种造楼机梁板滞后墙柱同层同步混凝土浇注方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010848140.XA CN112096072B (zh) 2020-08-21 2020-08-21 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202210447781.3A Division CN114908969A (zh) 2020-08-21 2020-08-21 一种造楼机梁板滞后墙柱同层同步混凝土浇注方法

Publications (2)

Publication Number Publication Date
CN112096072A CN112096072A (zh) 2020-12-18
CN112096072B true CN112096072B (zh) 2022-06-07

Family

ID=73754048

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202210447781.3A Pending CN114908969A (zh) 2020-08-21 2020-08-21 一种造楼机梁板滞后墙柱同层同步混凝土浇注方法
CN202010848140.XA Active CN112096072B (zh) 2020-08-21 2020-08-21 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202210447781.3A Pending CN114908969A (zh) 2020-08-21 2020-08-21 一种造楼机梁板滞后墙柱同层同步混凝土浇注方法

Country Status (1)

Country Link
CN (2) CN114908969A (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4010586A (en) * 1974-02-27 1977-03-08 Gebr. Zehtner Ag (Armierungs-Unternehmung) Method for the manufacture of reinforcement members and member manufactured by the method
KR100860422B1 (ko) * 2006-12-20 2008-09-25 신기황 수평,수직 일체형 콘크리트 구조물을 성형하기 위한 거푸집장치
CN103195193A (zh) * 2013-04-24 2013-07-10 石家庄晶达建筑体系有限公司 现浇式钢筋焊接网架复合混凝土剪力墙的构造及施工方法
CN203429798U (zh) * 2013-07-16 2014-02-12 中国建筑第八工程局有限公司 超高层水平二次结构预埋钢筋结构
CN105507462A (zh) * 2015-11-27 2016-04-20 中国建筑第七工程局有限公司 兼具承重和保温功能的复合墙体及其施工方法
CN206053320U (zh) * 2016-08-31 2017-03-29 中国建筑第八工程局有限公司 可周转定型免剔凿预埋板筋保护槽
CN110761402A (zh) * 2019-10-10 2020-02-07 上海欧跃建筑安装工程有限公司 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法
CN210263425U (zh) * 2019-06-24 2020-04-07 中建八局第一建设有限公司 一种用于核心筒与外框楼板连接的新型预埋装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726476B2 (ja) * 1991-06-11 1995-03-22 戸田建設株式会社 床の構築装置
CN203939144U (zh) * 2014-05-15 2014-11-12 华南理工大学建筑设计研究院 用于连接建筑结构中剪力墙与混凝土楼板的装置
CN106285687A (zh) * 2015-05-20 2017-01-04 中煤第三建设(集团)有限责任公司 混凝土井塔建造方法
CN209384639U (zh) * 2018-08-08 2019-09-13 李宜君 一种应用于房屋滑模成型装置的取模装置
CN109469232A (zh) * 2018-11-07 2019-03-15 中建四局第建筑工程有限公司 一种用于爬模施工的楼板预留钢筋的预留方法及装置
CN209989959U (zh) * 2019-04-19 2020-01-24 湖南省第四工程有限公司 混凝土后浇板钢筋预留装置
CN110886488A (zh) * 2019-10-28 2020-03-17 上海欧跃建筑安装工程有限公司 一种智能集成高层造楼机

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4010586A (en) * 1974-02-27 1977-03-08 Gebr. Zehtner Ag (Armierungs-Unternehmung) Method for the manufacture of reinforcement members and member manufactured by the method
KR100860422B1 (ko) * 2006-12-20 2008-09-25 신기황 수평,수직 일체형 콘크리트 구조물을 성형하기 위한 거푸집장치
CN103195193A (zh) * 2013-04-24 2013-07-10 石家庄晶达建筑体系有限公司 现浇式钢筋焊接网架复合混凝土剪力墙的构造及施工方法
CN203429798U (zh) * 2013-07-16 2014-02-12 中国建筑第八工程局有限公司 超高层水平二次结构预埋钢筋结构
CN105507462A (zh) * 2015-11-27 2016-04-20 中国建筑第七工程局有限公司 兼具承重和保温功能的复合墙体及其施工方法
CN206053320U (zh) * 2016-08-31 2017-03-29 中国建筑第八工程局有限公司 可周转定型免剔凿预埋板筋保护槽
CN210263425U (zh) * 2019-06-24 2020-04-07 中建八局第一建设有限公司 一种用于核心筒与外框楼板连接的新型预埋装置
CN110761402A (zh) * 2019-10-10 2020-02-07 上海欧跃建筑安装工程有限公司 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法

Also Published As

Publication number Publication date
CN114908969A (zh) 2022-08-16
CN112096072A (zh) 2020-12-18

Similar Documents

Publication Publication Date Title
CN106381952B (zh) 一种装配式叠合空腔楼盖
HRP20211747T1 (hr) Građevinska konstrukcija od monolitnih zidova i međukatnih ploča
CN106013567A (zh) 一种受力岛装配式钢筋砼空腔楼盖
CN105863140A (zh) 一种受力岛空腔楼盖用预制空腔构件
CN111734018A (zh) 一种模壳结构、免拆模具以及混凝土墙施工方法
CN112726878A (zh) 一种砌体填充墙构造柱免支模施工方法、预制模块及模具
CN108118807A (zh) 一种钢框混凝土隔墙板及其施工方法
CN205839952U (zh) 被动式建筑节能一体化系统
CN112096072B (zh) 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法
CN105780990A (zh) 一种用于空腔楼盖的预制装配式空腔楼板
KR20090123388A (ko) 피씨 보 제작용 몰드
CN111042442A (zh) 一种预制混凝土空心构件及其制备方法
CN212802541U (zh) 一种空腔框架梁模壳
CN108843016B (zh) 剪力墙模板内撑条与拉结筋组合式构件及方法
CN115741984A (zh) 钢管混凝土边缘约束叠合剪力墙制备方法
RU2421580C1 (ru) Способ возведения монолитно-каркасного здания с декоративной наружной отделкой
CN114274306A (zh) 一种预制钢结构外墙挂板生产工艺
CN206110427U (zh) 一种装配式叠合空腔楼盖
CN110700468A (zh) 预制拼装式箱型免拆模密肋叠合楼板施工方法
CN219241317U (zh) 一种混凝土高低跨楼板的预制支撑模具
CN205935349U (zh) 一种受力岛空腔楼盖用预制空腔构件
CN219671866U (zh) 一种装配式构造柱和抱框柱结构
CN212001599U (zh) 一种大跨度可变空间的装配式建筑
CN212001877U (zh) 一种预制件生产用免拆模模块及包含该模块的预制件
EP3719229B1 (en) Concrete floor panel, method of production of such panel and floor made of this panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 201109 floor 3, building B, No. 940 Jianchuan Road, Minhang District, Shanghai

Patentee after: Nest Technology (Shanghai) Co.,Ltd.

Patentee after: Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd.

Address before: Room 3412, building 3, 1700 Gangyan Road, Gangyan Town, Chongming District, Shanghai

Patentee before: Shanghai Ouyue construction and Installation Engineering Co.,Ltd.

Patentee before: Jiangsu Henggui Chuangke Construction Engineering Technology Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for synchronous concrete pouring of beams, slabs, lagging walls, and columns on the same floor for building machines

Effective date of registration: 20230815

Granted publication date: 20220607

Pledgee: Societe Generale Bank Co.,Ltd. Qingpu Branch of Shanghai

Pledgor: Nest Technology (Shanghai) Co.,Ltd.|Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd.

Registration number: Y2023310000465

PE01 Entry into force of the registration of the contract for pledge of patent right