CN112046707B - 一种半潜式海洋平台合拢高支撑拆除方法 - Google Patents

一种半潜式海洋平台合拢高支撑拆除方法 Download PDF

Info

Publication number
CN112046707B
CN112046707B CN202010915274.9A CN202010915274A CN112046707B CN 112046707 B CN112046707 B CN 112046707B CN 202010915274 A CN202010915274 A CN 202010915274A CN 112046707 B CN112046707 B CN 112046707B
Authority
CN
China
Prior art keywords
pulling
support
high support
semi
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010915274.9A
Other languages
English (en)
Other versions
CN112046707A (zh
Inventor
徐戎
王接班
蔡志勇
王云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Bureau Cruise Manufacturing Co ltd
China Merchants Jinling Shipyard Jiangsu Co Ltd
Original Assignee
China Merchants Bureau Cruise Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Bureau Cruise Manufacturing Co ltd filed Critical China Merchants Bureau Cruise Manufacturing Co ltd
Priority to CN202010915274.9A priority Critical patent/CN112046707B/zh
Publication of CN112046707A publication Critical patent/CN112046707A/zh
Application granted granted Critical
Publication of CN112046707B publication Critical patent/CN112046707B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种半潜式海洋平台合拢高支撑拆除方法,本发明通过拉移将高支撑分成两部分拉移出半潜平台底部,然后通过门座式起重机分解拆除,可减少拆除过程中的交叉作业,降低安全风险,同时对海洋平台自身作业的影响较少,在准备充足的情况下,效率较高。

Description

一种半潜式海洋平台合拢高支撑拆除方法
技术领域
本发明涉及船舶及海工产品制造技术领域,特别涉及一种半潜式海洋平台合拢高支撑拆除方法。
背景技术
半潜式海洋平台具有极强的抗风浪能力、优良的运动性能、巨大的甲板面积和装载容量、高效的作业效率等。其结构形式一般包括:上船体、浮体两个及立柱四个,浮体与上船体之间用立柱连接,左右浮体之间一般通过两个横撑管连接。半潜式海洋平台的建造方式一般采用整体上部船体提升浮体滑移、上船体整体吊装、常规搭积木、浮吊吊装上船体等几种常见的建造合拢方式,而常规搭积木的方式尤为有效,技术相对成熟,成本较低,安全风险小等有点,使用尤为广泛。而常规搭积木的方式合拢半潜式海洋平台,需要采用高支撑为上船体的合拢提供搭载定位的平台,高支撑数量较多,尺寸较大,整体强度要求较高。在上船体全部合拢完成、整体强度刚性满足要求后,合拢高支撑方可拆除。
目前,公知的合拢高支撑拆除方法是采用滑车吊点主吊、汽车吊辅助吊装放倒的方式拆除,此方案主要的困难是:
1)半潜平台上船体反底需与设置大量的吊点,用于主吊放倒高支撑,吊点的焊接及拆除对反底油漆破坏较多,影响后期生产进度。
2)合拢高支撑放倒占用场地空间较大,但半潜平台底部空间狭小,高支撑数量较多,在放倒过程中风险较大,极易与其它高支撑或平台结构相碰,同时交叉作业较多,安全风险大。
发明内容
本发明的目的在于提供一种半潜式海洋平台合拢高支撑拆除方法。
本发明采用的技术方案是:
一种半潜式海洋平台合拢高支撑拆除方法,其特征在于:包括以下步骤:
步骤1:根据高支撑拉移路径,将沿线的地面整平,相关突出地筋等清理干净,防止拉移过程中影响连续性;
步骤2:根据高支撑的布置特点,采用钢管或方管、钢丝绳等将高支撑底部和上部连接起来,分两部分做成艏部7组支撑、艉部9组支撑,高支撑下部前端布置拉耳,钢管或方管与高支撑底部之间采用焊接,高支撑顶部已经有走道平台连接,用钢丝绳将整体绑牢加固;
步骤3:在平台艏部布置拉移绞车装置,绞车与地面固定,通过滑车、卸扣、5m*30t钢丝绳与艏部7组高支撑底部拉耳连接,绞车通过滑车、卸扣、30m*50t钢丝绳与拉耳连接,拉耳需与地面固定;
步骤4:将高支撑顶部支墩割断拆除,高支撑与半潜式海洋平台反底脱离;
步骤5:将艏部7组高支撑通过拉移的方式拉出半潜式海洋平台底部后,拆除拉移绞车装置,采用门座式起重机将艏部高支撑分解拆除;
步骤6:绞车与地面固定,通过滑车、卸扣、5m*30t钢丝绳与艏部9组高支撑底部拉耳连接;
步骤7:将艏部9组高支撑整体拉移出半潜式海洋平台底部后,拆除拉移绞车装置,然后采用门座式起重机将艏部高支撑分解拆除。
本发明的优点:通过拉移将高支撑分成两部分拉移出半潜平台底部,然后通过门座式起重机分解拆除,可减少拆除过程中的交叉作业,降低安全风险,同时对海洋平台自身作业的影响较少,在准备充足的情况下,效率较高。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细叙述。
图1为本发明的装置布置图;
图2为本发明图1中I的放大图。
其中:1、半潜式海洋平台;2、艏部7组高支撑;3、艉部9组支撑;4、绞车;5、卸扣;6、30m*50t钢丝绳;7、滑车;8、拉耳;9、50T*5m钢丝绳。
具体实施方式
如图1-2所示,一种半潜式海洋平台合拢高支撑拆除方法,包括以下步骤:
步骤1:根据高支撑拉移路径,将沿线的地面整平,相关突出地筋等清理干净,防止拉移过程中影响连续性;
步骤2:根据高支撑的布置特点,采用钢管或方管、钢丝绳等将高支撑底部和上部连接起来,分两部分做成艏部7组支撑2、艉部9组支撑3,高支撑下部前端布置拉耳8,钢管或方管与高支撑底部之间采用焊接,高支撑顶部已经有走道平台连接,用钢丝绳将整体绑牢加固;
步骤3:在平台艏部布置拉移绞车装置,绞车4与地面固定,通过滑车7、卸扣5、30m*50t钢丝绳6与艏部7组高支撑2底部拉耳8连接,绞车4通过滑车7、卸扣5、30m*50t钢丝绳6与拉耳8连接,拉耳8需与地面固定;
步骤4:将高支撑顶部支墩割断拆除,高支撑与半潜式海洋平台1反底脱离;
步骤5:将艏部7组高支撑2通过拉移的方式拉出半潜式海洋平台1底部后,拆除拉移绞车装置,采用门座式起重机将艏部高支撑2分解拆除;
步骤6:绞车4与地面固定,通过滑车7、卸扣5、50T*5m钢丝绳9与艏部9组高支撑3底部拉耳8连接;
步骤7:将艏部9组高支撑3整体拉移出半潜式海洋平台1底部后,拆除拉移绞车装置,然后采用门座式起重机将艏部高支撑分解拆除。
本发明通过拉移将高支撑分成两部分拉移出半潜平台底部,然后通过门座式起重机分解拆除,可减少拆除过程中的交叉作业,降低安全风险,同时对海洋平台自身作业的影响较少,在准备充足的情况下,效率较高。

Claims (1)

1.一种半潜式海洋平台合拢高支撑拆除方法,其特征在于:包括以下步骤:
步骤1:根据高支撑拉移路径,将沿线的地面整平,突出地筋清理干净,防止拉移过程中影响连续性;
步骤2:根据高支撑的布置特点,采用钢管或方管、钢丝绳将高支撑底部和上部连接起来,分两部分做成艏部7组支撑、艉部9组支撑,高支撑下部前端布置拉耳,钢管或方管与高支撑底部之间采用焊接,高支撑顶部已经有走道平台连接,用钢丝绳将整体绑牢加固;
步骤3:在平台艏部布置拉移绞车装置,绞车与地面固定,通过滑车、卸扣、30m*50t钢丝绳与艏部7组高支撑底部拉耳连接,绞车通过滑车、卸扣、30m*50t钢丝绳与拉耳连接,拉耳需与地面固定;
步骤4:将高支撑顶部支墩割断拆除,高支撑与半潜式海洋平台反底脱离;
步骤5:将艏部7组高支撑通过拉移的方式拉出半潜式海洋平台底部后,拆除拉移绞车装置,采用门座式起重机将艏部高支撑分解拆除;
步骤6:绞车与地面固定,通过滑车、卸扣、50T*5m钢丝绳与艉部9组高支撑底部拉耳连接;
步骤7:将艉部9组高支撑整体拉移出半潜式海洋平台底部后,拆除拉移绞车装置,然后采用门座式起重机将艉部高支撑分解拆除。
CN202010915274.9A 2020-09-03 2020-09-03 一种半潜式海洋平台合拢高支撑拆除方法 Active CN112046707B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010915274.9A CN112046707B (zh) 2020-09-03 2020-09-03 一种半潜式海洋平台合拢高支撑拆除方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010915274.9A CN112046707B (zh) 2020-09-03 2020-09-03 一种半潜式海洋平台合拢高支撑拆除方法

Publications (2)

Publication Number Publication Date
CN112046707A CN112046707A (zh) 2020-12-08
CN112046707B true CN112046707B (zh) 2023-09-05

Family

ID=73606823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010915274.9A Active CN112046707B (zh) 2020-09-03 2020-09-03 一种半潜式海洋平台合拢高支撑拆除方法

Country Status (1)

Country Link
CN (1) CN112046707B (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1058828A1 (ru) * 1982-07-14 1983-12-07 Предприятие П/Я Р-6109 Способ центровки блоков перед их подачей в сборочную зону при строительстве верхнего корпуса полупогружной платформы
RU2030504C1 (ru) * 1991-04-23 1995-03-10 Государственный научно-исследовательский и проектный институт по освоению месторождений нефти и газа "Гипроморнефтегаз" Способ демонтажа опорного блока сквозной морской стационарной платформы
US6183165B1 (en) * 1996-05-23 2001-02-06 Wirth Maschinen-Und Bohrgerate-Fabrik Gmbh Process and device for separation of pipes or columns fixed in the ground
CN104527924A (zh) * 2014-12-19 2015-04-22 大连船舶重工集团海洋工程有限公司 半潜式海洋平台上部甲板合拢支撑专用工装
CN105836049A (zh) * 2016-04-26 2016-08-10 中国海洋石油总公司 张力腿平台的陆地整体合拢工艺
CN207944358U (zh) * 2018-03-03 2018-10-09 中交第二航务工程局有限公司 一种海上钢箱梁吊装快速拆卸支墩
CN109468955A (zh) * 2018-11-12 2019-03-15 湖南金海钢结构有限公司 一种大型桁架拆除工装
CN110271975A (zh) * 2019-06-14 2019-09-24 中国一冶集团有限公司 狭小空间下水中钢平台拆除装置
CN111148692A (zh) * 2018-01-22 2020-05-12 吴植融 直筒式平台筒体甲板与上部设施的建造方法及直筒式平台

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1058828A1 (ru) * 1982-07-14 1983-12-07 Предприятие П/Я Р-6109 Способ центровки блоков перед их подачей в сборочную зону при строительстве верхнего корпуса полупогружной платформы
RU2030504C1 (ru) * 1991-04-23 1995-03-10 Государственный научно-исследовательский и проектный институт по освоению месторождений нефти и газа "Гипроморнефтегаз" Способ демонтажа опорного блока сквозной морской стационарной платформы
US6183165B1 (en) * 1996-05-23 2001-02-06 Wirth Maschinen-Und Bohrgerate-Fabrik Gmbh Process and device for separation of pipes or columns fixed in the ground
CN104527924A (zh) * 2014-12-19 2015-04-22 大连船舶重工集团海洋工程有限公司 半潜式海洋平台上部甲板合拢支撑专用工装
CN105836049A (zh) * 2016-04-26 2016-08-10 中国海洋石油总公司 张力腿平台的陆地整体合拢工艺
CN111148692A (zh) * 2018-01-22 2020-05-12 吴植融 直筒式平台筒体甲板与上部设施的建造方法及直筒式平台
CN207944358U (zh) * 2018-03-03 2018-10-09 中交第二航务工程局有限公司 一种海上钢箱梁吊装快速拆卸支墩
CN109468955A (zh) * 2018-11-12 2019-03-15 湖南金海钢结构有限公司 一种大型桁架拆除工装
CN110271975A (zh) * 2019-06-14 2019-09-24 中国一冶集团有限公司 狭小空间下水中钢平台拆除装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大型海洋平台建造总体合拢技术;刘广辉;于雁云;林焰;姜盛坤;杨霖;;船舶工程(第07期) *

Also Published As

Publication number Publication date
CN112046707A (zh) 2020-12-08

Similar Documents

Publication Publication Date Title
CN101100217A (zh) 一种海上平台整体建造吊装方法及其专用吊机
KR20150084913A (ko) 부유식 풍력 터빈의 이송 및 설치를 위한 부유 가능한 이송 및 설치 구조, 부유식 풍력 터빈과 그 이송 및 설치의 방법
CN108726359B (zh) 一种吊机翻身工艺
CN202911923U (zh) 一种组合式震源船
CN102642601B (zh) 双体可移动全回转式起重船
CN101804849A (zh) 用于海上油气开发的半潜式平台的建造方案
CN201534603U (zh) 海洋工程双体船
CN104805821B (zh) 海洋油田天然气压缩处理自升式平台
CN111559473B (zh) 一种散货船艏部总段的吊装方法
CN102582786A (zh) 深海浮式平台的建造工艺
KR100940795B1 (ko) 에어백을 이용한 중량구조물의 이동 및 진수방법
CN114715336A (zh) 适用于深水的海上风电筒型基础运输安装一体化船舶及安装方法
CN112046707B (zh) 一种半潜式海洋平台合拢高支撑拆除方法
CN109231026B (zh) 用于海上风电机组关键零部件的吊装装置
CN203112377U (zh) 一种海上风电机组分体吊装装置
CN106759203A (zh) 自升式海洋平台桩腿结构安装合拢的方法
CN111409806B (zh) 发电机移出方法
CN115057369B (zh) 一种海上风机安装方法
CN108482586B (zh) 单桩顶升滑移上船工艺
CN108018778B (zh) 不通航水域的猫道索架设牵引系统及猫道索快速架设方法
CN113482004A (zh) 一种海上多筒导管架基础及其风电整机码头下水施工方法
CN113374645A (zh) 一种海上多筒导管架基础风电机组码头组装方法
CN111962543A (zh) 一种稳桩平台与母船的快速连接与分离工艺
CN219490976U (zh) 一种u型漂浮式打桩船
CN213707526U (zh) 一种半潜式起重船的起重机

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240102

Address after: 226100 room 2, No.1, Xin'anjiang Road, Binjiang street, Haimen District, Nantong City, Jiangsu Province

Patentee after: China Merchants Bureau Cruise Manufacturing Co.,Ltd.

Patentee after: China Merchants Jinling shipping (Jiangsu) Co.,Ltd.

Address before: No.2261, Haimen street, Nantong City, Jiangsu Province

Patentee before: China Merchants Bureau Cruise Manufacturing Co.,Ltd.