CN111894297A - Hole patching device for building construction - Google Patents

Hole patching device for building construction Download PDF

Info

Publication number
CN111894297A
CN111894297A CN202010642123.0A CN202010642123A CN111894297A CN 111894297 A CN111894297 A CN 111894297A CN 202010642123 A CN202010642123 A CN 202010642123A CN 111894297 A CN111894297 A CN 111894297A
Authority
CN
China
Prior art keywords
plate body
fixedly connected
hole
base
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010642123.0A
Other languages
Chinese (zh)
Other versions
CN111894297B (en
Inventor
梁广远
刘宗宝
汪从
裴付博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN202010642123.0A priority Critical patent/CN111894297B/en
Publication of CN111894297A publication Critical patent/CN111894297A/en
Application granted granted Critical
Publication of CN111894297B publication Critical patent/CN111894297B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Abstract

The utility model provides a hole patching device for construction, includes the base, its characterized in that: the upper surface of the base is symmetrically and fixedly connected with two fixing rods, two second plate bodies, two second supporting rods and two first supporting rods respectively, the upper surface of the base is symmetrically provided with two first plate bodies, the bottom of each first plate body is provided with a hole groove, the two fixing rods are respectively and rotatably connected to the inner side walls of the two hole grooves through second bearings, and the two first plate bodies are located between the two second plate bodies; through the collocation setting of casing and third plate body isotructure, can load the grout and can control the flow of grout, through the collocation setting of first plate body, dead lever, second bearing and threaded rod isotructure, can adjust the size of annotating the material according to the size of building hole and recess, prevent that grout is extravagant, through the setting of sixth plate body, can smooth the grout after pouring into hole and recess, need not post processing, labour saving and time saving.

Description

Hole patching device for building construction
Technical Field
The invention relates to the technical field of building construction hole patching, in particular to a hole patching device for building construction.
Background
As is well known, with the continuous development of the building industry, more and more high buildings are erected, at present, in engineering buildings, concrete reinforced floors may need to be subjected to hole reserving treatment to facilitate pumping of concrete or construction and the like, in short, hole reserving is necessary, but after construction is finished, some holes need to be plugged, in addition, in the process of building decoration, grooves and holes are reserved on the wall surface after water pipes are buried and also need to be repaired, most of the existing hole reserving modes are that the holes are filled with cement paste firstly and then are leveled again, hole reserving work needs to be subjected to secondary construction, time and energy are wasted, and when the existing hole reserving tools are used for hole reserving work, operation of hole cement paste filling work is inconvenient, the size of the filling tools cannot be adjusted according to the size of the cement paste and the size of the grooves, so that workers can drop a large amount of cement paste when the holes are reserved, the hole patching device for building construction and the using method are provided for the reason that resources are wasted and the hole patching device is not easy to clean in the later period.
Disclosure of Invention
The invention aims to provide a safe and reliable hole patching device for building construction.
In order to achieve the purpose, the technical solution of the invention is as follows:
the utility model provides a hole patching device for construction, includes the base, its characterized in that:
the upper surface of the base is symmetrically and fixedly connected with two fixed rods, two second plate bodies, two second supporting rods and two first supporting rods respectively, the upper surface of the base is symmetrically provided with two first plate bodies, the bottom of each first plate body is provided with a hole groove, the two fixed rods are respectively and rotatably connected with the inner side walls of the two hole grooves through second bearings, the two first plate bodies are positioned between the two second plate bodies, one side of each second plate body, far away from the first plate body, is in threaded connection with a threaded rod, one end of the threaded rod penetrates through one side of each second plate body and is rotatably connected with one side of the adjacent first plate body through the first bearings, the tops of the two first supporting rods and the tops of the two second supporting rods are fixedly connected with a shell, the inner side wall of the shell is provided with a sliding groove, and the inner side wall of the sliding groove is in sliding connection with, the third plate body is far away from one side fixedly connected with fourth plate body of spout, the lateral wall sliding connection of fourth plate body in the inside wall of casing, one side fixedly connected with sixth plate body of base.
The hole patching device for building construction can be further realized by adopting the following technical measures.
According to the hole patching device for building construction, the base is located between the two first plate bodies, the upper surface of the base is fixedly connected with the fifth plate body, and the first supporting rod and the second supporting rod are located between the two first plate bodies.
In the hole patching device for building construction, the top of the shell is connected with the top cover in a sliding mode, and the center of the upper surface of the top cover is fixedly connected with the second handle.
In the hole patching device for building construction, the third plate body is located on the outer side wall inside the sliding groove and fixedly connected with the rubber pad, and the fourth plate body is far away from one side of the sliding groove and fixedly connected with the first handle.
In the hole patching device for building construction, one side of the sixth plate body is fixedly connected with the third handle, and the bottom of the base is fixedly connected with the fourth handle.
In the hole patching device for building construction, a ring body is fixedly connected to one side of the base, which is far away from the sixth plate body, and a cloth belt is sleeved on the outer side wall of the ring body.
After the technical scheme is adopted, the hole patching device for building construction has the following advantages:
1. the hole patching device has simple structure and convenient manufacture;
2. the flow of the cement paste is controlled, the size of the injected material can be adjusted according to the sizes of the building holes and the grooves, and the cement paste waste is prevented;
3. can smooth the grout after pouring into hole and recess, need not post processing, labour saving and time saving reduces engineering cost.
Drawings
FIG. 1 is a schematic structural diagram of a hole filling device according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a first plate body according to the present invention;
fig. 3 is a top view of fig. 1.
In the figure: 1. a base; 2. a first plate body; 3. a second plate body; 4. a first bearing; 5. a threaded rod; 6. a first support bar; 7. a second support bar; 8. a housing; 9. a chute; 10. a third plate body; 11. a rubber pad; 12. a fourth plate body; 13. a first handle; 14. a fifth plate body; 15. a top cover; 16. a second handle; 17. a ring body; 18. a cloth belt; 19. a sixth plate body; 20. a third handle; 21. a fourth handle; 22. a hole groove; 23. fixing the rod; 24. a second bearing.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
Referring to fig. 1-3, the hole patching device for building construction of the present invention comprises a base 1, wherein the upper surface of the base 1 is symmetrically and fixedly connected with two fixing rods 23, two second plate bodies 3, two second support rods 7 and two first support rods 6, the upper surface of the base 1 is symmetrically provided with two first plate bodies 2, the bottom of each first plate body 2 is provided with a hole slot 22, the two fixing rods 23 are respectively and rotatably connected to the inner side walls of the two hole slots 22 through second bearings 24, the two first plate bodies 2 are positioned between the two second plate bodies 3, one side of each second plate body 3 far away from the first plate body 2 is in threaded connection with a threaded rod 5, one end of each threaded rod 5 penetrates through one side of the second plate body 3 and is rotatably connected to one side of the adjacent first plate body 2 through the first bearings 4, the tops of the two first support rods 6 and the two second support rods 7 are fixedly connected with a shell 8, spout 9 has been seted up to casing 8's inside wall, and spout 9's inside wall sliding connection has third plate body 10, and one side fixedly connected with fourth plate body 12 of spout 9 is kept away from to third plate body 10, and the lateral wall sliding connection of fourth plate body 12 is in casing 8's inside wall, one side fixedly connected with sixth plate body 19 of base 1.
The upper surface of the base 1, which is positioned between the two first plate bodies 2, is fixedly connected with a fifth plate body 14, and the two first supporting rods 6 and the two second supporting rods 7 are positioned between the two first plate bodies 2; through the arrangement of the fifth plate body 14, when cement paste falls from the inside of the shell 8, the cement paste can be prevented from falling from the position of the fifth plate body 14. The top of the shell 8 is connected with a top cover 15 in a sliding manner, and the center of the upper surface of the top cover 15 is fixedly connected with a second handle 16; the top cover 15 can have a protective function for the housing 8, meanwhile, the top cover 15 has a fixing and supporting function for the second handle 16, and the top cover 15 can be conveniently taken down from the top of the housing 8 through the arrangement of the second handle 16.
The outer side wall of the third plate body 10 positioned inside the sliding chute 9 is fixedly connected with a rubber pad 11, and one side of the fourth plate body 12 far away from the sliding chute 9 is fixedly connected with a first handle 13; through the setting of rubber pad 11, can be so that between third plate body 10 and the spout 9 inseparabler, through the setting of first handle 13, the staff of being convenient for is through the first handle 13 of push-and-pull for fourth plate body 12 and third plate body 10 slide in the inside of spout 9. One side of the sixth plate body 19 is fixedly connected with a third handle 20, and the bottom of the base 1 is fixedly connected with a fourth handle 21; through the setting of third handle 20 and fourth handle 21, the staff of being convenient for snatchs this device of operation, can be according to the hobby of different staff and the position of restoreing the wall body, by the structure that the staff oneself selected to want to snatch. A ring body 17 is fixedly connected to one side of the base 1 far away from the sixth plate body 19, and a cloth belt 18 is sleeved on the outer side wall of the ring body 17; through the setting of ring body 17, can have the effect of support to strap 18, through the setting of strap 18 for this device is convenient for hang, thereby makes this device be convenient for deposit and carry.
Example 2
The invention discloses a method for using a hole patching device for building construction, which comprises the following steps:
when the device is used, the second handle 16 is pulled to open the top cover 15, cement paste for hole patching is placed in the shell 8, the fixing rod 23 is rotatably connected with the first plate body 2 through the second bearing 24, so that the threaded rod 5 can be rotated to push or pull one side of the first plate body 2, which is far away from the fixing rod 23, to move, so as to adjust the included angle between the two first plate bodies 2, a worker can select to grab the fourth handle 21 or the third handle 20 according to own favor and the position of the hole patching to operate the device, one sides of the two first plate bodies 2, which are far away from the fixing rod 23, are attached to the edges of the holes or the grooves of the wall body, the positions of the two first plate bodies 2 are adjusted, so that the sides of the first plate bodies 2, which are attached to the holes or the grooves, are matched with the sizes of the holes or the grooves, then the first handle 13 is pulled, so that the first handle 13 pulls the third plate body 10 to the outside of the chute 9 through, make grout drop to the below of casing 8, the setting of fifth plate body 14, can prevent that grout from dropping from the top that base 1 and fifth plate body 14 are adjacent, the velocity of flow of grout can be controlled to the size of taking out through third plate body 10, make grout drop to the top of base 1, then spacing through two first plate bodies 2, make grout can get into in the hole or the recess of wall body, then control this device and upwards remove, utilize sixth plate body 19 to smooth grout, thereby restore the wall body.
Compared with the prior art, the hole patching device for building construction can be used for filling cement paste and controlling the flow of the cement paste by matching and arranging the structures such as the shell and the third plate body, can be used for adjusting the size of a filling material according to the sizes of building holes and grooves by matching and arranging the structures such as the first plate body, the fixed rod, the second bearing and the threaded rod, and can prevent the waste of the cement paste.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (6)

1. The utility model provides a patching hole ware for construction, includes base (1), its characterized in that:
the upper surface of the base (1) is symmetrically and fixedly connected with two fixing rods (23), two second plate bodies (3), two second supporting rods (7) and two first supporting rods (6) respectively, the upper surface of the base (1) is symmetrically provided with the two first plate bodies (2), the bottom of each first plate body (2) is provided with a hole groove (22), the two fixing rods (23) are respectively and rotatably connected with the inner side walls of the two hole grooves (22) through second bearings (24), the two first plate bodies (2) are positioned between the two second plate bodies (3), one side of each second plate body (3) far away from the corresponding first plate body (2) is in threaded connection with a threaded rod (5), one end of each threaded rod (5) penetrates through one side of the corresponding second plate body (3) and is rotatably connected with one side of the adjacent first plate body (2) through each first bearing (4), two first bracing piece (6) and two top fixedly connected with casing (8) of second bracing piece (7), spout (9) have been seted up to the inside wall of casing (8), the inside wall sliding connection of spout (9) has third plate body (10), keep away from third plate body (10) one side fixedly connected with fourth plate body (12) of spout (9), the lateral wall sliding connection of fourth plate body (12) in the inside wall of casing (8), one side fixedly connected with sixth plate body (19) of base (1).
2. A hole patching device for building construction as claimed in claim 1, wherein a fifth plate (14) is fixedly connected to the upper surface of the base (1) between the two first plates (2), and the two first support bars (6) and the two second support bars (7) are both located between the two first plates (2).
3. A patch hole device for building construction as claimed in claim 1, characterized in that a top cover (15) is slidably connected to the top of the housing (8), and a second handle (16) is fixedly connected to the center of the upper surface of the top cover (15).
4. A hole patching device for building construction as claimed in claim 1, wherein the outer side wall of the third plate body (10) inside the chute (9) is fixedly connected with a rubber pad (11), and the side of the fourth plate body (12) far away from the chute (9) is fixedly connected with a first handle (13).
5. A hole patching device for building construction as claimed in claim 1, wherein a third handle (20) is fixedly connected to one side of the sixth plate body (19), and a fourth handle (21) is fixedly connected to the bottom of the base (1).
6. The hole patching device for building construction as claimed in claim 1, wherein a ring body (17) is fixedly connected to one side of the base (1) far away from the sixth plate body (19), and a cloth tape (18) is sleeved on the outer side wall of the ring body (17).
CN202010642123.0A 2020-07-06 2020-07-06 Hole patching device for building construction Active CN111894297B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010642123.0A CN111894297B (en) 2020-07-06 2020-07-06 Hole patching device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010642123.0A CN111894297B (en) 2020-07-06 2020-07-06 Hole patching device for building construction

Publications (2)

Publication Number Publication Date
CN111894297A true CN111894297A (en) 2020-11-06
CN111894297B CN111894297B (en) 2022-07-22

Family

ID=73191648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010642123.0A Active CN111894297B (en) 2020-07-06 2020-07-06 Hole patching device for building construction

Country Status (1)

Country Link
CN (1) CN111894297B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4988272A (en) * 1989-03-06 1991-01-29 Nolan Kenneth J Grout compressing and finishing tool
CN203701537U (en) * 2014-02-10 2014-07-09 中国长江三峡集团公司 Rapid filling device of concrete side wall joints
CN204590453U (en) * 2015-04-08 2015-08-26 洛阳理工学院 A kind of hand held roof crack repairing machine
CN107237513A (en) * 2017-08-13 2017-10-10 唐云龙 Device is filled up in a kind of wall gap for building
CN206873980U (en) * 2017-05-27 2018-01-12 瑞派尔(宜昌)科技集团有限责任公司 A kind of fracture drainage pours hopper
CN107724218A (en) * 2017-09-14 2018-02-23 南京慧智灵杰投资管理有限公司 A kind of road structure stitches filling device
CN209538961U (en) * 2018-11-16 2019-10-25 苏州侨佳精密科技有限公司 A kind of adjustable damp hinge
CN110644739A (en) * 2019-11-14 2020-01-03 帕尼多(徐州)信息科技有限公司 Joint mixture extrusion device of at uniform velocity ejection of compact
CN210217063U (en) * 2019-06-12 2020-03-31 江西金凯新型墙板科技有限公司 Plate joint filling device for light wall plate

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4988272A (en) * 1989-03-06 1991-01-29 Nolan Kenneth J Grout compressing and finishing tool
CN203701537U (en) * 2014-02-10 2014-07-09 中国长江三峡集团公司 Rapid filling device of concrete side wall joints
CN204590453U (en) * 2015-04-08 2015-08-26 洛阳理工学院 A kind of hand held roof crack repairing machine
CN206873980U (en) * 2017-05-27 2018-01-12 瑞派尔(宜昌)科技集团有限责任公司 A kind of fracture drainage pours hopper
CN107237513A (en) * 2017-08-13 2017-10-10 唐云龙 Device is filled up in a kind of wall gap for building
CN107724218A (en) * 2017-09-14 2018-02-23 南京慧智灵杰投资管理有限公司 A kind of road structure stitches filling device
CN209538961U (en) * 2018-11-16 2019-10-25 苏州侨佳精密科技有限公司 A kind of adjustable damp hinge
CN210217063U (en) * 2019-06-12 2020-03-31 江西金凯新型墙板科技有限公司 Plate joint filling device for light wall plate
CN110644739A (en) * 2019-11-14 2020-01-03 帕尼多(徐州)信息科技有限公司 Joint mixture extrusion device of at uniform velocity ejection of compact

Also Published As

Publication number Publication date
CN111894297B (en) 2022-07-22

Similar Documents

Publication Publication Date Title
CN109505408B (en) Outer wall hole plugging umbrella and construction method
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN204571288U (en) Floor slab preformed hole mould
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN111894297B (en) Hole patching device for building construction
CN207920078U (en) A kind of concrete wall pocket mouth gap plugging device
CN209493945U (en) A kind of distribution device and connection structure of deep basal pit huge foundation underplate concrete
CN114790755A (en) Concrete raft board post-cast strip construction joint template
CN207436515U (en) The hoisting beam of efficient construction of precast floorslab
CN210195241U (en) Regularization template reinforcement spare
CN208148158U (en) It is a kind of live with strength mortar preparation facilities
CN203797264U (en) Counterweight base for mounting outdoor device of communication engineering
CN210263989U (en) Wall body bearing structure is built in room
CN108118895A (en) A kind of construction mixed mud reserved opening gap plugging device
CN207092542U (en) The mould of pre-buried circuit in a kind of floor
CN206231787U (en) A kind of Multifunctional mobile ash pan
CN214365023U (en) Plastering device for cement mortar in constructional engineering
CN209556313U (en) A kind of scaffold for decoration
CN219138391U (en) Pump line export concrete transfer device
CN207669540U (en) A kind of aerated bricks integrated cutter device anyhow
CN207211748U (en) A kind of concrete-pouring template support meanss
CN204370796U (en) Hoistway formwork platform
CN112095609A (en) Plastering device for slope finding and leveling and construction method
CN211473425U (en) A floor is pour construction and is used support body platform for housing construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant