CN108118895A - A kind of construction mixed mud reserved opening gap plugging device - Google Patents

A kind of construction mixed mud reserved opening gap plugging device Download PDF

Info

Publication number
CN108118895A
CN108118895A CN201711392609.8A CN201711392609A CN108118895A CN 108118895 A CN108118895 A CN 108118895A CN 201711392609 A CN201711392609 A CN 201711392609A CN 108118895 A CN108118895 A CN 108118895A
Authority
CN
China
Prior art keywords
support plate
arc panel
loop bar
riser
reserved opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711392609.8A
Other languages
Chinese (zh)
Inventor
李楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711392609.8A priority Critical patent/CN108118895A/en
Publication of CN108118895A publication Critical patent/CN108118895A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a kind of construction mixed mud reserved opening gap plugging devices, including the first support plate and the second support plate, floor is mounted in first support plate and the second support plate, release materials are filled in the gap formed between the floor and standpipe, one end of first support plate is connected with the first arc panel, one end of second support plate is connected with the second arc panel, the arc port of first arc panel is welded with the first fixed block, the arc port of second arc panel is welded with the second fixed block, first fixed block is equipped with bolt, support riser is coated on the outer wall of the standpipe, the support riser is hollow structure, and it is equipped with sliding shoe in the sliding slot offered on support riser.The present invention is reasonable in design, uses more convenient, good practical effect;By being filled with release materials in the gap between floor and standpipe so that demould more convenient after construction, increase the efficiency of construction.

Description

A kind of construction mixed mud reserved opening gap plugging device
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of construction is sealed with mixed mud reserved opening gap Block apparatus.
Background technology
For current China's building mostly using monolithic reinforced concrete structure, ventilating duct reserving hole is easy for construction, just to ensure In straightening, reserving hole is usually more bigger than ventilating duct material size itself.Concrete mostly by cementing material, gather materials with water by Certain proportion is prepared, agitated shaping of vibrating, the artificial stone conserved under certain condition, and reserved opening is each Essential one of engineering, situations such as hole being caused shapeless too early such as form removal, as form removal will cause to mix at hole too late Situations such as solidifying soil destroys.In order to ensure the quality of the hole to be provided in constructure body structure and beauty, in constructure construction procedure The construction of middle reserved opening reparation is very important.At present, it is non-in the general building engineering of concrete at home It is often ripe, and the later stage of pipeline is laid with most for accounting for engineering always.
Using the construction method of reserved opening closure in constructure construction procedure, but existing construction method was being constructed The out-of-flatness of concrete face is be easy to cause in journey, and constructing device component is all fixed mode, can not be adjusted, and is used Limitation of getting up is larger, and practical function is bad.
The content of the invention
It, can be with it is a primary object of the present invention to provide a kind of construction mixed mud reserved opening gap plugging device Effectively solve the problems, such as in background technology.
To achieve the above object, the technical solution taken of the present invention is:
A kind of construction mixed mud reserved opening gap plugging device, including the first support plate and the second support plate, Floor is mounted in first support plate and the second support plate, is filled in the gap formed between the floor and standpipe Release materials, one end of first support plate are connected with the first arc panel, and one end of second support plate is connected with second Arc panel, the arc port of first arc panel are welded with the first fixed block, the arc port welding of second arc panel There is the second fixed block, first fixed block is equipped with bolt, support riser, the support are coated on the outer wall of the standpipe Riser is hollow structure, and supports and be equipped with sliding shoe on riser in the sliding slot that offers, and the is fixedly connected on the sliding shoe A positioning block is movably connected by the first pivot pin and the first loop bar on first locating piece, an end cap of first loop bar The second loop bar is connected to, one end of second loop bar is flexibly connected by the second pivot pin with the second locating piece, second positioning The one side of block is fixedly mounted on the bottom of the second support plate.
Further, the support riser is arc shape, and the radian size of one second arc panel of size of radian is identical.
Further, location hole is equipped in the sliding slot opened up on the support riser, the location hole on sliding shoe with opening If hole size it is identical.
Further, first loop bar and the second loop bar form a telescopic rod.
Further, the screw hole with bolt bolt is offered on second fixed block.
Compared with prior art, the present invention has the advantages that:The present invention is reasonable in design, uses and compares It is convenient, good practical effect;By being filled with release materials in the gap between floor and standpipe so that demoulded after construction It is more convenient, increase the efficiency of construction;By being coated with support riser on the outer wall of standpipe, support riser is cavity structure, Sliding shoe moves in sliding slot, changes the Support Position of the first loop bar and the second loop bar, so as to change the support stress to standpipe Point, the first loop bar and the second loop bar form a telescopic rod, the different position for supporting riser can be supported, operated It is more convenient, increase practical function.
Description of the drawings
Fig. 1 is overall structure diagram of the present invention.
Fig. 2 is the top view of arc panel of the present invention.
Fig. 3 is the structure diagram of present invention support riser.
Fig. 4 is the structure diagram of loop bar of the present invention.
In figure:1st, the first support plate;2nd, riser is supported;3rd, sliding shoe;4th, the first pivot pin;5th, the first locating piece;6th, floor; 7th, the second support plate;8th, the second pivot pin;9th, the second locating piece;10th, release materials;11st, standpipe;12nd, the second arc panel;13rd, Two fixed blocks;14th, the first fixed block;15th, bolt;16th, the first arc panel;17th, location hole;18th, the first loop bar;19th, second set Bar.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, with reference to Specific embodiment, the present invention is further explained.
As shown in Figs 1-4, a kind of construction mixed mud reserved opening gap plugging device, including the first support plate 1 With the second support plate 7, be mounted on floor 6 in 1 and second support plate 7 of the first support plate, the floor 6 and standpipe 11 it Between in the gap that forms filled with release materials 10, one end of first support plate 1 is connected with the first arc panel 16, described the One end of two support plates 7 is connected with the second arc panel 12, and the arc port of first arc panel 16 is welded with the first fixed block 14, the arc port of second arc panel 12 is welded with the second fixed block 13, and first fixed block 14 is equipped with bolt 15, Support riser 2 is coated on the outer wall of the standpipe 11, the support riser 2 is hollow structure, and supports and offered on riser 2 Sliding slot in be equipped with sliding shoe 3, be fixedly connected with the first locating piece 5 on the sliding shoe 3, pass through on first locating piece 5 First pivot pin 4 is movably connected with the first loop bar 18, and one end of first loop bar 18 is socketed with the second loop bar 19, described second set One end of bar 19 is flexibly connected by the second pivot pin 8 with the second locating piece 9, and the one side of second locating piece 9 is fixedly mounted on The bottom of second support plate 7.
Wherein, the support riser 2 is arc shape, and the radian size of one second arc panel 12 of size of radian is identical.
Wherein, described support is equipped with location hole 17 in the sliding slot opened up on riser 2, on the location hole 17 and sliding shoe 3 The hole size opened up is identical, convenient that processing is fixed to sliding shoe 3.
Wherein, 18 and second loop bar 19 of the first loop bar forms a telescopic rod, can meet the difference of support riser 2 Highly.
Wherein, the screw hole with 15 bolt of bolt is offered on second fixed block 13, bolt 15 is combined with screw hole, So that the first arc panel 16 and the second arc panel 12 are combined closely.
It should be noted that the present invention is a kind of construction mixed mud reserved opening gap plugging device, during work, The first arc panel 16 being connected with the first support plate 1 and the second arc panel 12 being connected with the second support plate 7 are coated on standpipe 11 Outer wall on, be then fixed using bolt 15, support riser 2 is also coated on standpipe 11, supports the cunning that opens up on riser 2 Sliding shoe 3 is equipped in slot, the first locating piece 5 is welded on sliding shoe 3, passes through the first pivot pin 4 and first set on the first locating piece 5 Bar 18 is flexibly connected, and one end of the first loop bar 18 is connected by 8 activity of the second pivot pin on the second loop bar 19 and the second locating piece 9 It connects, the telescopic rod that the first loop bar 18 and the second loop bar 19 are formed can be adjusted according to the height of support riser 2, use Compare flexibly, also improve practical function.
The basic principles, main features and the advantages of the invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (5)

1. a kind of construction mixed mud reserved opening gap plugging device, including the first support plate (1) and the second support plate (7), it is characterised in that:Floor (6), the floor (6) are mounted on first support plate (1) and the second support plate (7) Filled with release materials (10) in the gap formed between standpipe (11), one end of first support plate (1) is connected with the One arc panel (16), one end of second support plate (7) are connected with the second arc panel (12), first arc panel (16) Arc port is welded with the first fixed block (14), and the arc port of second arc panel (12) is welded with the second fixed block (13), first fixed block (14) is equipped with bolt (15), and support riser (2) is coated on the outer wall of the standpipe (11), The support riser (2) is hollow structure, and supports and sliding shoe (3), the slip are equipped in the sliding slot offered on riser (2) The first locating piece (5) is fixedly connected on block (3), passes through the first pivot pin (4) and the first loop bar on first locating piece (5) (18) it is movably connected, one end of first loop bar (18) is socketed with the second loop bar (19), one end of second loop bar (19) It is flexibly connected by the second pivot pin (8) with the second locating piece (9), the one side of second locating piece (9) is fixedly mounted on second The bottom of support plate (7).
2. a kind of construction according to claim 1 mixed mud reserved opening gap plugging device, it is characterised in that: The support riser (2) is arc shape, and the radian size of one second arc panel (12) of size of radian is identical.
3. a kind of construction according to claim 1 mixed mud reserved opening gap plugging device, it is characterised in that: Location hole (17) is equipped in the sliding slot opened up on the support riser (2), is opened up on the location hole (17) and sliding shoe (3) Hole size is identical.
4. a kind of construction according to claim 1 mixed mud reserved opening gap plugging device, it is characterised in that: First loop bar (18) and the second loop bar (19) form a telescopic rod.
5. a kind of construction according to claim 1 mixed mud reserved opening gap plugging device, it is characterised in that: It is offered on second fixed block (13) and the screw hole of bolt (15) bolt.
CN201711392609.8A 2017-12-21 2017-12-21 A kind of construction mixed mud reserved opening gap plugging device Withdrawn CN108118895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711392609.8A CN108118895A (en) 2017-12-21 2017-12-21 A kind of construction mixed mud reserved opening gap plugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711392609.8A CN108118895A (en) 2017-12-21 2017-12-21 A kind of construction mixed mud reserved opening gap plugging device

Publications (1)

Publication Number Publication Date
CN108118895A true CN108118895A (en) 2018-06-05

Family

ID=62230743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711392609.8A Withdrawn CN108118895A (en) 2017-12-21 2017-12-21 A kind of construction mixed mud reserved opening gap plugging device

Country Status (1)

Country Link
CN (1) CN108118895A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296278A (en) * 2019-06-28 2019-10-01 中国五冶集团有限公司 Plugging structure at floor pre-manufactured hole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296278A (en) * 2019-06-28 2019-10-01 中国五冶集团有限公司 Plugging structure at floor pre-manufactured hole

Similar Documents

Publication Publication Date Title
CN106760503A (en) A kind of constructional column based on standard knot combination is poured uses template
CN109505408B (en) Outer wall hole plugging umbrella and construction method
CN207296408U (en) Portable concrete constructional column irrigation device
CN108582466A (en) A kind of steel reinforcement cage of prefabricated box girder mould
CN106948493A (en) A kind of pre- seat slurry fabricated construction component connection method
CN206530050U (en) A kind of super large reserved opening hanging mould structure
CN207073278U (en) A kind of building engineering construction formwork for placing
CN108118895A (en) A kind of construction mixed mud reserved opening gap plugging device
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN207920078U (en) A kind of concrete wall pocket mouth gap plugging device
CN213927071U (en) Simple and easy angle steel lintel strutting arrangement
CN108798715A (en) A kind of tunnel type pipe gallery sectional type component assembly method
CN209011364U (en) A kind of vertical connector of precast wall body
CN104453235B (en) Current conversion station fire wall construction technology
CN207958977U (en) A kind of device to bind for bridge hollow pier
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN206667492U (en) A kind of prefabricated composite wallboard and the laterally attached structure of precast stair
CN210825071U (en) Square wireless remote control vibrating concrete overhead hoist
CN207436515U (en) The hoisting beam of efficient construction of precast floorslab
CN209053376U (en) A kind of porous brick external decoration wall cladding system
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN206801086U (en) A kind of rigid mouth on support column
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN205935652U (en) Template is pour in building engineering construction
CN203755666U (en) Finished grade beam binding mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180605

WW01 Invention patent application withdrawn after publication