CN207958977U - A kind of device to bind for bridge hollow pier - Google Patents

A kind of device to bind for bridge hollow pier Download PDF

Info

Publication number
CN207958977U
CN207958977U CN201820353154.2U CN201820353154U CN207958977U CN 207958977 U CN207958977 U CN 207958977U CN 201820353154 U CN201820353154 U CN 201820353154U CN 207958977 U CN207958977 U CN 207958977U
Authority
CN
China
Prior art keywords
hollow pier
cover plate
bridge hollow
bridge
side cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820353154.2U
Other languages
Chinese (zh)
Inventor
王戟峰
晁圣峰
胡鹏
刘道清
赵芳振
刘帅男
韦国栋
郑永龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Tie Shanghai Engineering Co Ltd Of Group Of Engineering Bureau 4th
Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Zhong Tie Shanghai Engineering Co Ltd Of Group Of Engineering Bureau 4th
Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Tie Shanghai Engineering Co Ltd Of Group Of Engineering Bureau 4th, Shanghai Civil Engineering Co Ltd of CREC filed Critical Zhong Tie Shanghai Engineering Co Ltd Of Group Of Engineering Bureau 4th
Priority to CN201820353154.2U priority Critical patent/CN207958977U/en
Application granted granted Critical
Publication of CN207958977U publication Critical patent/CN207958977U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of devices to bind for bridge hollow pier, the cover plate main body at the top of bridge hollow pier is closed including lid, it is equipped with sealant between at the top of cover plate main body and bridge hollow pier, cover plate main body includes the cover plate of the side cover board and multiple rectangular-shapes of two semicircle shapes, two side cover boards are mounted on the both ends at the top of bridge hollow pier, multiple cover plates are mounted side by side on the intermediate position at the top of bridge hollow pier and between two side cover boards, the upper surface of each side cover board and each cover plate is uniformly distributed multiple force mechanisms being transported to convenient for tower crane at the top of bridge hollow pier.The utility model has the beneficial effects that manufacture craft is simple, constructing operation is easy, and the construction time is short, time saving and energy saving, and construction efficiency is high, and cost is relatively low, while construction personnel's security risk reduces, securely and reliably.

Description

A kind of device to bind for bridge hollow pier
Technical field
The utility model is related to technical field of bridge construction, and in particular to a kind of device to bind for bridge hollow pier.
Background technology
Currently, since railway, highway are greatly developed, the construction of mountain railway, highway is also to come one after another, on design mountain Area's railway, highway bridge and across deep valley, stream when generally use Hollow High Pier with Thin Wall form carry out bridge pier shaft set Meter, meets force request while to reduce concrete amount, and when constructing Hollow High Pier with Thin Wall, thin-wall hollow high-pier It is the essential process of entire pier construction to bind, and due to pier height, construction environment is complicated and the factors such as working face is limited are made At Hollow High Pier with Thin Wall bind difficulty of construction increase, security risk improve, and construction cost increase.
The routine techniques that Hollow High Pier with Thin Wall binds is:(1) steel pipe frame or scaffold are set up in hollow pier, using taking If full hall scaffold as load-carrying construction construction operation and transport, form platform and carry out concrete construction of binding, finally bind Scaffold is removed after the completion;(2) the pre-buried I-steel fulcrum in hollow pier wall top is utilized, I-shaped gooseneck is set up on its fulcrum, it is horizontal Power transmission rod piece is arranged on beam to be used for that hollow pier is supported to bind bed die, to complete concrete construction of binding;(3) hollow thin-walled high pier is utilized Inside and outside steel form sets up I-shaped gooseneck and power transmission distribution beam as fulcrum on its fulcrum, and envelope is completed after forming operation platform Push up concrete construction.Usually there is following drawback in above several conventional technique schemes:1, constructing operation is cumbersome, construction period It is long, it spends human and material resources;2, construction personnel's security risk is larger.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of devices to bind for bridge hollow pier, this binds Device manufacture craft is simple, easy to operate, and the construction time is short, and security risk is relatively low;Meanwhile the apparatus structure that binds is simple, at This is relatively low, easy to maintenance.
The technical solution that the utility model solves above-mentioned technical problem is as follows:
A kind of device to bind for bridge hollow pier, including lid close the cover plate main body at the top of bridge hollow pier, described Sealant is equipped between at the top of cover plate main body and the bridge hollow pier, the cover plate main body includes the side cover board of two semicircle shapes With the cover plate of multiple rectangular-shapes, two side cover boards are mounted on the both ends at the top of the bridge hollow pier, multiple described Cover plate is mounted side by side on the intermediate position at the top of the bridge hollow pier and between two side cover board, each described The upper surface of side cover board and each cover plate is uniformly distributed to be had and multiple is transported to the bridge hollow pier convenient for tower crane The force mechanism at top.
The utility model has the beneficial effects that:It is bound to bridge hollow pier by cover plate main body, then leads to sealant Gap between bridge hollow pier and cover plate main body is sealed, and the effect that binds is good;Cover plate main body includes two semicircle shapes The cover plate of side cover board and multiple rectangular-shapes, side cover board and cover plate are fabricated separately when making, and manufacture craft is easy;Tower crane seals Two side cover boards and multiple cover plates are transported to composition cover plate main body at the top of bridge hollow pier successively by force mechanism when top It binds, convenient and quick construction, construction efficiency significantly improves, securely and reliably.
Based on the above technical solution, the utility model can also do following improvement.
Further, the force mechanism is hanging ring or lifting lug.
Advantageous effect using above-mentioned further scheme is the features simple structure of hanging ring or lifting lug, only need to will be on tower crane when construction Rope tie up on hanging ring or lifting lug, easy to operate, time saving and energy saving, construction efficiency significantly improves.
Further, the sealant is mortar sealant.
Advantageous effect using above-mentioned further scheme be by mortar sealant to cover plate main body and bridge hollow pier it Between gap be sealed, sealing effect is good, while sealant can also increase the stability of cover plate main body.
Further, the side cover board and the cover plate are formed by net-shaped steel ledges and concreting, the net Shape reinforced frame with coat its concrete outer rim at a distance from be 1.5~3.5cm.
Advantageous effect using above-mentioned further scheme is that side cover board and cover plate are by net-shaped steel ledges and concrete It pours, manufacture craft is simple;Protective layer between net-shaped steel ledges and the concrete outer edge for coating it is to steel mesh reinforcement Frame is protected.
Further, the net-shaped steel ledges is formed by connecting by transverse steel and longitudinal reinforcement uniform intervals.
Advantageous effect using above-mentioned further scheme is net-shaped steel ledges by transverse steel and longitudinal reinforcement uniform intervals It works out, stability is good.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model Bridge hollow pier;
Fig. 3 is the structural schematic diagram that the utility model is mounted on bridge hollow pier.
In attached drawing, parts list represented by the reference numerals are as follows:
1, bridge hollow pier, 2, sealant, 3, side cover board, 4, cover plate, 5, force mechanism.
Specific implementation mode
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining this practicality It is novel, it is not intended to limit the scope of the utility model.
As shown in Figure 1, Figure 2 and Figure 3, the utility model provides a kind of device to bind for bridge hollow pier, including lid The cover plate main body at 1 top of bridge hollow pier is closed, cover plate main body and bridge hollow pier are equipped with sealant 2 between 1 top, on the one hand Sealant 2 plays sealing function, and another aspect sealant 2 may make cover plate main body to be fixed on the top of bridge hollow pier 1, increases The stability of cover plate main body;Cover plate main body includes the cover plate 4 of the side cover board 3 and multiple rectangular-shapes of two semicircle shapes, two Side cover board 3 is mounted on the both ends at 1 top of bridge hollow pier, and multiple cover plates 4 are mounted side by side on the centre at 1 top of bridge hollow pier Position and between two side cover boards 3, since the volume of cover plate main body is larger, tower crane is very inconvenient, dangerous larger, because Cover plate main body is separated into the multiple side cover boards 3 and cover plate 4 of small volume by this;Side cover board 3 and cover plate 4 use model system Make, manufacture craft is simple, easy to operate, is operated without professional;The small volume of side cover board 3 and cover plate 4, does not account for field Ground, transition are convenient;When bridge hollow pier 1 binds, side cover board 3 and 4 piecemeal tower crane of cover plate need to only be transported to bridge hollow pier 1 Top, it is easy to operate, it is time saving and energy saving, it binds efficient.It is transported for convenience of tower crane, each side cover board 3 and each cover plate 4 Upper surface uniformly distributed have multiple force mechanisms 5 that the top of bridge hollow pier 1 is transported to convenient for tower crane;When tower crane, only Rope on tower crane need to be tied up to the force mechanism 5 on side cover board 3 and cover plate 4, you can the tower crane stablized is delivered to bridge The top of beam hollow pier 1, stability is good, easy to operate.
In the utility model, force mechanism 5 is hanging ring or lifting lug.The upper surface of semicircle shape side cover board 3 is preferably provided with three Rope on tower crane need to only be tied up to side by hanging ring or lifting lug and the position for being located at end positions and center of arc, when tower crane Position corresponding to 1 top of bridge hollow pier is smoothly transported after on three hanging rings or lifting lug of cover board 3, it is easy to operate, The stability that side cover board 3 transports is good;The upper surface of rectangular-shape cover plate 4 is preferably provided with four hanging rings or lifting lug and is located at The corresponding position in four angles, when tower crane the rope on tower crane need to only be tied up on four hanging rings or lifting lug of cover plate 4 after it is steady Transport to the corresponding position in the top of bridge hollow pier 1, easy to operate, the stability that cover plate 4 is transported is good.Side cover board 3 Stability is very good during transport with cover plate 4, without adjusting its orientation before being placed on bridge hollow pier 1, directly It connects and is placed on the corresponding position of bridge hollow pier 1, just, construction efficiency greatly improves for operation.
Preferably, in the utility model, sealant 2 is mortar sealant, and mortar sealant has viscous stickiness well, can Side cover board 3 and cover plate 4 are fixed on to the top of bridge hollow pier 1, increases the stability of side cover board 3 and cover plate 4, rises simultaneously To sealing function, sealing effect is good.
In the utility model, side cover board 3 and cover plate 4 are the reinforcing bars made of net-shaped steel ledges and concreting Concrete, the thickness of reinforced concrete are 10~20cm, net-shaped steel ledges with coat at a distance from its concrete outer rim as 1.5~3.5cm, net Shape reinforced frame forms a protective layer with concrete corresponding edge thereon, and protective layer protects net-shaped steel ledges;Net-shaped steel Ledges is formed by connecting by transverse steel and longitudinal reinforcement uniform intervals, and stability is preferable.
The utility model makes and the process of transport is as follows:
The net-shaped steel ledges worked out is placed in corresponding mold, semicircle shape is respectively formed by concreting Side cover board 3 and rectangular-shape cover plate 4;Two side cover boards 3 and multiple cover plates 4 are transported to bridge successively by tower crane The top of hollow pier 1 is placed on corresponding position;The cover plate main body formed by mortar opposite side cover board 3 and cover plate 4 with Gap between bridge hollow pier 1 is sealed, while the seam between side cover board 3 and cover plate 4 and two neighboring cover plate 4 Gap is equally sealed using mortar.
The utility model changes the mode that traditional bridge hollow pier 1 binds, and the larger cover plate main body of volume is separated adult Product smaller two side cover boards 3 and multiple cover plates 4, side cover board 3 and cover plate 4 are completed in floor manufacture in advance, are then passed through The mode of tower crane is successively by two side cover boards 3 and the transport of multiple cover plates 4 to the top of bridge hollow pier 1, cover plate 4 herein Depending on quantity starves size according to 1 top of bridge hollow pier, easy to operate, time saving and energy saving, cost is relatively low, and construction efficiency obviously carries Height, while the security risk of construction personnel reduces.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all in this practicality Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (5)

1. a kind of device to bind for bridge hollow pier, it is characterised in that:The lid at the top of bridge hollow pier (1) is closed including lid Sealant (2) is equipped between at the top of plate body, the cover plate main body and the bridge hollow pier (1), the cover plate main body includes The cover plate (4) of the side cover board (3) and multiple rectangular-shapes of two semicircle shapes, two side cover boards (3) are mounted on the bridge Both ends at the top of beam hollow pier (1), multiple cover plates (4) are mounted side by side on the centre at the top of the bridge hollow pier (1) Position and between two side cover boards (3), each side cover board (3) and each upper surface of the cover plate (4) It is uniformly distributed to have multiple force mechanisms (5) being transported to convenient for tower crane at the top of the bridge hollow pier (1).
2. a kind of device to bind for bridge hollow pier according to claim 1, it is characterised in that:The force mechanism (5) it is hanging ring or lifting lug.
3. a kind of device to bind for bridge hollow pier according to claim 1, it is characterised in that:The sealant (2) it is mortar sealant.
4. a kind of device to bind for bridge hollow pier according to claim 1, it is characterised in that:The side cover board (3) and the cover plate (4) is formed by net-shaped steel ledges and concreting, the net-shaped steel ledges and its institute of cladding The distance for stating the outer rim of concrete is 1.5~3.5cm.
5. a kind of device to bind for bridge hollow pier according to claim 4, it is characterised in that:The steel mesh reinforcement Frame is formed by connecting by transverse steel and longitudinal reinforcement uniform intervals.
CN201820353154.2U 2018-03-15 2018-03-15 A kind of device to bind for bridge hollow pier Expired - Fee Related CN207958977U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820353154.2U CN207958977U (en) 2018-03-15 2018-03-15 A kind of device to bind for bridge hollow pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820353154.2U CN207958977U (en) 2018-03-15 2018-03-15 A kind of device to bind for bridge hollow pier

Publications (1)

Publication Number Publication Date
CN207958977U true CN207958977U (en) 2018-10-12

Family

ID=63743398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820353154.2U Expired - Fee Related CN207958977U (en) 2018-03-15 2018-03-15 A kind of device to bind for bridge hollow pier

Country Status (1)

Country Link
CN (1) CN207958977U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610341A (en) * 2019-01-16 2019-04-12 中交四公局第六工程有限公司 A kind of solid section constructing method of Thin-wall Hollow Pier pier top
CN113356055A (en) * 2021-07-19 2021-09-07 中铁二院工程集团有限责任公司 Suspension bridge tower and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610341A (en) * 2019-01-16 2019-04-12 中交四公局第六工程有限公司 A kind of solid section constructing method of Thin-wall Hollow Pier pier top
CN113356055A (en) * 2021-07-19 2021-09-07 中铁二院工程集团有限责任公司 Suspension bridge tower and construction method thereof

Similar Documents

Publication Publication Date Title
CN105256713B (en) Half assembled steel concrete combination beam and its method of construction
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN207958977U (en) A kind of device to bind for bridge hollow pier
CN104328717B (en) CRTS III plate-type non-fragment orbit self-compacting concrete builds frock and method
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN206438380U (en) The long overhanging crossbeam bridge structure of one kind
CN103031918A (en) Pin type plaster mould shell and concrete combined dense rib flat slab and manufacturing method thereof
CN201942994U (en) Bridge bearing pad
CN202401753U (en) Sliding die device
CN205604081U (en) Wet seam of T roof beam is pour and is removed sliding chute device
CN104746875B (en) A kind of portable block-shaped discarded concrete pours device
CN207420026U (en) Part bracing means is poured after a kind of superimposed sheet
CN107366427B (en) A kind of city cast-in-situ hollow Sandwich Plates concrete construction method
CN109208786A (en) A kind of ring muscle that is easily installed fastens shear wall structure and its installation method
CN109763658A (en) A kind of support device and its construction method for arrangement material distributing machine in elevator
CN205840082U (en) A kind of BRT Lightweight core mould close rib composite floor structure
CN106914984A (en) A kind of construction method of prefabricated composite construction board
CN210477335U (en) Precast box culvert concreting equipment
CN107938907A (en) A kind of inclined roof exempts from formwork construction method
CN207017652U (en) A kind of wet joint template dismounting construction tool
CN208473287U (en) New type formwork
CN208294101U (en) A kind of large-span steel girder mounting slip and promote coupling apparatus
CN207740015U (en) A kind of bored tunnel corrugated steel-mixed mud composite lining structure
CN205777582U (en) A kind of concrete pier base moulding bed assembled for large-scale steel structure body
CN207211563U (en) Precast stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181012

CF01 Termination of patent right due to non-payment of annual fee