CN208473287U - New type formwork - Google Patents

New type formwork Download PDF

Info

Publication number
CN208473287U
CN208473287U CN201820257840.XU CN201820257840U CN208473287U CN 208473287 U CN208473287 U CN 208473287U CN 201820257840 U CN201820257840 U CN 201820257840U CN 208473287 U CN208473287 U CN 208473287U
Authority
CN
China
Prior art keywords
mould plate
right mould
left template
template
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820257840.XU
Other languages
Chinese (zh)
Inventor
林威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co.,Ltd.
Original Assignee
Wing Aircraft Technology (tianjin) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wing Aircraft Technology (tianjin) Co Ltd filed Critical Wing Aircraft Technology (tianjin) Co Ltd
Priority to CN201820257840.XU priority Critical patent/CN208473287U/en
Application granted granted Critical
Publication of CN208473287U publication Critical patent/CN208473287U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to building mould plate technique field more particularly to a kind of new type formworks, including symmetrically arranged several pieces of left templates and symmetrically arranged several blocks of right mould plates, two positioning bolt, the positioning sleeves being used alternatingly;The left template and the shape of right mould plate are trapezoidal, the top narrow lower portion of left template is wide, the wide lower part in the top of right mould plate is narrow, the side of the left template and right mould plate is respectively equipped with strip groove, positioning sleeve is between left template and right mould plate, positioning bolt passes through left template, positioning sleeve and right mould plate, and left template and right mould plate are fixed.Using the formwork structure of the utility model, An Mo, set up or to remove speed fast, concrete can be poured continuously upwards without there is cold seam.Construction speed is fast, shortens the duration of a project, reduces scene processing and welding, thereby reduces environmental pollution.

Description

New type formwork
Technical field
The utility model relates to building mould plate technique field more particularly to a kind of new type formworks.
Background technique
Traditional concrete labyrinth generally encloses stupefied steel template structure in bulk using framed bent pipe, cannot continuously construct. In order to save a height of 3m of the general layer of material or so, turn around time is one week or more, unfavorable to construction speed is stepped up.Most critical is peace It is difficult to ensure entirely, mould could be pacified by putting up security protection by safety rope in high-altitude, set up and removed, security protection risk is big.
Utility model content
Purpose of the utility model is to overcome the shortcomings of the above technology, and to provide a kind of new type formwork and its users Method.
In order to achieve the above object, the utility model adopts the following technical solutions: a kind of new type formwork, it is characterised in that: packet It includes symmetrically arranged several pieces of left templates and symmetrically arranged several blocks of right mould plates, two positioning bolts being used alternatingly, position Set;The left template and the shape of right mould plate be it is trapezoidal, the top narrow lower portion of left template is wide, and the wide lower part in the top of right mould plate is narrow, The side of the left template and right mould plate is respectively equipped with strip groove, and positioning sleeve is between left template and right mould plate, positioning bolt Across left template, positioning sleeve and right mould plate, left template and right mould plate are fixed.
Preferably, the top of symmetrical left template and right mould plate is fixed together by fixed plate.
The beneficial effects of the utility model are: compared with the existing technology, using the formwork structure of the utility model, An Mo, It is fast to set up or remove speed, concrete can be poured continuously upwards without there is cold seam.Construction speed is fast, shortens the duration of a project, subtracts Lack live processing and welding, thereby reduces environmental pollution.Light with piece weight, the connection between structure is simple, upwards It is short to turn the time, is able to satisfy concrete continuous and is constructed upwards without there is cold seam, the interlayer intermittent time meets current art specification Regulation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
With reference to the accompanying drawing and specific embodiment of the present utility model is described in detail in preferred embodiment.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion is signified Device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this is practical Novel limitation.
As shown in Figure 1, a kind of new type formwork, including symmetrically arranged several pieces of left templates 1 and several pieces symmetrically arranged Right mould plate 2, two positioning bolts being used alternatingly 3, positioning sleeve;Left template and right mould plate are all to be divided into inside in setting Left template and outside left template and inside right mould plate and outside right mould plate, the shape of the left template and right mould plate Shape be it is trapezoidal, the top narrow lower portion of left template is wide, the wide lower part in the top of right mould plate is narrow, can also in turn, such as right mould plate Top narrow lower portion is wide, and the wide lower part in the top of left template is narrow, in this way can be in order to be lifted up, the side of the left template and right mould plate Portion is respectively equipped with strip groove 4, positioning sleeve between left template and right mould plate, positioning bolt pass through left template, positioning sleeve and Right mould plate fixes left template and right mould plate.When being lifted up left template and right mould plate, the positioning bolt of bottommost is first removed, Positioning sleeve is retained in inside concrete, and the positioning bolt on top slightly pine is hereinafter, left template and right mould plate can be lifted up One end distance, the distance are exactly the length of strip groove, and the positioning bolt for promoting a upper back is located at strip groove lower position, then The positioning bolt removed is connected into the position that the same positioning sleeve is put into strip groove top, then casting concrete again, successively back and forth, Continuous placing is thereby realized, and without dismantling template.
For the ease of two pieces of left templates of promotion and two blocks of right mould plates simultaneously, the top of symmetrical left template and right mould plate passes through Fixed plate 5 is fixed together.
In use, following the steps below: Step 1: first assembling left template and right mould plate, corresponding two pieces of left templates Between be packed into two positioning sleeves, for two positioning sleeves respectively close to the upper and lower part of strip groove, two positioning bolts will be corresponding Two pieces of left templates and two blocks of right mould plates are fixed respectively, and left template and right mould plate are successively staggered;
Step 2: after being completed left template and right mould plate, casting concrete;
Step 3: dismantling the positioning bolt of left template and right mould plate bottommost after concrete setting;
Step 4: putting on the narrow right mould plate in the wide lower part in portion on first, the positioning bolt after disassembly is connected into the same positioning sleeve again The upper position in strip groove is retightened together;
Step 5: putting on narrow lower portion wide left template in portion's on again, the positioning bolt after disassembly is connected into the same positioning sleeve again The upper position in strip groove is retightened together;
Step 6: after mentioning same height on whole left templates and right mould plate, then carry out one-time-concreting concrete;
Step 7: repeating step 3 to step 6, until building pours completion.
Using the formwork structure of the utility model, An Mo, set up or to remove speed fast, concrete can continuously pour upwards and Do not occur cold seam.Construction speed is fast, shortens the duration of a project, reduces scene processing and welding, thereby reduces environmental pollution.Tool There is piece weight light, the connection between structure is simple, and it is short to turn the time upwards, is able to satisfy concrete continuous and is constructed upwards without going out Existing cold seam, interlayer intermittent time meet the regulation of current art specification.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the protection scope of the utility model.

Claims (2)

1. a kind of new type formwork, it is characterised in that: including symmetrically arranged several pieces of left templates and the symmetrically arranged several pieces of right sides Template, two positioning bolt, the positioning sleeves being used alternatingly;The left template and the shape of right mould plate be it is trapezoidal, left template it is upper Portion's narrow lower portion is wide, and the wide lower part in the top of right mould plate is narrow, and the side of the left template and right mould plate is respectively equipped with strip groove, positioning sleeve Between left template and right mould plate, positioning bolt passes through left template, positioning sleeve and right mould plate, and left template and right mould plate are consolidated It is fixed.
2. new type formwork according to claim 1, it is characterised in that: the top of symmetrical left template and right mould plate passes through solid Fixed board is fixed together.
CN201820257840.XU 2018-02-13 2018-02-13 New type formwork Active CN208473287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820257840.XU CN208473287U (en) 2018-02-13 2018-02-13 New type formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820257840.XU CN208473287U (en) 2018-02-13 2018-02-13 New type formwork

Publications (1)

Publication Number Publication Date
CN208473287U true CN208473287U (en) 2019-02-05

Family

ID=65206713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820257840.XU Active CN208473287U (en) 2018-02-13 2018-02-13 New type formwork

Country Status (1)

Country Link
CN (1) CN208473287U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222499A (en) * 2018-02-13 2018-06-29 神翼航空器科技(天津)有限公司 New type formwork and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222499A (en) * 2018-02-13 2018-06-29 神翼航空器科技(天津)有限公司 New type formwork and its application method

Similar Documents

Publication Publication Date Title
CN207700067U (en) A kind of packaged type box culvert construct trolley
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN205575408U (en) Concrete precast component shedder
CN208473287U (en) New type formwork
CN207959922U (en) A kind of building template mobile convenient for adjusting
CN206337827U (en) A kind of slim-lined construction post automatic vibrating device
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN208950298U (en) A kind of new structure circular cross section cylinder mould
CN205636497U (en) Pier shaft template and operation platform integration system
CN206123903U (en) Prefabricated assembled concrete stairway mould
CN207958977U (en) A kind of device to bind for bridge hollow pier
CN207273501U (en) Kerbstone prefabricated steel-template
CN206448534U (en) One kind suspension movable folding type concrete chute
CN205188975U (en) Portable concrete placement platform
CN108222499A (en) New type formwork and its application method
CN212406110U (en) Structure for pouring concrete beam post-cast strip by adopting inflatable template
CN207812625U (en) Special-shaped gutter template integrated apparatus
CN206941628U (en) A kind of construction site enclosing prefabricated foundation
CN209837825U (en) Comb rack structure of three-dimensional parking equipment
CN206205452U (en) A kind of telescopic bulk concrete pours regularization operating platform
CN206110495U (en) Soldering split head
CN217480807U (en) Take segmentation of open-close plate to pour constructional column aluminum mould board
CN206815819U (en) A kind of shaped steel fastener template set architectonical
CN206987373U (en) Core column concrete pours mouth mold tool
CN204977005U (en) Small -size prefabricated component drawing of patterns frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220317

Address after: 300000 6-902, No.60, 1st Street, Binhai New Area Development Zone, Tianjin

Patentee after: TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co.,Ltd.

Address before: 300350 Tianjin Jinnan District Jinnan Economic Development Zone (West District) Hongkong block 3, block B 206-4.

Patentee before: TIANJIN DIVINE WING AIRCRAFT TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right