CN108222499A - New type formwork and its application method - Google Patents

New type formwork and its application method Download PDF

Info

Publication number
CN108222499A
CN108222499A CN201810148009.5A CN201810148009A CN108222499A CN 108222499 A CN108222499 A CN 108222499A CN 201810148009 A CN201810148009 A CN 201810148009A CN 108222499 A CN108222499 A CN 108222499A
Authority
CN
China
Prior art keywords
mould plate
right mould
left templates
positioning
templates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810148009.5A
Other languages
Chinese (zh)
Inventor
林威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wing Aircraft Technology (tianjin) Co Ltd
Original Assignee
Wing Aircraft Technology (tianjin) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wing Aircraft Technology (tianjin) Co Ltd filed Critical Wing Aircraft Technology (tianjin) Co Ltd
Priority to CN201810148009.5A priority Critical patent/CN108222499A/en
Publication of CN108222499A publication Critical patent/CN108222499A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to building mould plate technique field more particularly to a kind of new type formwork, including symmetrically arranged several pieces of left templates and symmetrically arranged several blocks of right mould plates, two positioning bolts being used alternatingly, positioning sleeves;The left templates and the shape of right mould plate are trapezoidal, the top narrow lower portion of left templates is wide, the wide lower part in top of right mould plate is narrow, the side of the left templates and right mould plate is respectively equipped with bar-shaped trough, positioning sleeve is between left templates and right mould plate, positioning bolt passes through left templates, positioning sleeve and right mould plate, and left templates and right mould plate are fixed.An Mo, formwork structure using the present invention is set up or to remove speed fast, concrete can be poured continuously upwards without there is cold seam.Construction speed is fast, shortens the duration of a project, reduces scene processing and welding, thereby reduces environmental pollution.

Description

New type formwork and its application method
Technical field
The present invention relates to building mould plate technique field more particularly to a kind of new type formwork and its application methods.
Background technology
Traditional concrete labyrinth generally encloses stupefied steel template structure in bulk using framed bent pipe, it is impossible to continuous construction. In order to save the general floor height of material as 3m or so, turn around time is one week or more, unfavorable to stepping up construction speed.Most critical is peace It is difficult to ensure entirely, mould could be pacified by putting up security protection by safety rope in high-altitude, set up and removed, security protection risk is big.
Invention content
It is an object of the invention to overcome the shortcomings of above-mentioned technology, and provide a kind of new type formwork and its application method.
The present invention to achieve the above object, using following technical scheme:A kind of new type formwork, it is characterised in that:Including right Claim several pieces of left templates of setting and symmetrically arranged several blocks of right mould plates, two positioning bolts being used alternatingly, positioning sleeves;Institute The shape for stating left templates and right mould plate is trapezoidal, and the top narrow lower portion of left templates is wide, and the wide lower part in top of right mould plate is narrow, the left side The side of template and right mould plate is respectively equipped with bar-shaped trough, and for positioning sleeve between left templates and right mould plate, positioning bolt passes through a left side Template, positioning sleeve and right mould plate, left templates and right mould plate are fixed.
Preferably, the top of symmetrical left templates and right mould plate is fixed together by fixed plate.
A kind of application method of new type formwork, it is characterised in that:Include the following steps:Include the following steps:Step 1: first Left templates and right mould plate are assembled, is packed into two positioning sleeves between corresponding two pieces of left templates, two positioning sleeves are respectively close to bar shaped The upper and lower part of slot, two positioning bolts fix corresponding two pieces of left templates and two blocks of right mould plates respectively, left templates and Right mould plate is staggered successively;
Step 2: after being completed left templates and right mould plate, casting concrete;
Step 3: after concrete setting, the positioning bolt of left templates and right mould plate bottommost is dismantled;
Step 4: putting on the narrow right mould plate in the wide lower part in portion on first, the positioning bolt after dismounting is connected into same positioning sleeve again The upper position in bar-shaped trough is retightened together;
Step 5: putting on narrow lower portion wide left templates in portion's on again, the positioning bolt after dismounting is connected into same positioning sleeve again The upper position in bar-shaped trough is retightened together;
Step 6: after similary height is mentioned on whole left templates and right mould plate, then carry out one-time-concreting concrete;
Step 7: step 3 is repeated to step 6, until building pours completion.
The beneficial effects of the invention are as follows:Relative to the prior art, An Mo, formwork structure using the present invention is set up or is torn open Except speed is fast, concrete can be poured continuously upwards without there is cold seam.Construction speed is fast, shortens the duration of a project, reduces scene Processing and welding, thereby reduce environmental pollution.Light with piece weight, the connection between structure is simple, turns the time upwards Short, meeting concrete continuous, construction meets the regulation of current art specification without there is cold seam, interlayer intermittent time upwards.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and the preferred embodiment specific embodiment that the present invention will be described in detail.
In the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear", The orientation or position relationship of the instructions such as "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer " is based on attached drawing institutes The orientation or position relationship shown is for only for ease of the description present invention and simplifies description rather than instruction or imply signified dress It puts or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limit of the invention System.
As shown in Figure 1, a kind of new type formwork, including symmetrically arranged several pieces of left templates 1 and several pieces symmetrically arranged Right mould plate 2, two positioning bolts being used alternatingly 3, positioning sleeves;It is in setting that left templates and right mould plate, which are all, is divided into inside Left templates and the left templates in outside and the right mould plate of inside and the right mould plate in outside, the shape of the left templates and right mould plate Shape is trapezoidal, the top narrow lower portion of left templates is wide, and the wide lower part in top of right mould plate is narrow, can also in turn, such as right mould plate Top narrow lower portion is wide, and the wide lower part in top of left templates is narrow, in this way can be in order to be lifted up, the side of the left templates and right mould plate Portion is respectively equipped with bar-shaped trough 4, positioning sleeve between left templates and right mould plate, positioning bolt pass through left templates, positioning sleeve and Right mould plate fixes left templates and right mould plate.When being lifted up left templates and right mould plate, the positioning bolt of bottommost is first removed, Positioning sleeve is retained in inside concrete, and left templates and right mould plate hereinafter, can be lifted up by the positioning bolt slightly pine on top One end distance, the distance are exactly the length of bar-shaped trough, and the positioning bolt for promoting a upper back is located at bar-shaped trough lower position, then The positioning bolt removed is connected into the position that same positioning sleeve is put into bar-shaped trough top, then casting concrete again, successively back and forth, Continuous placing is thereby realized, and template need not be dismantled.
For the ease of two pieces of left templates of promotion and two blocks of right mould plates simultaneously, the top of symmetrical left templates and right mould plate passes through Fixed plate 5 is fixed together.
In use, it follows the steps below:Step 1: first assemble left templates and right mould plate, corresponding two pieces of left templates Between be packed into two positioning sleeves, for two positioning sleeves respectively close to the upper and lower part of bar-shaped trough, two positioning bolts will be corresponding Two pieces of left templates and two blocks of right mould plates are fixed respectively, and left templates and right mould plate are staggered successively;
Step 2: after being completed left templates and right mould plate, casting concrete;
Step 3: after concrete setting, the positioning bolt of left templates and right mould plate bottommost is dismantled;
Step 4: putting on the narrow right mould plate in the wide lower part in portion on first, the positioning bolt after dismounting is connected into same positioning sleeve again The upper position in bar-shaped trough is retightened together;
Step 5: putting on narrow lower portion wide left templates in portion's on again, the positioning bolt after dismounting is connected into same positioning sleeve again The upper position in bar-shaped trough is retightened together;
Step 6: after similary height is mentioned on whole left templates and right mould plate, then carry out one-time-concreting concrete;
Step 7: step 3 is repeated to step 6, until building pours completion.
An Mo, formwork structure using the present invention is set up or removes that speed is fast, and concrete can be poured continuously upwards without going out Existing cold seam.Construction speed is fast, shortens the duration of a project, reduces scene processing and welding, thereby reduces environmental pollution.With list Part is light-weight, and the connection between structure is simple, and it is short to turn the time upwards, and meeting concrete continuous, construction is cold without occurring upwards Seam, interlayer intermittent time meet the regulation of current art specification.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (3)

1. a kind of new type formwork, it is characterised in that:Including symmetrically arranged several pieces of left templates and the symmetrically arranged several pieces of right sides Template, two positioning bolts being used alternatingly, positioning sleeves;The left templates and the shape of right mould plate be it is trapezoidal, left templates it is upper Portion's narrow lower portion is wide, and the wide lower part in top of right mould plate is narrow, and the side of the left templates and right mould plate is respectively equipped with bar-shaped trough, positioning sleeve Between left templates and right mould plate, positioning bolt passes through left templates, positioning sleeve and right mould plate, and left templates and right mould plate are consolidated It is fixed.
2. new type formwork according to claim 1 and its application method, it is characterised in that:Symmetrical left templates and right mould plate Top be fixed together by fixed plate.
3. a kind of application method using new type formwork in claims 1 or 22, it is characterised in that:Include the following steps:Step First, left templates and right mould plate are first assembled, is packed into two positioning sleeves between corresponding two pieces of left templates, two positioning sleeves respectively close to The upper and lower part of bar-shaped trough, two positioning bolts fix corresponding two pieces of left templates and two blocks of right mould plates respectively, left mould Plate and right mould plate are staggered successively;
Step 2: after being completed left templates and right mould plate, casting concrete;
Step 3: after concrete setting, the positioning bolt of left templates and right mould plate bottommost is dismantled;
Step 4: putting on the narrow right mould plate in the wide lower part in portion on first, the positioning bolt after dismounting is connected into same positioning sleeve together again Retighten the upper position in bar-shaped trough;
Step 5: putting on narrow lower portion wide left templates in portion's on again, the positioning bolt after dismounting is connected into same positioning sleeve together again Retighten the upper position in bar-shaped trough;
Step 6: after similary height is mentioned on whole left templates and right mould plate, then carry out one-time-concreting concrete;
Step 7: step 3 is repeated to step 6, until building pours completion.
CN201810148009.5A 2018-02-13 2018-02-13 New type formwork and its application method Pending CN108222499A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810148009.5A CN108222499A (en) 2018-02-13 2018-02-13 New type formwork and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810148009.5A CN108222499A (en) 2018-02-13 2018-02-13 New type formwork and its application method

Publications (1)

Publication Number Publication Date
CN108222499A true CN108222499A (en) 2018-06-29

Family

ID=62661751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810148009.5A Pending CN108222499A (en) 2018-02-13 2018-02-13 New type formwork and its application method

Country Status (1)

Country Link
CN (1) CN108222499A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2040128U (en) * 1988-01-11 1989-06-28 孙国栋 Sectionally formwork-sliding unit used for concrete buildings
JPH0732337A (en) * 1993-07-21 1995-02-03 Fujita Corp Site precast concrete formwork method
RU2157443C2 (en) * 1998-07-06 2000-10-10 Пермская государственная сельскохозяйственная академия им.акад.Д.Н.Прянишникова Lifting-and-turning concrete form
KR20040096898A (en) * 2004-10-06 2004-11-17 (주)씨에스티개발 A round shape form for manhloe cover
CN101457587A (en) * 2008-12-01 2009-06-17 江苏江都建设工程有限公司 Template mutual-lifting type climbing formwork device and method
CN104314306A (en) * 2014-11-05 2015-01-28 安徽水利开发股份有限公司 Construction column formwork capable of achieving one-time integrated pouring forming of concrete
CN107447668A (en) * 2017-08-27 2017-12-08 贵州新联爆破工程集团有限公司 A kind of automatic lifting positions tapered pier template
CN208473287U (en) * 2018-02-13 2019-02-05 神翼航空器科技(天津)有限公司 new template

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2040128U (en) * 1988-01-11 1989-06-28 孙国栋 Sectionally formwork-sliding unit used for concrete buildings
JPH0732337A (en) * 1993-07-21 1995-02-03 Fujita Corp Site precast concrete formwork method
RU2157443C2 (en) * 1998-07-06 2000-10-10 Пермская государственная сельскохозяйственная академия им.акад.Д.Н.Прянишникова Lifting-and-turning concrete form
KR20040096898A (en) * 2004-10-06 2004-11-17 (주)씨에스티개발 A round shape form for manhloe cover
CN101457587A (en) * 2008-12-01 2009-06-17 江苏江都建设工程有限公司 Template mutual-lifting type climbing formwork device and method
CN104314306A (en) * 2014-11-05 2015-01-28 安徽水利开发股份有限公司 Construction column formwork capable of achieving one-time integrated pouring forming of concrete
CN107447668A (en) * 2017-08-27 2017-12-08 贵州新联爆破工程集团有限公司 A kind of automatic lifting positions tapered pier template
CN208473287U (en) * 2018-02-13 2019-02-05 神翼航空器科技(天津)有限公司 new template

Similar Documents

Publication Publication Date Title
CN207700067U (en) A kind of packaged type box culvert construct trolley
CN208486364U (en) Frame structure system
CN107338727A (en) A kind of overall demolition, installation anticollision wall form and its walking track crane move system
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN205575408U (en) Concrete precast component shedder
CN105220619A (en) A kind of method of quick manufacture two-wire nose circle solid pier
CN205604081U (en) Wet seam of T roof beam is pour and is removed sliding chute device
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN205153536U (en) Structure is assembled to self -balancing integral template of reinforced concrete roof beam
CN204997807U (en) Prefabricated little case roof beam centre form device
CN109736625A (en) The bracing means and reinforcement means of tall and big concrete chimney outer tube wall
CN108222499A (en) New type formwork and its application method
CN208473287U (en) new template
CN206636209U (en) A kind of constructing device of reinforced concrete structure
CN201865053U (en) Continuous steel beam template
CN210061545U (en) Prefabricated T roof beam concrete placement platform truck
CN104405417A (en) Inverted arch construction trolley for self-propelled tunnel
CN203668857U (en) Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates
CN209368658U (en) A kind of precast beam with locating piece
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN209114330U (en) A kind of steel reinforced concrete girder cast-in-place concrete wing plate formwork jumbo
CN104099870B (en) Roller type prefabricated box girder internal mold demoulding device as well as manufacturing, construction and operation method thereof
CN107288261A (en) A kind of construction method of reinforced column cavity
CN110067207B (en) Steel bar binding protection frame for high pier flip formwork construction
CN206205452U (en) A kind of telescopic bulk concrete pours regularization operating platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629