CN205777582U - Concrete pier bed-jig for assembling large steel structure - Google Patents

Concrete pier bed-jig for assembling large steel structure Download PDF

Info

Publication number
CN205777582U
CN205777582U CN201620441607.8U CN201620441607U CN205777582U CN 205777582 U CN205777582 U CN 205777582U CN 201620441607 U CN201620441607 U CN 201620441607U CN 205777582 U CN205777582 U CN 205777582U
Authority
CN
China
Prior art keywords
concrete pier
concrete
steel structure
pier
floor board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620441607.8U
Other languages
Chinese (zh)
Inventor
苏铠
张益民
雷志强
王加林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201620441607.8U priority Critical patent/CN205777582U/en
Application granted granted Critical
Publication of CN205777582U publication Critical patent/CN205777582U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A concrete pier bed-jig for assembling large steel structures, the concrete pier bed-jig is erected on a floor slab right above a concrete beam, the main body of the concrete pier bed-jig is a reinforced concrete pier, and the reinforced concrete pier is a cuboid with the volume of 1500 multiplied by 800 multiplied by 600 mm; a leveling cushion block is arranged on the reinforced concrete pier, and the bottom end part of the steel structure to be lifted is arranged above the leveling cushion block; the steel bar in the reinforced concrete abutment is a horizontal bar, and the size of the steel bar is12~14mm, the horizontal ribs comprise 2-4 transverse ribs and 2-4 longitudinal ribs. The utility model can recycle the concrete slurry left in the concrete pouring process and the waste steel bars, save the construction materials, have obvious economic benefit and improve the construction efficiency; the utility model discloses when the floor board is pour, pour the pier above floor board concrete beam, carry out the reinforcing bar for the floor board in other words and encrypt the reinforcement, increase the bearing capacity of floor board, but wide application in need assemble the engineering of steel structure at the floor board.

Description

A kind of concrete pier base moulding bed assembled for large-scale steel structure body
Technical field
This utility model relates to the realm of building construction, particularly relates to a kind of concrete pier assembled for large-scale steel structure body Back tyre frame.
Background technology
" large-scale component hydraulic pressure CONTROLLED INTEGRAL LIFT TECHNOLOGY " is applied to the bridge of large span, large-scale body the most on a large scale at present Educate venue, project fields is built in exhibition center, hangar, room, and the steel structure body of lifting typically need to complete in floor plates assembly.Because of to be hoisted The general weight of steel structure body is the hugest, and the load that the assembled stage causes is relatively big, floor plates limited load bearing capacities, need to be to assembled building Laminate carries out substantial amounts of scaffold and returns back to top, and the assembled moulding bed used is generally steel construction moulding bed, and material need to additionally be bought, so Assembled steel structure body to be hoisted needs to expend a large amount of manpower and materials and the consuming time is longer, affects the duration.
Summary of the invention
The purpose of this utility model is to provide a kind of concrete pier base moulding bed assembled for large-scale steel structure body, to solve Traditional assembled floor plates need to be carried out substantial amounts of scaffold and return back to top, material need to additionally be bought, and assembled steel structure body to be hoisted needs Expend a large amount of manpower and materials and the consuming time is longer, the problem affecting the duration.
For achieving the above object, this utility model takes techniques below scheme:
A kind of concrete pier base moulding bed assembled for large-scale steel structure body, it is characterised in that: described concrete pier back tyre Being erected in the floor plates directly over beams of concrete, its main body is armored concrete pier, and described armored concrete pier sets There is leveling block, be the bottom part of steel construction to be hoisted on described leveling block.
Preferably, the reinforcing bar in described armored concrete pier is horizontal bar, and described horizontal bar includes horizontal bar and longitudinal direction Muscle, has 2 ~ 4 respectively.
It is further preferred that described armored concrete pier is cuboid.
Additionally, described armored concrete pier volume is 1500 × 800 × 600mm.
It is further preferred that the size of described reinforcing bar is12~14mm。
The beneficial effects of the utility model:
(1) this utility model can by casting concrete at ordinary times time the concrete slurry left over reclaim profit with waste steel bar With, facilitate site operation, save construction material, remarkable in economical benefits, improve efficiency of construction.
(2) this utility model is when floor plates pours, and pours pier, be equivalent to floor above floor plates beams of concrete Plate carries out reinforcing bar encryption and reinforces, and increases the bearing capacity of floor plates, can be widely applied to need at floor plates assembly steel structure body Engineering.
Accompanying drawing explanation
By the detailed description made in conjunction with the following drawings, of the present utility model above-mentioned and/or other aspects and advantage will Becoming more apparent upon and be easier to understand, these accompanying drawings the most schematically, are not limiting as the present invention, wherein:
Fig. 1 is the structural representation of a kind of concrete pier base moulding bed assembled for large-scale steel structure body of this utility model;
Fig. 2 is the Construction State figure of a kind of concrete pier base moulding bed assembled for large-scale steel structure body of this utility model.
Reference: 1-armored concrete pier;2-reinforcing bar;3-leveling block;4-floor plates;5-beams of concrete;6-treats Lifting steel structural.
Detailed description of the invention
For the technological means making this utility model realize, character of innovation, reach purpose and be easy to understand with effect, below In conjunction with accompanying drawing, this utility model is further illustrated.
The embodiment recorded at this is specific detailed description of the invention of the present utility model, is used for illustrating of the present utility model Design, is all explanatory and exemplary, should not be construed as this utility model embodiment and the limit of this utility model scope System.In addition to the embodiment recorded at this, those skilled in the art can also be public based on the application claims and description institute The content opened uses other technical scheme obvious, and these technical schemes include using doing the embodiment recorded at this Go out the technical scheme of any obvious substitutions and modifications.
This utility model provides a kind of concrete pier base moulding bed assembled for large-scale steel structure body, and the scene of facilitating is executed Work, saves construction material, for improving efficiency of construction, the concrete slurry left over during by casting concrete at ordinary times and waste steel bar Recycle, pour when floor plates pours as armored concrete pier as shown in Figure 1 above floor plates beams of concrete, can So that volume is the cuboid of 1500 × 800 × 600mm, concrete pier base moulding bed is located at the floor plates 4 directly over beams of concrete 5 On, its main body is armored concrete pier 1, and armored concrete pier 1 is provided with leveling block 3, for waiting to carry on leveling block 3 Rising the bottom part of steel construction 6, the reinforcing bar 2 in armored concrete pier 1 is horizontal bar, and the size of reinforcing bar 2 is12~ 14mm, horizontal bar includes horizontal bar and longitudinal rib, has 2 ~ 4 respectively.
Specific implementation method of the present utility model: construct, by concrete pier base moulding bed according to steel construction and floor slab structure Being arranged on floor plates beams of concrete upper end, lifting steel structural lower surface contacts with concrete pier base assembly moulding bed, concrete pier base Assembled moulding bed top can add cushion block, and to regulate truss depth, detailed description of the invention is as shown in Figure 2.
This utility model can by casting concrete at ordinary times time the concrete slurry left over recycle with waste steel bar, side Site operation, save construction material, improve efficiency of construction.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all in this practicality Within novel spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in guarantor of the present utility model Within the scope of protecting.

Claims (5)

1. the concrete pier base moulding bed for the assembly of large-scale steel structure body, it is characterised in that: described concrete pier base moulding bed Being located in the floor plates (4) directly over beams of concrete (5), its main body is armored concrete pier (1), described reinforced concrete knoll Platform (1) is provided with leveling block (3), is the bottom part of steel construction to be hoisted (6) on described leveling block (3).
A kind of concrete pier base moulding bed assembled for large-scale steel structure body, it is characterised in that: institute The reinforcing bar (2) stated in armored concrete pier (1) is horizontal bar, and described horizontal bar includes horizontal bar and longitudinal rib, have 2 respectively ~ Article 4,.
A kind of concrete pier base moulding bed assembled for large-scale steel structure body, it is characterised in that: institute Stating armored concrete pier (1) is cuboid.
A kind of concrete pier base moulding bed assembled for large-scale steel structure body, it is characterised in that: institute Stating armored concrete pier (1) volume is 1500 × 800 × 600mm.
A kind of concrete pier base moulding bed assembled for large-scale steel structure body, it is characterised in that: The size of described reinforcing bar (2) is12~14mm。
CN201620441607.8U 2016-05-16 2016-05-16 Concrete pier bed-jig for assembling large steel structure Expired - Fee Related CN205777582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620441607.8U CN205777582U (en) 2016-05-16 2016-05-16 Concrete pier bed-jig for assembling large steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620441607.8U CN205777582U (en) 2016-05-16 2016-05-16 Concrete pier bed-jig for assembling large steel structure

Publications (1)

Publication Number Publication Date
CN205777582U true CN205777582U (en) 2016-12-07

Family

ID=57409491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620441607.8U Expired - Fee Related CN205777582U (en) 2016-05-16 2016-05-16 Concrete pier bed-jig for assembling large steel structure

Country Status (1)

Country Link
CN (1) CN205777582U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267556A (en) * 2020-10-10 2021-01-26 广东省构建工程建设有限公司 Large-span steel structure corridor assembling construction process for narrow space

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267556A (en) * 2020-10-10 2021-01-26 广东省构建工程建设有限公司 Large-span steel structure corridor assembling construction process for narrow space

Similar Documents

Publication Publication Date Title
CN102877582B (en) Composite floor with steel bar trusses, profiled steel plate and regenerated concrete, and manufacturing method for composite floor
CN201738443U (en) Prefabricated concrete double-overlapping beam
CN104763078A (en) Shock-absorption type frame-shear wall combination structure system and construction method thereof
CN108104284A (en) Shear wall steel arm is embedded in the wallboard connecting structure and assembly method of floor
CN211646905U (en) Steel bar truss prestressed concrete superimposed sheet
CN103276894A (en) Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN102444237A (en) Large-span prestressed concrete double-T plate with four rib angles under plate rib removed
CN204876055U (en) Building foundation
CN205777582U (en) Concrete pier bed-jig for assembling large steel structure
CN107201796A (en) A kind of truss plate
CN104612291B (en) Non-dismantling heat preservation wall module unit
CN204876339U (en) A a superimposed sheet supporting beam for steel construction building
CN207794401U (en) A kind of composite floor
CN205636493U (en) A device that is used for high mound of hollow thin wall of bridge to bind
CN203546908U (en) Assembly type building wall beam stable connection structure
CN209339419U (en) A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section
CN207194317U (en) Quick detach type split heads
CN206829597U (en) A kind of combinable plastic building template
CN105386553A (en) Cast-in-place hollow floor structure based on GFM (Gel Filtration Medium) inflatable inner molds and construction method
CN211229118U (en) Assembled hidden beam floor system
CN204000958U (en) A kind of novel ater-casting place braced structures
CN209353372U (en) Structure is built in the room for being built in the underground space
CN216616959U (en) A building brick timber structure that just has reinforced structure for old city transformation
CN217734509U (en) Steel bar truss prestressed concrete folding device
CN218176242U (en) A prefabricated high performance concrete confined shear wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20170516