CN106760503A - A kind of constructional column based on standard knot combination is poured uses template - Google Patents

A kind of constructional column based on standard knot combination is poured uses template Download PDF

Info

Publication number
CN106760503A
CN106760503A CN201611025339.2A CN201611025339A CN106760503A CN 106760503 A CN106760503 A CN 106760503A CN 201611025339 A CN201611025339 A CN 201611025339A CN 106760503 A CN106760503 A CN 106760503A
Authority
CN
China
Prior art keywords
template
formwork
standard
pouring
poured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611025339.2A
Other languages
Chinese (zh)
Inventor
蔡东升
蒋玉波
施卫平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu University
Original Assignee
Jiangsu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu University filed Critical Jiangsu University
Priority to CN201611025339.2A priority Critical patent/CN106760503A/en
Publication of CN106760503A publication Critical patent/CN106760503A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/028—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for columns' capital
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/025—Buckets specially adapted for use with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明提供了一种基于标准节组合的构造柱浇筑用模板,包括前模板、浇筑漏斗、后模板和夹具,所述前模板包括前标准模板、前机动模板、顶端浇筑模板,所述夹具包括对拉螺杆、螺栓、方木竖楞、横楞,所述前模板和后模板分别设置在墙体两侧,通过夹具分别与墙体紧密贴合,所述前模板和后模板与对应墙体共同形成用于浇筑构造柱的成型空间,本发明采用标准节组合拼装施工,可自由装拆和开合,可进行分段浇筑和振捣,防止混凝土出现蜂窝、麻面、空洞情况,并且在构造柱顶端施工时,采用浇注漏斗既可以方便浇筑,也保证混凝土充分密实,提高材料的周转效率,极大的方便施工。

The invention provides a formwork for pouring construction columns based on standard joint combinations, including a front formwork, a pouring funnel, a rear formwork and a clamp, the front formwork includes a front standard formwork, a front motorized formwork, and a top pouring formwork, and the clamps include The front and rear formworks are arranged on both sides of the wall respectively for tensioning the screws, bolts, square timber vertical corrugations and horizontal corrugations. Together, they form a forming space for pouring structural columns. The present invention adopts standard joint assembly construction, which can be assembled and disassembled and opened and closed freely, and can be poured and vibrated in sections to prevent honeycomb, pockmarks, and cavities in the concrete. When constructing the top of the structural column, the use of pouring funnel can not only facilitate pouring, but also ensure that the concrete is fully dense, improve the turnover efficiency of materials, and greatly facilitate construction.

Description

一种基于标准节组合的构造柱浇筑用模板A formwork for pouring structural columns based on standard joint combinations

技术领域technical field

本发明涉及一种建筑施工工具,具体为一种基于标准节组合的构造柱浇筑用模板。The invention relates to a building construction tool, in particular to a template for pouring structural columns based on standard joint combinations.

背景技术Background technique

随着建筑施工技术的不断发展,对墙体砌筑成型质量的要求越来越高。现有建筑工程构造柱施工中,通常是将木模板预先紧贴在墙体两侧形成构造柱的浇筑空间,然后从构造柱模板上端留设的开口中人工灌注混凝土,墙体构造柱施工采用一次支模到顶,一次完成砼浇筑。由于构造柱空间较小且钢筋较密,采用上述方法进行施工,构造柱的中下部位混凝土浇筑和振捣不便,极易造成成型后的混凝土观感和实体质量差,又由于浇筑口处混凝土无法有效振捣,构造柱顶部与主体结构之间无法产生有效连接,从而导致建筑物抗震性能降低影响安全。在操作过程中,模板安装、拆除麻烦,材料周转次数低,人力、物力浪费现象严重。With the continuous development of building construction technology, the requirements for the quality of wall masonry molding are getting higher and higher. In the construction of structural columns in existing construction projects, the wooden formwork is usually pre-closed on both sides of the wall to form a pouring space for the structural columns, and then concrete is artificially poured from the opening left on the upper end of the structural column formwork. The construction of the wall structural columns uses Once the formwork is supported to the top, the concrete pouring is completed at one time. Due to the small space of the structural column and the dense steel bars, the above method is used for construction. The concrete pouring and vibration of the middle and lower parts of the structural column are inconvenient, which easily leads to poor appearance and physical quality of the formed concrete, and because the concrete at the pouring port cannot With effective vibration, no effective connection can be produced between the top of the structural column and the main structure, resulting in a decrease in the seismic performance of the building and affecting safety. During the operation, the installation and removal of the formwork is troublesome, the turnover of materials is low, and the waste of manpower and material resources is serious.

申请号为201510272937.9的专利公开了一种构造柱模板,同样是基于标准化节的思想,包括正面模板和背面模板,虽然施工效率能够提高,但是背面模板与正面模板的高度尺寸需要匹配,且正面模板和背面模板的固定方法要求同步进行,增加了模板固定环节的操作时间;另外由于正面浇注模板的构造要求,浇筑口的开口位置偏下,易导致构造柱上端混凝土无法有效浇筑。The patent with application number 201510272937.9 discloses a construction column formwork, which is also based on the idea of standardized sections, including the front formwork and the back formwork. Although the construction efficiency can be improved, the height of the back formwork and the front formwork needs to match, and the front formwork It is required to be synchronized with the fixing method of the back formwork, which increases the operating time of the formwork fixing link; in addition, due to the structural requirements of the front pouring formwork, the opening position of the pouring port is lower, which may easily lead to the ineffective pouring of the concrete at the upper end of the structural column.

申请号201110285923.2的专利公开了一种砌筑工程构造柱分段施工方法,需要先根据构造柱来确定技术参数,然后进行模板加工制作,再分段安装和砼浇筑。该方法较为繁琐,砌筑墙体时就需要把预留洞口考虑在内,时间和物力成本较高,不具有较强的普适性,材料浪费的现象比较严重,又因施工现场工人整体素质普遍不高,在操作精确性上难以得到保证。The patent application number 201110285923.2 discloses a segmented construction method of structural columns in masonry engineering. It is necessary to first determine the technical parameters according to the structural columns, then process and manufacture formwork, and then install and pour concrete in segments. This method is relatively cumbersome, and the reserved opening needs to be taken into account when building the wall, and the cost of time and material resources is relatively high. It is generally not high, and it is difficult to guarantee the accuracy of operation.

发明内容Contents of the invention

针对现有技术中存在不足,本发明提供了一种能够有效保证构造柱混凝土浇筑质量,并且装拆方便、提高工作效率的构造柱浇筑用模板。Aiming at the deficiencies in the prior art, the present invention provides a formwork for pouring structural columns that can effectively ensure the quality of concrete pouring for structural columns, is convenient to assemble and disassemble, and improves work efficiency.

本发明是通过以下技术手段实现上述技术目的的。The present invention achieves the above-mentioned technical purpose through the following technical means.

一种基于标准节组合的构造柱浇筑用模板,包括前模板、浇筑漏斗4、后模板5和夹具6,所述前模板包括前标准模板、前机动模板和顶端浇筑模板;A formwork for pouring structural columns based on standard joint combinations, including a front formwork, a pouring funnel 4, a rear formwork 5 and a clamp 6, and the front formwork includes a front standard formwork, a front motorized formwork and a top pouring formwork;

所述前标准模板包括第一板体、两个分别位于第一板体上下两端的第一横肋和两个第一纵肋,所述第一横肋和第一纵肋分别与第一板体一体成型,所述第一横肋上设有第一栓孔,所述前标准模板和前机动模板的形状相同,所述前机动模板的高度有多种选择;The front standard formwork includes a first plate body, two first transverse ribs and two first longitudinal ribs respectively located at the upper and lower ends of the first plate body, and the first transverse ribs and the first longitudinal ribs are connected with the first plate body respectively. The body is integrally formed, the first transverse rib is provided with a first bolt hole, the shape of the front standard formwork and the front motorized formwork are the same, and the height of the front motorized formwork has multiple options;

所述顶端浇筑模板,包括第三板体、三个分别位于第三板体上下两端以及中间的第三横肋和两个第三纵肋,所述第三横肋和第三纵肋分别与第三板体一体成型,所述第三板体两端的第三横肋上设有第三栓孔,所述第三板体上端中间开设有浇筑口,所述浇筑口上设有与浇筑口形状相同的槽板,所述槽板的三边分别设有卡槽,封闭闸板与槽板可拆卸连接,封闭闸板能由槽板卡位将浇筑口密封;The top pouring formwork includes a third plate body, three third transverse ribs and two third longitudinal ribs respectively located at the upper and lower ends of the third plate body and in the middle, the third transverse ribs and the third longitudinal ribs are respectively Formed integrally with the third plate body, the third cross ribs at both ends of the third plate body are provided with third bolt holes, the middle of the upper end of the third plate body is provided with a pouring port, and the pouring port is provided with a pouring port Slot plates with the same shape, the three sides of the trough plates are respectively provided with card slots, the closed ram is detachably connected to the trough plate, and the closed ram can be locked by the slot plate to seal the pouring port;

所述浇筑漏斗包括下料漏斗、漏斗闸板和漏斗口,所述下料漏斗通过卡槽与槽板可拆卸连接,所述漏斗闸板能够封闭漏斗口;The pouring funnel includes a blanking funnel, a funnel gate and a funnel mouth, the blanking funnel is detachably connected to the slot plate through a slot, and the funnel gate can close the funnel mouth;

所述前标准模板、前机动模板、顶端浇筑模板之间可拆卸连接;The detachable connection between the front standard formwork, the front motorized formwork and the top pouring formwork;

所述前模板与后模板通过夹具与墙体紧密贴合;The front formwork and the rear formwork are closely attached to the wall through the clamp;

所述前模板与后模板以及对应墙体共同形成用于浇筑构造柱的成型空间。The front formwork, the rear formwork and the corresponding wall jointly form a molding space for pouring structural columns.

优选地,所述前标准模板的高度为600mm,所述前机动模板的高度为150mm或者300mm。Preferably, the height of the front standard formwork is 600mm, and the height of the front motorized formwork is 150mm or 300mm.

优选地,所述夹具包括对拉螺杆、螺栓、方木竖楞和横楞,所述前模板设置在墙体的一侧,所述后模板置在墙体的另外一侧,所述后模板为木制,在前模板左右两侧分别设有方木竖楞,在方木竖楞前端设有横楞,所述后模板与前模板对应位置也设有方木竖楞,所述螺杆穿过横楞、方木竖楞、后模板以及墙体,螺杆两侧分别连接有螺母,将前模板、后模板分别与墙体紧密贴合。Preferably, the clamps include pull screws, bolts, square timber vertical flutes and horizontal flutes, the front template is set on one side of the wall, the rear template is placed on the other side of the wall, and the rear template It is made of wood, with square wooden vertical corrugations on the left and right sides of the front formwork, and horizontal wooden corrugations at the front end of the square wooden vertical corrugations. Through horizontal flute, square wood vertical flute, rear formwork and wall, nuts are connected to both sides of the screw respectively, and the front formwork and rear formwork are respectively closely attached to the wall.

优选地,所述前标准模板、前机动模板、顶端浇筑模板之间通过栓孔和孔销钉连接。Preferably, the front standard formwork, the front motorized formwork and the top pouring formwork are connected through bolt holes and hole pins.

优选地,所述前标准模板的第一板体上位于两个第一纵肋外侧设有第一钉孔,前标准模板通过第一钉孔和铁钉实现前标准模板与墙体之间的二次固定。Preferably, the first plate body of the front standard formwork is provided with first nail holes outside the two first longitudinal ribs, and the front standard formwork realizes the connection between the front standard formwork and the wall through the first nail holes and iron nails. Secondary fix.

优选地,所述顶端浇筑模板的第三板体上位于两个第三纵肋外侧设有第三钉孔,顶端浇筑模板通过第三钉孔和铁钉实现顶端浇筑模板与墙体之间的二次固定。Preferably, the third plate body of the top casting formwork is provided with a third nail hole outside the two third longitudinal ribs, and the top casting formwork realizes the connection between the top casting formwork and the wall through the third nail holes and iron nails. Secondary fix.

优选地,还包括双面海绵防漏胶条,所述双面海绵防漏胶条位于墙体与前模板以及后模板之间,沿墙体纵向延伸布置。Preferably, it also includes a double-sided foam leak-proof adhesive strip, the double-sided foam leak-proof adhesive strip is located between the wall body and the front formwork and the rear formwork, and is arranged along the longitudinal extension of the wall body.

优选地,所述前标准模板、前机动模板、顶端浇筑模板的制作材料为钢。Preferably, the front standard formwork, front motorized formwork and top pouring formwork are made of steel.

本发明与现有技术相比具有以下优点:Compared with the prior art, the present invention has the following advantages:

1)本装置用于浇筑构造柱混凝土时,采用标准节组合拼装施工,可进行分段浇筑和振捣,防止混凝土出现蜂窝、麻面、空洞情况;1) When this device is used to pour concrete for structural columns, it adopts standard joint assembly construction, which can be poured and vibrated in sections to prevent honeycomb, pockmarked surface, and voids in the concrete;

2)在构造柱顶端施工时,采用浇注漏斗既可以方便浇筑,也保证混凝土充分密实;2) When constructing at the top of the structural column, using a pouring funnel can not only facilitate pouring, but also ensure that the concrete is fully dense;

3)该装置可自由装拆和开合,不需要在混凝土初凝后人工凿除漏斗处多余混凝土,能够提高材料的周转效率,极大的方便了施工。3) The device can be freely assembled, disassembled, opened and closed, and does not need to manually chisel out excess concrete at the funnel after the initial setting of the concrete, which can improve the turnover efficiency of materials and greatly facilitate construction.

附图说明Description of drawings

图1为本发明所述的模板用于构造柱浇筑的整套施工装置主视图。Fig. 1 is a front view of a whole set of construction equipment for pouring construction columns using the formwork according to the present invention.

图2为本发明所述的模板用于构造柱浇筑的整套施工装置后视图。Fig. 2 is a rear view of a whole set of construction equipment for pouring construction columns with the formwork according to the present invention.

图3为本发明所述的前标准模板的结构示意图。Fig. 3 is a schematic structural diagram of the pre-standard template of the present invention.

图4为本发明所述的前机动模板的结构示意图。Fig. 4 is a structural schematic diagram of the front motorized formwork according to the present invention.

图5为本发明所述的顶端浇筑模板的结构示意图。Fig. 5 is a structural schematic diagram of the top pouring formwork according to the present invention.

图6为图5的剖面图。FIG. 6 is a cross-sectional view of FIG. 5 .

图7为本发明所述的漏斗的结构示意图。Fig. 7 is a schematic structural view of the funnel of the present invention.

图8为图7的左视图。Fig. 8 is a left side view of Fig. 7 .

图9为本发明所述的漏斗用于顶端浇筑模板的结构示意图。Fig. 9 is a schematic structural view of the funnel used in the top pouring formwork according to the present invention.

图10为本发明所述的前模板和后模板用夹具固定在墙体上的结构示意图。Fig. 10 is a structural schematic view of the front formwork and the rear formwork fixed on the wall with clamps according to the present invention.

图11为图10中横楞的主视图。Fig. 11 is a front view of the horizontal flute in Fig. 10 .

其中:1.前标准模板;101.第一板体;102.第一横楞;103.第一纵肋;104.第一栓孔;105.第一钉孔;2.前机动模板;204.第二栓孔;205.第二钉孔;3.顶端浇筑模板;301.第三板体;302.第三横肋;303第三纵肋;304.第三栓孔;305.第三钉孔;306.槽板;307.卡槽;308.封闭闸板4.浇筑漏斗;401.下料漏斗;402.漏斗闸板;5.后模板;6.固定夹具;601.对拉螺杆;602.螺母;603.方木竖楞;604.横楞;7.墙体。Among them: 1. Front standard formwork; 101. First plate body; 102. First horizontal corrugation; 103. First longitudinal rib; 104. First bolt hole; 105. First nail hole; 2. Front motorized formwork; 204 .Second bolt hole; 205. Second nail hole; 3. Top pouring formwork; 301. Third plate body; 302. Third transverse rib; 303 Third longitudinal rib; 304. Third bolt hole; 305. Third Nail hole; 306. Groove plate; 307. Card slot; 308. Closed gate 4. Pouring funnel; 401. Blanking funnel; 402. Funnel gate; ; 602. Nut; 603. Square wood vertical corrugated; 604. Horizontal corrugated; 7. Wall.

具体实施方式detailed description

下面结合附图以及具体实施例对本发明作进一步的说明,但本发明的保护范围并不限于此。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.

如图1、2所示,一种基于标准节组合的构造柱浇筑混凝土用模板,包括前模板、浇筑漏斗4、后模板5和夹具6,所述前模板包括前标准模板1、前机动模板2、顶端浇筑模板3,所述夹具6包括对拉螺杆601、螺栓602、方木竖楞603、横楞604,所述前模板和后模板分别设置在墙体7两侧并与对应墙体共同形成用于浇筑构造柱的成型空间。所述前模板和后模板5通过夹具6分别与墙体7紧密贴合。所述前模板为钢制的,后模板5为木制的。在墙体7与前、后模板贴合处设置有沿墙体7纵向延伸布置的双面海绵防漏胶条,通过夹具6将所述防漏胶条压紧在前、后模板与对应墙体7之间。As shown in Figures 1 and 2, a formwork for pouring concrete for construction columns based on standard joint combinations includes a front formwork, a pouring funnel 4, a rear formwork 5 and a clamp 6, and the front formwork includes a front standard formwork 1, a front motorized formwork 2. The top pouring formwork 3, the fixture 6 includes a pull screw 601, a bolt 602, a square wooden vertical corrugation 603, and a horizontal corrugation 604. The front formwork and the rear formwork are respectively arranged on both sides of the wall 7 and connected to the corresponding wall. Together they form the forming space for pouring the structural columns. The front formwork and the rear formwork 5 are closely attached to the wall body 7 through clamps 6 respectively. The front formwork is made of steel, and the back formwork 5 is made of wood. A double-sided sponge leak-proof adhesive strip arranged along the longitudinal extension of the wall 7 is arranged at the junction between the wall body 7 and the front and rear templates, and the leak-proof adhesive strip is pressed against the front and rear templates and the corresponding wall by the clamp 6 Between body 7.

如图3所示,所述前标准模板1包括第一板体101、两个分别位于第一板体101上下两端的第一横肋102、两个第一纵肋103,所述第一横肋102上设有第一栓孔104。如图4所示,所述前标准模板1和前机动模板2的形状相同,所述前机动模板2的高度可调节。As shown in Figure 3, the front standard formwork 1 includes a first plate body 101, two first transverse ribs 102 respectively located at the upper and lower ends of the first plate body 101, and two first longitudinal ribs 103. The rib 102 is provided with a first bolt hole 104 . As shown in FIG. 4 , the front standard template 1 and the front motorized template 2 have the same shape, and the height of the front motorized template 2 can be adjusted.

如图5和图6所示,所述顶端浇筑模板3,包括第三板体301、三个分别位于第三板体301上下两端以及中间的第三横肋302、两个第三纵肋303、所述第三板体301两端的第三横肋302上设有第三栓孔304,所述第三板体301上端中间开设有浇筑口,所述浇筑口上设有与浇筑口形状相同的槽板306,所述槽板306的三边分别设有卡槽307,封闭闸板308与槽板306可拆卸连接,封闭闸板308能由槽板306卡位将浇筑口密封。As shown in Figures 5 and 6, the top pouring formwork 3 includes a third plate body 301, three third transverse ribs 302 respectively located at the upper and lower ends of the third plate body 301 and in the middle, and two third longitudinal ribs 303. The third transverse rib 302 at both ends of the third plate body 301 is provided with a third bolt hole 304, and a pouring port is opened in the middle of the upper end of the third plate body 301, and the pouring port has the same shape as the pouring port. The groove plate 306, the three sides of the groove plate 306 are respectively provided with a card groove 307, the closing gate plate 308 is detachably connected with the groove plate 306, and the closing gate plate 308 can be locked by the groove plate 306 to seal the pouring port.

如图7和图8所示,所述浇筑漏斗4包括下料漏斗401、漏斗闸板402和漏斗口,所述下料漏斗401通过卡槽307与槽板306可拆卸连接,所述漏斗闸板402能够封闭漏斗口。As shown in Figure 7 and Figure 8, the pouring funnel 4 includes a feeding funnel 401, a funnel gate 402 and a funnel mouth, the feeding funnel 401 is detachably connected to the groove plate 306 through a slot 307, and the funnel gate Plate 402 is able to close the mouth of the funnel.

实际施工操作时,预先粘贴双面海绵防漏胶条,如图10所示,采用对拉螺杆601和螺母602固定通高后模板5和墙体7前后两侧的方木竖楞603,此时构造柱内钢筋已绑扎架设完成,其空间由墙体7和后模板5三面密封。然后安装最底端前标准模板1,又称第一标准节,本实施例中第一标准节的高度为600mm,采用横楞604和螺母602压紧固定,必要时可用钉孔105和铁钉实现板与墙体的二次固定,横楞604的主视图如图11所示。此时构造柱最底端四周密封,向内浇筑混凝土并振捣,由于混凝土下落高差不大,能够有效防止混凝土由高处下落所造成的离析现象,且混凝土的有效振捣可防止蜂窝麻面的产生,从而保证了构造柱的浇筑质量。During the actual construction operation, the double-sided sponge leak-proof adhesive strips are pasted in advance, as shown in Figure 10, and the double-height rear formwork 5 and the square wooden vertical corrugations 603 on the front and rear sides of the wall body 7 are fixed by using the pull screw 601 and the nut 602. When the steel bar in the structural column has been bound and erected, its space is sealed on three sides by the wall body 7 and the rear formwork 5 . Then install the bottom front standard template 1, also known as the first standard section. The height of the first standard section in this embodiment is 600mm, and it is fixed by horizontal corrugation 604 and nut 602. If necessary, nail holes 105 and iron nails can be used. The secondary fixing of the board and the wall is realized, and the front view of the horizontal corrugation 604 is shown in Fig. 11 . At this time, the bottom of the structural column is sealed around, and the concrete is poured inward and vibrated. Since the height difference of the concrete drop is not large, the segregation phenomenon caused by the concrete falling from a high place can be effectively prevented, and the effective vibration of the concrete can prevent honeycomb numbness. Surface generation, thus ensuring the pouring quality of the structural column.

第一标准节安装浇筑完成后安装第二标准节,同样采用横楞604和螺母602压紧固定,必要时可用第一钉孔105和铁钉实现板与墙体的二次固定,采用第一栓孔104和孔销钉实现第一标准节与第二标准节之间的连接,随后浇筑振捣混凝土。第三、第四标准节同第二标准节操作。After the installation and pouring of the first standard section is completed, the second standard section is installed, and it is also pressed and fixed by horizontal corrugation 604 and nut 602. If necessary, the first nail hole 105 and iron nails can be used to realize the secondary fixing of the board and the wall. The bolt hole 104 and the hole pin realize the connection between the first standard section and the second standard section, and then the vibrated concrete is poured. The third and fourth standard sections operate with the second standard section.

前机动模板2又称机动节的安装与使用与前标准模板1相同,采用横楞604和螺母602压紧固定,必要时可用前机动模板2的第二钉孔205和铁钉实现板与墙体的二次固定,采用栓孔第二204和孔销钉实现机动节与标准节或机动节与机动节之间的连接,随后浇筑振捣混凝土。机动节段可由若干块大小不同的模板组合而成,本实施例中机动节的高度为150mm或者300mm,其主要目的是为了调整顶端浇筑模版安装高度,以方便作业与保证施工质量。The installation and use of the front motorized formwork 2, also known as the motorized section, is the same as that of the front standard formwork 1. It is fixed by horizontal corrugation 604 and nuts 602. If necessary, the second nail hole 205 and iron nails of the front motorized formwork 2 can be used to realize the connection between the board and the wall. For the secondary fixation of the body, the second bolt hole 204 and hole pins are used to realize the connection between the motorized section and the standard section or between the motorized section and the motorized section, and then the vibrating concrete is poured. The motorized section can be composed of several templates of different sizes. In this embodiment, the height of the motorized section is 150mm or 300mm. Its main purpose is to adjust the installation height of the top pouring formwork to facilitate operation and ensure construction quality.

顶端浇筑模板3的安装与标准节相同,用横楞604和螺栓602压紧固定,必要时可用第三钉孔305和铁钉实现板与墙体的二次固定,采用第三栓孔304和孔销钉实现标准节或机动节之间的连接。The installation of the top pouring formwork 3 is the same as that of the standard section, and it is pressed and fixed with the horizontal corrugation 604 and the bolt 602. If necessary, the third nail hole 305 and iron nails can be used to realize the secondary fixing of the board and the wall, and the third bolt hole 304 and the Hole pins realize the connection between standard sections or motorized sections.

顶端浇筑模板3的浇筑口为构造柱中上部输送和振捣混凝土通道,如图9所示,开启封闭闸板308和漏斗闸板402,安装下料漏斗401,混凝土通过下料漏斗401输送并从开口处插入振捣棒进行振捣,直至混凝土面高于构造柱顶端,依次合上封闭闸板308和漏斗闸板402,拆卸下料漏斗401,进行混凝土封闭养护。下料漏斗401中多余混凝土进行回收,下料漏斗401可循环使用。从而保证了构造柱的浇筑质量,且不需要进行顶部混凝土的二次处理,大大提高施工工作效率。The pouring opening of the top pouring formwork 3 is the channel for conveying and vibrating the concrete in the upper part of the construction column. As shown in Figure 9, the closed gate 308 and the funnel gate 402 are opened, and the blanking hopper 401 is installed, and the concrete is conveyed through the blanking hopper 401 and Insert a vibrating rod from the opening to vibrate until the concrete surface is higher than the top of the structural column, close the closing gate 308 and the funnel gate 402 in sequence, disassemble the feeding funnel 401, and perform concrete sealing and curing. The excess concrete in the feeding hopper 401 is recycled, and the feeding hopper 401 can be recycled. Thus, the pouring quality of the structural column is ensured, and the secondary treatment of the top concrete is not required, which greatly improves the construction work efficiency.

所述实施例为本发明的优选的实施方式,但本发明并不限于上述实施方式,在不背离本发明的实质内容的情况下,本领域技术人员能够做出的任何显而易见的改进、替换或变型均属于本发明的保护范围。The described embodiment is a preferred implementation of the present invention, but the present invention is not limited to the above-mentioned implementation, without departing from the essence of the present invention, any obvious improvement, replacement or modification that those skilled in the art can make Modifications all belong to the protection scope of the present invention.

Claims (8)

1. a kind of constructional column based on standard knot combination is poured and uses template, it is characterised in that including front template, pour funnel (4), Rear pattern plate (5) and fixture (6), the front template include preceding standard form (1), preceding motor-driven template (2) and top formwork for placing (3);
The preceding standard form (1) is including the first plate body (101), two respectively positioned at the of the first plate body (101) upper and lower ends One cross rib (102) and two the first longitudinal ribs (103), first cross rib (102) and the first longitudinal rib (103) respectively with the first plate body (101) it is integrally formed, first cross rib (102) is provided with the first keyhole (104), the preceding standard form (1) and preceding motor-driven The shape of template (2) is identical, and the height of the preceding motor-driven template (2) has multiple choices;
The top formwork for placing (3) including the 3rd plate body (301), three respectively be located at the 3rd plate body (301) upper and lower ends with And the 3rd cross rib (302), two the 3rd longitudinal ribs (303) of centre, the 3rd cross rib (302) and the 3rd longitudinal rib (303) are respectively It is integrally formed with the 3rd plate body (301), the 3rd cross rib (302) at the 3rd plate body (301) two ends is provided with the 3rd keyhole (304), offered in the middle of the 3rd plate body (301) upper end and pour mouth, the mouth that pours is provided with to pour mouth-shaped identical Frid 306, three sides of the frid 306 are respectively equipped with draw-in groove 307, and closing flap 308 is detachably connected with frid 306, envelope Closing flashboard 308 can will pour mouth sealing by the screens of frid 306;
The funnel (4) that pours includes blanking funnel (401), funnel flashboard (402) and bell mouth, the blanking funnel (401) It is detachably connected with frid (306) by draw-in groove (307), the funnel flashboard (402) being capable of closing funnel mouthful;
The preceding standard form (1), preceding motor-driven template (2), top formwork for placing are detachably connected between (3);
The front template is brought into close contact by fixture (6) with rear pattern plate (5) with wall (7);
The front template is collectively forming the molding space for pouring constructional column with rear pattern plate (5) and corresponding wall (7).
2. the constructional column based on standard knot combination as claimed in claim 1 is poured and uses template, it is characterised in that the preceding standard The height of template (1) is 600mm, and the height of the preceding motor-driven template (2) is 150mm or 300mm.
3. the constructional column based on standard knot combination as claimed in claim 1 is poured and uses template, it is characterised in that the fixture (6) stupefied (603) are erected including Screw arbor with nut at both-ends (601), bolt (602), the lumps of wood and horizontal stroke is stupefied (604), the front template is arranged on wall (7) side, the rear pattern plate (5) is arranged on the other side of wall (7), and the rear pattern plate (5) is wooden, on a front template left side The right side is respectively provided on two sides with the lumps of wood and erects stupefied (603), and erecting stupefied (603) front end in the lumps of wood is provided with horizontal stupefied (604), the rear pattern plate (5) with Front template correspondence position also is provided with the lumps of wood and erects stupefied (603), the screw rod (601) through horizontal stupefied (604), the lumps of wood erect stupefied (603) with And wall (7), screw rod (601) both sides are connected to nut (602), and front template, rear pattern plate (5) is tight with wall (7) respectively Closely connected conjunction.
4. the constructional column based on standard knot combination as claimed in claim 1 is poured and uses template, it is characterised in that the preceding standard Connected by keyhole and hole pin between template (1), preceding motor-driven template (2), top formwork for placing (3).
5. the constructional column based on standard knot combination as claimed in claim 1 is poured and uses template, it is characterised in that the preceding standard Two the first longitudinal rib (103) outsides are located on first plate body (101) of template (1) and are provided with the first nail (105), preceding standard form (1) the secondary fixation before being realized by the first nail (105) and iron nail between standard form (1) and wall (7).
6. the constructional column based on standard knot combination as claimed in claim 1 is poured and uses template, it is characterised in that poured on the top Two the 3rd longitudinal rib (303) outsides are located on 3rd plate body (301) of building mould (3) and are provided with the 3rd nail (305), top pours Template (3) realizes the secondary fixation between top formwork for placing (3) and wall (7) by the 3rd nail (305) and iron nail.
7. the constructional column based on standard knot combination as described in claim any one of 1-6 is poured and uses template, it is characterised in that also Including two-sided sponge leakproof adhesive tape, the two-sided sponge leakproof adhesive tape be located at wall (7) and front template and rear pattern plate (5) it Between.
8. the constructional column based on standard knot combination as described in claim any one of 1-6 is poured and uses template, it is characterised in that institute State preceding standard form (1), preceding motor-driven template (2), top formwork for placing (3) making material be steel.
CN201611025339.2A 2016-11-22 2016-11-22 A kind of constructional column based on standard knot combination is poured uses template Pending CN106760503A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611025339.2A CN106760503A (en) 2016-11-22 2016-11-22 A kind of constructional column based on standard knot combination is poured uses template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611025339.2A CN106760503A (en) 2016-11-22 2016-11-22 A kind of constructional column based on standard knot combination is poured uses template

Publications (1)

Publication Number Publication Date
CN106760503A true CN106760503A (en) 2017-05-31

Family

ID=58970073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611025339.2A Pending CN106760503A (en) 2016-11-22 2016-11-22 A kind of constructional column based on standard knot combination is poured uses template

Country Status (1)

Country Link
CN (1) CN106760503A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661240A (en) * 2018-05-22 2018-10-16 中国矿业大学 A kind of straight type wall structure column construction method
CN108798004A (en) * 2018-06-28 2018-11-13 中国建筑局(集团)有限公司 Exempt from to pick constructional column of chisel and pour template subassembly
CN108999407A (en) * 2018-09-29 2018-12-14 北京首钢建设集团有限公司 A kind of constructional column concreting top uses the construction method of funnel
CN109113338A (en) * 2018-09-13 2019-01-01 中铁十六局集团城市建设发展有限公司 A kind of tool-type mould bases of constructional column top one-piece casting
CN110206303A (en) * 2019-06-05 2019-09-06 南通鑫金建设集团有限公司 Hollow elastic sealing strip secondary structure template construction method is installed
CN111042386A (en) * 2019-11-28 2020-04-21 江苏永联精筑建设集团有限公司 Novel constructional column anti-slurry-overflowing construction process
CN111236636A (en) * 2020-03-23 2020-06-05 浙江省三建建设集团有限公司 Wall constructional column pouring and shaping device and method
CN113338613A (en) * 2021-05-28 2021-09-03 中铁二十局集团第六工程有限公司 Constructional column mould
CN113356059A (en) * 2021-05-28 2021-09-07 中国水利水电第四工程局有限公司 Concrete pouring equipment for bridge pier column
CN113982261A (en) * 2021-09-27 2022-01-28 中国一冶集团有限公司 Constructional column compensation type combined aluminum mould and formwork supporting construction method thereof
CN116856697A (en) * 2023-07-18 2023-10-10 中冶天工集团有限公司 Assembled door and window frame combined template and construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB468141A (en) * 1935-12-30 1937-06-30 Malcolm Mcalpine Improvements in shuttering devices for the building of ferro concrete structures
CN102003069A (en) * 2010-11-24 2011-04-06 温州中城建设集团有限公司 Construction method and pouring device for framework masonry infill wall structure
CN102383598A (en) * 2011-09-23 2012-03-21 中国十七冶集团有限公司 Method for section construction of building project constructional column
US20120286134A1 (en) * 2009-12-10 2012-11-15 Efrain Rojas Pimienta Adjustable metal formwork system for concrete structures
CN104314306A (en) * 2014-11-05 2015-01-28 安徽水利开发股份有限公司 Construction column formwork capable of achieving one-time integrated pouring forming of concrete
CN104831923A (en) * 2015-05-26 2015-08-12 温州东瓯建设集团有限公司 Constructional column steel molding plate
CN104963289A (en) * 2015-06-09 2015-10-07 沈阳市政集团有限公司 Integral one-time pouring construction method of large-volume concrete for special-shaped pier stud
CN205259600U (en) * 2015-12-30 2016-05-25 兖矿东华建设有限公司 Template is pour to high -rise building constructional column
CN105971272A (en) * 2016-06-23 2016-09-28 杭州江润科技有限公司 Fabricated type reinforced concrete constructional column adopting aluminum templates and block filling wall and construction method
CN206267523U (en) * 2016-11-22 2017-06-20 江苏大学 A kind of constructional column based on standard knot combination is poured uses template

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB468141A (en) * 1935-12-30 1937-06-30 Malcolm Mcalpine Improvements in shuttering devices for the building of ferro concrete structures
US20120286134A1 (en) * 2009-12-10 2012-11-15 Efrain Rojas Pimienta Adjustable metal formwork system for concrete structures
CN102003069A (en) * 2010-11-24 2011-04-06 温州中城建设集团有限公司 Construction method and pouring device for framework masonry infill wall structure
CN102383598A (en) * 2011-09-23 2012-03-21 中国十七冶集团有限公司 Method for section construction of building project constructional column
CN104314306A (en) * 2014-11-05 2015-01-28 安徽水利开发股份有限公司 Construction column formwork capable of achieving one-time integrated pouring forming of concrete
CN104831923A (en) * 2015-05-26 2015-08-12 温州东瓯建设集团有限公司 Constructional column steel molding plate
CN104963289A (en) * 2015-06-09 2015-10-07 沈阳市政集团有限公司 Integral one-time pouring construction method of large-volume concrete for special-shaped pier stud
CN205259600U (en) * 2015-12-30 2016-05-25 兖矿东华建设有限公司 Template is pour to high -rise building constructional column
CN105971272A (en) * 2016-06-23 2016-09-28 杭州江润科技有限公司 Fabricated type reinforced concrete constructional column adopting aluminum templates and block filling wall and construction method
CN206267523U (en) * 2016-11-22 2017-06-20 江苏大学 A kind of constructional column based on standard knot combination is poured uses template

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661240B (en) * 2018-05-22 2019-06-28 中国矿业大学 A kind of straight type wall structure column construction method
CN108661240A (en) * 2018-05-22 2018-10-16 中国矿业大学 A kind of straight type wall structure column construction method
CN108798004A (en) * 2018-06-28 2018-11-13 中国建筑局(集团)有限公司 Exempt from to pick constructional column of chisel and pour template subassembly
CN109113338B (en) * 2018-09-13 2024-03-19 中铁十六局集团城市建设发展有限公司 Tool type die carrier for integrally pouring top of constructional column
CN109113338A (en) * 2018-09-13 2019-01-01 中铁十六局集团城市建设发展有限公司 A kind of tool-type mould bases of constructional column top one-piece casting
CN108999407A (en) * 2018-09-29 2018-12-14 北京首钢建设集团有限公司 A kind of constructional column concreting top uses the construction method of funnel
CN110206303A (en) * 2019-06-05 2019-09-06 南通鑫金建设集团有限公司 Hollow elastic sealing strip secondary structure template construction method is installed
CN111042386A (en) * 2019-11-28 2020-04-21 江苏永联精筑建设集团有限公司 Novel constructional column anti-slurry-overflowing construction process
CN111236636A (en) * 2020-03-23 2020-06-05 浙江省三建建设集团有限公司 Wall constructional column pouring and shaping device and method
CN113338613A (en) * 2021-05-28 2021-09-03 中铁二十局集团第六工程有限公司 Constructional column mould
CN113356059A (en) * 2021-05-28 2021-09-07 中国水利水电第四工程局有限公司 Concrete pouring equipment for bridge pier column
CN113356059B (en) * 2021-05-28 2022-05-27 中国水利水电第四工程局有限公司 Concrete pouring equipment for bridge pier column
CN113982261A (en) * 2021-09-27 2022-01-28 中国一冶集团有限公司 Constructional column compensation type combined aluminum mould and formwork supporting construction method thereof
CN116856697A (en) * 2023-07-18 2023-10-10 中冶天工集团有限公司 Assembled door and window frame combined template and construction method

Similar Documents

Publication Publication Date Title
CN102003069B (en) Construction method and pouring device for structural column of frame masonry filled wall
CN110409713A (en) A kind of segmentation of constructional column concrete, which is poured, smashes construction method and constructional column casting and compacting of concrete constructing structure
CN205259600U (en) Template is pour to high -rise building constructional column
CN209228042U (en) A kind of corner constructional column erecting device
CN204590634U (en) For pouring into a mould the feed arrangement of constructional column
CN205677249U (en) A kind of casting concrete constructional column hopper
CN205531327U (en) Pour bracket
CN113047612B (en) Fabricated building constructional column and construction method thereof
CN209568705U (en) A kind of constructional column regularization template formwork erecting structure
CN110145124A (en) A reinforcement tool and its construction method for controlling the quality of horizontal stubble of shear walls
CN106639305B (en) Slidable lifting type constructional column steel formwork and construction method thereof
CN210658959U (en) Concrete pouring and ramming construction structure for a structural column
CN109138274B (en) A kind of construction method of infill wall structural column
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN204983646U (en) Device is assembled to reinforced concrete structure post -cast strip template
CN210421932U (en) Feeding funnel for pouring moulds for construction columns
CN210439701U (en) Pouring device for vertical concrete member
CN210164239U (en) Instrument formula intelligence extrusion constructional column pours device
CN204552085U (en) Formwork concreting structure in constructional column top at the bottom of a kind of Vierendeel girder
CN204199687U (en) A kind of bath is fallen plate-girder side shaping tool formula between defending and is hung die device
CN110067379A (en) A kind of constructional column pours tool and a kind of constructional column casting method
CN102121313A (en) Rebar planting-free formwork erecting method for masonry construction and device thereof
CN110984568B (en) A water stop step template device and construction method
CN107939044A (en) A kind of concrete exterior wall reserves component hole plugging device and method
CN210164233U (en) A construction column pouring tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531