Device is filled up in a kind of wall gap for building
Technical field
The present invention relates to construction machinery equipment technical field, device is filled up in specifically a kind of wall gap for building.
Background technology
Building machinery is the general name of plant equipment used in engineering construction and town and country construction, and it includes excavating machinery, shovel soil fortune
Defeated machinery, compacting machinary, crane tool, piling machinery, pavement construction machinery, concreting machinery, concrete product machinery, reinforcing bar
Level prestressing force is mechanical, finishing machinery, a variety of mechanical compositions such as aerial operation machine.It is that building machinery is normal that device is filled up in wall gap
One of instrument, but traditional wall gap for building is filled up device and is not provided with to gap progress clearing function, causes
Many impurity are remained in gap, have impact on gap fills up quality, while effect not provided with filler repairing on gap, influence
The aesthetic property of wall.
The content of the invention
Device is filled up it is an object of the invention to provide a kind of wall gap for building, to solve building of the prior art
Device is filled up with wall gap not provided with clearing function is carried out to gap, causes to remain many impurity in gap, have impact on seam
Gap fills up quality, while effect provided with filler repairing on gap, the problem of influenceing the aesthetic property of wall.
To achieve the above object, the present invention provides following technical scheme:Device is filled up in a kind of wall gap for building, including
Support base and belt, the center of the support base are provided with support column, and the inside of the support column is provided with square opening, institute
State and commutating tooth is fixed with square opening, the support column is provided with first gear post, second gear post and the 3rd sprocket, described the
One sprocket is located at the top of second gear post, and the 3rd sprocket is located at the lower section of second gear post, the first gear
The side of post is fixed with elongate posts, and the inside of the elongate posts, which is provided with bolt hole, the bolt hole, is connected with stud, the spiral shell
The side of post is fixed with fixed block, and the side of the fixed block is provided with scraper plate, and the side of the second gear post is fixed with filling
Agent storage tank, the side of the 3rd sprocket is fixed with expansion link, between the elongate posts, filler storage tank and expansion link
Connecting rod is connected with, the expansion link side is fixed with fix bar, and the side of the fix bar is fixed with connector, the connection
The side of head is provided with steel ball, and the opposite side of the first gear post, second gear post and the 3rd sprocket is respectively and fixedly provided with small-sized
Rotating wheel.
It is preferred that, the side of the support column is provided with large-scale rotating wheel, the large-scale rotating wheel and first gear post, second
Sprocket and the 3rd sprocket are connected by belt transmission, and wind is provided with the large-scale rotating wheel.
It is preferred that, the bottom of the filler storage tank is fixed with booster pump, and the side of filler storage tank is provided with spray
Mouth.
It is preferred that, the bottom four of the support base is hung is provided with anti-skidding runners at angle.
It is preferred that, the surface of the steel ball is provided with potassium steel layer.
It is preferred that, the commutating tooth is connected with the engagement of first gear post, second gear post and the 3rd sprocket.
It is preferred that, the scraper plate is provided with three altogether, and adjacent scraper plate spacing is equal.
Compared with prior art, utstanding substantial characteristics and significant improvement of the present invention are:Scientific structure of the present invention
Rationally, it is easy to use efficient;Due to what is connected between elongate posts, filler storage tank and expansion link by connecting rod, it is ensured that
The compactness connected between elongate posts, filler storage tank and expansion link, it is to avoid loosened during long-time use
Phenomenon, have impact on the efficiency that wall is filled up;Because large-scale rotating wheel and first gear post, second gear post and the 3rd sprocket are logical
Belt transmission connection is crossed, large-scale rotating wheel is shaken manually makes the synchronous motion of three sprockets, it is ensured that the effect that wall gap is filled up
Rate;The length of manual adjustable telescopic rod, makes steel ball be in suitable position in gap, facilitate steel ball by the dust in gap and
Impurity is cleaned out, and good basis is provided for follow-up gap filling, while the potassium steel layer of steel ball surface has well
Wearability, it is to avoid steel ball, which works long hours, to be damaged, extends the service life of steel ball;Stud passes through with elongate posts Inner bolt holes
Threaded connection, make the fixed block of stud side easy to disassemble and change, and the scraper plate of fixed block side three can be by gap both sides
Filler cleaning scraped clean, it is ensured that the cleaning aesthetic property of wall, improve the practicality that device is filled up in wall gap.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is blade structure schematic diagram of the invention;
Fig. 3 is square opening structural representation of the invention;
Fig. 4 is steel ball structure schematic diagram of the invention.
In figure:The anti-skidding runners of 1- support bases, 2-, 3- expansion links, 4- fix bars, 5- booster pumps, 6- fillers storage tank,
7- nozzles, 8- elongate posts, 9- connecting rods, 10- support columns, 11- first gears post, 12- second gears post, the sprockets of 13- the 3rd,
The small-sized rotating wheels of 14-, 15- belts, 16- winds, the large-scale rotating wheels of 17-, 18- bolts hole, 19- studs, 20- fixed blocks, 21-
Scraper plate, 22- square openings, 23- commutating tooths, 24- connectors, 25- potassium steel layer, 26- steel balls.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Refer in Fig. 1-4, the embodiment of the present invention, device, including the He of support base 1 are filled up in a kind of wall gap for building
Belt 15, the center of support base 1 is provided with support column 10, and the inside of support column 10 is provided with square opening 22, square opening 22
Commutating tooth 23 is fixed with, support column 10 is provided with first gear post 11, the sprocket 13 of second gear post 12 and the 3rd, first gear post
11 are located at the top of second gear post 12, and the 3rd sprocket 13 is located at the lower section of second gear post 12, the one of first gear post 11
Side is fixed with elongate posts 8, and the inside of elongate posts 8, which is provided with bolt hole 18, bolt hole 18, is connected with stud 19, the side of stud 19
Fixed block 20 is fixed with, the side of fixed block 20 is provided with scraper plate 21, and stud 19 is connected through a screw thread with the Inner bolt holes 18 of elongate posts 8
, make the fixed block 20 of the side of stud 19 easy to disassemble and change, and fixed block 20 side three scraper plate 21 can be by gap both sides
Filler cleaning scraped clean, it is ensured that the cleaning aesthetic property of wall, the side of second gear post 12 is fixed with filler storage
Tank 6, the side of the 3rd sprocket 13 is fixed with expansion link 3, is connected between elongate posts 8, filler storage tank 6 and expansion link 3
Connecting rod 9, due to what is connected between elongate posts 8, filler storage tank 6 and expansion link 3 by connecting rod 9, it is ensured that elongate posts
8th, the compactness connected between filler storage tank 6 and expansion link 3, it is to avoid what is loosened during long-time use shows
As, the efficiency that wall is filled up is have impact on, the side of expansion link 3 is fixed with fix bar 4, and the side of fix bar 4 is fixed with connector 24,
The side of connector 24 is provided with steel ball 26, and the length of manual adjustable telescopic rod 3 makes steel ball 26 be in position suitable in gap
Put, facilitate steel ball 26 to clean out the dust and impurity in gap, good basis is provided for follow-up gap filling, the
One sprocket 11, the opposite side of the sprocket 13 of second gear post 12 and the 3rd are respectively and fixedly provided with small-sized rotating wheel 14, support column 10
Side is provided with large-scale rotating wheel 17, and large-scale rotating wheel 17 leads to first gear post 11, the sprocket 13 of second gear post 12 and the 3rd
Cross belt 15 to be connected, wind 16 be installed on large-scale rotating wheel 17, due to large-scale rotating wheel 17 and first gear post 11,
The sprocket 13 of second gear post 12 and the 3rd is connected by belt 15, and large-scale rotating wheel 17 is shaken manually makes three sprockets
Synchronous motion, it is ensured that the efficiency that wall gap is filled up, the bottom of filler storage tank 6 is fixed with booster pump 5, and filler is deposited
The side of storage tank 6 is provided with nozzle 7, and the bottom four of support base 1 is hung is provided with anti-skidding runners 2 at angle, and the surface of steel ball 26 is set
There is potassium steel layer 25, commutating tooth 23 is connected with first gear post 11, the engagement of the sprocket 13 of second gear post 12 and the 3rd, and scraper plate 21 is total to
Provided with three, and the adjacent spacing of scraper plate 21 is equal.
The present invention operation principle be:Device will be filled up and be moved to the position specified, wind 16 is held and drive large-scale turn
The rotation of driving wheel 17, and large-scale rotating wheel 17 passes through belt with first gear post 11, the sprocket 13 of second gear post 12 and the 3rd
15 drive connection, can drive three sprockets simultaneously it is downward or run up, the collapsing length of adjustable telescopic rod 3,
Steel ball 16 is set to be located in the gap of wall, then steel ball 16 cleans out the residue in gap, booster pump 5 is stored to filler
Tank 6 applies pressure, and filler is sprayed onto in gap from nozzle 7, and the fixed block 20 of the side of elongate posts 8 is moved up and down, and makes fixed block 20
One side scraper plate 21 is scraped to gap on wall, and unnecessary filler is cleaned out, it is ensured that the aesthetic property of wall, makes wall
It is stronger that device applicability is filled up in gap.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as to the claim involved by limitation.