CN111675133A - 狭窄空间内管道抬拉移动装置及抬拉移动方法 - Google Patents
狭窄空间内管道抬拉移动装置及抬拉移动方法 Download PDFInfo
- Publication number
- CN111675133A CN111675133A CN202010646975.7A CN202010646975A CN111675133A CN 111675133 A CN111675133 A CN 111675133A CN 202010646975 A CN202010646975 A CN 202010646975A CN 111675133 A CN111675133 A CN 111675133A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- lifting
- horizontal
- jack
- trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000003303 reheating Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F3/00—Devices, e.g. jacks, adapted for uninterrupted lifting of loads
- B66F3/46—Combinations of several jacks with means for interrelating lifting or lowering movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C5/00—Base supporting structures with legs
- B66C5/02—Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F13/00—Common constructional features or accessories
Abstract
本发明公开了一种狭窄空间内管道抬拉移动装置及抬拉移动方法,解决了如何在狭窄空间简单经济地移动体积和重量均大的管道的问题。在三角形车底架(1)的顶端面中央处固定设置有千斤顶(2),在导向筒(4)与三角形车底架(1)之间设置有导向筒支撑架(5),千斤顶(2)的向上伸出的输出轴(3)的顶端穿过导向筒(4)后设置在导向筒(4)的正上方,在丝杠(7)的顶端面上固定连接有支撑立杆(8),在支撑立杆(8)的侧壁上固定焊接有水平状U形叉(9),在前抬拉小车的水平状U形叉与后抬拉小车的水平状U形叉之间设置有被移动管道(10)。本发明提供的狭窄空间管道水平移动的简易设备,能简单、快速地实现整体管道的水平移动。
Description
技术领域
本发明涉及一种管道移动装置,特别涉及一种狭窄空间内管道的抬拉移动装置及抬拉移动方法。
背景技术
在当前电站工程施工中,主汽管道、再热热段管道、再热冷段管道、高低压旁路系统管道、各自疏水系统管路、主给水管道系统管道、热力汽水系统管道等,多采取集中布置在电站工程的夹层中;这些管道的数量较多,且绝大部分管道自重较大,从安装环境、经济上考虑,都无法设置永久的起重吊装设备,进行这些设备管道的移动和吊装,而外部的起吊设备也难以进入;只能使用简易的起重装置或多人合力进行拖拉或者抬升移动,人力耗费较大,因此,如何开发一种经济可靠的简易设备,以适合狭窄空间移动的装置是现有技术需要解决的技术问题。
发明内容
本发明提供了一种狭窄空间内管道抬拉移动装置及抬拉移动方法,解决了如何在狭窄空间简单经济地移动体积和重量均大的管道的技术问题。
本发明是通过以下技术方案解决以上技术问题的:
本发明的总体构思是:对管道采用抬拉的方法,在前后两移动小车上均设置有输出轴向上伸出的千斤顶,在千斤顶的顶端设置横向抬拉杆,将前横向抬拉杆设置到管道前端管口中,将后横向抬拉杆设置到管道的后端口中,通过同时起升两千斤顶,将管道抬起,通过同时移动两车体,将管道移送到预定位置,同时降下千斤顶,将管道放在地面上。
一种狭窄空间内管道抬拉移动装置,包括前抬拉小车、后抬拉小车和被移送管道,前抬拉小车的结构与后抬拉小车的结构完全相同完全,在前抬拉小车的三角形车底架下设置有万向行走轮,在三角形车底架的顶端面中央处固定设置有千斤顶,在千斤顶的正上方设置有导向筒,在导向筒与三角形车底架之间设置有导向筒支撑架,千斤顶的向上伸出的输出轴的顶端穿过导向筒后设置在导向筒的正上方,在输出轴的顶端面上设置有带螺纹沉孔,在带螺纹沉孔中螺接有丝杠,在丝杠的顶端面上固定连接有支撑立杆,在支撑立杆的侧壁上固定焊接有水平状U形叉,在前抬拉小车的水平状U形叉与后抬拉小车的水平状U形叉之间设置有被移动管道。
水平状U形叉是叉接在被移动管道的管口上端的;在三角形车底架的每边框架上均等间隔地设置有七个万向轮。
一种狭窄空间内管道抬拉移动装置的抬拉移动方法,包括以下步骤:
第一步、根据被移动管道的口径,通过旋转丝杠,调整水平状U形叉的高度,使千斤顶顶升起后,将被移动管道抬离地面;
第二步、将前抬拉小车上的千斤顶和后抬拉小车上的千斤顶均降下;
第三步、将前抬拉小车移动到被移动管道的前端口处,将前抬拉小车上的水平状U形叉插到被移动管道的前端口的顶端处,使被移动管道的前端口的顶端管壁设置在水平状U形叉内;将后抬拉小车上的水平状U形叉插到被移动管道的后端口的顶端处,使被移动管道的后端口的顶端管壁设置在水平状U形叉内;
第四步、同时启动前抬拉小车上的千斤顶和后抬拉小车上的千斤顶,将被移动管道水平抬起;
第五步、通过推动两小车,将被移动管道移送到预定位置,同时,降下前抬拉小车上的千斤顶和后抬拉小车上的千斤顶,将被移动管道放置到地面上,移走两小车,完成被移动管道的抬拉移送。
本发明提供的狭窄空间管道水平移动的简易设备,能简单、快速地实现整体管道的水平移动,并在少量人力的情况下便可进行移动管道,并有效的提高工作效率。
附图说明
图1是本发明的结构示意图。
具体实施方式
下面结合附图对本发明进行详细说明:
一种狭窄空间内管道抬拉移动装置,包括前抬拉小车、后抬拉小车和被移送管道10,前抬拉小车的结构与后抬拉小车的结构完全相同完全,在前抬拉小车的三角形车底架1下设置有万向行走轮,在三角形车底架1的顶端面中央处固定设置有千斤顶2,在千斤顶2的正上方设置有导向筒4,在导向筒4与三角形车底架1之间设置有导向筒支撑架5,千斤顶2的向上伸出的输出轴3的顶端穿过导向筒4后设置在导向筒4的正上方,在输出轴3的顶端面上设置有带螺纹沉孔6,在带螺纹沉孔6中螺接有丝杠7,在丝杠7的顶端面上固定连接有支撑立杆8,在支撑立杆8的侧壁上固定焊接有水平状U形叉9,在前抬拉小车的水平状U形叉9与后抬拉小车的水平状U形叉之间设置有被移动管道10。
水平状U形叉9是叉接在被移动管道10的管口上端的;在三角形车底架1的每边框架上均等间隔地设置有七个万向轮。
一种狭窄空间内管道抬拉移动装置的抬拉移动方法,包括以下步骤:
第一步、根据被移动管道10的口径,通过旋转丝杠7,调整水平状U形叉9的高度,使千斤顶2顶升起后,将被移动管道10抬离地面;
第二步、将前抬拉小车上的千斤顶2和后抬拉小车上的千斤顶均降下;
第三步、将前抬拉小车移动到被移动管道10的前端口处,将前抬拉小车上的水平状U形叉9插到被移动管道10的前端口的顶端处,使被移动管道10的前端口的顶端管壁设置在水平状U形叉9内;将后抬拉小车上的水平状U形叉插到被移动管道10的后端口的顶端处,使被移动管道10的后端口的顶端管壁设置在水平状U形叉内;
第四步、同时启动前抬拉小车上的千斤顶2和后抬拉小车上的千斤顶,将被移动管道10水平抬起;
第五步、通过推动两小车,将被移动管道10移送到预定位置,同时,降下前抬拉小车上的千斤顶2和后抬拉小车上的千斤顶,将被移动管道10放置到地面上,移走两小车,完成被移动管道10的抬拉移送。
本发明的三角形车底架1的边长为800毫米的等边三角形底座,底座下方安装的万向轮为直径为60毫米的万向滚轮,目的是为了可以让管道通过液压装置支撑在移动装置上时,可更加灵活的移动,千斤顶2的外径为120毫米,三角形车底架1的高为200毫米。
Claims (3)
1.一种狭窄空间内管道抬拉移动装置,包括前抬拉小车、后抬拉小车和被移送管道(10),前抬拉小车的结构与后抬拉小车的结构完全相同完全,其特征在于,在前抬拉小车的三角形车底架(1)下设置有万向行走轮,在三角形车底架(1)的顶端面中央处固定设置有千斤顶(2),在千斤顶(2)的正上方设置有导向筒(4),在导向筒(4)与三角形车底架(1)之间设置有导向筒支撑架(5),千斤顶(2)的向上伸出的输出轴(3)的顶端穿过导向筒(4)后设置在导向筒(4)的正上方,在输出轴(3)的顶端面上设置有带螺纹沉孔(6),在带螺纹沉孔(6)中螺接有丝杠(7),在丝杠(7)的顶端面上固定连接有支撑立杆(8),在支撑立杆(8)的侧壁上固定焊接有水平状U形叉(9),在前抬拉小车的水平状U形叉(9)与后抬拉小车的水平状U形叉之间设置有被移动管道(10)。
2.根据权利要求1所述的一种狭窄空间内管道抬拉移动装置,其特征在于,水平状U形叉(9)是叉接在被移动管道(10)的管口上端的;在三角形车底架(1)的每边框架上均等间隔地设置有七个万向轮。
3.利用如权利要求2所述的一种狭窄空间内管道抬拉移动装置的抬拉移动方法,包括以下步骤:
第一步、根据被移动管道(10)的口径,通过旋转丝杠(7),调整水平状U形叉(9)的高度,使千斤顶(2)顶升起后,将被移动管道(10)抬离地面;
第二步、将前抬拉小车上的千斤顶(2)和后抬拉小车上的千斤顶均降下;
第三步、将前抬拉小车移动到被移动管道(10)的前端口处,将前抬拉小车上的水平状U形叉(9)插到被移动管道(10)的前端口的顶端处,使被移动管道(10)的前端口的顶端管壁设置在水平状U形叉(9)内;将后抬拉小车上的水平状U形叉插到被移动管道(10)的后端口的顶端处,使被移动管道(10)的后端口的顶端管壁设置在水平状U形叉内;
第四步、同时启动前抬拉小车上的千斤顶(2)和后抬拉小车上的千斤顶,将被移动管道(10)水平抬起;
第五步、通过推动两小车,将被移动管道(10)移送到预定位置,同时,降下前抬拉小车上的千斤顶(2)和后抬拉小车上的千斤顶,将被移动管道(10)放置到地面上,移走两小车,完成被移动管道(10)的抬拉移送。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010646975.7A CN111675133A (zh) | 2020-07-07 | 2020-07-07 | 狭窄空间内管道抬拉移动装置及抬拉移动方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010646975.7A CN111675133A (zh) | 2020-07-07 | 2020-07-07 | 狭窄空间内管道抬拉移动装置及抬拉移动方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111675133A true CN111675133A (zh) | 2020-09-18 |
Family
ID=72438225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010646975.7A Pending CN111675133A (zh) | 2020-07-07 | 2020-07-07 | 狭窄空间内管道抬拉移动装置及抬拉移动方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111675133A (zh) |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3027856U (ja) * | 1995-11-02 | 1996-08-20 | 株式会社イトマサ | 簡易薄形ジャッキ装置 |
CN106223204A (zh) * | 2016-08-29 | 2016-12-14 | 沈阳市政集团有限公司 | 一种预应力张拉高窄区域辅助施工张拉台车及施工方法 |
CN106352158A (zh) * | 2016-11-30 | 2017-01-25 | 二十二冶集团天津建设有限公司 | 管廊管道运输安装方法 |
CN106560440A (zh) * | 2015-10-01 | 2017-04-12 | 中山市蓝河光电照明科技有限公司 | 一种千斤顶组件 |
US20170182604A1 (en) * | 2015-12-29 | 2017-06-29 | Sumner Manufacturing Co., Inc. | Jack stand apparatus adaptable to various diameters of pipe |
CN107869184A (zh) * | 2017-12-04 | 2018-04-03 | 方宣崇 | 一种排水用管道疏通设备 |
CN107917878A (zh) * | 2017-12-19 | 2018-04-17 | 成都来宝石油设备有限公司 | 基于油气管道检查的移动装置 |
CN207402647U (zh) * | 2017-10-19 | 2018-05-25 | 四川佳泰防腐绝缘材料有限公司 | 一种金属管道防腐处理夹持装置 |
CN207771649U (zh) * | 2017-12-18 | 2018-08-28 | 成都大漠石油技术有限公司 | 基于石油输送管道加工的夹持装置 |
CN208087039U (zh) * | 2018-03-28 | 2018-11-13 | 徐州中通给排水材料有限公司 | 管道搬运夹持装置 |
CN208474649U (zh) * | 2018-07-11 | 2019-02-05 | 山西一建集团有限公司 | 建筑工程室内环境管道移动辅助装置 |
CN109333416A (zh) * | 2018-12-26 | 2019-02-15 | 荣成市天健管道防腐保温器材有限公司 | 一种管道防腐旋转夹持装置 |
CN208842443U (zh) * | 2018-08-24 | 2019-05-10 | 中国建筑第八工程局有限公司 | 管道搬运小车 |
CN109987546A (zh) * | 2019-03-12 | 2019-07-09 | 北京城建道桥建设集团有限公司 | 廊道内自行式管道运输安装车及其施工方法 |
CN209226537U (zh) * | 2018-12-05 | 2019-08-09 | 上海宝冶集团有限公司 | 一种可移动式管道安装工装 |
CN209336768U (zh) * | 2019-01-03 | 2019-09-03 | 淮南矿业(集团)有限责任公司 | 用于运输管道的小车 |
CN110631900A (zh) * | 2019-10-24 | 2019-12-31 | 太仓金昊达新材料有限公司 | 一种碳纤维复合材料管道试件夹持装置 |
CN212334477U (zh) * | 2020-07-07 | 2021-01-12 | 中国能源建设集团山西电力建设有限公司 | 狭窄空间内管道抬拉移动装置 |
-
2020
- 2020-07-07 CN CN202010646975.7A patent/CN111675133A/zh active Pending
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3027856U (ja) * | 1995-11-02 | 1996-08-20 | 株式会社イトマサ | 簡易薄形ジャッキ装置 |
CN106560440A (zh) * | 2015-10-01 | 2017-04-12 | 中山市蓝河光电照明科技有限公司 | 一种千斤顶组件 |
US20170182604A1 (en) * | 2015-12-29 | 2017-06-29 | Sumner Manufacturing Co., Inc. | Jack stand apparatus adaptable to various diameters of pipe |
CN106223204A (zh) * | 2016-08-29 | 2016-12-14 | 沈阳市政集团有限公司 | 一种预应力张拉高窄区域辅助施工张拉台车及施工方法 |
CN106352158A (zh) * | 2016-11-30 | 2017-01-25 | 二十二冶集团天津建设有限公司 | 管廊管道运输安装方法 |
CN207402647U (zh) * | 2017-10-19 | 2018-05-25 | 四川佳泰防腐绝缘材料有限公司 | 一种金属管道防腐处理夹持装置 |
CN107869184A (zh) * | 2017-12-04 | 2018-04-03 | 方宣崇 | 一种排水用管道疏通设备 |
CN207771649U (zh) * | 2017-12-18 | 2018-08-28 | 成都大漠石油技术有限公司 | 基于石油输送管道加工的夹持装置 |
CN107917878A (zh) * | 2017-12-19 | 2018-04-17 | 成都来宝石油设备有限公司 | 基于油气管道检查的移动装置 |
CN208087039U (zh) * | 2018-03-28 | 2018-11-13 | 徐州中通给排水材料有限公司 | 管道搬运夹持装置 |
CN208474649U (zh) * | 2018-07-11 | 2019-02-05 | 山西一建集团有限公司 | 建筑工程室内环境管道移动辅助装置 |
CN208842443U (zh) * | 2018-08-24 | 2019-05-10 | 中国建筑第八工程局有限公司 | 管道搬运小车 |
CN209226537U (zh) * | 2018-12-05 | 2019-08-09 | 上海宝冶集团有限公司 | 一种可移动式管道安装工装 |
CN109333416A (zh) * | 2018-12-26 | 2019-02-15 | 荣成市天健管道防腐保温器材有限公司 | 一种管道防腐旋转夹持装置 |
CN209336768U (zh) * | 2019-01-03 | 2019-09-03 | 淮南矿业(集团)有限责任公司 | 用于运输管道的小车 |
CN109987546A (zh) * | 2019-03-12 | 2019-07-09 | 北京城建道桥建设集团有限公司 | 廊道内自行式管道运输安装车及其施工方法 |
CN110631900A (zh) * | 2019-10-24 | 2019-12-31 | 太仓金昊达新材料有限公司 | 一种碳纤维复合材料管道试件夹持装置 |
CN212334477U (zh) * | 2020-07-07 | 2021-01-12 | 中国能源建设集团山西电力建设有限公司 | 狭窄空间内管道抬拉移动装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212334477U (zh) | 狭窄空间内管道抬拉移动装置 | |
CN204675673U (zh) | 一种砌块层间施工物料垂直运输装置 | |
CN206538164U (zh) | 电缆沟盖板吊装搬运装置 | |
CN201376819Y (zh) | 自升降式电缆盘支架 | |
CN111675133A (zh) | 狭窄空间内管道抬拉移动装置及抬拉移动方法 | |
CN206506229U (zh) | 一种可移动式电缆敷设装置 | |
CN110252823A (zh) | 受限空间下重型轧机牌坊的转向滑移方法 | |
CN109236211A (zh) | 一种修井作业机 | |
CN209260563U (zh) | 一种用于现浇连续梁的贝雷梁桁架整体横向平移装置 | |
CN204162350U (zh) | 电力盖板液压吊装装置 | |
CN203583484U (zh) | 一种轻型组装式跟管钻孔拔管机空间移动起重架 | |
CN218950839U (zh) | 一种用于隧洞内钢衬段压力钢管吊装装置 | |
CN109227028B (zh) | 一种蓄能电站压力钢管集水槽钢安装装置及方法 | |
CN202379616U (zh) | 移动式简易起吊装置 | |
CN112340596A (zh) | 钢筋笼的吊装装置及其吊装方法 | |
CN206954226U (zh) | 液压平台转运系统 | |
CN213892623U (zh) | 一种用于管厂油管修复的多管拖车 | |
CN201614550U (zh) | 双层四线公铁两用钢桁桥整孔架设用3000吨级架桥机 | |
CN219217043U (zh) | 一种用于线盘放线的组合支架 | |
CN105672910B (zh) | 油管牵引举升辅助机械 | |
CN202804587U (zh) | 可移动升降式液压拔轮装置 | |
CN213799965U (zh) | 一种用于管厂油管修复的单管拖车 | |
CN213294502U (zh) | 一种用于矿山管路安装的吊装支架 | |
CN204793876U (zh) | 一种井下电缆敷设放线装置 | |
CN219194328U (zh) | 一种用于超长立柱桩的桩机顶升装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20200918 |