CN111591889A - 一种平移式吊车梁的安装方法 - Google Patents
一种平移式吊车梁的安装方法 Download PDFInfo
- Publication number
- CN111591889A CN111591889A CN202010271165.8A CN202010271165A CN111591889A CN 111591889 A CN111591889 A CN 111591889A CN 202010271165 A CN202010271165 A CN 202010271165A CN 111591889 A CN111591889 A CN 111591889A
- Authority
- CN
- China
- Prior art keywords
- crane
- translation
- crane beam
- lifting
- translational
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C6/00—Girders, or track-supporting structures, specially adapted for cranes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种平移式吊车梁的安装方法,包括以下几个步骤:S1、在厂房立柱上侧设置平移横梁;S2、待安装吊车梁的组装;S3、在组装好的的吊车梁上确定起吊点,并在起吊点上设置吊环;S4、使用吊机将吊车梁吊离地面,在吊装过程中进行调整校正;S5、将吊车梁吊至平移横梁上方,并与平移横梁相互连接;S6、移动平移横梁,同时吊机带动吊车梁配合平移横梁的移动,最终将平移横梁移动到安装位置;S7、将吊车梁落在厂房立柱上,并与平移横梁相互拆除,对平移横梁进行加固;S8、对安装后的吊车梁进行验收;采用本方案安装的吊车梁,能够保证吊车梁与安装位置的对齐,避免过程中的调整,有效减小安装误差。
Description
技术领域
本发明涉及吊车梁安装技术领域,具体为一种平移式吊车梁的安装方法。
背景技术
吊车梁是支撑桥式起重机运行的梁结构。梁上有吊车轨道,起重机通过轨道在吊车梁上来回行驶。
现有吊车梁的安装,多采用吊装方式,吊装过程中调整位置,较为不便,且最后安装误差较大,影响使用。
发明内容
本发明的目的在于提供一种平移式吊车梁的安装方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种平移式吊车梁的安装方法,包括以下几个步骤:
S1、在厂房立柱上侧设置平移横梁;
S2、待安装吊车梁的组装;
S3、在组装好的的吊车梁上确定起吊点,并在起吊点上设置吊环;
S4、使用吊机将吊车梁吊离地面,在吊装过程中进行调整校正;
S5、将吊车梁吊至平移横梁上方,并与平移横梁相互连接;
S6、移动平移横梁,同时吊机带动吊车梁配合平移横梁的移动,最终将平移横梁移动到安装位置;
S7、将吊车梁落在厂房立柱上,并与平移横梁相互拆除,对平移横梁进行加固;
S8、对安装后的吊车梁进行验收。
作为本发明一种优选的技术方案,所述步骤S1中,所述平移横梁与吊车梁最终安装位置相互平行,且在平移横梁两端设置有滑轨,平移横梁沿着滑轨运动。
作为本发明一种优选的技术方案,所述步骤S2中,将待安装的吊车梁输送到平移横梁下方,并对分段式的吊车梁进行组装固定。
作为本发明一种优选的技术方案,所述步骤S3中,吊车梁上起吊点设置个数不少于两个,且关于吊车梁的重心位置相互对称设置;在起吊点上焊接吊环,所述吊环由直径不小于20mm的圆形钢制成。
作为本发明一种优选的技术方案,所述步骤S4中,在吊车梁吊离地面10cm、150cm处分别进行校正调整方向,保证吊车梁与平移横梁保持水平。
作为本发明一种优选的技术方案,所述步骤S5中,在平移横梁侧面设置有连接杆,连接杆两端分别连接在平移横梁与吊车梁上,且连接处铰接。
作为本发明一种优选的技术方案,所述步骤S6中,平移横梁进行平移工作,过程中吊车梁在吊机带动下配合平移横梁的移动,最终将平移横梁移动到安装位置处。
作为本发明一种优选的技术方案,所述步骤S7中,吊机将吊车梁逐渐放下,过程中调整平移横梁位置以配合;吊车梁落在厂房立柱后,拆除与平移横梁的连接,并使用混凝土对吊车梁两端进行浇筑固定。
作为本发明一种优选的技术方案,所述步骤S8中,混凝土冷却后,检验吊车梁的使用误差,保证误差小于验收规定误差,并记录建设单位、设计单位、监理单位以及施工单位。
与现有技术相比,本发明的有益效果是:本发明一种平移式吊车梁的安装方法,采用本方案安装的吊车梁,能够保证吊车梁与安装位置的对齐,避免过程中的调整,有效减小安装误差,安装过程简单,操作方便,适宜于推广使用。
具体实施方式
下面对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明提供一种技术方案:一种平移式吊车梁的安装方法,包括以下几个步骤:
S1、在厂房立柱上侧设置平移横梁;
S2、待安装吊车梁的组装;
S3、在组装好的的吊车梁上确定起吊点,并在起吊点上设置吊环;
S4、使用吊机将吊车梁吊离地面,在吊装过程中进行调整校正;
S5、将吊车梁吊至平移横梁上方,并与平移横梁相互连接;
S6、移动平移横梁,同时吊机带动吊车梁配合平移横梁的移动,最终将平移横梁移动到安装位置;
S7、将吊车梁落在厂房立柱上,并与平移横梁相互拆除,对平移横梁进行加固;
S8、对安装后的吊车梁进行验收。
进一步的,所述步骤S1中,所述平移横梁与吊车梁最终安装位置相互平行,且在平移横梁两端设置有滑轨,平移横梁沿着滑轨运动。
进一步的,所述步骤S2中,将待安装的吊车梁输送到平移横梁下方,并对分段式的吊车梁进行组装固定。
进一步的,所述步骤S3中,吊车梁上起吊点设置个数不少于两个,且关于吊车梁的重心位置相互对称设置;在起吊点上焊接吊环,所述吊环由直径不小于20mm的圆形钢制成。
进一步的,所述步骤S4中,在吊车梁吊离地面10cm、150cm处分别进行校正调整方向,保证吊车梁与平移横梁保持水平。
进一步的,所述步骤S5中,在平移横梁侧面设置有连接杆,连接杆两端分别连接在平移横梁与吊车梁上,且连接处铰接。
进一步的,所述步骤S6中,平移横梁进行平移工作,过程中吊车梁在吊机带动下配合平移横梁的移动,最终将平移横梁移动到安装位置处。
进一步的,所述步骤S7中,吊机将吊车梁逐渐放下,过程中调整平移横梁位置以配合;吊车梁落在厂房立柱后,拆除与平移横梁的连接,并使用混凝土对吊车梁两端进行浇筑固定。
进一步的,所述步骤S8中,混凝土冷却后,检验吊车梁的使用误差,保证误差小于验收规定误差,并记录建设单位、设计单位、监理单位以及施工单位。
具体的:在步骤S1中,对应吊车梁的安装位置,在厂房立柱上侧设置平移横梁,平移横梁能够沿着两端导轨移动,并且平移横梁的位置与最终吊车梁相互平行;平移横梁作为标准参考,对后期吊车梁的安装进行限制。在步骤S2中,对吊车梁进行组装,并将吊车梁移动到平移横梁下方,方便后续吊起与平移横梁固定连接。步骤S3对吊车梁上设置起吊点以及吊环,起吊点设置多个,且关于吊车梁重心点相互对称,保证整体吊车梁均匀受力,避免偏转;吊环的设置方便吊车梁与吊机连接。步骤S4,吊车梁在吊机作用下吊起,吊起过程中,人工在相应高度调整吊车梁朝向,方便与后续与平移横梁的安装;10cm、150cm进行两次调整,减小每次调整的工作量。步骤S5中,将吊车梁与平移横梁通过连接杆固定连接,连接杆两端铰接,从而吊车梁与平移横梁保持平行的前提下,能够上下调整位置。步骤S6中平移横梁进行平移,吊车梁在吊车带动下配合移动;由于平移横梁两端限制在导轨中,能够保证平移横梁的位置,故而与之平行的吊车梁的位置也能够保证,保证吊车梁与最终安装位置平行、对齐。步骤S7中,吊车梁落在安装位置后,拆除连接杆,拆除平移横梁,并使用混凝土对吊车梁两端进行浇筑固定,完成吊车梁的安装。在步骤S8中,对吊车梁的使用误差进行验收,保证其符合规定要求,并记录相应单位,方便后续工作的进行。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (9)
1.一种平移式吊车梁的安装方法,其特征在于,包括以下几个步骤:
S1、在厂房立柱上侧设置平移横梁;
S2、待安装吊车梁的组装;
S3、在组装好的的吊车梁上确定起吊点,并在起吊点上设置吊环;
S4、使用吊机将吊车梁吊离地面,在吊装过程中进行调整校正;
S5、将吊车梁吊至平移横梁上方,并与平移横梁相互连接;
S6、移动平移横梁,同时吊机带动吊车梁配合平移横梁的移动,最终将平移横梁移动到安装位置;
S7、将吊车梁落在厂房立柱上,并与平移横梁相互拆除,对平移横梁进行加固;
S8、对安装后的吊车梁进行验收。
2.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S1中,所述平移横梁与吊车梁最终安装位置相互平行,且在平移横梁两端设置有滑轨,平移横梁沿着滑轨运动。
3.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S2中,将待安装的吊车梁输送到平移横梁下方,并对分段式的吊车梁进行组装固定。
4.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S3中,吊车梁上起吊点设置个数不少于两个,且关于吊车梁的重心位置相互对称设置;在起吊点上焊接吊环,所述吊环由直径不小于20mm的圆形钢制成。
5.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S4中,在吊车梁吊离地面10cm、150cm处分别进行校正调整方向,保证吊车梁与平移横梁保持水平。
6.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S5中,在平移横梁侧面设置有连接杆,连接杆两端分别连接在平移横梁与吊车梁上,且连接处铰接。
7.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S6中,平移横梁进行平移工作,过程中吊车梁在吊机带动下配合平移横梁的移动,最终将平移横梁移动到安装位置处。
8.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S7中,吊机将吊车梁逐渐放下,过程中调整平移横梁位置以配合;吊车梁落在厂房立柱后,拆除与平移横梁的连接,并使用混凝土对吊车梁两端进行浇筑固定。
9.根据权利要求1所述的一种平移式吊车梁的安装方法,其特征在于:所述步骤S8中,混凝土冷却后,检验吊车梁的使用误差,保证误差小于验收规定误差,并记录建设单位、设计单位、监理单位以及施工单位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010271165.8A CN111591889A (zh) | 2020-04-08 | 2020-04-08 | 一种平移式吊车梁的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010271165.8A CN111591889A (zh) | 2020-04-08 | 2020-04-08 | 一种平移式吊车梁的安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111591889A true CN111591889A (zh) | 2020-08-28 |
Family
ID=72187472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010271165.8A Pending CN111591889A (zh) | 2020-04-08 | 2020-04-08 | 一种平移式吊车梁的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111591889A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609032A (zh) * | 2020-11-30 | 2021-04-06 | 上海宝冶冶金工程有限公司 | 出铁场吊车梁更换方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101736700A (zh) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | 宽幅钢箱梁悬臂吊装施工方法 |
CN201990369U (zh) * | 2011-01-14 | 2011-09-28 | 扬州市神力吊具制造有限公司 | 剪叉式管桩模吊具 |
CN102372228A (zh) * | 2010-08-19 | 2012-03-14 | 中冶天工集团有限公司 | 大跨度吊车梁平移安装方法 |
CN204281079U (zh) * | 2014-11-11 | 2015-04-22 | 上海交运大件物流有限公司 | 用于大件物流的门式起重机的梁上推进机构 |
CN204917649U (zh) * | 2015-08-31 | 2015-12-30 | 武汉钢铁(集团)公司 | 钢板横吊专用吊具 |
CN105668410A (zh) * | 2014-11-17 | 2016-06-15 | 蔡夏莲 | 一种整体平移式吊车梁的安装方法 |
CN106315407A (zh) * | 2015-06-29 | 2017-01-11 | 中国二十冶集团有限公司 | 狭小空间内超大型吊车梁滑移拆除方法 |
CN106882697A (zh) * | 2017-02-28 | 2017-06-23 | 中国葛洲坝集团第工程有限公司 | 一种大型结构钢筋无变形吊具及吊装方法 |
CN208197158U (zh) * | 2018-04-02 | 2018-12-07 | 中交二公局第四工程有限公司 | 一种节段预制箱梁的钢筋胎吊具 |
CN210150563U (zh) * | 2019-06-25 | 2020-03-17 | 中交二航局第四工程有限公司 | 一种适用于预制节段梁吊装的钢筋骨架吊具 |
-
2020
- 2020-04-08 CN CN202010271165.8A patent/CN111591889A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101736700A (zh) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | 宽幅钢箱梁悬臂吊装施工方法 |
CN102372228A (zh) * | 2010-08-19 | 2012-03-14 | 中冶天工集团有限公司 | 大跨度吊车梁平移安装方法 |
CN201990369U (zh) * | 2011-01-14 | 2011-09-28 | 扬州市神力吊具制造有限公司 | 剪叉式管桩模吊具 |
CN204281079U (zh) * | 2014-11-11 | 2015-04-22 | 上海交运大件物流有限公司 | 用于大件物流的门式起重机的梁上推进机构 |
CN105668410A (zh) * | 2014-11-17 | 2016-06-15 | 蔡夏莲 | 一种整体平移式吊车梁的安装方法 |
CN106315407A (zh) * | 2015-06-29 | 2017-01-11 | 中国二十冶集团有限公司 | 狭小空间内超大型吊车梁滑移拆除方法 |
CN204917649U (zh) * | 2015-08-31 | 2015-12-30 | 武汉钢铁(集团)公司 | 钢板横吊专用吊具 |
CN106882697A (zh) * | 2017-02-28 | 2017-06-23 | 中国葛洲坝集团第工程有限公司 | 一种大型结构钢筋无变形吊具及吊装方法 |
CN208197158U (zh) * | 2018-04-02 | 2018-12-07 | 中交二公局第四工程有限公司 | 一种节段预制箱梁的钢筋胎吊具 |
CN210150563U (zh) * | 2019-06-25 | 2020-03-17 | 中交二航局第四工程有限公司 | 一种适用于预制节段梁吊装的钢筋骨架吊具 |
Non-Patent Citations (2)
Title |
---|
严正庭,严捷编: "《预埋件设计手册》", 30 September 1994 * |
广东省建筑安全协会编著: "《建筑起重信号司索工》", 31 July 2017 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609032A (zh) * | 2020-11-30 | 2021-04-06 | 上海宝冶冶金工程有限公司 | 出铁场吊车梁更换方法 |
CN112609032B (zh) * | 2020-11-30 | 2022-09-27 | 上海宝冶冶金工程有限公司 | 出铁场吊车梁更换方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107178211B (zh) | 钢结构安装用的桁吊系统 | |
CN110902560B (zh) | 一种超大型轨道吊大梁拼装工艺 | |
CN112663971A (zh) | 钢结构屋盖预拼装滑移安装装置及安装方法 | |
CN110104564B (zh) | 一种桥式起重机总装工艺 | |
CN110984637B (zh) | 一种炼钢氧枪阀站钢结构模块化安装方法 | |
CN111591889A (zh) | 一种平移式吊车梁的安装方法 | |
CN104989111A (zh) | 钢结构高层吊装施工方法 | |
CN109055637B (zh) | 一种高炉大修中炉壳安装的液压提升工艺 | |
CN110846462B (zh) | 一种转炉氧枪固定轨道与钢结构立柱整体安装方法 | |
CN218950827U (zh) | 一种h型钢输送用固定结构 | |
CN109537466B (zh) | 一种钢结构梁悬吊在空中的定位方法 | |
CN202000263U (zh) | 下行式移动模架结构 | |
CN115924707A (zh) | 一种大型轧机机架吊装方法 | |
RU2005103604A (ru) | Установка для производства алюминия электролизом расплава | |
CN209288636U (zh) | 一种泵管拼焊辅助装置 | |
CN113982100A (zh) | 复杂环境下钢通廊整体滑移安装方法 | |
CN105002829A (zh) | 一种钢索塔整体制造方法 | |
CN214615508U (zh) | 钢结构屋盖预拼装滑移安装装置 | |
CN218145384U (zh) | 轨枕模具用的吊具中的起吊工位位置校正装置 | |
CN218968637U (zh) | 一种装配化预制墩帽承托型吊具 | |
CN115341070B (zh) | 炉体平移更换式电炉结构及炉体更换方法 | |
CN218619991U (zh) | 一种钢结构型材吊装装置 | |
CN220667017U (zh) | 一种钢结构屋顶临时支撑分级卸载装置 | |
CN210064940U (zh) | 一种蛇型柔性直流换流阀起吊装置 | |
CN214243524U (zh) | 一种用于后张法预制梁辅助吊装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200828 |
|
RJ01 | Rejection of invention patent application after publication |